34

V. TechnicalRequirementsSCOPEOFWORK

PTMOBARSARANAENERGIisgoingtodelivertheworkwithscopeof

1. BasicDesign2. DetailDesign3. Calculationdatasheet4. IsometricDrawing5. MTO6. Andotherrelatedworks

WhichstatedastheresponsibilityofSubcontractorThelistoftheworkscanbeseenintheTable1.

Table1.Scopeofwork

NO DESCRIPTION REMARKSPROCESS

1 SPECIFICATION ProcessDesignbasis V BEDD V ProcessDescription&ControlPhilosphy V 2 DRAWING OverallBlockFlowDiagram ProcessFlowDiagram(PFD)ForFireFightingSystem ProcessFlowDiagram(PFD)ForWaterTreatment

SystemandWaterBalance

P&IDFuelOilSystem P&IDFuelGasSystem P&IDLubricatingOilSystem P&IDWaterTreatmentSystem P&IDDrawingWWTP(oilywatersystem) P&IDForFireFightingSystem P&IDInstrumentairandPlantairsystem P&IDInterconnectingCoolingWaterSystem LayoutFireFightingEquipment 3 CALCULATION Linesizingcalculation HSDandFuelGasConsumptionCalculation WaterConsumptionCalculation ProcessCalculationFuelOilStorageTank

35

ProcessCalculationLubricatingOilStorageTank ProcessCalculationWaterTank DeepWell(RawWater)PumpCalculation ServiceWaterPumpCalculation SludgeTransferPumpCalculation LubricationOilUnloadingPumpCalculation Firewaterconsumptioncalculation CalculationforFireWaterPump CalculationforJockeyPump HydraulicCalculation 4 PROCESSDATASHEET ProcessDatasheetforBOP 5 SPECIFICATION ProcessIndividualSpecificationforWaterTreatment

System

ProcessIndividualSpecificationforWasteWaterTreatmentSystem

ProcessSpecificationforFireProtectionSystem 6 LIST EquipmentList LineList MECHANICAL 1 EngineeringDocument EngineeringSpecification Construction/InstallationProcedure Calculation DataSheet List&Report LoadingDataforTank 2 EngineeringDrawing StandardDrawing GeneralArrangementforTank LayoutDrawing(forHVAC,Plumbing,FireFighting) IsometricDrawing 3 MTO MTOHVAC MTOPlumbing MTOFireFighting 4 Others Consingering

36

PIPING

1 EngineeringDocument

EngineeringSpesification

InspectionandTestPlan(ITP)

List&Report

2 EngineeringDrawing

StandardDrawingandSupport

PlotPlan/EquipmentLayout

KeyPlan/drawingIndex

PipingLayout(OutsideCube/Interconnection)

IsometricDrawing(OutsideCube/Interconnection)

InformationDrawing(LoadingData,Nozzle

Orientation,InsertPlate,etc.)

3 MTO

MTOPipingMaterial(OutsideCube/Interconnection)

MTOPipeSupport

4 Other

Consingering

CIVIL

1 Specification

EngineeringSpecificationForCivilandStructure

2 Civil(CalculationandEngineeringDrawing)

Foundation

- AsperdeliverableList

Structure

- AsperdeliverableList

SubStructure

- AsperdeliverableList

Drainage

Pavement

3 Data

PipingLayout&InformationLoadingData

4 MTO

5 OTHER

Consingering

ELECTRICAL

1 BasicEngineering

37

SingleLineDiagram ElectricalSystemDescription&SystemAnalysis ElectricalEquipment&MotorList StandardDrawing DesignCriteria EngineeringSpecification DataSheet 2 DETAILENGINEERING CableSchedule ShematicDiagram ConnectionDiagram HazardousAreaClassification CableTray,Trench,Pit&PowerWiringLayout Grounding&LightningWiringLayout Lighting&ReceptacleWiringLayout Telephone&PublicAddressWiringLayout MaterialTakeOff 3 OTHER Consingering INSTRUMENT 1 BASICENGINEERING DataSheetandCalculation StandardDrawing DesignCriteria EngineeringSpecification 2 DETAILENGINEERING InstrumentLayout InstrumentCableSchedule TypicalDrawingForInstalation MaterialTakeOff InstrumentWorkVolume Symbol&Index 3 OTHERS Consingering *ALLINCLUDENATIVEFILES(CADdrawing,word,excelandotherdocuments)

HUMANRESOURCESPTMOBARSARANAENERGIwillprovideengineeringteamwhichconsistsofthefollowingfields

38

MECHANICAL

• EnergyConversionandPowerGeneration• MechanicalDesignandHeavyEquipment• PipingandFluidTransfer• Material

ELECTRICAL,INSTRUMENTATIONANDCONTROL

• DistributionSystem• PowerandElectricalProtectionSystem• DriveandMotor• HighVoltageandEarthingSystem• IndustrialControlandInstrumentation

