Application and Use of

Continuous Flight Auger Piles

in Western Canada

Presented By:

Jeff Grieder, P.Eng.Regional Manager – Alberta (North)

North American Caisson Limited

Page 2: Application and Use of Continuous Flight Auger Piles in ... Lunch... · Application and Use of Continuous Flight Auger Piles in Western Canada Presented By: ... •No impact shocks,

2

CFA Piles – A Brief History

• Used in Europe and USA for over 25 years

• Aka – Auger Cast Pile

• First project in Western Canada in 2005

• 14,000 piles used on over 45 projects in Western Canada

• Over 25 full scale load tests completed and counting

Page 3: Application and Use of Continuous Flight Auger Piles in ... Lunch... · Application and Use of Continuous Flight Auger Piles in Western Canada Presented By: ... •No impact shocks,

3

Why Use CFA Piles?

• Why not?

• Sleeves and/or temporary casings are not required

• No impact shocks, vibrations, low noise, allowing piling work in sensitive urban and re-development areas.

• Can be utilized in a wide range of cohesive and cohesion-less soils, with or without the presence of a water-bearing strata.

• Production rates can easily outperform comparative cased holes or expanded base piles depending on soil conditions and concrete supply.

• Semi- Displacement, resulting in lateral soil compression that increase final load bearing capacity.

Page 4: Application and Use of Continuous Flight Auger Piles in ... Lunch... · Application and Use of Continuous Flight Auger Piles in Western Canada Presented By: ... •No impact shocks,

4

CFA Piles - Installation

Page 5: Application and Use of Continuous Flight Auger Piles in ... Lunch... · Application and Use of Continuous Flight Auger Piles in Western Canada Presented By: ... •No impact shocks,

5

Drilling Phase

• The auger is screwed into the soil with little tailings elevation.

• Positive crowd pressure is maintained on the auger.

• A plug or hinged cap is located at the bottom of the auger that prevents soil from entering the hollow drill stem; the plug will then be ejected or open when concrete pumping begins.

• A positive penetration rate is maintained to prevent deconsolidation of the shaft in cohesion-less soils.

Page 6: Application and Use of Continuous Flight Auger Piles in ... Lunch... · Application and Use of Continuous Flight Auger Piles in Western Canada Presented By: ... •No impact shocks,

6

Extraction Phase

• Once design depth is reached, concrete pumping begins

• The stem plug is ejected under concrete pressure

• The auger is pulled with a slight forward or no rotation to avoid de-consolidation

• An auger cleaner at the base of the mast strips tailings from the flights as the auger is extracted

Page 7: Application and Use of Continuous Flight Auger Piles in ... Lunch... · Application and Use of Continuous Flight Auger Piles in Western Canada Presented By: ... •No impact shocks,

7

Extraction Phase

• Once design depth is reached, concrete pumping begins

• The stem plug is ejected under concrete pressure

• The auger is pulled with a slight forward or no rotation to avoid de-consolidation

• An auger cleaner at the base of the mast strips tailings from the flights as the auger is extracted

Page 8: Application and Use of Continuous Flight Auger Piles in ... Lunch... · Application and Use of Continuous Flight Auger Piles in Western Canada Presented By: ... •No impact shocks,

8

CFA Piles - Applications:

• Buildings

• Process Units

• Transportation Structures

• Earth Retention Walls

• Ground Improvement

CFA Pile Load Capacity:

• 50 to 2,000 kN Axial

• Uplift Loads

• Lateral/Moment Loads

Page 9: Application and Use of Continuous Flight Auger Piles in ... Lunch... · Application and Use of Continuous Flight Auger Piles in Western Canada Presented By: ... •No impact shocks,

9

Advantages of CFA piles are:

• No vibration,

• Low noise levels,

• No temporary casing required,

• Speed of installation, and

• Lower unit cost.

Disadvantages of CFA piles are:

• Temperature limits on installation, and

• Difficultly penetrating very hard bearing layers.

Page 10: Application and Use of Continuous Flight Auger Piles in ... Lunch... · Application and Use of Continuous Flight Auger Piles in Western Canada Presented By: ... •No impact shocks,

10

CFA Pile Design

• CFA Pile capacity typically falls between a drilled and driven pile

• Load/Settlement behavior of CFA piles are similar to drilled and driven piles

• Total axial capacity QT = Qs + QB

• Side resistance mobilized with small displacements

• Allowable side shear greater than that of a drilled pile

• Only design for end bearing is suitable soil conditions

Page 11: Application and Use of Continuous Flight Auger Piles in ... Lunch... · Application and Use of Continuous Flight Auger Piles in Western Canada Presented By: ... •No impact shocks,

11

CFA Pile Materials - Concrete

Typical Mix Design Proportions:

• 25 to 35 Mpa Compressive Strength @28 days

• Slump 200 mm +/- 25

• W/C = 0.45 Typical

• Up to 35% Flyash

• Air Entrainment

• Course Aggregate (14mm)

• 2 to 4 hour workability

• Hydration Stabilizer

• Mid/High range water reducer

Page 12: Application and Use of Continuous Flight Auger Piles in ... Lunch... · Application and Use of Continuous Flight Auger Piles in Western Canada Presented By: ... •No impact shocks,

12

CFA Pile Materials - Reinforcement

• The method of construction of the CFA pile requires the cage to be inserted after the concrete is placed.

• Cages have to be properly manufactured and well assembled (preferably tack welded).

• Minimum concrete cover is maintained by use of cage centralizers.

• The butt diameter of the cage is reduced to aid installation.

