Skyway 126 Wind Energy Design and Operations Report
M.K. Ince and Associates Ltd. Appendix June 14, 2013
Appendix IV
Radar and Radio Communications Impact Assessment
Skyway 126 Wind Energy
Potential Impacts on Radio Communication,
Radar and Seismoacoustic Systems
Prepared by: M.K. Ince and Associates Ltd.
Prepared for: Cloudy Ridge Wind Park LP
June 14, 2013
June 14, 2013
Cloudy Ridge Wind Park LP
c/o WindWorks Power Corp.
346 Waverly Street
Ottawa, Ontario
K2P 0W5
Attention: Dr. Ingo Stuckmann
Reference: Skyway 126 Wind Energy, Radar and Radio Communications Impact
Assessment Report
Dear Dr. Stuckmann,
We are pleased to present a copy of the Radar and Radio Communications Impact Assessment Report for
Skyway 126 Wind Energy project. This report summarizes the findings of M.K. Ince and Associates
Ltd.’s assessment of the potential impacts of Skyway 126 Wind Energy on Radio Communication, Radar
and Seismoacoustic Systems. The assessment methods follow the protocol laid out in the document
Technical Information and Coordination Process Between Wind Turbines and Radiocommunication and
Radar Systems (RABC/CanWEA, 2012), produced jointly by the Radio Advisory Board of Canada and
the Canadian Wind Energy Association.
The results of this assessment indicate that impacts to radio communication, radar and seismoacoustic
system from the Skyway 126 Wind Energy project are anticipated to be limited. It will be included as part
of the Renewable Energy Approval Application package to be submitted to the Ministry of the
Environment for the Skyway 126 Wind Energy project, as an appendix to the Design and Operations
Report.
Please feel free to contact us if you have any questions or concerns.
Sincerely,
M. K. INCE AND ASSOCIATES LTD.
Martin Ince, P. Eng.
Skyway 126 Wind Energy Communications Impact Assessment
M.K. Ince and Associates Ltd. i June 14, 2013
Table of Contents
SKYWAY 126 WIND ENERGY .................................................................................................................................. 1
1 INTRODUCTION ............................................................................................................................................. 1
1.1 PROJECT OVERVIEW .......................................................................................................................................... 1 1.2 REGULATORY AND REPORTING REQUIREMENTS ....................................................................................................... 1
2 RADIO COMMUNICATION, RADAR AND SEISMOACOUSTIC SYSTEMS IN THE STUDY AREA ............................ 4
2.1 RADIO COMMUNICATION SYSTEMS....................................................................................................................... 4 2.2 ENVIRONMENT CANADA WEATHER RADAR ............................................................................................................ 4 2.3 SEISMOACOUSTIC STATIONS ................................................................................................................................ 4 2.4 AIR TRAFFIC CONTROL RADAR AND AIRFIELDS ........................................................................................................ 4 2.5 ADDITIONAL CONSULTATION ............................................................................................................................... 4
3 CONSULTATION ZONES FOR RADIOCOMMUNICATION SYSTEMS .................................................................. 5
3.1 POINT TO POINT SYSTEMS .................................................................................................................................. 5 3.2 BROADCAST TRANSMITTERS ................................................................................................................................ 5 3.3 OVER-THE-AIR RECEPTORS ................................................................................................................................. 5 3.4 CELLULAR, LAND MOBILE, AND POINT TO POINT SYSTEMS BELOW 890 MHZ ............................................................... 6 3.5 SATELLITE GROUND STATIONS ............................................................................................................................. 6 3.6 VHF OMNIRANGE BEACONS ............................................................................................................................... 6
4 CONSULTATION ZONES FOR SKYWAY 126 WIND ENERGY.............................................................................. 7
4.1 MANDATORY CONSULTATIONS ............................................................................................................................ 7 4.2 ANALYSIS OF SPECTRUM DIRECT DATABASE SEARCH RESULTS .................................................................................... 8
5 CONCLUSIONS & RECOMMENDATIONS ....................................................................................................... 10
5.1 RECOMMENDATIONS ....................................................................................................................................... 10
6 QUALIFICATIONS AND LIMITATIONS ........................................................................................................... 11
7 REFERENCES ................................................................................................................................................ 12
List of Figures FIGURE 1-1: SKYWAY 126 WIND ENERGY PROJECT – PROJECT OVERVIEW MAP ............................................................................ 2 FIGURE 1-2: SKYWAY 126 WIND ENERGY PROJECT -- RADAR AND RADIO COMMUNICATION SYSTEMS MAP ....................................... 3
List of Tables TABLE 4-1 SUMMARY OF MANDATORY CONSULTATIONS ........................................................................................................... 7 TABLE 4-2 IMPACT ON RADIOCOMMUNICATION AND RADAR SYSTEMS ......................................................................................... 8
List of Appendices Appendix A Radio Communication Systems in the Project Area Appendix B Consultation
Skyway 126 Wind Energy Communications Impact Assessment
M.K. Ince and Associates Ltd. 1 June 14, 2013
1 INTRODUCTION
1.1 Project Overview
Cloudy Ridge Wind Park LP (the Proponent) proposes to build the Skyway 126 Wind Energy project, a
10 MW Class 4 Wind Energy Generation Facility, on privately-owned agricultural lands within the
Municipality of Grey Highlands near the town of Badjeros. It will consist of five (5) REpower MM92
wind turbines of 2 MW each, located in five (5) proposed locations. The REpower MM92 has a sound
power level of 103.2 dB(A). The turbines are three bladed horizontal axis wind turbine generators that
will be mounted on 100 m hubs and have blade diameters of 92.5 m, for a maximum total height of
146.25 m above grade. Figure 1-2 depicts all radar and radio communication systems within the project
area. The project turbines will be bounded to the north by South Line C, to the east by Grey Road 9, to the
South by Grey Road 9, and to the west by Road 57A. In addition, project cabling will be constructed
along South Line C, Road 63, and 4th Concession B Road. A Power Purchase Agreement (PPA) has been
acquired for the project under Ontario’s Feed-In Tariff (FIT) Program.
1.2 Regulatory and Reporting Requirements
The Green Energy and Green Economy Act, passed in the Province of Ontario in 2009, mandates a
Renewable Energy Approval (REA) process under the Environmental Protection Act, Ontario Regulation
359/09 for specified classes of renewable energy projects. The Skyway 126 Wind Energy project is
subject to this process, which will evaluate the project’s environmental impacts and propose measures to
mitigate or avoid them.
This report summarizes the findings of M.K. Ince and Associates Ltd.’s assessment of the potential
impacts of the Skyway 126 Wind Energy project on Radio Communication, Radar and Seismoacoustic
Systems. The assessment methods follow the protocol laid out in the document Technical Information
and Coordination Process Between Wind Turbines and Radiocommunication and Radar Systems
(RABC/CanWEA, 2012), produced jointly by the Radio Advisory Board of Canada and the Canadian
Wind Energy Association.
The RABC/CanWEA document outlines the procedure for determining consultation zones with respect to
Radio Communication, Radar and Seismoacoustic Systems based on the characteristics of each system. In
the event of an overlap between the project area and the consultation zone of a communication system,
consultation with the system operator is recommended.
Skyway 126 Wind Energy Communications Impact Assessment
M.K. Ince and Associates Ltd. 2 June 14, 2013
Figure 1-1: Skyway 126 Wind Energy Project – Project Overview Map
Skyway 126 Wind Energy Communications Impact Assessment
M.K. Ince and Associates Ltd. 3 June 14, 2013
Figure 1-2: Skyway 126 Wind Energy Project -- Radar and Radio Communication Systems Map
Skyway 126 Wind Energy Communications Impact Assessment
M.K. Ince and Associates Ltd. 4 June 14, 2013
2 RADIO COMMUNICATION, RADAR AND SEISMOACOUSTIC
SYSTEMS IN THE STUDY AREA
2.1 Radio Communication Systems
The Spectrum group of Industry Canada manages the use of the electromagnetic spectrum in Canada.
Their database was searched on November 26, 2012 for all stations within 60 km of the project site. The
analysis of the search results is discussed in Section 4.2. Radio communication systems surrounding the
project area are depicted in Figure 1-2, with further details on the system included in Appendix A.
2.2 Environment Canada Weather Radar
The nearest Environment Canada weather radar station is WKR, located in King City, ON. This station is
approximately 65 km from the nearest turbine in the Skyway 126 Wind Energy project. The WKR station
is located well outside the 50 km consultation zone specified in the RABC/CanWEA document.
2.3 Seismoacoustic Stations
The Natural Resources Canada seismoacoustic station closest to the site is the SADO station, located near
Sadowa, ON. This station is approximately 150 km from the Skyway 126 Wind Energy project. The
proposed wind farm is outside the recommended 50 km consultation zone for this station.
2.4 Air Traffic Control Radar and Airfields
The consultation zone around a military or civilian airport is a minimum of 10 km as outlined in the
RABC/CANWEA Guidelines and could extend up to 80 km depending on the type of Air Traffic Control
(ATC) radar present. The nearest airport for which records were found in MKI’s desktop analysis is the
Collingwood Regional Airport, approximately 30 km northeast of the project site. NAV Canada was
contacted and supplied with a turbine layout to ensure no potential for interference with the equipment or
operations at this or any other air traffic control radars. NAV Canada has indicated that no impacts are
anticipated.
2.5 Additional Consultation
RABC and CanWEA mandate correspondence with certain agencies to coordinate the assessment of
possible wind turbine effects on telecommunication and radar systems. These agencies include:
The Department of National Defense
Royal Canadian Mounted Police
Canadian Coast Guard
Environment Canada.
Public Safety Agencies
Skyway 126 Wind Energy Communications Impact Assessment
M.K. Ince and Associates Ltd. 5 June 14, 2013
Responses from correspondence with these agencies are outlined in Section 4.1 and included in
Appendix B.
3 CONSULTATION ZONES FOR RADIOCOMMUNICATION SYSTEMS
3.1 Point to Point Systems
The RABC/CanWEA document prescribes the consultation zone for a point to point link as being a 1 km
radius around the transmission and reception sites, and a cylinder around the signal path with a diameter
defined as:
√
Where Lc = Diameter of the cylinder, m
D = Path length, km
F = Signal frequency, GHz
R = Rotor Diameter, m
The data from the Spectrum Direct database search were used to determine how closely each signal
passes by the project area. All link stations transmitting and receiving within 60 km of the project area
centre were mapped. Consultation zones were calculated for any signal paths passing near or through the
project area.
Rogers Communication Partnership operates one point-to-point system within the consultation zone of
the proposed project and was contacted with the turbine coordinates. Discussions with Rogers
Communications initially identified potential impacts to one microwave path which have since been
addressed by shifting the proposed turbine locations outside the anticipated zone of interference. Further
information regarding the point to point systems and license holder are summarized in Figure 1-2 and
Appendix A. A summary of correspondence is included in Appendix B.
3.2 Broadcast Transmitters
As recommended by the RABC/CanWEA document, TV or radio broadcast transmitters have a
consultation zone of 2 km for FM and TV stations, and 15 km for an AM directional antenna system and
5 km for an omnidirectional AM antenna system. The proposed Skyway 126 Wind Energy project is
within the consultation zone of Bayshore Broadcasting Corporation’s proposed FM radio broadcast
station with the call sign CFDC-FM, identified in the Industry Canada’s Spectrum Direct Database.
Consultation with Bayshore Broadcasting Corporations has indicated that this station has not yet been
constructed and that due to its separation distance from the Skyway 126 Wind Energy project, no impacts
would be anticipated.
3.3 Over-the-Air Receptors
For broadcast receivers, which MKI assumes to be any residence, the consultation zone is defined as:
Skyway 126 Wind Energy Communications Impact Assessment
M.K. Ince and Associates Ltd. 6 June 14, 2013
1. 15 km for Analog TV receivers
2. 10 km for Digital TV receivers.
There are several nearby communities within these consultation zones. Should reception problems arise
after construction of the wind farm, mitigation measures will need to be discussed with the affected
residents.
3.4 Cellular, Land Mobile, and Point to Point Systems below 890 MHz
The RABC document prescribes a 1 km radius consultation zone for cellular networks, land mobile
networks, and point to point systems below 890 MHz. No such systems exist within 1 km of the proposed
wind farm site, and therefore no consultation is required.
3.5 Satellite Ground Stations
Wind turbines may also interfere with a satellite link if located between the satellite and a ground station
receiver. The RABC/CanWEA guidelines recommend a 500 m radius consultation zone around satellite
ground stations. Beyond 500 m, the consultation zone is a cone extending up to 10 km along the
transmission path, with a width defined by the following:
√
Where D= Distance from the ground satellite antenna, km
F= Signal frequency, GHz
B= Turbine rotor diameter, m
There are no satellite ground stations within 10 km of any of the proposed turbines. No interference issues
are anticipated.
There could, however, be satellite TV receivers at some of the residences within 10 km of the project site.
If reception issues arise after construction of the proposed turbines, mitigation measures will have to be
discussed with affected residents on a case-by-case basis.
3.6 VHF OmniRange Beacons
VHF OmniRange (VOR) is a type of short-range air navigation beacon. The RABC/CanWEA document
prescribes a consultation zone of 15 km around these facilities. No VOR beacons exist within 15 km of
the Skyway 126 Wind Energy project.
Skyway 126 Wind Energy Communications Impact Assessment
M.K. Ince and Associates Ltd. 7 June 14, 2013
4 CONSULTATION ZONES FOR SKYWAY 126 WIND ENERGY
4.1 Mandatory Consultations
The Department of National Defense (DND), Royal Canadian Mounted Police (RCMP), Environmental
Canada, Canadian Coast Guard and various public safety agencies were contacted and supplied with a
turbine layout. The results of these consultations are summarized in Table 4-1 below and included in
Appendix B.
Table 4-1 Summary of Mandatory Consultations
Agency Consulted Response
DND – Radar, air defense, ATC, airport and NAVAIDS No impacts anticipated
DND – Radiocommunication systems No impacts anticipated
Environment Canada No impacts anticipated
Canadian Coast Guard No impacts anticipated
RCMP No response received as of June 14, 2013
NAV Canada No impacts anticipated
Ontario Provincial Police No impacts anticipated
Grey Highlands Fire Department No response received as of June 14, 2013
Skyway 126 Wind Energy Communications Impact Assessment
M.K. Ince and Associates Ltd. 8 June 14, 2013
4.2 Analysis of Spectrum Direct Database Search Results
Table 4-2: Impact on Radiocommunication and Radar Systems
System Type Recommended
Consultation Zone around
system
Overlap
with
Consultation
Zones
Comments Effect Assessment
Point-to-Point Systems above
890 MHz: Microwave Links
1 km around the tower, Cylinder
of Lc around between the
transmit and receive locations
N Turbine 4 was initially within the
consultation zone of the following point-to-
point link owned by Rogers:
XJV217-XJV210
Following consultation
with Rogers, Turbine 4
was moved to mitigate
impacts.
Broadcast transmitters AM, FM
and TV stations Multi-channel
Multipoint Distribution Service
(MMDS) Systems
AM Station: 5 km for an
omnidirectional antenna system
and 15 km for a directional
antenna system
FM Station: 2.0 km
TV Station: 2.0 km
Y All turbines are within 5 km of a FM
Broadcast transmitter, with the call sign
CFDC-FM.
Consultation with the
tower operators
(Bayshore Broadcasting
Corporation) indicates
that no impacts are
anticipated.
Over-the-Air Reception TV
off-air pickup Consumer TV
receivers
Analog TV station: 15 km
Digital TV station: 10 km
Y There could be residences receiving over-
the-air TV service near the project site.
Television reception
issues at local residences
are possible; if issues
arise, mitigation will be
required.
Cellular type networks, Land
Mobile Radio networks and
Point-to-Point Systems below
890 MHz
1 km around call towers
Cylinder of Lc around the path
between the transmit and receive
locations
N There are no cellular type networks within 5
km of any turbines.
There are no Land Mobile Radio networks
within 15 km of any turbines.
There are no point to point systems below
890 MHz within 5 km of any turbines.
The turbines have no
foreseeable impacts on
cellular type networks,
land mobile radio
networks and point to
point systems below 890
MHz.
Skyway 126 Wind Energy Communications Impact Assessment
M.K. Ince and Associates Ltd. 9 June 14, 2013
System Type Recommended
Consultation Zone around
system
Overlap
with
Consultation
Zones
Comments Effect Assessment
Satellite Systems
Direct-to-Home (DTH),
Satellite Ground Stations
500 m
Beyond 500m, a cone of width
Lc extending up to 10 km from
the satellite ground station
Y There are no satellite ground stations within
10 km of any turbines. However, there may
be residences within 10 km receiving
satellite TV service.
The turbines have no
foreseeable impacts on
the satellite systems.
VHF OmniRange (VOR) 15 km N There are no VOR systems within 15 km of
any turbines.
The turbines have no
foreseeable impacts on
VOR systems.
Skyway 126 Wind Energy Communications Impact Assessment
M.K. Ince and Associates Ltd. 10 June 14, 2013
5 CONCLUSIONS & RECOMMENDATIONS
Industry Canada’s Spectrum database was searched for radiocommunication systems near the Project
Location. Rogers Communications Partnership and Bayshore Broadcasting Corporation both operate
infrastructure within the consultation zones recommended by RABC/CanWEA and have been contacted
and informed of the proposed turbine locations to discuss potential impacts to communications resulting
from the Skyway 126 Wind Energy project. Rogers Communications initially identified potential
interference with its network, however, through consultation, the proposed layout has been altered to
mitigate any impacts. Bayshore Broadcasting has indicated that no impacts are anticipated.