CIVIL

• Geotechnical(Geologist)• Geodetic• Structural(StaticAnalysis)• Structural(DynamicAnalysis)• CivilQA&QC• CivilInfrastructures• Architect• AutoCADDrafterORGANIZATIONTheengineeringteamwillbeledbyProjectmanagerandsupportedby3coLeaderincivil,mechanicalandelectrical&Instrumentengineering.Theteamwillbedividedinto2teams,consistsof30MWTeamand20MWTeam.Thesedivisionisneededtoproducemoreefficientworkflow,where4locationsofprojectcanbeworkedinparallel.Eachteam,i.e30MWTeamand20MWTeam,willbeledbyaseniorengineerandhasteammemberofcivilengineers,mechanicalengineers,electricalandinstrumentengineers.ThesupportingstaffofdraftersandcostestimatorsareavailableforeachteamThenon-technicalsupportingstaffareavailabletoprovidethebestservice,toensurethatalltheworkflowcanbeachievedsmoothlywithoutanydisturbance.

39

Project Manager Arief Hariyanto

Civil Lead Engineer Pandit Parma

Mechanical Lead Engineer Chakimoelmal Jaskur

Electrical Lead Engineer Nanang Hariyanto

30 MW Team Civil

• Senior Engineer • Assistant Engineer • Drafter 1 • Drafter 2

Mechanical • Senior Engineer • Assistant engineer • Drafter 1 • Drafter 2

Electrical and Instrument • Senior engineers • Assistant Engineer • Drafter 1 • Drafter 2

20 MW Team Civil

• Senior Engineer • Assistant Engineer • Drafter 1 • Drafter 2

Mechanical • Senior Engineer • Assistant engineer • Drafter 1 • Drafter 2

Electrical and Instrument • Senior Engineer • Assistant engineer • Drafter 1 • Drafter 2

Supporting Team

Administration Treasury General Affair Schedule keeper Transportation

40

Technical competence and Experiences The engineering team of PT MOBAR SARANA ENERGI has high competence, with long and very wide experiences either in power or in oil and gas industries. Various projects have been completed by engineering team of PT MSE, such as PLTGU 130 MW Bekasi Power. The scope of work was the Engineering Procurement and Construction of PLTGU. The calculation of Heat and Mass Balance of main component, i.e Gas Turbine, HRSG and Steam Turbine as well as Balance of Plant. The example of the work can be found in the Figure 1 and the Figure 2. Mr Chakimoelmal Jaskur was the mechanical engineering team leader of the project.

Figure 1. Layout of PLTGU

41

Figure 2. Heat and Mass Balance of PLTGU Bekasi Power

Other project related to this project also has been completed by member of PT MSE Engineering team. The project of PJB Muara tawar can be as the example of our products of engineering projects. The project was to develop the Detail design of electrical system including the calculation sheets and other documents. The result of this project can be seen in the Appendix Mr. M Arief Gunawan Sungkar has very long experience in power generation industry particularly with Wartsila products and EPC Projects such as

• EPC MFO system project PLTD Sei Raya, PLN Wil. Kalbar • Rehab project PLTD Sei Raya, PLN Wil. Kalbar • EPC MFO system project Leung Bata, PLN wil. SBU

With all very competence and very closed related to this project, PT MSE is very confident to be able to handle project. Approval Process Related to the technical documents, there will be a document approval process including technical drawings. Path and duration of the approval process will created and expected the document and personnel involved in the discussion became more orderly and effective.

a. Flow of submitted documents have the status as follows: IFI : Issued for

Information IFR : Issued for Review IFA : Issued for Approval AFF : Approved for Final

IFR, IFA and AFF used in the approval process documents and engineering drawings. While the IFI is just information. The status of first time submitted engineering documents and drawings is IFR, and the next is IFA and AFF. IFR

42

documents can be instantly transformed into AFF if there were only minor comments.

b. The duration of the document approval process is set as follows: i. Submitted documents by Planning Consultant should be

reviewed by PT PP, a maximum of three (3) days for number submitted documents between 1 - 5 files (submit at the same time).

ii. Submitted documents by Planning Consultant should be reviewed by PT PP, a maximum of seven (7) days for number submitted documents between 1 - 10 files (submit at the same time).

iii. Planning Consultant need to revise the document that has been returned by PT PP, a maximum of six (6) days for number submitted documents between 1 - 5 files (back at the same time)

iv. Planning Consultant need to revise the document that has been returned by PT PP, a maximum of twelve (12) days for number submitted documents between 1 - 10 files (back at the same time)

Document with IFR and IFA status that submitted to PT PP can be returned to the Consultant to be revised without waiting for a signature of project leader PT PP. AFF status document declared valid after signed by the Project Leader PP.

