arasor lem manufacturing introduction 060526
DESCRIPTION
Arasor Presentation FileTRANSCRIPT
Arasor Manufacturing Brief
Introduction
June 1st, 2006
Modulator Products
•Pre-chirp
•Zero-chirp
Compact Modulator
Dual-output Modulator
Low Drive Voltage Modulator
Other Products•APD Receiver
•Optical Subsystem
•BOA
•OPS
SMD APD Receiver
5U Subsystem
1U Subsystem1U OPS
BOA
Production Lines
Modulator packaging line
Modulator assembly line
Production Capability
•High speed (12.5Gbps) Opto-Electronic chip manufacturing
•High speed (12.5Gbps) devices packaging
•Ribbon and wire bonding
•Automatic ball and wedge bonding
•Very fine precise fiber pigtailing
•High magnitude microscope
•Hermetic sealing
•Fine leak test
•Reliability test based on GR-468
•High speed characterization
•High speed network analyze testing
High Quality Equipment
Precise fiber pigtailing
High magnitude microscopeRibbon Bonding
Hermetic seal
High Quality Equipment
Wire bonder
Modulator high speed testBias temperature cycle test
Fine leak test
High Quality Equipment
Modulator pigtail station
Reliability test equipment
Temperature cycling chamber
Auto-wirebonder
Component network testing
Production Capacity
Monthly capacity of the products predicted
•Modulator: 2000 pieces
•APD receiver: 2000 pieces
•Subsystem: 500 sets
•BOA: 200 pieces/sets
•Rack-mount OPS: 200 sets
Arasor (Guangzhou) Organization Chart
General Manager
John Liao
DGM Manufacture
Zhenying Wu
DGM Logistics
Peter Chu
DGM Administrate
Jianmin Wu
-Finance: Tony Gu
- HR: FQ Chen
- Adm.: Erric Lian
- Prod: XiangdongWang
-Test: Fei Gao
-Equ.: Bin Zhang
-PE: Tiyo
-QA: JS Lee/Fuhu Xu
- PM & MM: Shimin Ye
- Purchasing: Yunlong He
Proprietary and confidential of Arasor (Guangzhou)
Nansha Manufacturing Organization Chart
DGM Manufacture
Zhenying Wu
Equipment
Bin Zhang
Production Eng.
Tiyo
Test
Fei Gao
-Device O-E Test: Zhongxiang Lin
-Network Test: Jianfeng Xu
-Circuit Product Test: Zhi Yang
-Equipment Test: TBD
-Reliability Test: TBD
- Equipment Repair: Guiyuan Liu/Kai Gao
-Facility Operation: TBD
-Equipment Management: TBD
-Machine Shop: Tao Yu
- Product Project Management: HuiZhang
-Electronics: JC Chen
-O-E Technology: XF Liang/HY Fu
-Mechanics: JB He/ K Jiang
-Software: TBD
Proprietary and confidential of Arasor (Guangzhou)
Production
Xiangdong Wang
Quality Assurance
JS Lee/Fuhu Xu
- Manage Systems: Charles Chen
-SQC/CS: Bob Liu/ YZ Song
-IPQC/OQC: DayueZhang
-DCC: CJ Sun
-IQC: Rui Zhang
-Packing: TBD
-RE: TBD
- Modulator: SS Wang/HQ Wang
-APD Receiver: TBD
-Subsystem/Wimax: DS Jiang/HD Huang/SY Zhao
-EDFA/OPS/ITLA: DQ Liu/DD Xie
南沙慧视生产管理流程
Manufacturing Flow Chart
salessales
QCQC QCQC
PlanningPlanning
ProductionProduction
Test & Ins.Test & Ins.
WarehouseWarehouse
PurchasingPurchasingProduct R&DProduct R&D
CustomerCustomer SupplierSupplier
CustomerCustomer
SPC Technology
IQCIncoming
Materials
EAEnviron.
Assurance
PQCManufacture
Processes
FQCFinal
Products
IAInfrastructure
Assurance
RAReliability
Assurance
HRAHuman Resource
Assurance
Monitoring &
Measuring
Control
QA Practice in Production
DCDocuments
Control
ER
P S
yst
em
Manufacturing ProcessesManufacturing ProcessesManufacturing ProcessesManufacturing ProcessesManufacturing ProcessesManufacturing ProcessesManufacturing ProcessesManufacturing Processes
5S
Issue SCAR to Vendor
Issue SCAR to Vendor
MRB Meeting Disposition
MRB Meeting Disposition
Sorting/Rework/UAI/RTV
Sorting/Rework/UAI/RTV
SCAR Follow Up
SCAR Follow Up
RejectReject
IQC Inspection
IQC Inspection
Material Receiving
Material Receiving
• Generate GRN through MRP
• Check PO & AVL
• Follow QIP & Sampling Plan Perform Incoming Inspection AQL
• Maj.=1.0%, Min.=2.5%AcceptAccept
IdentificationIdentification
Record and Filing
Record and Filing
Material Warehouse
Material Warehouse
• Identify the Inspection & Test Result
• Record the Inspection Result
• Move to Material Warehouse
• Engineer Perform Parts Approval
Qualification of Vendor
Qualification of Vendor
Material Approval
Material Approval
• Vendor Assessment & Qualification
StartStart
Material KitingMaterial Kiting • Material Preparation
Check Before Production
Check Before Production
SettleSettle
NGNG
OKOK
• Check BOM• Calibrated Equipment & Test
Fixture
ProductionProduction
• Standard Operating Procedure (SOP)• FAI• Process Parameter Control
Cosmetic Check
Cosmetic Check
RepairRepair
FailFail • Cosmetic Check• 100%• Visual Aid and SIP (Cosmetic)
Function Test
Function Test
AA
ReworkRework
FailFail
PassPass
PassPass
• Function Test• 100% • SIP
AA
PackingPacking• Follow SOP Requirement
OQCOQC ReworkRework
FailFail
Finished Good Warehouse
Finished Good Warehouse
PassPass
• Functionality Test & Cosmetic Check
• Sampling Inspection : • AQL Maj.=1.0%, Min.=2.5%
• Handling, Storage & Preservation
Product Shipment
Product Shipment
ENDEND
PassPass