Various public agencies were also consulted as mandated by RABC and CanWEA. No negative impacts
have been identified by these agencies to date; however, several responses are still pending as of June 14,
2013, at the time of this assessment. Appendix B includes a summary of the parties contacted for
consultation, with their contact information and any responses received with regards to the Skyway 126
Wind Energy .
The results of this assessment indicate that impacts to radio communication, radar and seismoacoustic
system from the Skyway 126 Wind Energy project are anticipated to be limited.
5.1 Recommendations
Based on the results of this study, the following recommendations were made:
Complaints of degraded quality related to direct-to-home satellite receivers, television and FM
radio receivers within 15 km of the wind farm should be monitored and if need be mitigated post-
construction by movement of receiver dish or other means agreed upon by the proponent and
impacted party.
Continue ongoing consultation with public and private agencies.
Skyway 126 Wind Energy Communications Impact Assessment
M.K. Ince and Associates Ltd. 11 June 14, 2013
6 QUALIFICATIONS AND LIMITATIONS
M. K. Ince & Associates Ltd. (MKI) has prepared this report in accordance with its proposal and
information provided by its Client. The information and analysis contained herein is for the sole benefit of
the Client and save for regulatory review purposes may not be relied upon by any other person.
MKI’s assessment was made in accordance with guidelines, regulations and procedures believed to be
current at this time. Changes in guidelines, regulations and enforcement policies can occur at any time
and such changes could affect the conclusions and recommendations of this report.
The reports, maps and related documents may rely on information provided to MKI by the Client. This
information may include but is not limited to manufacturer and construction specifications and other
related information. Maps are created using a Geographic Information System (GIS) that compiles
records, information, and data from various sources which may contain errors. While we have referred to
and made use of reports, maps and geospatial data and specifications prepared by others, we assume no
liability for the accuracy of the information contained within.
Maps and documents made available by MKI are not legal surveys and are not intended to be used as
such. No original surveying is included as part of these maps. If any contradictions exist between this
document and relevant municipal, provincial or federal laws, regulations, codes, or policies, the text of the
laws, regulations, codes or policies will be the legal authority.
Skyway 126 Wind Energy Communications Impact Assessment
M.K. Ince and Associates Ltd. 12 June 14, 2013
7 REFERENCES
Industry Canada, Spectrum Management and Telecommunications. (2012). Spectrum Direct Database.
Retrieved , November 26, 2012, from Industry Canada:
https://sd.ic.gc.ca/pls/engdoc_anon/web_search.geographical_input
Radio Advisory Board of Canada (RABC)/Canadian Wind Energy Association (CanWEA). (2012).
Technical Information and Coordination Process Between Wind Turbines and
Radiocommunication and Radar Systems
Skyway 126 Wind Energy Communications Impact Assessment
M.K. Ince and Associates Ltd. Appendix June 14, 2013
Appendix A: Radio Communication Systems in Project Area
Skyway 126 Wind Energy Communications Impact Assessment
M.K. Ince and Associates Ltd. Appendix June 14, 2013
Radio Communication Systems illustrated in Figure 1-3
System Call Sign Link
Call Sign
Tx
Frequency
(MHz)
Rx
Frequency
(MHz)
Tx Antenna
Azimuth
(deg)
Rx Antenna
Azimuth
(deg)
Licensee Consultation
Radius (m)
Distance
(m)
Point to Point
Signal Path
XJV217 XJV210 14770 15245 187.1 187.1 Rogers
Communications
Partnership
75 180
Point to Point
Signal Path
XJV217 CIN445 18662.5 15245 7.1 7.1 Rogers
Communications
Partnership
66 >1500
Point to Point
Signal Path
XJV217 VEL678 6113.2 6365.3 162.2 162.2 Rogers
Communications
Partnership
90 >1500
Point to Point
(Cellular)
SITE703716 - 869 824 - - Rogers
Communications
Partnership
1000 >1500
Broadcast Shelburne - 104.9 - - - Bayshore
Broadcasting
Corporation
2000 1100
Skyway 126 Wind Energy Communications Impact Assessment
M.K. Ince and Associates Ltd. Appendix June 14, 2013
Appendix B: Consultation
Skyway 126 Wind Energy Communications Impact Assessment
M.K. Ince and Associates Ltd. Appendix June 14, 2013
Summary of Mandatory Consultation
Party to Consult Contact Signal Type Call Sign Response
Recommended Consultations
Rogers
Communication
Corporation
Milan Vujosevic Point to point XJV210 to XJV217 No impacts
anticipated
Bayshore
Broadcasting
Corporation
Robert Coyne FM Broadcasting
Station
Shelburne No impacts
anticipated
Mandatory Consultations
Department of
National Defense
(DND)
Mario Lavoie Radiocommunication
Systems
- No impacts
anticipated
Adin Switzer Military Air Defense
and ATC Radars
- No impacts
anticipated
Royal Canadian
Mounted Police
- Radar - No response
received
Canadian Coast
Guard
Martin Grégoire Vessel Traffic System
Radars
- No impacts
anticipated
Environment
Canada
Carolyn J. Rennie Weather Radars - No impacts
anticipated
NAV Canada Diane Levesque Civilian Radar and Air
Navigation Equipment
- No impacts
anticipated
Ontario Provincial
Police
Mark Fox Ground
Communications
- No impacts
anticipated
Grey Highlands
Fire Department
- Ground
Communications
- No response
received
Skyway 126 Wind Energy Communications Impact Assessment
M.K. Ince and Associates Ltd. Appendix June 14, 2013
Bayshore Broadcasting
Carolyn Truong <[email protected]>
Wind farm
Robert Coyne <[email protected]> Mon, Nov 19, 2012 at 11:42 AM
Hi Carlyn
Sorry for the late reply on your request but at this time Bayshore Broadcasting has not commenced a broadcasting
operation at this location the tower site is only proposed. But as the the wind farm is over 1000 meters from this site
I see no impact to the operation of a transmitter site at this location. We operation a site in Bruce county with a wind
farm that is the same as the proposed site with no effect on our operation.
Robert Coyne
Bayshore Broadcasting Corp.
Mkince.ca Mail - Wind farm https://mail.google.com/mail/u/0/?ui=2&ik=f451843616&view=pt&searc...
1 of 1 11/19/2012 12:34 PM
Approvals M. K. Ince and Associates Ltd. <[email protected]>
Query Regarding Potential Impacts of Skyway 126 Wind Farm on Bayshore Broadcasting
Approvals M. K. Ince and Associates Ltd. <[email protected]> Mon, Nov 19, 2012 at 10:24 AM
Cc: Carolyn Truong <[email protected]>, David Barrie <[email protected]>
Hi Robert,
I would like to check in on this issue as we have not yet received a response from Bayshore Broadcasting. Please let me know if you require
further information from us or if there is perhaps someone else that would be a more appropriate point of contact.
I have attached the turbine coordinates in this message. Thanks for your time and cooperation!
Best Regards,
Carolyn Truong
On Thu, Aug 23, 2012 at 10:04 AM, Approvals M. K. Ince and Associates Ltd. <[email protected]> wrote:
Hi Robert,
I'd just like to follow up on my previous email sent July 16, 2012 regarding the potential for interference of communications at Bayshore
Broadcasting as a result of the proposed Skyway 126 Wind Farm in the Municipality of Grey Highlands.
Please advise if you foresee any impacts resulting from the proposed wind farm.
Best Regards,
Carolyn Truong
On Mon, Jul 16, 2012 at 12:09 PM, Approvals M. K. Ince and Associates Ltd. <[email protected]> wrote:
Good morning Robert,
My name is Carolyn, I am contacting you on behalf of M. K. Ince and Associates Ltd, a consulting firm that has been retained to conduct
environmental studies for the proposed Skyway 126 Wind Farm in the Municipality of Grey Highlands, Ontario. According to the
Spectrum Direct database, Bayshore Broadcasting Corporation manages and operates communications infrastructure near the
proposed project area.
The Spectrum Direct database indicates that the following FM Broadcast station is in the vicinity of the proposed project:
Call Sign: Shelburne
Lat/Long (NAD83): 44°14'09"/-80°17'19"
The turbine coordinates are attached.
Please advise if you foresee any potential impacts to your telecommunications network as a result of the proposed wind farm.
Best Regards,
Carolyn Truong
--
M.K. Ince and Associates Ltd.
11 Cross St., Dundas, ON L9H 2R3
Phone: 905-628-0077
Fax: 905-628-1329
http://www.mkince.ca
--
M.K. Ince and Associates Ltd.
11 Cross St., Dundas, ON L9H 2R3
Phone: 905-628-0077
Fax: 905-628-1329
http://www.mkince.ca
Mkince.ca Mail - Query Regarding Potential Impacts of Skyway 126 Win... https://mail.google.com/mail/u/2/?ui=2&ik=f1ba1b1184&view=pt&q=sk...
1 of 2 11/19/2012 12:35 PM
--
M.K. Ince and Associates Ltd.
11 Cross St., Dundas, ON L9H 2R3
Phone: 905-628-0077
Fax: 905-628-1329
http://www.mkince.ca
Turbine Information 2012-11-16.pdf
272K
Mkince.ca Mail - Query Regarding Potential Impacts of Skyway 126 Win... https://mail.google.com/mail/u/2/?ui=2&ik=f1ba1b1184&view=pt&q=sk...
2 of 2 11/19/2012 12:35 PM
Skyway 126 Wind Energy Communications Impact Assessment
M.K. Ince and Associates Ltd. Appendix June 14, 2013
Coast Guard
Approvals M. K. Ince and Associates Ltd. <[email protected]>
Skyway 126 Wind Farm - Impacts on Radar and Radio Communication
XNCR, Windfarm Coordinator <[email protected]> Fri, May 25, 2012 at 9:53 AM
To: "Approvals M. K. Ince and Associates Ltd." <[email protected]>Cc: Genevieve Brown <[email protected]>, Karla Klein <[email protected]>
Hello, I apologize for the delay in responding to you. Since the transfer of the Wind Farm Coordinator reponsibility to me, I was not given e-mailaccess right away.
The closest CCG system is a communication site located 25 km from your proposed wind farm (Skyway 126). Therefore, we do not
anticipate any interference problems.
Regards,
Martin Grégoire, P. EngCanadian Coast Guard
From: Approvals M. K. Ince and Associates Ltd. [mailto:[email protected]]
Sent: April 27, 2012 2:18 PM
To: XNCR, Windfarm Coordinator
Cc: Genevieve Brown; Karla Klein
Subject: Re: Skyway 126 Wind Farm - Impacts on Radar and Radio Communication
Hello,
Since we last contacted you on April 19th regarding potential interference due to the Skyway 126 Wind Farm, a sixth turbine has beenadded to the wind farm. Please find attached the coordinates of all six turbines.
Please contact us if you have any concerns with respect to the proposed turbines.
Thank you,
Genevieve Brown
On Thu, Apr 19, 2012 at 2:02 PM, Approvals M. K. Ince and Associates Ltd. <[email protected]> wrote:
Dear coordinator,
On behalf of the Skyway 126 Wind Farm, M.K. Ince and Associates, would like to request consultation for the impact of wind turbines onradio communication and radar systems. The Skyway 126 Wind Farm is at a preliminary stage of investigations and MK Ince iscompleting a communications impact assessment for the project as outlined by RABC and CanWEA in their guidelines. The proposedSkyway 126 Wind Farm is located near the communities of Badjeros, within the Municipality of Grey Highlands . The wind farm containsfive turbines; the proposed coordinates and heights of the turbines are attached in this email.
Please contact us if you have any concerns with respect to the proposed wind turbines.
Thank you for your help,
Genevieve Brown
M.K. Ince and Associates Ltd.
11 Cross St., Dundas, ON L9H 2R3
Phone: 905-628-0077
Fax: 905-628-1329
http://www.mkince.ca
Mkince.ca Mail - Skyway 126 Wind Farm - Impacts on Radar and Radio... https://mail.google.com/mail/u/2/?ui=2&ik=f1ba1b1184&view=pt&q=sk...
1 of 1 11/19/2012 12:43 PM
Skyway 126 Wind Energy Communications Impact Assessment
M.K. Ince and Associates Ltd. Appendix June 14, 2013
Department of National Defense
6/3/13 Mkince.ca Mail - Fwd: Detailed Analysis - No Interference - Skyway 126 Wind Farm, Badjeros, Ont - REVISED LAYOUT - WTA-2056
https://mail.google.com/mail/u/1/?ui=2&ik=f1ba1b1184&view=pt&search=inbox&msg=13efbc553c23e43f 1/1
Approvals M. K. Ince and Associates Ltd. <[email protected]>
Fwd: Detailed Analysis - No Interference - Skyway 126 Wind Farm, Badjeros, Ont - REVISEDLAYOUT - WTA-2056
[email protected] <[email protected]> Fri, May 31, 2013 at 2:06 PMTo: [email protected]
Thank you. Project revision noted.
Adin SwitzerCaptAEC Liaison OfficerCCISF/ESICCATESS/ESTTMADéfense nationale | National Defence8 Wing Trenton, Astra, ON K0K 3W0TEL: 613 392-2811 Ext4834 (CSN: 827-4834)FAX: 613 965-3200Gouvernement du Canada | Government of Canada
ü Please consider the environment before printing this email | S'il vous plaît pensez à l'environnement a
From: Approvals M. K. Ince and Associates Ltd. [mailto:[email protected]] Sent: Tuesday, 28, May, 2013 11:34 AMTo: Switzer Capt AB@ATESS@TrentonCc: Hanna VovkSubject: Re: Detailed Analysis - No Interference - Skyway 126 Wind Farm, Badjeros, Ont - REVISED LAYOUT - WTA-2056
[Quoted text hidden]
[Quoted text hidden]
[Quoted text hidden]
Please consider the environment before printing this email | S'il vous plat pensez l'environnement a
-- Carolyn Truong, E.I.T.
M.K. Ince and Associates Ltd.11 Cross Street, Dundas, ON L9H 2R3Phone: 905-628-0077 ext. 246Fax: 905-628-1329Email: [email protected]
--
M.K. Ince and Associates Ltd.11 Cross St., Dundas, ON L9H 2R3Phone: 905-628-0077Fax: 905-628-1329*http://*www.mkince.ca
5/28/13 Mkince.ca Mail - Fwd: Detailed Analysis - No Interference - Skyway 126 Wind Farm, Badjeros, Ont - REVISED LAYOUT - WTA-2056
https://mail.google.com/mail/u/1/?ui=2&ik=f1ba1b1184&view=pt&search=sent&msg=13eebc68e5265e99 1/1
Approvals M. K. Ince and Associates Ltd. <[email protected]>
Fwd: Detailed Analysis - No Interference - Skyway 126 Wind Farm, Badjeros, Ont - REVISEDLAYOUT - WTA-2056
Approvals M. K. Ince and Associates Ltd. <[email protected]> Tue, May 28, 2013 at 11:34 AMTo: [email protected]: Hanna Vovk <[email protected]>
Dear Adin,
Please be advised that the project layout for the Skyway 126 Wind Energy project located near Badjeros, Ont (WTA-2056) has beenupdated since our last correspondence (December 3, 2012). Turbine 6 has been dropped. Turbines 1-5 remain in the same position. Arevised layout is attached.
If you have any questions or concerns, please do not hesitate to contact us.
Thank you,
M.K. Ince and Associates Ltd.
[Quoted text hidden]
--
M.K. Ince and Associates Ltd.11 Cross St., Dundas, ON L9H 2R3Phone: 905-628-0077Fax: 905-628-1329http://www.mkince.ca
Skyway 126 Wind Energy Project -- Turbine Coordinates (2013-05-28).pdf168K
Approvals M. K. Ince and Associates Ltd. <[email protected]>
Detailed Analysis - No Interference - Skyway 126 Wind Farm, Badjeros Ont -WTA-2056
Approvals M. K. Ince and Associates Ltd. <[email protected]> Mon, Nov 19, 2012 at 12:57 PM
Cc: Carolyn Truong <[email protected]>, [email protected]
Hi Adin,
Please be advised that since our last correspondence, the turbine layout of the proposed Skyway 126 Wind Farm has
been revised. The coordinates of several turbines have been altered and I have attached the new turbine locations to
this message. We are in the process of finalizing this project and do not anticipate any further revisions to the layout at
this point.
Thanks for your continued time and cooperation. Please confirm that the proposed project is not anticipated to impact
DND radar and flight operations.
Best Regards,
Carolyn Truong
[Quoted text hidden]
[Quoted text hidden]
Turbine Information 2012-11-16.pdf
272K
Mkince.ca Mail - Detailed Analysis - No Interference - Skyway 126 Win... https://mail.google.com/mail/u/0/?ui=2&ik=f1ba1b1184&view=pt&q=s...
1 of 1 5/27/2013 6:40 PM
Approvals M. K. Ince and Associates Ltd. <[email protected]>
Detailed Analysis - No Interference - Skyway 126 Wind Farm, Badjeros Ont -WTA-2056
[email protected] <[email protected]> Thu, May 10, 2012 at 1:35 PM
To: [email protected], [email protected]
Genevieve,
We have completed the detailed analysis of your proposed site, Skyway 126 Wind Farm, located near Badjeros, Ont
(WTA-2056). The results of our detailed analysis have shown that there is likely to be minimal interference with DND
radar and flight operations.