Work Methodology The methodology of this project can be described as follow:

1. The study of technical data of the main equipment and its requirements to determine the necessity of the systems to develop the planning and to look for any possible problems can arise.

2. Field survey in parallel for all locations in aspects of Civil, Mechanical, Electrical and Instrumentation

3. Mechanical calculation per the technical data of main equipment and other related systems

4. Loading analysis of the system according to the standard related to the power plant and simulate it using ETAP software

5. Calculation of capacity of each apparatus and machine according to produce the drawing, work plan documents and other technical aspects, TOC, BoQ, engineering estimate as well as the reports

6. Presentation and weekly meeting with PT PP EPC Division 7. Technical assistance to the contractors during procurement and

construction works

43

Deliverables items The detail items must be delivered in this project can be found in the appendix. However, in general it can be categorized in the following items:

1. Technical specification The detail specifications are needed to ensure that the construction work can be conducted in high quality. It must consist of

• General description of the work including the fulfillment of the regulation related to the work

• Specific description of work including the pattern of the work flow, material flow, installation sequence of each equipment

• Scope of work of each sub system work • References and standard related to the work

2. Drawing for procurement/bidding The drawing must be approved by project owner before delivered to the candidates

3. Engineering estimates After the design process, the engineering estimates must be determined to be reference for project owner. It must be completed with unit price of the components

4. Construction drawing The final stage of engineering is to produce the construction drawing for procurement/bidding process. It will be also used for reference during the construction process. All document must be delivered according to deliverables list of the RFQ documents.

44

VI. Master Schedule All works will be delivered in 60 days after the kick of meeting with PT PP. The detail of master schedule can be found in Table 2

Table 2. Master schedule

Description Week 1 2 3 4 5 6 7 8

Kick-Off Meeting Survey Lapangan Labuhan Bajo

Nabire Ternate Bontang

Desain Proses Sipil (Labuhan Bajo & Nabire) System Studies Calculation Details Drawing Details Data Equipment Sheet

Desain Proses Mekanikal (Labuhan Bajo & Nabire)

System Studies Calculation Details Drawing Details Data Sheet Equipment

Desain Proses Elektrikal (Labuhan Bajo & Nabire)

System Studies Calculation Details Drawing Details Data Sheet Equipment

Desain Proses Sipil (Ternate & Bontang) System Studies Calculation Details Drawing Details

45

Data Equipment Sheet Desain Proses Mekanikal (Ternate & Bontang) System Studies

Calculation Details Drawing Details Data Sheet Equipment

Desain Proses Elektrikal (Ternate & Bontang) System Studies Calculation Details Drawing Details Data Sheet Equipment

46

VII. Experience List The experience list of PT MSE can be seen in the Table 3.

Table 3. Experience List of PT MSE

YEAR PROJECT NAME CLIENT MECHANICAL

2011 DISPLAY MONITORING EQUIPMENT EXPENSE FOR CAPACITY UP AT

PT ASTRA HONDA MOTOR

2011 MODIFIKASI MAINT MC DIAGNOSTIC TESTER PT ASTRA HONDA MOTOR 2011 JASA SERVICE DIAGNOSTIC P3 PT ASTRA HONDA MOTOR 2011 FINAL INSPECTION TEST & DUCTING EXHAUST PT ASTRA HONDA MOTOR 2012 JASA PEMBUATAN HMI DAN IMPLEMENTASI WORKSTATION IDLP 2012 PALLET MAKING FTI 2012 COLLAPSIBLE BASKET PT PHE 2012 PENGADAAN ALAT LAB ITB ITB 2012 JASA SERVICE MESIN DIAGNOSTIC P3 PT. ASTRA HONDA MOTOR 2012 MOUNTING ANTENNA SISTEM MECATECH 2012 SERVICE COMPRESSION SCREW HEXAGON PT TITAN 2012 SP[ROKET FOR BP-709 PT. AMOCO MITSUI PTA INDONESIA 2012 JASA MODIF FINAL INSPECTION FOR CBS TYPE PT. ASTRA HONDA MOTOR 2013 OPEN TOP BASKET - PHE PT. PERTAMINA HULU ENERGI 2013 REPAIR ROTARY VALVE - PT. TITAN PT. TITAN 2013 TRASH BASKET & B3 STEEL BOX PT. PERTAMINA HULU ENERGI 2013 ALAU UJI LITBANG PU LITBANG 2013 PIPA - FTI PT. FUJITECHNICA INDONESIA 2013 SCREW JET COOKER - STARCH SOLUTION (PAK SONSON) 2013 MODIFIKASI EXHAUST FAN DUCTING - AHM PT. ASTRA HONDA MOTOR 2013 CHASSY DIAGNOSTIC TESTER - AHM PT. ASTRA HONDA MOTOR

47

2013 PUSH BUTTON STAND - FTI PT. FUJITECHNICA INDONESIA 2013 FINAL TEST STAND - AHM PT. ASTRA HONDA MOTOR 2014 SCM CONTROL SYSTEM TRI MANUNGGAL PERKASA