• Subject to concrete quality and consistency, it is today possible to install full length cages in one piece.

• Vibratory methods can be used to assist setting the cage.

Page 13: Application and Use of Continuous Flight Auger Piles in ... Lunch... · Application and Use of Continuous Flight Auger Piles in Western Canada Presented By: ... •No impact shocks,

13

CFA Pile -Quality Control

• Good site investigation that goes as deep as piles will be drilled (12 to 28 m).

• Experienced Geotechnical Inspector.

• Pile Installation Recorder (PIR)

• Post Installation Non-destructive Testing (NDT).

Page 14: Application and Use of Continuous Flight Auger Piles in ... Lunch... · Application and Use of Continuous Flight Auger Piles in Western Canada Presented By: ... •No impact shocks,

14

CFA Pile - Quality Control

During boring phase PIR records:

• auger rotation speed

• Penetration rate

• rotary torque

During concrete phase PIR records:

• Concrete pressure

• Lifting Rate

• and volume of concrete placed vs. extraction speed

The system displays in real

time for operator control.

Page 15: Application and Use of Continuous Flight Auger Piles in ... Lunch... · Application and Use of Continuous Flight Auger Piles in Western Canada Presented By: ... •No impact shocks,

15

CFA Pile - Load Testing

Economics of Load Testing:

• The semi-displacement and construction process contributes to high capacities

• Resistance Factor 0.4 vs 0.6 – Huge Cost Savings!.

Page 16: Application and Use of Continuous Flight Auger Piles in ... Lunch... · Application and Use of Continuous Flight Auger Piles in Western Canada Presented By: ... •No impact shocks,

16

CFA Pile - Load Testing

Load Testing Methods:

• Dynamic Pile Testing (PDA)

• Top Load Static Load Tests (conventional Load Frame)

• Rapid Load Testing – Statnamic Testing

• Osterberg Cell Testing (O-cell Testing)

Page 17: Application and Use of Continuous Flight Auger Piles in ... Lunch... · Application and Use of Continuous Flight Auger Piles in Western Canada Presented By: ... •No impact shocks,

17

CFA Pile - Load Testing

Top Load Static Testing:

• Compressive Loads Up to 6.5 MN

• Tension Loads up to 5.0 MN

• ASTM D-1184 Standard or Quick Load Test method

• Hydraulic Jack c/w Load Cell – Jack Runs Test, Load cell Confirms jack

• Strain Gauges for Load Transfer Down Pile Shaft

Page 18: Application and Use of Continuous Flight Auger Piles in ... Lunch... · Application and Use of Continuous Flight Auger Piles in Western Canada Presented By: ... •No impact shocks,

18

CFA Pile - Load Testing

Page 19: Application and Use of Continuous Flight Auger Piles in ... Lunch... · Application and Use of Continuous Flight Auger Piles in Western Canada Presented By: ... •No impact shocks,

19

CFA Pile - Load Testing

O-Cell testing:

• No reaction piles

• Higher test loads (up to 150 MN)

• Direct measurement

• Special concrete mix

Page 20: Application and Use of Continuous Flight Auger Piles in ... Lunch... · Application and Use of Continuous Flight Auger Piles in Western Canada Presented By: ... •No impact shocks,

20

CFA Pile - Load Testing

Page 21: Application and Use of Continuous Flight Auger Piles in ... Lunch... · Application and Use of Continuous Flight Auger Piles in Western Canada Presented By: ... •No impact shocks,

21

CFA Pile - Load Testing

Page 22: Application and Use of Continuous Flight Auger Piles in ... Lunch... · Application and Use of Continuous Flight Auger Piles in Western Canada Presented By: ... •No impact shocks,

22

CFA Pile – Design Load vs. Displacement

0

1

2

3

4

5

6

7

8

9

0 200 400 600 800 1000 1200 1400 1600 1800 2000

Dis

pla

cem

en

t (m

m)

Applied Load (kN)

Page 23: Application and Use of Continuous Flight Auger Piles in ... Lunch... · Application and Use of Continuous Flight Auger Piles in Western Canada Presented By: ... •No impact shocks,

23

CFA Pile – Displacement at Maximum Load

0

5

10

15

20

25

30

35

0 500 1,000 1,500 2,000 2,500 3,000 3,500 4,000

Dis

pla

cem

en

t (m

m)

Applied Load (kN)

Chart Title

Page 24: Application and Use of Continuous Flight Auger Piles in ... Lunch... · Application and Use of Continuous Flight Auger Piles in Western Canada Presented By: ... •No impact shocks,

24

CFA Pile - Information

FWHA Geotechnical Circular No. 8

http://www.fhwa.dot.gov/engineering/geotech/pubs/gec8/index.cfm

Page 25: Application and Use of Continuous Flight Auger Piles in ... Lunch... · Application and Use of Continuous Flight Auger Piles in Western Canada Presented By: ... •No impact shocks,

25

CFA Pile - Conclusions

• CFA pile is economical for projects with good to marginal soils

• Load testing is economical

• Load testing can be done quickly

• Project savings of 20 to 30%

• Test to failure when possible

Page 26: Application and Use of Continuous Flight Auger Piles in ... Lunch... · Application and Use of Continuous Flight Auger Piles in Western Canada Presented By: ... •No impact shocks,

26

CFA Moving Forward

• Cased Auger Piling (CAP)

• Cased Secant Piling (CSP)

Page 27: Application and Use of Continuous Flight Auger Piles in ... Lunch... · Application and Use of Continuous Flight Auger Piles in Western Canada Presented By: ... •No impact shocks,