Therefore, as a result of these findings we have no objections with your project as submitted (attached).
When confirmed, we would ask that you advise this office of the construction date for subject project in order to advise
our flying operations at CFB Borden.
If however, the layout were to change/move, please re-submit that proposal for another assessment using the
assigned WTA number listed above. The concurrence for this site is valid for 24 months from date of this email. If the
project should be cancelled or delayed during this timeframe please advise this office accordingly.
It should be noted that our office looks at each submission on a case by case basis and as such, concurrence on this
submission in no way constitutes a concurrence for similar projects in the same area, nor does it indicate that similar
concurrence might be offered in another region.
Finally, the concurrence offered in this email extends only to the subject projects and current proponent. Should the
project or any part of it be altered, or be sold to another developer, this office must be notified and we reserve the right
to reassess the project.
Thank you for your patience on this matter and for considering DND radar and airport facilities in your project
development process.
If you have any questions feel free to contact me.
Thank you.
<<Turbine Information 2012-04-27.pdf>>
Adin Switzer
Capt
AEC Liaison Officer
CCISF/ESICC
ATESS/ESTTMA
Défense nationale | National Defence
8 Wing Trenton, Astra, ON K0K 3W0
TEL: 613 392-2811 Ext4834 (CSN: 827-4834)
FAX: 613 965-3200
Gouvernement du Canada | Government of Canada
ü Please consider the environment before printing this email | S'il vous plaît pensez à l'environnement a
Turbine Information 2012-04-27.pdf
166K
Mkince.ca Mail - Detailed Analysis - No Interference - Skyway 126 Win... https://mail.google.com/mail/u/0/?ui=2&ik=f1ba1b1184&view=pt&q=s...
1 of 1 5/27/2013 6:34 PM
Thomas Bernacki <[email protected]>
Feedback re. lighting of turbines at Skyway 126
Katie Meyer-Beck <[email protected]> Sat, Dec 8, 2012 at 9:26 PM
To: Thomas Bernacki <[email protected]>
Cc: Collin Branton <[email protected]>
Hi Tom:
as I mentioned to you earlier this week, on Dec. 5, 2012 at 12:37 p.m. I received a call from Rod Miskey from the
400th Squadrant of Borden near Feversham. His email address is [email protected]
MKI (Karla Klein) sent a request for feedback with a topographical map and a land use proposal on April 5, 2012.
Miskey reports that he is responsible for the helicopter operations out of the facility nearby to the project. Helicopter
fly-ins or approaches often happen at night with night vision goggles or under cloud cover. He also noted that
helicopters fly low -- approximately 50 feet over the tree tops.
he noted that often turbines are equipped with red LED lights, however, the issue with thos is that they are not visible
at night via night vision goggles
He requested that 1.) the turbine is equipped with at least one incandescent light; 2.) He mentioned that sometime
turbine manufacturers equip the turbines with three lights; could one of the three sockets be an infrared light?
We requested information about construction timelines. I indicated to him that while the precise timelines are
unknown, notifications will be placed in the local newspaper when the REA documents are ready, which will include
more information at that time.
Collin: please log this communication. Tom I trust you will include this in the REA reporting as required. I will notify
Ingo.
Thanks,
Katie
--
Katie Meyer-Beck
Renewable Energy Project Manager
M.K. Ince and Associates Ltd.
11 Cross Street
Dundas, Ontario, L9H 2R3
Tel: 905-628-0077 ext. 242
Fax: 905-628-1329
E-mail: [email protected]
www.mkince.ca
P Please consider the environment before printing this e-mail.
1 of 1
Carolyn Truong <[email protected]>
Detailed Analysis - No Interference - Skyway 126 Wind Farm, Badjeros, Ont -
REVISED LAYOUT - WTA-2056
[email protected] <[email protected]> Mon, Dec 3, 2012 at 8:46 AM
Carolyn,
We have completed the detailed analysis of your proposed site revised layout, Skyway 126 Wind Farm, located
near Badjeros, Ont (WTA-2056). The results of our detailed analysis have shown that there is likely to be minimal
interference with DND radar and flight operations.
Therefore, as a result of these findings we have no objections with your project revised layout as submitted
(attached).
If however, the layout were to change/move, please re-submit that proposal for another assessment using the
assigned WTA number listed above. The concurrence for this site is valid for 24 months from date of this email. If
the project should be cancelled or delayed during this timeframe please advise this office accordingly.
It should be noted that our office looks at each submission on a case by case basis and as such, concurrence on
this submission in no way constitutes a concurrence for similar projects in the same area, nor does it indicate that
similar concurrence might be offered in another region.
Finally, the concurrence offered in this email extends only to the subject projects and current proponent. Should the
project or any part of it be altered, or be sold to another developer, this office must be notified and we reserve the
right to reassess the project.
As with our previous correspondence, we would kindly ask that you advise this office of the construction date for
subject project in order to advise our flying operations at CFB Borden.
Thank you for your patience on this matter and for considering DND radar and airport facilities in your project
development process.
If you have any questions feel free to contact me.
Thank you.
<<Turbine Information 2012-11-16.pdf>>
Adin Switzer
Capt
AEC Liaison Officer
CCISF/ESICC
ATESS/ESTTMA
Défense nationale | National Defence
8 Wing Trenton, Astra, ON K0K 3W0
TEL: 613 392-2811 Ext4834 (CSN: 827-4834)
FAX: 613 965-3200
Gouvernement du Canada | Government of Canada
ü Please consider the environment before printing this email | S'il vous plaît pensez à l'environnement a
Turbine Information 2012-11-16.pdf
272K
Mkince.ca Mail - Detailed Analysis - No Interference - Skyway 126 Wind... https://mail.google.com/mail/u/0/?ui=2&ik=f451843616&view=pt&searc...
1 of 1 12/3/2012 9:43 AM
Approvals M. K. Ince and Associates Ltd. <[email protected]>
Skyway 126 Wind Farm Impacts on Radar and Radio Communication
[email protected] <[email protected]> Mon, Nov 19, 2012 at 1:49 PM
To: [email protected]: [email protected]
I have reviewed your proposal in respect to DND's radio communication systems, and I have no objections or concerns.
Thank you for coordinating with DND.
Have a good Day.
Mr. Mario Lavoie
Spectrum Engineering Technician
National Defence | Défense nationale
Ottawa, Canada K1A 0K2
Telephone | Téléphone 613-992-3479
Facsimile | Télécopieur 613-991-3961
Government of Canada | Gouvernement du Canada
From: Approvals M. K. Ince and Associates Ltd. [mailto:[email protected]]
Sent: Monday, 19, November, 2012 13:33 PM
To: Lavoie MJ@ADM(IM) J6 Coord@Ottawa-Hull
Cc: +WindTurbines@ATESS@TRENTON; Carolyn Truong; David Barrie
Subject: Re: FW: FW: Skyway 126 Wind Farm Impacts on Radar and Radio Communication
Hi Mario,
Please be advised that since our last correspondence, the turbine layout of the proposed Skyway 126 Wind Farm has been revised. Thecoordinates of several turbines have been altered and I have attached the new turbine locations to this message. My apologies for all theback and forth, but we are currently in the process of finalizing this project and do not anticipate any further revisions to the layout at thistime.
Thanks for your continued time and cooperation. Please confirm that the proposed project is not anticipated to impact DND radiocommunications systems.
Best Regards,Carolyn Truong
On Fri, Apr 27, 2012 at 2:22 PM, <[email protected]> wrote:
I have reviewed your proposal in respect to DND's radio communication systems, and I have no objections or concerns.
Thank you for coordinating with DND.
Have a good Day.
Mr. Mario LavoieSpectrum Engineering TechnicianNational Defence | Défense nationaleOttawa, Canada K1A [email protected] | Téléphone 613-992-3479Facsimile | Télécopieur 613-991-3961Government of Canada | Gouvernement du Canada
From: Approvals M. K. Ince and Associates Ltd. [mailto:[email protected]]Sent: Friday, 27, April, 2012 14:14 PM
Mkince.ca Mail - Skyway 126 Wind Farm Impacts on Radar and Radio ... https://mail.google.com/mail/u/2/?ui=2&ik=f1ba1b1184&view=pt&searc...
1 of 3 11/22/2012 10:45 AM
To: Lavoie MJ@ADM(IM) J6 Coord@Ottawa-HullCc: Karla Klein; Genevieve BrownSubject: Re: FW: Skyway 126 Wind Farm Impacts on Radar and Radio Communication
Hello,
Since we last contacted you on April 19th regarding potential interference due to the Skyway 126 Wind Farm, a sixth turbine has beenadded to the wind farm. Please find attached the coordinates of all six turbines.
Please contact us if you have any concerns with respect to the proposed turbines.
Thank you,
Genevieve Brown
On Fri, Apr 20, 2012 at 7:51 AM, <[email protected]> wrote:
I have reviewed your proposal in respect to DND's radio communication systems, and I have no objections or concerns.
Thank you for coordinating with DND.
Have a good Day.
Mr. Mario LavoieSpectrum Engineering TechnicianNational Defence | Défense nationaleOttawa, Canada K1A [email protected] | Téléphone 613-992-3479
Facsimile | Télécopieur 613-991-3961Government of Canada | Gouvernement du Canada
From: Approvals M. K. Ince and Associates Ltd. [mailto:[email protected]]
Sent: Thursday, 19, April, 2012 13:58 PM
To: Lavoie MJ@ADM(IM) J6 Coord@Ottawa-Hull; +WindTurbines@ATESS@TRENTON
Cc: Karla Klein; Genevieve Brown
Subject: Skyway 126 Wind Farm Impacts on Radar and Radio Communication
Dear coordinator,
On behalf of the Skyway 126 Wind Farm, M.K. Ince and Associates, would like to request consultation for the impact of windturbines on radio communication and radar systems. The Skyway 126 Wind Farm is at a preliminary stage of investigations and MKInce is completing a communications impact assessment for the project as outlined by RABC and CanWEA in their guidelines. Theproposed Skyway 126 Wind Farm is located near the communities of Badjeros, within the Municipality of Grey Highlands . The windfarm contains five turbines; the proposed coordinates and heights of the turbines are attached in this email.
Please contact us if you have any concerns with respect to the proposed wind turbines.
Thank you for your help,
Genevieve Brown
--M.K. Ince and Associates Ltd.11 Cross St., Dundas, ON L9H 2R3Phone: 905-628-0077Fax: 905-628-1329***http://***www.mkince.ca
--
M.K. Ince and Associates Ltd.
Mkince.ca Mail - Skyway 126 Wind Farm Impacts on Radar and Radio ... https://mail.google.com/mail/u/2/?ui=2&ik=f1ba1b1184&view=pt&searc...
2 of 3 11/22/2012 10:45 AM
11 Cross St., Dundas, ON L9H 2R3
Phone: 905-628-0077
Fax: 905-628-1329
*http://*www.mkince.ca
Turbine Information 2012-11-16.pdf
272K
Mkince.ca Mail - Skyway 126 Wind Farm Impacts on Radar and Radio ... https://mail.google.com/mail/u/2/?ui=2&ik=f1ba1b1184&view=pt&searc...
3 of 3 11/22/2012 10:45 AM
Approvals M. K. Ince and Associates Ltd. <[email protected]>
Initial Analysis Consultation Zone Infringement - Skyway 126 Wind Farm -
Badjeros, Ont - WTA-2056
Approvals M. K. Ince and Associates Ltd. <[email protected]> Fri, Apr 27, 2012 at 2:15 PM
Cc: Karla Klein <[email protected]>, Genevieve Brown <[email protected]>
Hello,
Since we last contacted you on April 19th regarding potential interference due to the Skyway 126 Wind Farm, a sixth
turbine has been added to the wind farm. Please find attached the coordinates of all six turbines.
Please contact us if you have any concerns with respect to the proposed turbines.
Thank you,
Genevieve Brown
[Quoted text hidden]
Turbine Information 2012-04-27.pdf
166K
Mkince.ca Mail - Initial Analysis Consultation Zone Infringement - Skywa... https://mail.google.com/mail/u/0/?ui=2&ik=f1ba1b1184&view=pt&searc...
1 of 1 4/27/2012 2:28 PM
Approvals M. K. Ince and Associates Ltd. <[email protected]>
Initial Analysis Consultation Zone Infringement - Skyway 126 Wind Farm -
Badjeros, Ont - WTA-2056
[email protected] <[email protected]> Thu, Apr 26, 2012 at 9:40 AM
To: [email protected], [email protected]
Genevieve,
We have completed the initial analysis of the proposed wind farm under the project name Skyway 126 near
Badjeros, Ont. We have assigned a DND case number of WTA-2056, please include this number in any future
requests related to this site.
Our analysis has shown that the proposal falls within one (or more) of the DND consultation zones as outlined on our
website [ http://www.airforce.forces.gc.ca/8w-8e/units-unites/page-eng.asp?id=692 ] and in the RABC/CanWEA
document Technical Information and Coordination Process Between Wind Turbines and Radio Communication and
Radar Systems. As such this proposal will require a further more detailed analysis to determine any possible
effects/impact to the sites in question. The typical turn around time for a detailed analysis is from 2-6 weeks
depending upon the size and complexity of the site in question.
Thank you for your patience on this matter and for considering DND radar and airport facilities in your project
development process.
If you have any questions feel free to contact me otherwise, I will be in touch with you within a few weeks time with
our results.
Thank you.
Adin Switzer
Capt
AEC Liaison Officer
CCISF/ESICC
ATESS/ESTTMA
Défense nationale | National Defence
8 Wing Trenton, Astra, ON K0K 3W0
TEL: 613 392-2811 Ext4834 (CSN: 827-4834)
FAX: 613 965-3200
Gouvernement du Canada | Government of Canada
ü Please consider the environment before printing this email | S'il vous plaît pensez à l'environnement a
Mkince.ca Mail - Initial Analysis Consultation Zone Infringement - Skywa... https://mail.google.com/mail/u/0/?ui=2&ik=f1ba1b1184&view=pt&searc...
1 of 1 4/26/2012 9:39 AM
Approvals M. K. Ince and Associates Ltd. <[email protected]>
Skyway 126 Wind Farm Impacts on Radar and Radio Communication
Approvals M. K. Ince and Associates Ltd. <[email protected]> Thu, Apr 19, 2012 at 1:57 PM
To: "mario.lavoie2" <[email protected]>, windturbines <[email protected]>
Cc: Karla Klein <[email protected]>, Genevieve Brown <[email protected]>
Dear coordinator,
On behalf of the Skyway 126 Wind Farm, M.K. Ince and Associates, would like to request consultation for the
impact of wind turbines on radio communication and radar systems. The Skyway 126 Wind Farm is at a preliminary
stage of investigations and MK Ince is completing a communications impact assessment for the project as outlined
by RABC and CanWEA in their guidelines. The proposed Skyway 126 Wind Farm is located near the communities
of Badjeros, within the Municipality of Grey Highlands . The wind farm contains five turbines; the proposed
coordinates and heights of the turbines are attached in this email.
Please contact us if you have any concerns with respect to the proposed wind turbines.
Thank you for your help,
Genevieve Brown
--
M.K. Ince and Associates Ltd.
11 Cross St., Dundas, ON L9H 2R3
Phone: 905-628-0077
Fax: 905-628-1329
http://www.mkince.ca
2 attachments
Skyway 126_DND_2012-04-19.xls
69K
Skyway 126 Turbine Information 2012-04-19.pdf
165K
Mkince.ca Mail - Skyway 126 Wind Farm Impacts on Radar and Radio ... https://mail.google.com/mail/u/0/?ui=2&ik=f1ba1b1184&view=pt&searc...
1 of 1 4/19/2012 2:06 PM
Skyway 126 Wind Energy Communications Impact Assessment
M.K. Ince and Associates Ltd. Appendix June 14, 2013
Environment Canada
Approvals M. K. Ince and Associates Ltd. <[email protected]>
Skyway 126 - Impacts on Radar and Radio Communication
Weather Radars Contact,National Radar Program [Ontario] <[email protected]>Thu, May 30, 2013 at 9:18
AM
To: "Approvals M. K. Ince and Associates Ltd." <[email protected]>, "Weather Radars Contact,National Radar
Program [Ontario]" <[email protected]>
Cc: Hanna Vovk <[email protected]>
To whom it may concern,
Thank you for contacting the Meteorological Service of Canada, a branch of Environment Canada, regarding your
wind energy intentions.
Our preliminary assessment of the information provided to us via e-mail on May 28, 2013 indicates that any potential
interference that may be created by the Skyway 126 Wind Energy Project in Grey County will not be severe. Although
we would prefer our radar view to be interference free, this is not always reasonable. As a consequence, we do not
have strong objections to the current proposal.
If your plans are modified in any manner (e.g. number of turbines, height, placement or materials) this analysis would
no longer be valid. An updated analysis must be conducted.
Please contact us at: [email protected].
Thank you for your ongoing cooperation and we wish you success.
Best Regards,
Carolyn
______________________Carolyn Wilson (Rennie)
National Radar Program
Meteorological Service of Canada
Environment Canada
4905 Dufferin Street
Toronto, Ontario M3H 5T4
Office : 3N-WS12
Mkince.ca Mail - Skyway 126 - Impacts on Radar and Radio Communication https://mail.google.com/mail/u/0/?ui=2&ik=f1ba1b1184&view=pt&sear...