INTERNATIONAL 2014 PT NIPSEA CHEMICAL (PENGADAAN DAN PEMASANGAN

CONTROL SYSTEM DAN JASA ENGINERING DESIGN SERVICE UNTUK CED PROJECT)

PT. NIPSEA PAINT AND CHEMICALS

2014 FINAL TESTER STEP 2 PT. ASTRA HONDA MOTOR 2014 POLRI - TRANSPORTASI PT. SSSA 2015 CLEAN MAKER & LEAK TESTER PT. ASTRA HONDA MOTOR 2015 PT. LOTTE CHEMICAL-BOLT & NU CLAMP FOR BAG FILTER PT. LOTTE CHEMICALS 2015 PT. LOTTE CHEMICAL-BOLT & NU CLAMP FOR BAG FILTER PT. LOTTE CHEMICALS 2015 OLI SKIMMER PT. ASPROS BINAREKA 2015 MODIFIKASI CEROBONG PAINTING STEEL SUNTER PT. ASTRA HONDA MOTOR 2015 PANEL STAR DELTA 33,5KW PT. KSB INDONESIA 2015 PENG. & INSTALASI PIPA HYDRANT PT. FUJITECHNICA INDONESIA 2015 POMPA SHOWPEN INDO EXTRUSIONS 2015 AHM - MC RADIATOR COLLANT FILLING PT. ASTRA HONDA MOTOR 2015 KSB - PANEL PRIMING DND 24VDC PT. KSB INDONESIA 2015 FAIRING BOOTH PT. ASTRA HONDA MOTOR 2015 PRESSURE SAFETY VALVE PT. PEMBANGUNAN PERUMAHAN 2015 RISET PARKIR OTOMATIS PT. MOBAR SARANA ENERGI 2015 INSTALASI PLC PT. KSB INDONESIA 2015 MESJID GENTA PAK DINDIN 2015 AHM - REPLACEMENT EXHAUST AREA UC & TC LINE K PLANT

3 PT. ASTRA HONDA MOTOR

2015 PENGADAAN HYDRAULIC-INDO PT. INDEX 2015 KSB - ZELIO & EMERGENCY PT. KSB INDONESIA 2015 PT. INDEX - TEPLON PT. INDEX 2016 POLRI - ALMATSUS - BORGOL PT. SSSA

48

2016 AHM - ABS TESTER PT. ASTRA HONDA MOTOR 2016 JBR - PENGERJAAN SERTA PENYEDIA BAHAN MATERIAL DI

PROYEK INSFRASTRUKTUR PROYEK GEOTHERMAL DI CISOLOK-SUKABUMI

PT. JABAR BUMI KONSTRUKSI

2016 BEKISTING PT. JABAR BUMI KONSTRUKSI 2016 AHM - COLLAR PRESS MACHINE METRO GARMIN 2016 FLANGE & VALVE PT. HIRATEK 2016 INDO-MARKETING RECTIEFER UNIT - CHEMICAL PUMP PT. INDEX 2016 EXXEL TECHNOLOGI PTE LTD-AMPLIFIER PT. EXXEL TECHNOLOGI PTE LTD 2016 AHM - OTOMASI SIDESTAND DURABILITY PT. ASTRA HONDA MOTOR 2016 AHM - REPLACEMENT EXHAUST BLADE PT. ASTRA HONDA MOTOR 2016 PENGGANTIAN PINTU EVAPORATOR 1 PLANT 4 PT. ASTRA HONDA MOTOR 2016 PIPE SHOES KARAHA BODAS 2016 TRANSPORTASI TANKI PT. SSSA 2016 RANSPORTASI CABINET PT. SSSA 2016 BANGKA 50MW LOKASI AIR ANYIR, BANGKA PT. PP PLTG 2016 AHM - SEAT HARDNESS PT. ASTRA HONDA MOTOR 2016 ASPROS - ANCHOR PIPA DUDUKAN OIL SEPARATOR PT. ASPROS BINAREKA 2016 AHM - REKONDISI AIR SUPPLY UNIT - PAINTING CW P3 PT. ASTRA HONDA MOTOR 2016 FTMD - BALL PUNCH DEFORMATION TESTER FTMD 2016 AHM - PEMBUATAN CERB STEP 2 EXH WELDING FUEL TANK -

P1 PT. ASTRA HONDA MOTOR

2016 ASPROS - PEMBUATAN BOX & PLAT MEDIA FILTER SS304 (6UNIT)

PT. ASPROS BINAREKA

2016 ITB - WINCH SYSTEM MACHINE ITB 2016 INDEX - ANODIZING RECTIFIER PT. INDEX 2016 PA AGUS - TANKI STAINLESS PAK AGUS 2016 PT. INDEX - HALF PULSE RETRIFIER PT. INDEX 2016 AHM - MOD. CEROBONG WELDING 2B P2(BUFFING) PT. ASTRA HONDA MOTOR 2016 AHM - JASA MAINTENANCE DROP TEST PT. ASTRA HONDA MOTOR

49

2016 AHM - REPLACEMENT TANKI ACID UPL - P3 PT. ASTRA HONDA MOTOR 2016 AHM - MODIFIKASI CEROBONG STEP 2- CERB. EXH WELDING

LINE 3&4 P1 PT. ASTRA HONDA MOTOR

2016 SINKONA - PERBAIKAN JAKET REAKTOR PT. SINKONA LESTARI INDONESIA 2016 AHM - UPGRADING HEADLIGHT TESTER PT. ASTRA HONDA MOTOR 2016 PT. PUPESA - CONF. LETTER MACHINE COMPACT PT. PUPESA 2016 FTMD - JASA PEMBUATAN SPESIMEN PENELITIAN PN-7-20-

2016 FTMD

2016 AIR POLLUTION DISPERSION SIMULATION PT PEMBANGUNAN PERUMAHAN Div. EPC

2016 ITB - BRIQUETTE MACHINE ITB ITB ELECTRIC

2012 PRIMING ELECTRICAL 12VDC KSB 2012 JASA ELECTRICAL & INSTRUMENT CONTROL ROOM

PLN&DALLE IDLP

2012 JASA INSTALASI BESERTA PENGADAAN MATERIAL ELECTRICAL, INSTRUMENTASI&PLC

IDLP

2016 JASA STUDI SISTEM KELISTRIKAN PEMBANGKIT LISTRIK PT. ENERGY SAKTI TENAGA AIR 3 X 6 MW (PLTA PAKKAT) SENTOSA 2016 STUDY PENYAMBUNGAN PLTS 6M DI TARAKAN PT TRITAMA MITRA KALIMANTAN UTARA LESTARI (TML ENERGY) 2016 INVENTARISASI RUMAH BELUM BERLISTRIK DI PT. EDUMATIC KABUPATEN SUBANG INTERNASIONAL 2016 EVALUASI KEGIATAN LISTRIK PERDESAAN TAHUN 2014 - PT. EDUMATIC 2015 WILAYAH KABUPATEN BEKASI DAN KOTA BEKASI INTERNASIONAL 2016 INTERCONNECTION STUDY OF PLTA AEK NABARA PT. SUMBER BAHTERA ABADI 2016 STUDI PENYAMBUNGAN PLTS 3 MW DI KALIMANTAN PT TRITAMA MITRA SELATAN LESTARI (TML ENERGY) 2016 STUDI SISTEM KELISTRIKAN PT ENERGY KARYA PEMBANGKIT LISTRIK TENAGA MIKROHIDRO 2 X 5 MW PERSADA

50

DI SULAWESI SELATAN 2015 POWER SYSTEM ANALYSIS IN PANJANG ISLAND POWER PLANT HIRE ENGINEERING POWER SYSTEM ANALYSIS JAWA-13 STEAM POWER HIRE ENGINEERING PLANT (2X1000 MW) 2014 ELECTRICITY SYSTEM STUDY OF PLTA SALU URO & KALAENA PT. TIRTA ENERGY CEMERLANG 2016 ELECTRICITY SYSTEM STUDY MICRO HYDRO POWER PLANT PT. BANGUN ENERGI 2 X 2,5 MW (PLTM SALU PAKU) LESTARI 2015 DEVELOPMENT PLANNING OF SUB STATION AND POWER PT. ANGKASA PURA II CABLES AT SOEKARNO HATTA INTERNATIONAL AIRPORT 2014-2015

FEASIBILITY STUDY OF AIRPORT POWER PLANT AT PT. ANGKASA PURA II

KUALANAMU INTERNASIONAL AIRPORT 2014 ELECTRICITY ROADMAP STUDY PT. ANGKASA PURA II 2014 STUDI KELAYAKAN PEMBANGUNAN INDEPENDENT PT.PERTAMINA PUSAT POWER PRODUCER DI SUMATERA UTARA 2013-2016