1 of 2 5/30/2013 10:32 AM
5/28/13 Mkince.ca Mail - Skyway 126 - Impacts on Radar and Radio Communication
https://mail.google.com/mail/u/1/?ui=2&ik=f1ba1b1184&view=pt&search=sent&msg=13eebb2ed6c58081 1/1
Approvals M. K. Ince and Associates Ltd. <[email protected]>
Skyway 126 - Impacts on Radar and Radio Communication
Approvals M. K. Ince and Associates Ltd. <[email protected]> Tue, May 28, 2013 at 11:12 AMTo: "Weather Radars Contact,National Radar Program [Ontario]" <[email protected]>Cc: Hanna Vovk <[email protected]>
Dear Carolyn,
Please be advised that the project layout for the Skyway 126 Wind Energy project has been updated since ourlast correspondence (November 23, 2012). Turbine 6 has been dropped. Turbines 1-5 remain in the sameposition. A revised layout is attached.
Thank you,
M.K. Ince and Associates Ltd.
[Quoted text hidden]
Skyway 126 Wind Energy Project -- Turbine Coordinates (2013-05-28).pdf168K
Approvals M. K. Ince and Associates Ltd. <[email protected]>
Skyway 126 - Impacts on Radar and Radio Communication
Approvals M. K. Ince and Associates Ltd. <[email protected]> Mon, Nov 19, 2012 at 12:22 PM
To: "Weather Radars Contact,National Radar Program [Ontario]" <[email protected]>
Hi Carolyn,
Please be advised that the proposed layout of the Skyway 126 Wind Farm has been altered slightly since we last
contacted you. Turbine 4 has been shifted approximately 50m east. I have attached the most recent turbine
coordinates to this message.
Can we confirm that this revised layout is still acceptable with regard to limited impacts to communications of the
Meteorological Service of Canada?
Thanks for your time and continued cooperation!
Best Regards,
Carolyn Truong
[Quoted text hidden]
Turbine Information 2012-11-16.pdf
272K
Mkince.ca Mail - Skyway 126 - Impacts on Radar and Radio Communication https://mail.google.com/mail/u/0/?ui=2&ik=f1ba1b1184&view=pt&cat...
1 of 1 5/24/2013 10:50 AM
Approvals M. K. Ince and Associates Ltd. <[email protected]>
Skyway 126 - Impacts on Radar and Radio Communication
Weather Radars Contact,National Radar Program [Ontario] <[email protected]>Tue, Nov 20, 2012 at 10:12
AM
To: "Approvals M. K. Ince and Associates Ltd." <[email protected]>
Dear Mrs. Carolyn Truong,
Thank you for contacting the Meteorological Service of Canada, a branch of Environment Canada, regarding your
wind energy intentions.
The information you have provided will be analyzed and we will endeavor a response to you as soon as possible.
We will aim to complete our analysis within 2-3 weeks.
If you require any additional information or clarification please do not hesitate to contact us at
Best Regards,
______________________Carolyn Rennie
National Radar Program
Meteorological Service of Canada
Environment Canada
4905 Dufferin Street
Toronto, Ontario M3H 5T4
Office : 3N-WS12
Phone : 416-739-4931
-------------------------------------------------------
Carolyn Rennie
Le Programme Nationale de Radar
Service météorologique du Canada
Environnement Canada
4905, rue Dufferin
Toronto, Ontario M3H 5T4
Bureau : 3N-WS12
Téléphone : 416-739-4931
Mkince.ca Mail - Skyway 126 - Impacts on Radar and Radio Communication https://mail.google.com/mail/u/0/?ui=2&ik=f1ba1b1184&view=pt&cat...
1 of 2 5/24/2013 10:49 AM
Approvals M. K. Ince and Associates Ltd. <[email protected]>
Skyway 126 - Impacts on Radar and Radio Communication
Weather Radars Contact,National Radar Program [Ontario] <[email protected]> Fri, Nov 23, 2012 at 8:36 AM
To: "Approvals M. K. Ince and Associates Ltd." <[email protected]>, "Weather Radars Contact,National Radar Program [Ontario]"<[email protected]>
Dear Mrs. Carolyn Truong,
Thank you for contacting the Meteorological Service of Canada, a branch of Environment Canada, regarding your wind energy intentions.
Our preliminary assessment of the updated information provided to us via e-mail on November 19, 2012 indicates that any potentialinterference that may be created by the Skyway 126 Wind Farm in Grey County will not be severe. Although we would prefer our radar
view to be interference free, this is not always reasonable. As a consequence, we do not have strong objections to the current proposal.
If your plans are modified in any manner (e.g. number of turbines, height, placement or materials) this analysis would no longer be valid. An updated analysis must be conducted.
Please contact us at: [email protected].
We would also be interested to know where the project is in terms of approval process (FIT/REA).
Thank you for your ongoing cooperation and we wish you success.
Best Regards,
Carolyn Rennie
______________________Carolyn Rennie
National Radar Program
Meteorological Service of Canada
Environment Canada
4905 Dufferin Street
Toronto, Ontario M3H 5T4
Office : 3N-WS12
Phone : 416-739-4931
-------------------------------------------------------
Carolyn Rennie
Le Programme Nationale de Radar
Service météorologique du Canada
Environnement Canada
4905, rue Dufferin
Toronto, Ontario M3H 5T4
Bureau : 3N-WS12
Mkince.ca Mail - Skyway 126 - Impacts on Radar and Radio Communication https://mail.google.com/mail/u/2/?ui=2&ik=f1ba1b1184&view=pt&searc...
1 of 6 11/23/2012 9:43 AM
Téléphone : 416-739-4931
______________________
From: Approvals M. K. Ince and Associates Ltd. [mailto:[email protected]]
Sent: Monday, November 19, 2012 12:23 PM
To: Weather Radars Contact,National Radar Program [Ontario]
Subject: Re: Skyway 126 - Impacts on Radar and Radio Communication
Hi Carolyn,
Please be advised that the proposed layout of the Skyway 126 Wind Farm has been altered slightly since we last contacted you. Turbine4 has been shifted approximately 50m east. I have attached the most recent turbine coordinates to this message.
Can we confirm that this revised layout is still acceptable with regard to limited impacts to communications of the Meteorological Serviceof Canada?
Thanks for your time and continued cooperation!
Best Regards,Carolyn Truong
On Tue, Aug 14, 2012 at 3:33 PM, Weather Radars Contact,National Radar Program [Ontario] <[email protected]> wrote:
Dear Ms. Hannah Ince,
First of all, thank you for contacting the Meteorological Service of Canada, a branch of Environment Canada, with an update of theSkyway 126 wind farm layout.
Our preliminary assessment of the updated information provided to us via email on August 14, 2012 indicates that any potentialinterference that may be created by the Skyway 126 Wind Farm in Grey County will not be severe. Although we would prefer our radarview to be interference free, this is not always reasonable. As a consequence, we do not have strong objections to the current proposal.
If your plans are modified in any manner (e.g. number of turbines, height, placement or materials) this analysis would no longer be valid. An updated analysis must be conducted.
Please contact us at: [email protected].
Thank you for your ongoing cooperation and we wish you success.
Best Regards,
______________________
Carolyn Rennie
National Radar Program
Meteorological Service of Canada
Environment Canada
4905 Dufferin Street
Mkince.ca Mail - Skyway 126 - Impacts on Radar and Radio Communication https://mail.google.com/mail/u/2/?ui=2&ik=f1ba1b1184&view=pt&searc...
2 of 6 11/23/2012 9:43 AM
Toronto, Ontario M3H 5T4
Office : 3N-WS12
Phone : 416-739-4931
Cell : 289-221-1084
-------------------------------------------------------
Carolyn Rennie
Le Programme Nationale de Radar
Service météorologique du Canada
Environnement Canada
4905, rue Dufferin
Toronto, Ontario M3H 5T4
Bureau : 3N-WS12
Téléphone : 416-739-4931
Cellulaire : 289-221-1084
______________________
From: Approvals M. K. Ince and Associates Ltd. [mailto:[email protected]]
Sent: Tuesday, August 14, 2012 11:49 AM
To: Weather Radars Contact,National Radar Program [Ontario]
Subject: Re: Skyway 126 - Impacts on Radar and Radio Communication
Hello,
Since we last contacted you on April 27, the layout for the proposed Skyway 126 Wind Farm has shifted slightly. Please find attached thecoordinates of all the turbines.
If you have any questions or concerns about the proposed turbines please do not hesitate to ask us.
Thank you for you time,Hannah Ince
On Mon, Apr 30, 2012 at 9:45 AM, Weather Radars Contact,National Radar Program [Ontario] <[email protected]> wrote:
Dear Ms. Genevieve Brown,
Thank you for contacting the Meteorological Service of Canada, a branch of Environment Canada, regarding your wind energy intentions.
Our preliminary assessment of the updated information provided to us via email on April 27, 2012 indicates that any potential interferencethat may be created by the Skyway 126 Wind Farm in Grey County will not be severe. Although we would prefer our radar view to beinterference free, this is not always reasonable. As a consequence, we do not have strong objections to the current proposal.
If your plans are modified in any manner (e.g. number of turbines, height, placement or materials) this analysis would no longer be valid. An updated analysis must be conducted.
Please contact us at: [email protected].
Thank you for your ongoing cooperation and we wish you success.
Mkince.ca Mail - Skyway 126 - Impacts on Radar and Radio Communication https://mail.google.com/mail/u/2/?ui=2&ik=f1ba1b1184&view=pt&searc...
3 of 6 11/23/2012 9:43 AM
Best Regards,
______________________
Carolyn J. Rennie
National Radar Program
Meteorological Service of Canada
Environment Canada
4905 Dufferin Street
Toronto, Ontario M3H 5T4
Office : 3N-WS12
Phone : 416-739-4931
Cell : 289-221-1084
-------------------------------------------------------
Carolyn J. Rennie
Le Programme Nationale de Radar
Service météorologique du Canada
Environnement Canada
4905, rue Dufferin
Toronto, Ontario M3H 5T4
Bureau : 3N-WS12
Téléphone : 416-739-4931
Cellulaire : 289-221-1084
______________________
From: Approvals M. K. Ince and Associates Ltd. [mailto:[email protected]]
Sent: Friday, April 27, 2012 2:13 PM
To: Weather Radars Contact,National Radar Program [Ontario]
Cc: Karla Klein; Genevieve Brown
Subject: Re: Skyway 126 - Impacts on Radar and Radio Communication
Hello,
Since we last contacted you on April 19th regarding potential interference due to the Skyway 126 Wind Farm, a sixth turbine has beenadded to the wind farm. Please find attached the coordinates of all six turbines.
Please contact us if you have any concerns with respect to the proposed turbines.
Thank you,
Genevieve Brown
On Thu, Apr 19, 2012 at 3:13 PM, Weather Radars Contact,National Radar Program [Ontario] <[email protected]> wrote:
Dear Ms. Genevieve Brown,
Thank you for contacting the Meteorological Service of Canada, a branch of Environment Canada, regarding your wind energy intentions.
Our preliminary assessment of the information provided to us via email on April 19, 2012 indicates that any potential interference thatmay be created by the Skyway 126 Wind Farm in Grey County will not be severe. Although we would prefer our radar view to beinterference free, this is not always reasonable. As a consequence, we do not have strong objections to the current proposal.
Mkince.ca Mail - Skyway 126 - Impacts on Radar and Radio Communication https://mail.google.com/mail/u/2/?ui=2&ik=f1ba1b1184&view=pt&searc...
4 of 6 11/23/2012 9:43 AM
If your plans are modified in any manner (e.g. number of turbines, height, placement or materials) this analysis would no longer be valid. An updated analysis must be conducted.
Please contact us at: [email protected].
Thank you for your ongoing cooperation and we wish you success.
Best Regards,
______________________
Carolyn J. Rennie
National Radar Program
Meteorological Service of Canada
Environment Canada
4905 Dufferin Street
Toronto, Ontario M3H 5T4
Office : 3N-WS12
Phone : 416-739-4931
Cell : 289-221-1084
-------------------------------------------------------
Carolyn J. Rennie
Le Programme Nationale de Radar
Service météorologique du Canada
Environnement Canada
4905, rue Dufferin
Toronto, Ontario M3H 5T4
Bureau : 3N-WS12
Téléphone : 416-739-4931
Cellulaire : 289-221-1084
______________________
From: Approvals M. K. Ince and Associates Ltd. [mailto:[email protected]]
Sent: Thursday, April 19, 2012 2:04 PM
To: Weather Radars Contact,National Radar Program [Ontario]
Cc: Karla Klein; Genevieve Brown
Subject: Skyway 126 - Impacts on Radar and Radio Communication
Dear coordinator,
On behalf of the Skyway 126 Wind Farm, M.K. Ince and Associates, would like to request consultation for the impact of wind turbines onradio communication and radar systems. The Skyway 126 Wind Farm is at a preliminary stage of investigations and MK Ince iscompleting a communications impact assessment for the project as outlined by RABC and CanWEA in their guidelines. The proposedSkyway 126 Wind Farm is located near the communities of Badjeros, within the Municipality of Grey Highlands . The wind farm containsfive turbines; the proposed coordinates and heights of the turbines are attached in this email.
Please contact us if you have any concerns with respect to the proposed wind turbines.
Thank you for your help,
Genevieve Brown
M.K. Ince and Associates Ltd.
Mkince.ca Mail - Skyway 126 - Impacts on Radar and Radio Communication https://mail.google.com/mail/u/2/?ui=2&ik=f1ba1b1184&view=pt&searc...
5 of 6 11/23/2012 9:43 AM
11 Cross St., Dundas, ON L9H 2R3
Phone: 905-628-0077
Fax: 905-628-1329
http://www.mkince.ca
--
M.K. Ince and Associates Ltd.
11 Cross St., Dundas, ON L9H 2R3
Phone: 905-628-0077
Fax: 905-628-1329
http://www.mkince.ca
--
M.K. Ince and Associates Ltd.
11 Cross St., Dundas, ON L9H 2R3
Phone: 905-628-0077
Fax: 905-628-1329
http://www.mkince.ca
Mkince.ca Mail - Skyway 126 - Impacts on Radar and Radio Communication https://mail.google.com/mail/u/2/?ui=2&ik=f1ba1b1184&view=pt&searc...
6 of 6 11/23/2012 9:43 AM
Approvals M. K. Ince and Associates Ltd. <[email protected]>
Skyway 126 - Impacts on Radar and Radio Communication
Weather Radars Contact,National Radar Program [Ontario] <[email protected]>Tue, Aug 14, 2012 at 3:33
PM
To: "Approvals M. K. Ince and Associates Ltd." <[email protected]>, "Weather Radars Contact,National Radar
Program [Ontario]" <[email protected]>
Dear Ms. Hannah Ince,
First of all, thank you for contacting the Meteorological Service of Canada, a branch of Environment Canada, with an
update of the Skyway 126 wind farm layout.
Our preliminary assessment of the updated information provided to us via email on August 14, 2012 indicates that
any potential interference that may be created by the Skyway 126 Wind Farm in Grey County will not be severe.
Although we would prefer our radar view to be interference free, this is not always reasonable. As a consequence,
we do not have strong objections to the current proposal.
If your plans are modified in any manner (e.g. number of turbines, height, placement or materials) this analysis would
no longer be valid. An updated analysis must be conducted.
Please contact us at: [email protected].
Thank you for your ongoing cooperation and we wish you success.
Best Regards,
______________________
Carolyn Rennie
National Radar Program
Meteorological Service of Canada
Environment Canada
4905 Dufferin Street
Toronto, Ontario M3H 5T4
Office : 3N-WS12
Phone : 416-739-4931
Cell : 289-221-1084
-------------------------------------------------------
Carolyn Rennie
Mkince.ca Mail - Skyway 126 - Impacts on Radar and Radio Communication https://mail.google.com/mail/u/1/?ui=2&ik=f1ba1b1184&view=pt&searc...
1 of 2 16/08/2012 10:03 AM
Le Programme Nationale de Radar
Service météorologique du Canada
Environnement Canada
4905, rue Dufferin
Toronto, Ontario M3H 5T4
Bureau : 3N-WS12
Téléphone : 416-739-4931
Cellulaire : 289-221-1084
______________________
From: Approvals M. K. Ince and Associates Ltd. [mailto:[email protected]]
Sent: Tuesday, August 14, 2012 11:49 AM
To: Weather Radars Contact,National Radar Program [Ontario]
[Quoted text hidden]
[Quoted text hidden]
Mkince.ca Mail - Skyway 126 - Impacts on Radar and Radio Communication https://mail.google.com/mail/u/1/?ui=2&ik=f1ba1b1184&view=pt&searc...
2 of 2 16/08/2012 10:03 AM
Approvals M. K. Ince and Associates Ltd. <[email protected]>
Skyway 126 - Impacts on Radar and Radio Communication
Approvals M. K. Ince and Associates Ltd. <[email protected]> Tue, Aug 14, 2012 at 11:48 AM
To: "Weather Radars Contact,National Radar Program [Ontario]" <[email protected]>
Hello,
Since we last contacted you on April 27, the layout for the proposed Skyway 126 Wind Farm has shifted slightly.
Please find attached the coordinates of all the turbines.
If you have any questions or concerns about the proposed turbines please do not hesitate to ask us.
Thank you for you time,
Hannah Ince
[Quoted text hidden]
--
[Quoted text hidden]
Turbine Information 2012-08-14.pdf
162K
Mkince.ca Mail - Skyway 126 - Impacts on Radar and Radio Communication https://mail.google.com/mail/u/1/?ui=2&ik=f1ba1b1184&view=pt&searc...