ELECTRICITY SYSTEM ASSESSMENT IN 13 FIELDS PT. PERTAMINA EP

2016 FRONT END ENGINEERING DESIGN (FEED) POWER PLANT DISTRICT I UBEP LIRIK

PT. PERTAMINA EP

2012 KARAMA HEPP 450 MW WEST SULAWESI PT. PLN (PERSERO) PUSAT 2011 DYNAMIC STABILITY STUDIES FOR SUMATERA ELECTRIC PLN PUSLITBANG, P3B 2016 PEMUTAKHIRAN ROAD MAP LISTRIK PERDESAAN PT. PLN (Persero) 2016 EVALUASI KEGIATAN LISTRIK PERDESAAN TAHUN 2014 - UPT ESDM JAWA BARAT 2015 WILAYAH KABUPATEN DAN KOTA BEKASI WILAYAH II PURWAKARTA 2016 ANALISIS DAMPAK SISTEM TENAGA DI SUMATERA PT. PERTAMINA PERSERO 2016 UTARA ATAS PROYEK IPP KEK SEI MANGKEI 250 MW KEGIATAN PENYUSUNAN ROADMAP PENGEMBANGAN DINAS ENERGI DAN JARINGAN LISTRIK MENUJU RE JAWA BARAT 100% SUMBER DAYA MINERAL PROVINSI JAWA BARAT 2016 STUDI PELAKSANAAN OPERATION AND MAINTENANCE PT. ANGKASA PURA II

51

PERALATAN ELEKTRONIKA, ELEKTRIKAL DAN MEKANIKAL DI TERMINAL 3 ULTIMATE BANDAR UDARA 2016 POWER WHEELING IMPLEMENTATION STUDY PT. PLN (PERSERO) 2016 JASA MANAJEMEN KONSTRUKSI PEMBANGUNAN SUB PT. ANGKASA PURA II GARDU INDUK BANDARA SOEKARNO-HATTA DAN PENARIKAN KABEL POWER MENUJU GARDU HUBUNG BANDARA SOEKARNO-HATTA 2014 PENINGKATAN KAPASITAS DAN JARINGAN LISTRIK PT. ANGKASA PURA II 2017 BANDARA SOEKARNO HATTA TANGERANG 2016 REPLACEMENT PERALATAN JARINGAN LISTRIK PRIORITY PT. ANGKASA PURA II DAN NON PRIORITY KAWASAN TENGAH DI BANDARA 2016 SOEKARNO-HATTA PT. PLN TARAKAN ELECTRICITY BUSINESS DEVELOPMENT OF PT. PLN TARAKAN 2017 MEASUREMENT OF DYNAMIC PARAMETERS OF PT. PLN (PERSERO) PUSAT GENERATORS IN JAWA-BALI POWER SYSTEM, 2017 PENGATUR BEBAN 2017 ASSESMEN SISTEM JARINGAN LISTRIK BANDARA PT. ANGKASA PURA II SOEKARNO-HATTA 2017 JASA KONSULTAN PENGAWAS PAKET PEKERJAAN PT. ANGKASA PURA II REPLACEMENT PERALATAN JARINGAN LISTRIK PRIORITY DAN NON PRIORITY KAWASAN TENGAH DI BANDARA SOEKARNO HATTA 2017 STUDI SENSITIVITAS PENGEMBANGAN SISTEM PT. PLN (PERSERO) PUSAT KELISTRIKAN JAWA-BALI TAHUN 2019-2022 PENGATUR BEBAN ENGINEERING DESIGN OF 500 KV SUMATERA SYSTEM PT PLN (PERSERO) 2017 REASSESSMENT STUDIES OF ON GOING SUMATERA-JAVA PT. PLN PUSAT (PERSERO) 500KV HVDC INTERCONNECTION PROJECT FOR RELIABILITY & SECURITY OF POWER SUPPLY IN JAVA & 2017 FEASIBILITY STUDY OF AIRPORT POWER PLANT CONSORTIUM OF ANGKASA

52

PURA II-PERUSAHAAN GAS NEGARA-WIKA 2017 DEVELOPMENT STUDY OF JAWA-BALI GRID 2019-2022 PT. PLN (PUSAT) 2016 FRONT END ENGINEERING DESIGN (FEED) OF AIRPORT CONSORTIUM OF ANGKASA 2016 POWER PLANT PURA II-PERUSAHAAN GAS NEGARA-WIKA 2016 PLANNING AND POWER SYSTEM SUPPLY SWITCHGEAR 6,3 PT. PLN PJB KV CNG PLANT INTERNATIONAL COMPANY 2017 GRID INTEGRATION STUDY FOR SOLAR FARM IN BELITUNG INTERNATIONALE ZUSAMMENARBEIT

(GIZ) GMBH 2016 GRID CODE ANALYSIS FOR SUMATRA AND KALIMANTAN TRACTEBEL ENGINEERING 2016 GRID IMPACT STUDY OF SOLAR FARM IN LAMPUNG TRACTEBEL ENGINEERING 2016 LASOLO HYDRO POWER PLANT POWER SYSTEM STUDY PT LASOLO HIDRO ENERGI- POWER

CHINA 2016 PRELIMINARY GRID IMPACT STUDY GE ENERGY FOR SOLAR FARM IN NORTH SULAWESI 2016 GRID IMPACT STUDY TRACTEBEL ENGINEERING FOR SOLAR FARM 2016 TIMOR REGIONAL INTERCONNECTION STUDY WORLD BANK-TRACTEBEL ENGINEERING 2016 INTERCONNECTION STUDY OF BIOGAS POWER PLANT EVANS GROUP COMPANY GUNUNG PELAWAN LESTARI FEASIBILITY STUDY OF WASTE CRUSHER PT. MYEOUNGJIN INDONESIA 2016 ELECTRICITY STUDY OF PLTBG AANE JANGKANG BELITUNG AUSTINDO AUFWIND NEW