1 of 1 16/08/2012 10:02 AM
Approvals M. K. Ince and Associates Ltd. <[email protected]>
Skyway 126 - Impacts on Radar and Radio Communication
Approvals M. K. Ince and Associates Ltd. <[email protected]> Fri, Apr 27, 2012 at 2:13 PM
To: "Weather Radars Contact,National Radar Program [Ontario]" <[email protected]>
Cc: Karla Klein <[email protected]>, Genevieve Brown <[email protected]>
Hello,
Since we last contacted you on April 19th regarding potential interference due to the Skyway 126 Wind Farm, a sixth
turbine has been added to the wind farm. Please find attached the coordinates of all six turbines.
Please contact us if you have any concerns with respect to the proposed turbines.
Thank you,
Genevieve Brown
[Quoted text hidden]
Turbine Information 2012-04-27.pdf
166K
Mkince.ca Mail - Skyway 126 - Impacts on Radar and Radio Communication https://mail.google.com/mail/u/0/?ui=2&ik=f1ba1b1184&view=pt&searc...
1 of 1 4/27/2012 2:27 PM
Approvals M. K. Ince and Associates Ltd. <[email protected]>
Skyway 126 - Impacts on Radar and Radio Communication
Weather Radars Contact,National Radar Program [Ontario] <[email protected]>Thu, Apr 19, 2012 at 3:13
PM
To: "Approvals M. K. Ince and Associates Ltd." <[email protected]>, "Weather Radars Contact,National Radar
Program [Ontario]" <[email protected]>
Cc: Karla Klein <[email protected]>, Genevieve Brown <[email protected]>
Dear Ms. Genevieve Brown,
Thank you for contacting the Meteorological Service of Canada, a branch of Environment Canada,
regarding your wind energy intentions.
Our preliminary assessment of the information provided to us via email on April 19, 2012 indicates that
any potential interference that may be created by the Skyway 126 Wind Farm in Grey County will not be
severe. Although we would prefer our radar view to be interference free, this is not always reasonable. As
a consequence, we do not have strong objections to the current proposal.
If your plans are modified in any manner (e.g. number of turbines, height, placement or materials) this
analysis would no longer be valid. An updated analysis must be conducted.
Please contact us at: [email protected].
Thank you for your ongoing cooperation and we wish you success.
Best Regards,
______________________
Carolyn J. Rennie
National Radar Program
Meteorological Service of Canada
Environment Canada
4905 Dufferin Street
Toronto, Ontario M3H 5T4
Office : 3N-WS12
Phone : 416-739-4931
Cell : 289-221-1084
-------------------------------------------------------
Carolyn J. Rennie
Le Programme Nationale de Radar
Service météorologique du Canada
Environnement Canada
4905, rue Dufferin
Toronto, Ontario M3H 5T4
Bureau : 3N-WS12
Téléphone : 416-739-4931
Cellulaire : 289-221-1084
Mkince.ca Mail - Skyway 126 - Impacts on Radar and Radio Communication https://mail.google.com/mail/u/0/?ui=2&ik=f1ba1b1184&view=pt&searc...
1 of 2 4/19/2012 3:22 PM
______________________
From: Approvals M. K. Ince and Associates Ltd. [mailto:[email protected]]
Sent: Thursday, April 19, 2012 2:04 PM
To: Weather Radars Contact,National Radar Program [Ontario]
Cc: Karla Klein; Genevieve Brown
Subject: Skyway 126 - Impacts on Radar and Radio Communication
[Quoted text hidden]
Mkince.ca Mail - Skyway 126 - Impacts on Radar and Radio Communication https://mail.google.com/mail/u/0/?ui=2&ik=f1ba1b1184&view=pt&searc...
2 of 2 4/19/2012 3:22 PM
Approvals M. K. Ince and Associates Ltd. <[email protected]>
Skyway 126 - Impacts on Radar and Radio Communication
Approvals M. K. Ince and Associates Ltd. <[email protected]> Thu, Apr 19, 2012 at 2:04 PM
To: "Weather Radars Contact,National Radar Program [Ontario]" <[email protected]>Cc: Karla Klein <[email protected]>, Genevieve Brown <[email protected]>
Dear coordinator,
On behalf of the Skyway 126 Wind Farm, M.K. Ince and Associates, would like to request consultation for the impact of wind turbines onradio communication and radar systems. The Skyway 126 Wind Farm is at a preliminary stage of investigations and MK Ince iscompleting a communications impact assessment for the project as outlined by RABC and CanWEA in their guidelines. The proposedSkyway 126 Wind Farm is located near the communities of Badjeros, within the Municipality of Grey Highlands . The wind farm containsfive turbines; the proposed coordinates and heights of the turbines are attached in this email.
Please contact us if you have any concerns with respect to the proposed wind turbines.
Thank you for your help,
Genevieve Brown
M.K. Ince and Associates Ltd.
11 Cross St., Dundas, ON L9H 2R3
Phone: 905-628-0077
Fax: 905-628-1329
http://www.mkince.ca
Skyway 126 Turbine Information 2012-04-19.pdf
165K
Mkince.ca Mail - Skyway 126 - Impacts on Radar and Radio Communication https://mail.google.com/mail/u/0/?ui=2&ik=f1ba1b1184&view=pt&searc...
1 of 1 4/19/2012 2:09 PM
Skyway 126 Wind Energy Communications Impact Assessment
M.K. Ince and Associates Ltd. Appendix June 14, 2013
Local Police and Fire
5/28/13 Mkince.ca Mail - Skyway 126 Wind Farm - Communication Impacts
https://mail.google.com/mail/u/1/?ui=2&ik=f1ba1b1184&view=pt&search=sent&msg=13eebc2348a05ce1 1/1
Approvals M. K. Ince and Associates Ltd. <[email protected]>
Skyway 126 Wind Farm - Communication Impacts
Approvals M. K. Ince and Associates Ltd. <[email protected]> Tue, May 28, 2013 at 11:29 AMTo: [email protected], [email protected]: Hanna Vovk <[email protected]>
Good morning,
Please be advised that the project layout for the Skyway 126 Wind Energy project has been updated since ourlast correspondence (November 19, 2012). Turbine 6 has been dropped. Turbines 1-5 remain in the sameposition. A revised layout is attached.
Thank you for your time and assistance.
M.K. Ince and Associates Ltd.
[Quoted text hidden]
Skyway 126 Wind Energy Project -- Turbine Coordinates (2013-05-28).pdf168K
Approvals M. K. Ince and Associates Ltd. <[email protected]>
Skyway 126 Wind Farm - Communication Impacts
Approvals M. K. Ince and Associates Ltd. <[email protected]> Mon, Nov 19, 2012 at 1:42 PM
To: [email protected], [email protected]: Carolyn Truong <[email protected]>
Hello,
Please be advised that since our last correspondence, the turbine layout of the proposed Skyway 126 Wind Farm has been revised. Thecoordinates of several turbines have been altered and I have attached the new turbine locations to this message for your assessment. Weare in the process of finalizing this project and do not anticipate any further revisions to the Skyway 126 layout at this point.
Thanks for your time and assistance, it is much appreciated!.
Best Regards,Carolyn Truong
On Wed, Aug 8, 2012 at 9:38 AM, Approvals M. K. Ince and Associates Ltd. <[email protected]> wrote:Good morning,
On behalf of the Skyway 126 Wind Farm, M.K. Ince and Associates, would like to request consultation for the impact of wind turbines onradio communication and radar systems. The Skyway 126 Wind Farm is at a preliminary stage of investigations and MK Ince iscompleting a communications impact assessment for the project as outlined by RABC and CanWEA in their guidelines. The proposedSkyway 126 Wind Farm is located near the communities of Badjeros, within the Municipality of Grey Highlands . The wind farm containssix turbines; the proposed coordinates and heights of the turbines are attached in this email.
Please contact us if you have any concerns with respect to the proposed wind turbines.
Thank you for your assistance,Hannah Ince--
M.K. Ince and Associates Ltd.
11 Cross St., Dundas, ON L9H 2R3
Phone: 905-628-0077
Fax: 905-628-1329
http://www.mkince.ca
--
M.K. Ince and Associates Ltd.
11 Cross St., Dundas, ON L9H 2R3
Phone: 905-628-0077
Fax: 905-628-1329
http://www.mkince.ca
Turbine Information 2012-11-16.pdf
272K
Mkince.ca Mail - Skyway 126 Wind Farm - Communication Impacts https://mail.google.com/mail/u/2/?ui=2&ik=f1ba1b1184&view=pt&q=sk...
1 of 1 11/22/2012 11:36 AM
Skyway 126 Wind Energy Communications Impact Assessment
M.K. Ince and Associates Ltd. Appendix June 14, 2013
Ministry of Government Services
5/28/13 Mkince.ca Mail - Re: Skyway 126 Wind Farm - Communication Impacts
https://mail.google.com/mail/u/1/?ui=2&ik=f1ba1b1184&view=pt&search=sent&msg=13eebdbf76c450b7&dsqt=1 1/3
Approvals M. K. Ince and Associates Ltd. <[email protected]>
Re: Skyway 126 Wind Farm - Communication Impacts
Approvals M. K. Ince and Associates Ltd. <[email protected]> Tue, May 28, 2013 at 11:57 AMTo: "Fox, Mark (MGS)" <[email protected]>Cc: "Guido, Sandra (ENE)" <[email protected]>, Hanna Vovk <[email protected]>
Dear Mark,
As follow-up to the revised information below, please find attached a KML file of the turbine locations for your viewing.
Thank you,M.K. Ince and Associates Ltd.
On Tue, May 28, 2013 at 11:25 AM, Approvals M. K. Ince and Associates Ltd. <[email protected]> wrote:
Dear Mark,
Please be advised that the April 27, 2012 project layout for the Skyway 126 Wind Energy project has been updated since our lastcorrespondence (January 4, 2013). Minor modifications to the turbine locations have been made. Turbine 6 has been dropped. A revisedlayout is attached.
Please contact us if you have any concerns with respect to the proposed wind turbine locations.
Thank you,M.K. Ince and Associates Ltd.
On Fri, Jan 4, 2013 at 9:48 AM, Fox, Mark (MGS) <[email protected]> wrote:
Hi Hannah;
Based upon the attached April 27, 2012 Skyway 126 turbine placements, this project has been determine unlikely to affect the operationsof Ontario’s public safety mobile radio network. Please be advised that this network is only utilized by provincial ministries (ie OPP,MOHLTC, MTO, etc) and not utilized by federal, regional or local public safety organizations and that a reassessment will be requiredshould turbine placements change.
Kindly update your records to forward future Ontario’s Public Safety Radio system wind farm impact assessments to my attention.
I have included Sandra Guido from the Ministry of the Environment in my response to ensure awareness of our analysis results.
If you have any questions, you can contact me at 416-327-0383 or by email at [email protected].
Regards,
Mark Fox, P. Eng.
Network Radio Engineer
Government Mobile Communications Branch
Infrastructure Technology Services
5/28/13 Mkince.ca Mail - Re: Skyway 126 Wind Farm - Communication Impacts
https://mail.google.com/mail/u/1/?ui=2&ik=f1ba1b1184&view=pt&search=sent&msg=13eebdbf76c450b7&dsqt=1 2/3
Ministry of Government Services
155 University Ave, 14th Floor, Toronto, ON M5H 3B7
Email: [email protected]
Phone: 416-327-0383
FAX: 416-327-0353
Blackberry: 416-524-6547
From: Approvals M. K. Ince and Associates Ltd. [mailto:[email protected]] Sent: August 8, 2012 9:38 AMTo: Grelik, Alina (JUS); [email protected]: Skyway 126 Wind Farm - Communication Impacts
Good morning,
On behalf of the Skyway 126 Wind Farm, M.K. Ince and Associates, would like to request consultation for the impact of wind turbines onradio communication and radar systems. The Skyway 126 Wind Farm is at a preliminary stage of investigations and MK Ince iscompleting a communications impact assessment for the project as outlined by RABC and CanWEA in their guidelines. The proposedSkyway 126 Wind Farm is located near the communities of Badjeros, within the Municipality of Grey Highlands . The wind farm containssix turbines; the proposed coordinates and heights of the turbines are attached in this email.
Please contact us if you have any concerns with respect to the proposed wind turbines.
Thank you for your assistance,Hannah Ince--
M.K. Ince and Associates Ltd.
11 Cross St., Dundas, ON L9H 2R3
Phone: 905-628-0077
Fax: 905-628-1329
http://www.mkince.ca
--
M.K. Ince and Associates Ltd.11 Cross St., Dundas, ON L9H 2R3Phone: 905-628-0077Fax: 905-628-1329http://www.mkince.ca
--
M.K. Ince and Associates Ltd.11 Cross St., Dundas, ON L9H 2R3Phone: 905-628-0077Fax: 905-628-1329http://www.mkince.ca
5/28/13 Mkince.ca Mail - Re: Skyway 126 Wind Farm - Communication Impacts
https://mail.google.com/mail/u/1/?ui=2&ik=f1ba1b1184&view=pt&search=sent&msg=13eebdbf76c450b7&dsqt=1 3/3
2 attachments
Skyway 126 Wind Energy Project -- Turbine Coordinates (2013-05-28).pdf168K
S126 Turbines 2012-12-18.kml2K
Subject: Re: Skyway 126 Wind Farm - Communication Impacts
From: "Fox, Mark (MGS)" <[email protected]>
Date: Fri, 4 Jan 2013 14:48:46 +0000
To: "[email protected]" <[email protected]>
CC: "Guido, Sandra (ENE)" <[email protected]>
Hi Hannah;
Based upon the attached April 27, 2012 Skyway 126 turbine placements, this project has been determine
unlikely to affect the operations of Ontario’s public safety mobile radio network. Please be advised that this
network is only utilized by provincial ministries (ie OPP, MOHLTC, MTO, etc) and not utilized by federal,
regional or local public safety organizations and that a reassessment will be required should turbine
placements change.
Kindly update your records to forward future Ontario’s Public Safety Radio system wind farm impact
assessments to my attention.
I have included Sandra Guido from the Ministry of the Environment in my response to ensure awareness of
our analysis results.
If you have any questions, you can contact me at 416-327-0383 or by email at [email protected].
Regards,
Mark Fox, P. Eng.Network Radio Engineer
Government Mobile Communications Branch
Infrastructure Technology Services
Ministry of Government Services
155 University Ave, 14th Floor, Toronto, ON M5H 3B7
Email: [email protected]
Phone: 416-327-0383
FAX: 416-327-0353
Blackberry: 416-524-6547
From: Approvals M. K. Ince and Associates Ltd. [mailto:[email protected]]Sent: August 8, 2012 9:38 AMTo: Grelik, Alina (JUS); [email protected]: Skyway 126 Wind Farm - Communication Impacts
Good morning,
On behalf of the Skyway 126 Wind Farm, M.K. Ince and Associates, would like to request consultation for the
impact of wind turbines on radio communication and radar systems. The Skyway 126 Wind Farm is at a
preliminary stage of investigations and MK Ince is completing a communications impact assessment for the
project as outlined by RABC and CanWEA in their guidelines. The proposed Skyway 126 Wind Farm is
located near the communities of Badjeros, within the Municipality of Grey Highlands . The wind farm
Re: Skyway 126 Wind Farm - Communication Impacts
1 of 2
contains six turbines; the proposed coordinates and heights of the turbines are attached in this email.
Please contact us if you have any concerns with respect to the proposed wind turbines.
Thank you for your assistance,
Hannah Ince
--
M.K. Ince and Associates Ltd.
11 Cross St., Dundas, ON L9H 2R3
Phone: 905-628-0077
Fax: 905-628-1329
http://www.mkince.ca
Turbine Information 2012-04-27.pdf
Content-Description: Turbine Information 2012-04-27.pdf
Content-Type: application/pdf
Content-Encoding: base64
Re: Skyway 126 Wind Farm - Communication Impacts
2 of 2
Approvals M. K. Ince and Associates Ltd. <[email protected]>
Ontario Public Safety Radio Wind Farm communication impact assessmentrequests
Fox, Mark (MGS) <[email protected]> Tue, Nov 27, 2012 at 10:25 AM
To: "Approvals M. K. Ince and Associates Ltd." <[email protected]>
Cc: Carolyn Truong <[email protected]>
Hi Carolyn;
Thank you for providing the attached revised proposed Skyway 126 wind farm turbine layout. We will conduct an
impact assessment on the Ontario Government Public safety radio network and provide an impact statement. Please
be advised that this radio network is utilized exclusively for the following provincial ministries: OPP, MOHLTC, MTO,
MNR MOE, CISO, MOR, MCYS and MCS.
Please contact directly any regional/local Public safety radio systems managers (eg fire, police, local operations, etc)
within the vicinity of this proposed wind farm to conduct similar impact assessments to their networks.
Thanks,
Mark Fox, P. Eng.
Network Radio Engineer
Government Mobile Communications Branch
Infrastructure Technology Services
Ministry of Government Services
155 University Ave, 14th Floor, Toronto, ON M5H 3B7
Email: [email protected]
Phone: 416-327-0383
FAX: 416-327-0353
Blackberry: 416-524-6547
Mkince.ca Mail - Ontario Public Safety Radio Wind Farm communicatio... https://mail.google.com/mail/u/0/?ui=2&ik=f1ba1b1184&view=pt&q=...
1 of 2 5/27/2013 4:04 PM
Approvals M. K. Ince and Associates Ltd. <[email protected]>
Ontario Public Safety Radio Wind Farm communication impact assessmentrequests
Approvals M. K. Ince and Associates Ltd. <[email protected]> Mon, Nov 19, 2012 at 1:38 PM
To: "Fox, Mark (MGS)" <[email protected]>
Cc: Carolyn Truong <[email protected]>
Hi Mark,
Please be advised that since our last correspondence, the turbine layout of the proposed Skyway 126 Wind Farm has been revised. The
coordinates of several turbines have been altered and I have attached the new turbine locations to this message for your assessment. We
are in the process of finalizing this project and do not anticipate any further revisions to the Skyway 126 layout at this point.
Thanks for your time and assistance, it is much appreciated!.
Best Regards,
Carolyn Truong
[Quoted text hidden]
--
M.K. Ince and Associates Ltd.
11 Cross St., Dundas, ON L9H 2R3
Phone: 905-628-0077
Fax: 905-628-1329
http://www.mkince.ca
Turbine Information 2012-11-16.pdf
272K
Mkince.ca Mail - Ontario Public Safety Radio Wind Farm communicatio... https://mail.google.com/mail/u/0/?ui=2&ik=f1ba1b1184&view=pt&q=...
1 of 1 5/27/2013 4:03 PM
Approvals M. K. Ince and Associates Ltd. <[email protected]>
Ontario Public Safety Radio Wind Farm communication impact assessment
requests
Fox, Mark (MGS) <[email protected]> Wed, Aug 8, 2012 at 12:35 PM
To: "Approvals M. K. Ince and Associates Ltd." <[email protected]>
Hi Hannah;
As discussed, kindly direct all Government of Ontario Public Safety Radio Wind Farm communica on impact
assessment requests to my a#en on.
If possible, please provide the geographical study area with LAT/LONG coordinates or a Google Earth kml file to
accommodate future turbine placement changes as required within the study area.
Jeff Cook has recently forwarded the following Wind Farm communica on impact assessment requests:
Grey Highland Clean Energy project
Grey Highlands Zero Emission People (ZEP) project
Skyway 125 Wind Farm
ZEP Wind Farm Ganaraska Project
Skyway 126 Wind Farm
Snowy Ridge Wind Park
Se#lers Landing Wind Park
We will proceed with the assessments of each and provide a Government of Ontario Public Safety Radio impact
statement.
Thanks,
Mark Fox, P. Eng.
Network Radio Engineer
Mkince.ca Mail - Ontario Public Safety Radio Wind Farm communication... https://mail.google.com/mail/u/2/?ui=2&ik=f1ba1b1184&view=pt&q=sk...
1 of 2 11/19/2012 12:37 PM
Government Mobile Communications Branch
Infrastructure Technology Services
Ministry of Government Services
155 University Ave, 14th Floor, Toronto, ON M5H 3B7
Email: [email protected]
Phone: 416-327-0383
FAX: 416-327-0353
Blackberry: 416-524-6547
Mkince.ca Mail - Ontario Public Safety Radio Wind Farm communication... https://mail.google.com/mail/u/2/?ui=2&ik=f1ba1b1184&view=pt&q=sk...
2 of 2 11/19/2012 12:37 PM
Approvals M. K. Ince and Associates Ltd. <[email protected]>
Skyway 126 Wind Farm - Communication Impacts
Approvals M. K. Ince and Associates Ltd. <[email protected]> Wed, Aug 8, 2012 at 11:31 AM
Good morning,
On behalf of the Skyway 126 Wind Farm, M.K. Ince and Associates, would like to request consultation for the impact of wind turbines onradio communication and radar systems. The Skyway 126 Wind Farm is at a preliminary stage of investigations and MK Ince iscompleting a communications impact assessment for the project as outlined by RABC and CanWEA in their guidelines. The proposedSkyway 126 Wind Farm is located near the communities of Badjeros, within the Municipality of Grey Highlands . The wind farm containssix turbines; the proposed coordinates and heights of the turbines are attached in this email.
Please contact us if you have any concerns with respect to the proposed wind turbines.
Thank you for your assistance,Hannah Ince--
M.K. Ince and Associates Ltd.
11 Cross St., Dundas, ON L9H 2R3
Phone: 905-628-0077
Fax: 905-628-1329
http://www.mkince.ca
Turbine Information 2012-04-27.pdf
166K
Mkince.ca Mail - Skyway 126 Wind Farm - Communication Impacts https://mail.google.com/mail/u/1/?ui=2&ik=f1ba1b1184&view=pt&searc...
1 of 1 16/08/2012 10:19 AM
Skyway 126 Wind Energy Communications Impact Assessment
M.K. Ince and Associates Ltd. Appendix June 14, 2013
NAV CANADA
Approvals M. K. Ince and Associates Ltd. <[email protected]>
12-3322: 6 wind turbines (Skyway 126) - Badjeros, ON
Tranter, Melanie <[email protected]> Thu, May 30, 2013 at 2:00 PM
To: "Approvals M. K. Ince and Associates Ltd." <[email protected]>
Cc: Hanna Vovk <[email protected]>
Hello,
We appreciate the update and at this �me we will not send a revised le�er. Please advise us 10 days in advance at
the start of construc�on and upon comple�on of the project as per our original email sent on January 10, 2013.
Thank you,
MelanieTranter
LandUseOf�ice
AeronauticalInformationServices(AIS)
tel(613)248-3909
e-mail:[email protected]
From: Approvals M. K. Ince and Associates Ltd. [mailto:[email protected]]
Sent: May-28-13 11:41 AM
To: Tranter, Melanie
Cc: Hanna Vovk
Subject: Re: 12-3322: 6 wind turbines (Skyway 126) - Badjeros, ON
[Quoted text hidden]
---------- Forwarded message ----------
From: "Tranter, Melanie" <[email protected]>
To: Hannah Vovk <[email protected]>
Cc: "Ontario Region, Transport Canada" <[email protected]>
Date: Thu, 10 Jan 2013 08:40:04 -0500
Subject: 12-3322 LTP
Hello Hannah,
Please find attached a letter from NAV CANADA regarding your 6 wind turbines (Skyway 126) submitted on
2012-08-15.
We ask that you notify us at least 10 business days prior to the start of construction and upon completion. These
Mkince.ca Mail - 12-3322: 6 wind turbines (Skyway 126) - Badjeros, ON https://mail.google.com/mail/u/0/?ui=2&ik=f1ba1b1184&view=pt&sear...
1 of 2 5/30/2013 2:50 PM
5/28/13 Mkince.ca Mail - 12-3322: 6 wind turbines (Skyway 126) - Badjeros, ON
https://mail.google.com/mail/u/1/?ui=2&ik=f1ba1b1184&view=pt&search=sent&msg=13eebcca7d87909e 1/1
Approvals M. K. Ince and Associates Ltd. <[email protected]>
12-3322: 6 wind turbines (Skyway 126) - Badjeros, ON
Approvals M. K. Ince and Associates Ltd. <[email protected]> Tue, May 28, 2013 at 11:40 AMTo: "Tranter, Melanie" <[email protected]>Cc: Hanna Vovk <[email protected]>
Good morning Melanie,
Please be advised that the project layout for the Skyway 126 Wind Energy project has been updated since our last correspondence(January 10, 2013). Turbine 6 has been dropped. Turbines 1-5 remain in the same position. A revised layout is attached. Similarinformation has been sent to Transport Canada.
Please let us know if a new letter from NAV CANADA is required.
Thank you,
M.K. Ince and Associates Ltd.
[Quoted text hidden]
--
M.K. Ince and Associates Ltd.11 Cross St., Dundas, ON L9H 2R3Phone: 905-628-0077Fax: 905-628-1329http://www.mkince.ca
Skyway 126 Wind Energy Project -- Turbine Coordinates (2013-05-28).pdf168K
Skyway 126 <[email protected]>
Notice of Final Public Meeting for Skyway 126 Wind Energy
Katie Meyer-Beck <[email protected]> Wed, Feb 20, 2013 at 9:11 AM
To: [email protected], Chris Csatlos <[email protected]>
Cc: [email protected], Skyway 126 <[email protected]>
Dear Mr. Csatlos:
Please find herein a Notice of Final Public Meeting for Skyway 126 Wind Energy as per O.Reg 359/09. In
addition, the notice was sent to your address last week via mail.
The notice was also available on the project website (www.zeroemissionpeople.com), along with a copy of
the draft Renewable Energy Approval reports and technical studies for the proposed Skyway 126 Wind Energy
project.
We welcome any questions or feedback on the proposed project.
Best,
Katie
[Quoted text hidden]
2 attachments
S126 - Notice of Final Public Meeting_2013-02-14 FINAL.pdf
154K
NAV Canada Notice of Final Public Meeting EMAIL copy_2013-02-15 FINAL.pdf
77K
M.K. Ince and Associates Ltd.
February 19, 2013
Christopher Csatlos
AIS Data Collection Unit and Land Use Office
NAV CANADA
1601 Tom Roberts Road
P.O. Box 9824, Station T
Ottawa, ON K1G 6R2
Sent via email:
Attention: Christopher Csatlos
Reference: Notice of Final Public Meeting for Skyway 126 Wind Energy, near Badjeros in the
Municipality of Grey Highlands
Dear Christopher Csatlos:
M.K. Ince and Associates Ltd., on behalf of the project proponent Cloudy Ridge Wind Park LP, informs
you of a Final Public Meeting under the Renewable Energy Approval (REA) process for the Skyway 126
Wind Energy project. The project, which will consist of up to five (5) 2.0 MW wind turbines and
associated access roads and cabling, is to be located within the Municipality of Grey Highlands, near the
community of Badjeros, Ontario.
A Notice of Final Public Meeting is enclosed. This notice is also available on the project website
(www.zeroemissionpeople.com), along with a copy of the draft Renewable Energy Approval reports and
technical studies for the proposed Skyway 126 Wind Energy project. In addition, a hard copy of the
notice was sent to your address via mail last week.
We encourage you to contact us with any questions or concerns regarding the proposed Skyway 126
Wind Energy project. Thank you for your assistance and cooperation. We look forward to your response.
Sincerely,
M. K. INCE AND ASSOCIATES LTD.
Katie Meyer-Beck
Encl.
cc. Bill York c/o Cloudy Ridge Wind Park LP
NOTICE OF FINAL PUBLIC MEETING Distributed by Cloudy Ridge Wind Park LP regarding a
Proposal to Engage in a Renewable Energy Project
Project Name: Skyway 126 Wind Energy Proponent Name: Cloudy Ridge Wind Park LP Project website: www.zeroemissionpeople.com Project Location: On privately-owned agricultural lands within the Municipality of Grey Highlands, near the community of Badjeros,
Ontario Dated at the Municipality of Grey Highlands this the 20th of February, 2013
The proponent, Cloudy Ridge Wind Park LP, is planning to engage in a renewable energy project in respect of which the issuance of a Renewable Energy Approval (REA) is required. The proposal to engage in the project and the project itself is subject to the provisions of the Environmental Protection Act (Act) Part V.0.1 and Ontario Regulation 359/09 (Regulation). This notice must be distributed in accordance with section 15 of the Regulation prior to an application being submitted and assessed for completeness by the Ontario Ministry of the Environment. On Wednesday, April 24th, 2013, a public meeting will be held related to the Skyway 126 Wind Energy project:
Project Description: Pursuant to the Act and Regulation, the facility, in respect of which this project is to be engaged in, is considered to be a Class 4 Wind Energy Generation Facility. If approved, this facility would have a total maximum name plate capacity of 10 MW. The project location is described in the map below. Documents for Public Inspection: The Draft Project Description Report entitled Skyway 126 Wind Energy Description Report (Draft) describes the project as consisting of
of up to five (5) REpower MM92 wind turbines of 2 MW per turbine, wind turbine foundations, transformers, gravel access roads, underground electrical cabling, substation and other ancillary works. Further, the applicant has prepared the following documents in order to comply with the requirements under subsection 16 (5) of O. Reg. 359/09:
Project Description Report
Natural Heritage Assessment Reports, including: Records Review, Site Investigation Report,
Evaluation of Significance Report, Environmental Impact Study; Ministry of Natural
Resources (MNR) confirmation letter
Construction Plan Report
Decommissioning Plan Report
Water Bodies Assessment Report
Water Bodies Impact Assessment Report
Wind Turbine Specifications Report
Environmental Noise Impact Report
Design and Operations Report, including: Site Plan, Heritage Assessment Report with Ministry of Tourism, Culture and Sport (MTCS) confirmation letter, Shadow Flicker Report, Radar and Radio Communications Impact Assessment, Natural Heritage Environmental Effects Monitoring Plan, Archaeological Assessment Report with MTCS confirmation letter
The reports may be found online at www.zeroemissionpeople.com. Hard copies are available for viewing at:
Project Contacts and Information:
Project Contacts and Information:
To learn more about the project proposal, public meetings, or to communicate concerns, please contact: Bill York, Project Manager Cloudy Ridge Wind Park LP c/o Zero Emission People 346 Waverley Street Ottawa, ON K2P 0W5 Phone: (613) 827-7605 Email: [email protected]
OR
Katie Meyer-Beck, Project Manager M.K. Ince and Associates, Ltd. 11 Cross Street Dundas, Ontario L9H 2R3 Tel: (905) 628-0077 E-mail: [email protected]
Municipal Office of Grey Highlands 206 Toronto St S., Unit 1 POBox 409 Markdale, ON N0C 1H0
Flesherton Public Library 101 Highland Drive POBox 280 Flesherton, Ontario N0C 1E0
AND
Meeting Location: DATE: Wednesday, April 24th, 2013
TIME: 6:00 p.m. to 9:00 p.m. PLACE: Osprey Community Hall
494196 Grey Road 2 Maxwell, Ontario
FORMAT: Presentations, and Question and Answer 6:00 p.m. Presentation by the Proponent 6:15 p.m. Questions and Answers - the audience will have an opportunity to ask questions and receive answers in
a public forum. A moderator will be on hand to act as a neutral facilitator and ensure that all voices and viewpoints are heard. While we cannot guarantee that all questions can be answered at that time, we do guarantee that all questions submitted at the public meeting will be addressed in the Consultation Report, to be submitted as part of the Renewable Energy Approval application. 8:30 p.m. Open House - posters and one-on-one discussion
Please note, correspondence will form part of the public record related to the project and will be included in the Public Consultation Report. Please let us know if you would like correspondence kept confidential. We encourage comments, questions,
and concerns to be raised in written form and sent via e-mail.
M.K. Ince and Associates Ltd.
February 15, 2013
Christopher Csatlos
AIS Data Collection Unit and Land Use Office
NAV CANADA
1601 Tom Roberts Road
P.O. Box 9824, Station T
Ottawa, ON K1G 6R2
Attention: Christopher Csatlos
Reference: Notice of Final Public Meeting for Skyway 126 Wind Energy, near Badjeros in the
Municipality of Grey Highlands
Dear Christopher Csatlos:
M.K. Ince and Associates Ltd., on behalf of the project proponent Cloudy Ridge Wind Park LP, informs
you of a Final Public Meeting under the Renewable Energy Approval (REA) process for the Skyway 126
Wind Energy project. The project, which will consist of up to five (5) 2.0 MW wind turbines and
associated access roads and cabling, is to be located within the Municipality of Grey Highlands, near the
community of Badjeros, Ontario.
A Notice of Final Public Meeting is enclosed. This notice is also available on the project website
(www.zeroemissionpeople.com), along with a copy of the draft Renewable Energy Approval reports and
technical studies for the proposed Skyway 126 Wind Energy project.
We encourage you to contact us with any questions or concerns regarding the proposed Skyway 126
Wind Energy project. Thank you for your assistance and cooperation. We look forward to your response.
Sincerely,
M. K. INCE AND ASSOCIATES LTD.
Katie Meyer-Beck
Encl.
cc. Bill York c/o Cloudy Ridge Wind Park LP
Skyway 126 <[email protected]>
Notice of Draft Site Plan for Skyway 126 Wind Energy
Katie Meyer-Beck <[email protected]> Wed, Jan 30, 2013 at 3:53 PM
To: Chris Csatlos <[email protected]>, [email protected]
Dear Mr. Csatlos:
Please find attached in this email the following with regards to the Skyway 126 Wind Energy project:
1. Cover letter
2. Notice of Draft Site Plan for Skyway 126 Wind Energy
This notice has also been sent to your office earlier this week. Please do not hesitate to respond with any further
questions.
Best regards,
[Quoted text hidden]
2 attachments
NAV Canada Notice of Draft Site Plan letter EMAIL copy_2013-01-24 FINAL.pdf
75K
Skyway 126 Wind Energy Notice of Draft Site Plan_2013-01-30 FINAL updated.pdf
136K
M.K. Ince and Associates Ltd.
January 30, 2013
Christopher Csatlos
AIS Data Collection Unit and Land Use Office
NAV CANADA
1601 Tom Roberts Road
P.O. Box 9824, Station T
Ottawa, ON K1G 6R2
Sent via email:
Attention: Christopher Csatlos
Reference: Notice of Draft Site Plan for Skyway 126 Wind Energy, near Badjeros in the
Municipality of Grey Highlands
Dear Christopher Csatlos:
The proponent, Cloudy Ridge Wind Park LP, submits this Notice of Draft Site Plan under the Renewable
Energy Approval (REA) process for the Skyway 126 Wind Energy. The project, which will consist of up
to five (5) wind turbines with a total maximum name plate capacity of up to 10 MW, along with
associated access roads and cabling, is to be located within the Municipality of Grey Highlands, near the
community of Badjeros, Ontario.