CIVIL

53

2015 ENGINEERING DESIGN DETAIL OF POWER SYSTEM SUPPLY SWITCHGEAR 6,3 KV CNG PLANT

PT. PLN PJB

2014 PENINGKATAN KAPASITAS DAN JARINGAN LISTRIK BANDARA SOEKARNO HATTA TANGERANG

PT. ANGKASA PURA II

2013 ENGINEERING DESIGN DETAIL FOR REPLACEMENT PERALATAN JARINGAN LISTRIK PRIORITY DAN NON PRIORITY KAWASAN TENGAH DI BANDARA SOEKARNO-HATTA

PT. ANGKASA PURA II

2013 ENGINEERING DESIGN DETAIL OF SUB STATION AND POWER CABLES AT SOEKARNO HATTA INTERNATIONAL AIRPORT

PT. ANGKASA PURA II

INSTRUMENTATION 2011 SILO 10 CONTROL SYSTEM UPGRADE SIEMENS S5 TO S7 CV.SAHABAT PRATAMA 2011 SHIP UNLOADER A & B SECONDARY HMI PT. MITRA PANDAWA SENTOSA 2011 LOCK HOPPER CONTROL SYSTEM (LHCS) RETROFIT CV.SAHABAT PRATAMA 2011 PERAWANG OFFTAKE STATION METERING SYSTEM - HMI

PROGRAMMING PT. PRATIWI PUTRI SULUNG

2011 "INFOMEDIA" SOFTWARE DEVELOPMENT - KANTOR IMIGRASI BOGOR

DENY KUSWANDI

2011 "PENGAWASAN ORANG ASING" WEB APPLICATION DEVELOPMENT - KANTOR IMIGRASI BANDUNG

DENY KUSWANDI

2011 SPEED AWARENESS MONITORING, PROGRAMMING SERVICES PT.SYMMETRY CONTRACTING 2012 "VESSEL TRAFFIC MANAGEMENT" SOFTWARE DEVELOPMENT PT. KAESA INDAH SEJAHTERA 2012 PLC PROGRAMMING PANARAN OFFTAKE STATION PT. MOBAR SARANA ENERGI 2012 > TROBLESHOOTING FC TEKKO & LCM JAYA PT. MITRA PANDAWA SENTOSA > TROBLESHOOTING & PLC PROGRAMMING FC LOTUS 668 2012 > MAINTENANCE SERVICES, TOKA TINDUNG PT. MITRA PANDAWA SENTOSA POWERHOUSE. > PROVISION OF SCADA SYSTEM AT PLTD TRISAKTI > GENERATOR CONTROL PANEL

54

MODIFICATION FOR BLACKSTART OPERATION, PT. VALE INDONESIA 2012 > TANK OVERFILL PROTECTION SYSTEM CV. SAHABAT PRATAMA > LUBE OIL COMPLEX (LOC) III HMI UPGRADE > REDUNDANT HMI FOR LOCK HOPPER CONTROL SYSTEM (LHCS) 2012 PACKER 667 CONTROL SYSTEM CV. SAHABAT PRATAMA 2012 HMI PROGRAMMING, PROJECT TIE IN PAD 29 & PAD 30

(GEODIPA PLTP DIENG UNIT 1) PT. MITRA PANDAWA SENTOSA

2012 PLC PROGRAMMING WATER TREATMENT PACKAGE CV. BANGUN GUNA SEJAHTERA 2012 WEB-APP DEVELOPMENT : DENY KUSWANDI > APLIKASI POA KANIM BOGOR > DEMO APLIKASI KEPUASAN PELANGGAN 2013 > IMPROVISASI TRISAKTI PT. MITRA PANDAWA SENTOSA > MFO TRISAKTI > SCADA PLTD SORONG > SCADA PLTD BALI 1 > SCADA PLTD LOMBOK > SCADA PLTD BALI 2 2013 CPI SCADA PIPELINE PT. CONTROL SYSTEMS 2013 METER KALIBRATOR SYSTEM MEDAN PT. PRATIWI PUTRI SULUNG 2013 PLC PROGRAMMING WATER TREATMENT PACKAGE CV. BANGUN GUNA SEJAHTERA 2013 MODIFIKASI PROGRAM HMI AHM PT. MOBAR SARANA ENERGI 2013 SURVEY TELEMETERING PERTAMINA EP PT. LAPI ITB 2013 PERBAIKAN HMI METERING SAKO PERTAMINA EP 2013 TECHNICAL ASSESSMENT & LOOP CHECK DEHC, PLTP DIENG

UNIT 1 PT LAPI GANESHATAMA CONSL.