As per Ontario Regulation 359/09 (consolidated version, November. 2, 2012), s. 54.1, a Notice of Draft
Site Plan is enclosed to clarify the locations of turbines and other project infrastructure for Skyway 126
Wind Energy. This notice is also available on the project website (www.zeroemissionpeople.com), along
with a copy of the Draft Site Plan and associated appendices. In addition, a copy of the notice was sent to
your address earlier this week via mail.
We encourage you to contact us with any questions or concerns regarding the proposed Skyway 126
Wind Energy. Thank you for your assistance and cooperation. We look forward to your response.
Sincerely,
M. K. INCE AND ASSOCIATES LTD.
Katie Meyer-Beck
Encl.
cc. Cloudy Ridge Wind Park LP
NOTICE OF DRAFT SITE PLAN SECTION 54.1 ONTARIO REGULATION 359/09
Distributed by Cloudy Ridge Wind Park LP regarding a Proposal to Engage in a Renewable Energy Project
Project Name: Skyway 126 Wind Energy Proponent Name: Cloudy Ridge Wind Park LP Project website: www.zeroemissionpeople.com Project Location: On privately-owned agricultural lands within the Municipality of Grey Highlands, near the community of Badjeros, Ontario Dated at the Municipality of Grey Highlands this the 30th of January, 2013 The proponent, Cloudy Ridge Wind Park LP, is planning to engage in a renewable energy project in respect of which the issuance of a Renewable Energy Approval (REA) is required. The distribution of this Notice of Draft Site Plan (Notice) is subject to the provisions of the Environmental Protection Act (Act) Part V.0.1 and Ontario Regulation 359/09 (Regulation). This Notice is being distributed in accordance with sections 54 and 54.1 of the Regulation prior to an application being submitted and assessed for completeness by the Ministry of the Environment. For the purposes of the 550 meter setback prohibition (subsection 54(1) in O. Reg. 359/09) for the Skyway 126 Wind Energy project, Cloudy Ridge Wind Park LP has considered all noise receptors (as that term is defined in O. Reg. 359/09) existing on the day before this notice of draft site plan is published. The legal effect of this publication is that Cloudy Ridge Wind Park LP is not required to consider any new noise receptors that come into existence after this day. This notice was first published January 30, 2013. Project Description: Pursuant to the Act and Regulation, the renewable energy generation facility, in respect of which this project is to be engaged in, is a Wind Facility, Class 4. If approved, this facility would have a total maximum name plate capacity of up to 10 megawatts (MW). The project location is described in the map below.The project would consist of up to five (5) REpower MM92 wind turbines of 2 MW per turbine. Documents for Public Inspection: The Draft Project Description Report entitled Skyway 126 Wind Energy Draft Project Description Report describes the project as consisting of up to five (5) wind turbine generators, wind turbine foundations, step-up transformers, gravel access roads, underground and/or overhead electrical collection system, substation to connect to Hydro One power line, and temporary construction work spaces, as shown in the map below. The Draft Site Plan, associated appendices, and Environmental Noise Impact Report will be made available for public inspection at the Flesherton Public Library (101 Highland Drive, Flesherton, Ontario N0C 1E0) and on the Project website at www.zeroemissionpeople.com. Project Contacts and Information: To learn more about the project proposal, or to communicate concerns please contact: Bill York, Project Manager Cloudy Ridge Wind Park LP c/o Zero Emission People 346 Waverley Street Ottawa, ON, K2P 0W5 Phone: (613) 827-7605 E-mail: [email protected] OR Katie Meyer-Beck, Project Manager M.K. Ince and Associates Ltd. 11 Cross Street Dundas, Ontario, L9H 2R3 Phone: (905) 628-0077 E-mail: [email protected]
Skyway 126 Wind Energy
Please note, correspondence will form part of the public record related to the project and will be included in the Public Consultation Report. Please let us know if you would like correspondence kept confidential. We encourage comments, questions, and concerns to be raised in written form and sent via e-mail.
M.K. Ince and Associates Ltd.
January 28, 2013
Christopher Csatlos
AIS Data Collection Unit and Land Use Office
NAV CANADA
1601 Tom Roberts Road
P.O. Box 9824, Station T
Ottawa, ON K1G 6R2
Attention: Christopher Csatlos
Reference: Notice of Draft Site Plan for Skyway 126 Wind Energy, near Badjeros in the
Municipality of Grey Highlands
Dear Christopher Csatlos:
The proponent, Cloudy Ridge Wind Park LP, submits this Notice of Draft Site Plan, Draft Site Plan, and
associated appendices under the Renewable Energy Approval (REA) process for Skyway 126 Wind
Energy. The project, which will consist of up to five (5) wind turbines with a total maximum name plate
capacity of up to 10 MW, along with associated access roads and cabling, is to be located within the
Municipality of Grey Highlands, near the community of Badjeros, Ontario.
As per Ontario Regulation 359/09 (consolidated version, November 2, 2012), s. 54.1, a Notice of Draft
Site Plan is enclosed to clarify the locations of turbines and other project infrastructure for Skyway 126
Wind Energy. This notice is also available on the project website (www.zeroemissionpeople.com), along
with a copy of the Draft Site Plan and associated appendices.
We encourage you to contact us with any questions or concerns regarding the proposed Skyway 126
Wind Energy. Thank you for your assistance and cooperation. We look forward to your response.
Sincerely,
M. K. INCE AND ASSOCIATES LTD.
Katie Meyer-Beck
Encl.
cc. Cloudy Ridge Wind Park LP
1601 Tom Roberts, P.O. Box 9824 Stn T, Ottawa, ON, K1G 6R2 1601 Tom Roberts, C.P.9824 Succursale T, Ottawa, Ontario, K1G 6R2 Telephone: +1 (866) 577-0247, Fax: +1 (613) 248-4094 Téléphone: +1 (866) 577-0247, Télécopieur: +1 (613) 248-4094
Z-LDU-101 Version 1.0
January 10, 2013
Your file Skyway 126
Our file 12-3322
Ms. Hannah Vovk M.K. INCE and Associates 11 Cross St. Dundas, ON L9H 2R3 RE: Wind Farm: 6 Wind Turbines - Badjeros, ON (See attached spreadsheet for project details) Ms. Vovk, We have evaluated the captioned proposal and NAV CANADA has no objection to the project as submitted provided that the wind turbines do not exceed the maximum total height of 2200ft above sea level (ASL) as per the attached spreadsheet. In the interest of aviation safety, it is incumbent on NAV CANADA to maintain up-to-date aeronautical publications and issue NOTAM as required. To assist us in that end, we ask that you notify us at least 10 business days prior to the start of construction and upon completion. These notification requirements can be satisfactorily met by returning completed, signed copies of the attached forms by e-mail at [email protected] or fax at 613-248-4094. In the event that you should decide not to proceed with this project or if the structure is dismantled, please advise us accordingly so that we may formally close the file. If you have any questions, contact the Land Use Department by telephone at 1-866-577-0247 or e-mail at [email protected]. NAV CANADA's land use evaluation is valid for a period of 12 months. Our assessment is limited to the impact of the proposed physical structure on the air navigation system and installations; it neither constitutes nor replaces any approvals or permits required by Transport Canada, Industry Canada, other Federal Government departments, Provincial or Municipal land use authorities or any other agency from which approval is required. Industry Canada addresses any spectrum management issues that may arise from your proposal and consults with NAV CANADA engineering as deemed necessary. Yours truly,
Melanie Tranter for David Legault Manager, Data Collection Aeronautical Information Services cc ONTR - Ontario Region, Transport Canada
Approvals M. K. Ince and Associates Ltd. <[email protected]>
Fwd: FW: 12-1499 - Skyway 126 Wind Farm - Impacts on Radar and RadioCommunication
Approvals M. K. Ince and Associates Ltd. <[email protected]> Mon, Dec 3, 2012 at 11:17 AM
To: Land Use <[email protected]>
Hi Diane,
My apologies for the delay in getting back to you. Please find attached, the spreadsheet and map as requested.
Best Regards,
Carolyn Truong
[Quoted text hidden]
2 attachments
S126 Topographic Map for NavCanada 2012-11-30.pdf
3033K
Skyway 126_Nav Canada Wind_Farm_2012-10-02.xls
244K
Mkince.ca Mail - Fwd: FW: 12-1499 - Skyway 126 Wind Farm - Impact... https://mail.google.com/mail/u/0/?ui=2&ik=f1ba1b1184&view=pt&cat...
1 of 1 5/28/2013 5:32 PM
Approvals M. K. Ince and Associates Ltd. <[email protected]>
Fwd: FW: 12-1499 - Skyway 126 Wind Farm - Impacts on Radar and RadioCommunication
Land Use <[email protected]> Mon, Nov 19, 2012 at 6:24 PM
To: "[email protected]" <[email protected]>
Hello Carolyn,
Please re-send the attached spreadsheet and send us a new map.
Thank you.
Diane Levesque
Land Use
AIS Data Collection, NAV CANADA
Toll free: 1-866-577-0247
Fax: (613) 248-4094
Email: [email protected]
From: Approvals M. K. Ince and Associates Ltd. [mailto:[email protected]]
Sent: November 19, 2012 2:09 PM
To: Land Use
Subject: Re: FW: 12-1499 - Skyway 126 Wind Farm - Impacts on Radar and Radio Communication
[Quoted text hidden]
Copy of Skyway 126_Nav Canada Wind_Farm_2012-10-02.xls
244K
Mkince.ca Mail - Fwd: FW: 12-1499 - Skyway 126 Wind Farm - Impact... https://mail.google.com/mail/u/0/?ui=2&ik=f1ba1b1184&view=pt&cat...
1 of 1 5/28/2013 5:30 PM
Approvals M. K. Ince and Associates Ltd. <[email protected]>
Fwd: FW: 12-1499 - Skyway 126 Wind Farm - Impacts on Radar and RadioCommunication
Approvals M. K. Ince and Associates Ltd. <[email protected]> Mon, Nov 19, 2012 at 2:09 PM
To: Land Use <[email protected]>
Hello,
Please be advised that since our last correspondence, the turbine layout of the proposed Skyway 126 Wind Farm has
been revised. The coordinates of Turbine 4 have been altered and I have attached the new turbine locations to this
message for your assessment. We are in the process of finalizing this project and do not anticipate any further
revisions to the Skyway 126 layout at this point.
Thanks for your time and assistance, it is much appreciated!.
Best Regards,
Carolyn Truong
[Quoted text hidden]
Copy of Skyway 126_Nav Canada Wind_Farm_2012-10-02.xls
244K
Mkince.ca Mail - Fwd: FW: 12-1499 - Skyway 126 Wind Farm - Impact... https://mail.google.com/mail/u/0/?ui=2&ik=f1ba1b1184&view=pt&cat...
1 of 1 5/28/2013 5:30 PM
Approvals M. K. Ince and Associates Ltd. <[email protected]>
Fwd: FW: 12-1499 - Skyway 126 Wind Farm - Impacts on Radar and RadioCommunication
Approvals M. K. Ince and Associates Ltd. <[email protected]> Tue, Aug 14, 2012 at 11:33 AM
To: Land Use <[email protected]>
Hello,
There has been another change in the layout for the Skyway 126 Wind Farm, the turbines have been adjusted slightly.
Please find attached the coordinates of all six turbines as well as the a map of the current layout.
If you have any questions or concerns about the proposed turbines please contact us.
Thank you for your time,
Hannah Ince
[Quoted text hidden]
--
[Quoted text hidden]
2 attachments
Skyway 126 Working Current Layout Map 1 2012-07-25.pdf
2761K
Skyway 126_Nav Canada Wind_Farm_2012-08-14.xls
243K
Mkince.ca Mail - Fwd: FW: 12-1499 - Skyway 126 Wind Farm - Impact... https://mail.google.com/mail/u/0/?ui=2&ik=f1ba1b1184&view=pt&cat...
1 of 1 5/28/2013 5:28 PM
Approvals M. K. Ince and Associates Ltd. <[email protected]>
Fwd: FW: 12-1499 - Skyway 126 Wind Farm - Impacts on Radar and RadioCommunication
Genevieve Brown <[email protected]> Fri, Apr 20, 2012 at 9:00 AM
To: "Approvals M. K. Ince and Associates Ltd." <[email protected]>
-------- Original Message --------
Subject:FW: 12-1499 - Skyway 126 Wind Farm - Impacts on Radar and Radio Communication
Date:Thu, 19 Apr 2012 20:29:41 -0400
From:Land Use <[email protected]>
To:[email protected] <[email protected]>
CC:[email protected] <[email protected]>
Hello,
Please note the Land Use file no. is 12-1499 for this project. For multiple obstacles, please use the spreadsheet attached.
Also, please identify the turbines on the map and re-send another map.
Thank you.
Diane Levesque
Land Use
AIS Data Collection, NAV CANADA
Toll free: 1-866-577-0247
Fax: (613) 248-4094
Email: [email protected]
From: Approvals M. K. Ince and Associates Ltd. [mailto:[email protected]]
Sent: April 19, 2012 2:07 PM
To: Land Use
Cc: Karla Klein; Genevieve Brown
Subject: 12-1499 - Skyway 126 Wind Farm - Impacts on Radar and Radio Communication
Dear coordinator,
Mkince.ca Mail - Fwd: FW: 12-1499 - Skyway 126 Wind Farm - Impact... https://mail.google.com/mail/u/0/?ui=2&ik=f1ba1b1184&view=pt&cat...
1 of 2 5/28/2013 4:55 PM
Approvals M. K. Ince and Associates Ltd. <[email protected]>
Fwd: FW: 12-1499 - Skyway 126 Wind Farm - Impacts on Radar and Radio
Communication
Approvals M. K. Ince and Associates Ltd. <[email protected]> Fri, Apr 27, 2012 at 3:19 PM
To: Land Use <[email protected]>
Cc: Karla Klein <[email protected]>, Genevieve Brown <[email protected]>
Hello,
Since we last contacted you on April 19th regarding potential interference due to the Skyway 126 Wind Farm, a sixth
turbine has been added to the wind farm. Please find attached the coordinates of all six turbines.
Please contact us if you have any concerns with respect to the proposed turbines.
Thank you,
Genevieve Brown
[Quoted text hidden]
3 attachments
Skyway 126_Nav Canada Wind_Farm_2012-04-27.xls
252K
Skyway 126 Topo Map 2012-04-27.pdf
646K
Turbine Information 2012-04-27.pdf
166K
Mkince.ca Mail - Fwd: FW: 12-1499 - Skyway 126 Wind Farm - Impacts ... https://mail.google.com/mail/u/0/?ui=2&ik=f1ba1b1184&view=pt&q=sk...
1 of 1 4/27/2012 3:19 PM
Approvals M. K. Ince and Associates Ltd. <[email protected]>
Fwd: FW: 12-1499 - Skyway 126 Wind Farm - Impacts on Radar and Radio
Communication
Approvals M. K. Ince and Associates Ltd. <[email protected]> Fri, Apr 20, 2012 at 9:07 AM
To: Land Use <[email protected]>
Cc: Genevieve Brown <[email protected]>, Karla Klein <[email protected]>
Hello,
Please find attached all files including the excel file and map with turbine labels.
Thank you,
Genevieve Brown
[Quoted text hidden]
4 attachments
Skyway 126_Nav Canada Wind_Farm_2012-04-19.xls
252K
Skyway 126 Turbine Information 2012-04-19.pdf
165K
Skyway 126_NAV Canada Submission_Form_2012-04-19.doc
133K
Skyway 126 Topo Map 2012-04-20.pdf
895K
Mkince.ca Mail - Fwd: FW: 12-1499 - Skyway 126 Wind Farm - Impacts ... https://mail.google.com/mail/u/0/?ui=2&ik=f1ba1b1184&view=pt&searc...
1 of 1 4/20/2012 9:20 AM
Approvals M. K. Ince and Associates Ltd. <[email protected]>
Skyway 126 Wind Farm - Impacts on Radar and Radio Communication
Approvals M. K. Ince and Associates Ltd. <[email protected]> Thu, Apr 19, 2012 at 2:07 PM
To: Land Use <[email protected]>Cc: Karla Klein <[email protected]>, Genevieve Brown <[email protected]>
Dear coordinator,
On behalf of the Skyway 126 Wind Farm, M.K. Ince and Associates, would like to request consultation for the impact of wind turbines onradio communication and radar systems. The Skyway 126 Wind Farm is at a preliminary stage of investigations and MK Ince iscompleting a communications impact assessment for the project as outlined by RABC and CanWEA in their guidelines. The proposedSkyway 126 Wind Farm is located near the communities of Badjeros, within the Municipality of Grey Highlands . The wind farm containsfive turbines; the proposed coordinates and heights of the turbines are attached in this email.
Please contact us if you have any concerns with respect to the proposed wind turbines.
Thank you for your help,
Genevieve Brown
M.K. Ince and Associates Ltd.
11 Cross St., Dundas, ON L9H 2R3
Phone: 905-628-0077
Fax: 905-628-1329
http://www.mkince.ca
3 attachments
Skyway 126 Topo Map 2012-04-19.png
965K
Skyway 126_NAV Canada Submission_Form_2012-04-19.doc
133K
Skyway 126 Turbine Information 2012-04-19.pdf
165K
Mkince.ca Mail - Skyway 126 Wind Farm - Impacts on Radar and Radio... https://mail.google.com/mail/u/0/?ui=2&ik=f1ba1b1184&view=pt&searc...