2013 JASA PENDAMPINGAN LELANG RETROFIT DEHC PT LAPI GANESHATAMA CONSL. 2013 PMC PROYEK RETROFIT DEHC PLTP DIENG PT. GEO DIPA ENERGI 2013 PEMELIHARAAN METER KALIBRATOR DIMET BANDUNG PT. PRATIWI PUTRI SULUNG

55

2013 PLC PROGRAM MODIFICATION (PLC ON MAINTENANCE) COMPRESSOR STATION SEKERNAN & BELILAS

CV. PARAMA

2013 PLC CABLE RECTIFICATION COMPRESSOR STATION SEKERNAN CV. PARAMA 2013 PLC PROGRAMMING WATER TREATMENT PACKAGE CV. BANGUN GUNA SEJAHTERA 2013 INSTRUMENT ENGINEERING & INSTALLATION PLTU MALUKU

UTARA PT. MAHARANI PRIMA

2014 SOLAR POWER SYSTEM 3 X 300WP PT. ANUGRAH ARTHA MANDIRI JASA 2014 MAINTENANCE SERVICES, SPEED AWARENESS MONITORING

(SAM) SATNETCOM

2014 DATA COMMUNICATION SYSTEM TCP-DCS BELILAS COMPRESSOR STATION

TRANSPORTASI GAS INDONESIA

2014 METER KALIBRATOR SYSTEM PGN BATAM PT. PRATIWI PUTRI SULUNG 2014 DCS ASSESSMENT PLTP DIENG (BAILEY INFI90 & DELTA-V) PT. GEO DIPA ENERGI

2014 HMI UPGRADE, TANK FARM MONITORING PT. CONTROL SYSTEMS 2014 AIR DRYER UNIT CONTROLLER PT. SAHABAT PRATAMA 2014 HVAC CONTROL SYSTEM, RFCC PROJECT PT. MITRA PANDAWA SENTOSA

2014 ENGINEERING SERVICES PACKAGE PT. CINOVASI REKAPRIMA 2014 ENGINEERING SERVICES FOR HMI PT. YOKOGAWA INDONESIA 2014 MODIFICATION PLC PROGRAM & HMI PT. PRATIWI PUTRI SULUNG 2014 INSPECTION & REPAIR ESD PLC AT SEKERNAN TRANSPORTASI GAS INDONESIA

2014 PLC PROGRAMMING BANGUN GUNA SEJAHTERA 2014 SCM CONTROL SYSTEM TRI MANUNGGAL PERKASA

INTERNATIONAL 2014 SCM CONTROL SYSTEM ARCA ENERGI

2015 SAFETY SYSTEM [ESD] SPBG EMPAT SATRIA LESTARI KAMPUNG MELAYU - PULO GEBANG - CIPUTAT 2015 BLANKET CONTRACT FOR SERVICE OF WINCC SIEMENS AND

PLC SIEMENS SIMATIC 7 (INSTRUMENTATION SYSTEM AND TRANSPORTASI GAS INDONESIA

56

CONTROL) FOR 2 (TWO) YEARS AT RO2 BELILAS COMPRESSOR STATION

2015 SERVICES FOR CONTROL SYSTEM SCADA - INTAKE & WTP TANGERANG DENGAN MENGGUNAKAN PLC SIEMENS S7 - 1500 & S7 - 1200

BESTINDO PUTRA MANDIRI

2015 JASA UPGRADING MODBUS COMMUNICATION DANIEL FLOCOM S600 METER SALES INDRALAYA & BORANG STATION

MEDCO E&P INDONESIA

2015 SERVIS BAS ICONIC SANBE FARMA 2016 PERBAIKAN SISTEM SCADA PLC INTAKE (PLC TWDO) MOYA BEKASI JAYA 2016 SERVICE SYSTEM SCADA MOYA BEKASI JAYA 2016 SERVICE ENGINEERING: UPGRADE FIELD SERVER,

KONFIGURASI ULANG FIELD SERVER, CONTINUTY CABLE SANBE FARMA

2016 SERVICE ENGINEERING FOR DISPLAY PANEL STABILITY ROOM: TROUBLESHOOTING, CONTINUTY CABLE, PROGRAMMING & CONFIGURATION, TESTING

SANBE FARMA

2016 PENGADAAN SPAREPART F & G SYSTEM GTM & RO1 TRANSPORTASI GAS INDONESIA 2016 PENGADAAN MATERIAL & JASA PENGGANTIAN SAMMS MVX

PLC HWP GEO DIPA ENERGI UNIT DIENG

2016 CONTROL & MONITORING HVAC SYSTEM SANBE FARMA 2016 SERVICE TOUCH SCREEN TERMINAL PL 360T SANBE FARMA