1 of 1 4/19/2012 2:14 PM
Skyway 126 Wind Energy Communications Impact Assessment
M.K. Ince and Associates Ltd. Appendix June 14, 2013
Royal Canadian Mounted Police
5/28/13 Mkince.ca Mail - Skyway 126 Wind Farm - Impacts on Radar and Radio Communication
https://mail.google.com/mail/u/1/?ui=2&ik=f1ba1b1184&view=pt&search=sent&msg=13eebb8ca8cb9373 1/1
Approvals M. K. Ince and Associates Ltd. <[email protected]>
Skyway 126 Wind Farm - Impacts on Radar and Radio Communication
Approvals M. K. Ince and Associates Ltd. <[email protected]> Tue, May 28, 2013 at 11:19 AMTo: windfarm_coordinator <[email protected]>Cc: Hanna Vovk <[email protected]>
Dear Coordinator,
Please be advised that the project layout for the Skyway 126 Wind Energy project has been updated since ourlast correspondence (November 19, 2012). Turbine 6 has been dropped. Turbines 1-5 remain in the sameposition. A revised layout is attached.
Thank you,
M.K. Ince and Associates Ltd.
[Quoted text hidden]
Skyway 126 Wind Energy Project -- Turbine Coordinates (2013-05-28).pdf168K
Approvals M. K. Ince and Associates Ltd. <[email protected]>
Skyway 126 Wind Farm - Impacts on Radar and Radio Communication
Approvals M. K. Ince and Associates Ltd. <[email protected]> Mon, Nov 19, 2012 at 1:44 PM
To: windfarm_coordinator <[email protected]>
Cc: Carolyn Truong <[email protected]>
Hello,
Please be advised that since our last correspondence, the turbine layout of the proposed Skyway 126 Wind Farm has been revised. The
coordinates of several turbines have been altered and I have attached the new turbine locations to this message for your assessment. We are
in the process of finalizing this project and do not anticipate any further revisions to the Skyway 126 layout at this point.
Thanks for your time and assistance, it is much appreciated!.
Best Regards,
Carolyn Truong
On Fri, Apr 27, 2012 at 2:17 PM, Approvals M. K. Ince and Associates Ltd. <[email protected]> wrote:
Hello,
Since we last contacted you on April 19th regarding potential interference due to the Skyway 126 Wind Farm, a sixth turbine has been
added to the wind farm. Please find attached the coordinates of all six turbines.
Please contact us if you have any concerns with respect to the proposed turbines.
Thank you,
Genevieve Brown
On Thu, Apr 19, 2012 at 2:00 PM, Approvals M. K. Ince and Associates Ltd. <[email protected]> wrote:
Dear coordinator,
On behalf of the Skyway 126 Wind Farm, M.K. Ince and Associates, would like to request consultation for the impact of wind turbines on
radio communication and radar systems. The Skyway 126 Wind Farm is at a preliminary stage of investigations and MK Ince is
completing a communications impact assessment for the project as outlined by RABC and CanWEA in their guidelines. The proposed
Skyway 126 Wind Farm is located near the communities of Badjeros, within the Municipality of Grey Highlands . The wind farm contains
five turbines; the proposed coordinates and heights of the turbines are attached in this email.
Please contact us if you have any concerns with respect to the proposed wind turbines.
Thank you for your help,
Genevieve Brown
M.K. Ince and Associates Ltd.
11 Cross St., Dundas, ON L9H 2R3
Phone: 905-628-0077
Fax: 905-628-1329
http://www.mkince.ca
--
M.K. Ince and Associates Ltd.
11 Cross St., Dundas, ON L9H 2R3
Phone: 905-628-0077
Fax: 905-628-1329
http://www.mkince.ca
Mkince.ca Mail - Skyway 126 Wind Farm - Impacts on Radar and Radio... https://mail.google.com/mail/u/2/?ui=2&ik=f1ba1b1184&view=pt&q=sk...
1 of 2 11/19/2012 1:41 PM
Turbine Information 2012-11-16.pdf
272K
Mkince.ca Mail - Skyway 126 Wind Farm - Impacts on Radar and Radio... https://mail.google.com/mail/u/2/?ui=2&ik=f1ba1b1184&view=pt&q=sk...
2 of 2 11/19/2012 1:41 PM
Approvals M. K. Ince and Associates Ltd. <[email protected]>
Request for confirmation3 messages
Approvals M. K. Ince and Associates Ltd. <[email protected]> Tue, Jun 12, 2012 at 2:07 PM
To: windfarm_coordinator <[email protected]>
Hi,
This is a follow up to our phone conversation we just had. During this conversation you mentioned that the wind farm coordinator is notcurrently filled and there will be longer wait times as a result. Could you respond to confirm this information for our records?
Thank you for your help,Hannah Ince
--
M.K. Ince and Associates Ltd.
11 Cross St., Dundas, ON L9H 2R3
Phone: 905-628-0077
Fax: 905-628-1329
http://www.mkince.ca
Approvals M. K. Ince and Associates Ltd. <[email protected]> Tue, Jun 12, 2012 at 2:31 PM
---------- Forwarded message ----------From: Approvals M. K. Ince and Associates Ltd. <[email protected]>
Date: Tue, Jun 12, 2012 at 2:07 PMSubject: Request for confirmationTo: windfarm_coordinator <[email protected]>
Hi Alex,
This is a follow up to our phone conversation we just had. During this conversation you mentioned that the wind farm coordinator position
is not currently filled and there will be longer wait times as a result. Could you respond to confirm this information for our records?
Thank you for your help,Hannah Ince
--
M.K. Ince and Associates Ltd.
11 Cross St., Dundas, ON L9H 2R3
Phone: 905-628-0077
Fax: 905-628-1329
http://www.mkince.ca
[Quoted text hidden]
Alex Beckstead <[email protected]> Tue, Jun 12, 2012 at 3:06 PM
To: "Approvals M. K. Ince and Associates Ltd." <[email protected]>
That is correct. It will hopefully be filled in the coming months. Thank you
Alex BecksteadRadio Spectrum Engineer - Ingénieur du spectre radio
Mkince.ca Mail - Request for confirmation https://mail.google.com/mail/u/1/?ui=2&ik=f1ba1b1184&view=pt&searc...
1 of 2 06/07/2012 9:57 AM
Mobile Communication Services - Services de communication mobileRCMP - GRCtel.: 613-949-4519fax.: [email protected]>>> "Approvals M. K. Ince and Associates Ltd." <[email protected]> 6/12/2012 2:31 PM >>>[Quoted text hidden]
Mkince.ca Mail - Request for confirmation https://mail.google.com/mail/u/1/?ui=2&ik=f1ba1b1184&view=pt&searc...
2 of 2 06/07/2012 9:57 AM
Skyway 126 Wind Energy Communications Impact Assessment
M.K. Ince and Associates Ltd. Appendix June 14, 2013
Rogers Communications Partnership
5/28/13 Mkince.ca Mail - FW: Query Regarding Potential Impacts of Skyway 126 Wind Farm on Rogers Communications
https://mail.google.com/mail/u/1/?ui=2&ik=f1ba1b1184&view=pt&search=sent&msg=13eebb51ef14eafb 1/1
Approvals M. K. Ince and Associates Ltd. <[email protected]>
FW: Query Regarding Potential Impacts of Skyway 126 Wind Farm on RogersCommunications
Approvals M. K. Ince and Associates Ltd. <[email protected]> Tue, May 28, 2013 at 11:15 AMTo: Milan Vujosevic <[email protected]>Cc: Hanna Vovk <[email protected]>
Dear Milan,
Please be advised that the project layout for the Skyway 126 Wind Energy project has been updated since ourlast correspondence (November 16, 2012). Turbine 6 has been dropped. Turbines 1-5 remain in the sameposition. A revised layout is attached.
Thank you,
M.K. Ince and Associates Ltd.
[Quoted text hidden]
Skyway 126 Wind Energy Project -- Turbine Coordinates (2013-05-28).pdf168K
Carolyn Truong <[email protected]>
Fwd: FW: Query Regarding Potential Impacts of Skyway 126 Wind Farm on Rogers
Communications
Carolyn Truong <[email protected]> Fri, Nov 16, 2012 at 4:26 PM
To: Milan Vujosevic <[email protected]>Cc: "Approvals M. K. Ince and Associates Ltd." <[email protected]>, Katie Meyer-Beck <[email protected]>, ChristineHomuth <[email protected]>
Hi Milan,
Further to our correspondence in August, the turbine layout of the proposed Skyway 126 Wind Farm has been changed to mitigate anyimpacts to Rogers Communications. Turbine 4 has been shifted approximately 50 m east, the revised turbine coordinates are attached tothis message.
Please advise of any remaining issues or concerns regarding anticipated impacts to Rogers communications resulting from the proposedSkyway 126 project.
Best Regards,Carolyn Truong
On Fri, Aug 24, 2012 at 4:54 PM, Milan Vujosevic <[email protected]> wrote:
Carolyn,
Here is the required info.
Regards,
m
Rogers Site Call Sign Long Lat
C0121 XJV217 80° 17' 21.5"W 44° 13' 50.2"N
C0104 XJV210 80° 15' 43"W 44° 23' 34.2"N
From: Milan Vujosevic
Sent: Wednesday, August 22, 2012 11:20 AMTo: 'Carolyn Truong'
Cc: Cristian DraghiciSubject: RE: FW: Query Regarding Potential Impacts of Skyway 126 Wind Farm on Rogers Communications
Hi Carolyn,
Mkince.ca Mail - Fwd: FW: Query Regarding Potential Impacts of Skywa... https://mail.google.com/mail/u/0/?ui=2&ik=f451843616&view=pt&searc...
1 of 5 11/19/2012 10:41 AM
Yes, we will provide the coordinates of our sites shortly.
Cris-an,
Please provide coordinates of two sites connected with microwave link in ques-on.
Regards,
m
From: Carolyn Truong [mailto:[email protected]]
Sent: Wednesday, August 22, 2012 11:12 AM
To: Milan VujosevicCc: Christine Homuth; Approvals M. K. Ince and Associates Ltd.
Subject: Re: FW: Query Regarding Potential Impacts of Skyway 126 Wind Farm on Rogers Communications
Hi Milan,
Thanks for your response, we are looking into this issue. Would it be possible for you to provide the coordinates and call sign of the 2problematic point-to-point stations?
We are performing our analysis using Industry Canada's Spectrum Direct Database and the nearest stations that we have found have callsigns XJV217and XJV210. The identifiers C0121 Shelburne and C0104 Collingwood do not appear to show up in our search, and wewould like to ensure that our data is consistent with yours.
Best Regards,
Carolyn
On Tue, Aug 21, 2012 at 3:32 PM, Approvals M. K. Ince and Associates Ltd. <[email protected]> wrote:
---------- Forwarded message ----------From: Milan Vujosevic <[email protected]>
Date: Tue, Aug 21, 2012 at 10:19 AMSubject: FW: Query Regarding Potential Impacts of Skyway 126 Wind Farm on Rogers CommunicationsTo: "Approvals M. K. Ince and Associates Ltd." <[email protected]>
Good morning Carolyn,
The results of our analysis show that there will be indeed an impact of the proposed turbine T4 on Rogers’ exis-ng microwave path. As shown
in the a6achment, the distance between T4 and centerline of microwave beam is only 44.5m (not included poten-al inaccuracy). The turbine
blade diameter is 92.5m and it will definitely cut the Fresnel zone of microwave beam. According to the CANWEA guideline, minimum required
distance between turbine and centerline of the beam in this case should be 92m.
Please relocate the posi-on of the turbine T4 to meet this requirement. We hope that you can s-ll meet your project objec-ves.
Mkince.ca Mail - Fwd: FW: Query Regarding Potential Impacts of Skywa... https://mail.google.com/mail/u/0/?ui=2&ik=f451843616&view=pt&searc...
2 of 5 11/19/2012 10:41 AM
Best regards,
Milan Vujosevic
647-747-4692
From: Cristian Draghici
Sent: Monday, July 16, 2012 4:54 PMTo: Milan VujosevicSubject: RE: Query Regarding Potential Impacts of Skyway 126 Wind Farm on Rogers Communications
Hi Milan,
According to the list of 6 wind turbines and coordinates supplied in a6ached file, the proposed “Skyway126 Wind Farm” have impact with
exis!ng Rogers MW Network.
The distance between wind turbine T4 and C0121 Shelburne – C0104 Collingwood hop is only 44.5m, as in a6ached file.
T4 wind turbine has the blade diameter equal with 92.5m. In this case, wind turbine blade cut the Fresnel Ellipsoid more than 50% (my
es-ma-on is 60%).
Minimum distance according with CANWEA guideline formula is: Lc/2=92m.
Thanks,
Cris-an
From: Approvals M. K. Ince and Associates Ltd. [mailto:[email protected]]
Sent: Monday, July 16, 2012 11:43 AM
To: Milan VujosevicCc: Carolyn Truong; Christine Homuth
Subject: Query Regarding Potential Impacts of Skyway 126 Wind Farm on Rogers Communications
Good morning Milan,
M. K. Ince and Associates Ltd is consulting for Cloudy Ridge Wind Park LP, the developer of the Skyway 126 Wind Farm within theMunicipality of Grey Highlands, Ontario. According to the Spectrum Direct database, you represent the contact for Rogers WirelessPartnership for some antennas near the proposed project area.
The Spectrum Direct database indicates that there is a link between the following Roger’s Wireless antennas for this wind farm asfollows:Call Sign: XJV217Lat/Long (NAD83): 44°13'49"/-80°17'26"
The turbine coordinates are attached.
Please advise if you foresee any potential impacts to your telecommunications network as a result of the proposed wind farm.
Best Regards,
Carolyn Truong--
Mkince.ca Mail - Fwd: FW: Query Regarding Potential Impacts of Skywa... https://mail.google.com/mail/u/0/?ui=2&ik=f451843616&view=pt&searc...
3 of 5 11/19/2012 10:41 AM
Skyway 126 Wind Energy Communications Impact Assessment
M.K. Ince and Associates Ltd. Appendix June 14, 2013
Transport Canada
Approvals M. K. Ince and Associates Ltd. <[email protected]>
Transport Canada Submission: Skyway 126 Wind Energy project
Approvals M. K. Ince and Associates Ltd. <[email protected]> Mon, May 27, 2013 at 3:31 PM
To: CASO-SACO <[email protected]>
Cc: Sameer Shah <[email protected]>, Thomas Bernacki <[email protected]>, Hanna Vovk <[email protected]>
Good afternoon,
Please attached the Aeronautical Assessment Form for Obstruction and Lighting application for the Skyway 126 Wind Energy project
located near the town of Badjeros, Ontario. In addition to this attached document, please find attached:
1) A cover letter
2) A table of turbine locations and proposed lighting
3) A map illustrating turbine locations and lighting
Please provide your approval or comments at the earliest convenience. Similar information has been sent to NAV Canada.
Best regards,
M.K. Ince & Associates Ltd.
--
M.K. Ince and Associates Ltd.
11 Cross St., Dundas, ON L9H 2R3
Phone: 905-628-0077
Fax: 905-628-1329
http://www.mkince.ca
4 attachments
Skyway 126 Wind Energy Project -- Turbine Lighting Map (2013-05-24).pdf
1534K
Skyway 126 Wind Energy Project -- Transmittal Letter.pdf
135K
Signed Aeronautical Assessment Form for Obstruction -- Skyway 126 Wind Energy.pdf
865K
Skyway 126 Wind Energy Project -- Turbine Coordinates and Elevation.pdf
177K
Mkince.ca Mail - Transport Canada Submission: Skyway 126 Wind Ener... https://mail.google.com/mail/u/0/?ui=2&ik=f1ba1b1184&view=pt&sear...
1 of 1 5/28/2013 1:37 PM
Skyway 126 <[email protected]>
Notice of Final Public Meeting for Skyway 126 Wind Energy
Katie Meyer-Beck <[email protected]> Wed, Feb 20, 2013 at 9:09 AM
Cc: [email protected], Skyway 126 <[email protected]>
To Whom It May Concern:
Please find herein a Notice of Final Public Meeting for Skyway 126 Wind Energy as per O.Reg 359/09. In
addition, the notice was sent to your address last week via mail.
The notice was also available on the project website (www.zeroemissionpeople.com), along with a copy of
the draft Renewable Energy Approval reports and technical studies for the proposed Skyway 126 Wind Energy
project.
We welcome any questions or feedback on the proposed project.
Best,
Katie
--
Katie Meyer-Beck
Renewable Energy Project Manager
M.K. Ince and Associates Ltd.
11 Cross Street
Dundas, Ontario, L9H 2R3
Tel: 905-628-0077 ext. 242
Fax: 905-628-1329
E-mail: [email protected]
www.mkince.ca
� Please consider the environment before printing this e-mail.
2 attachments
Transport Canada Notice of Final Public Meeting EMAIL copy 2013-02-15 FINAL.pdf
77K
S126 - Notice of Final Public Meeting_2013-02-14 FINAL.pdf
154K
M.K. Ince and Associates Ltd.
February 19, 2013
Transport Canada, Civil Aviation
Ontario Region
300-4900 Yonge Street
Toronto ON M2N 6A5
Sent via email:
Reference: Notice of Final Public Meeting for Skyway 126 Wind Energy, near Badjeros in the
Municipality of Grey Highlands
To Whom It May Concern:
M.K. Ince and Associates Ltd., on behalf of the project proponent Cloudy Ridge Wind Park LP, informs
you of a Final Public Meeting under the Renewable Energy Approval (REA) process for the Skyway 126
Wind Energy project. The project, which will consist of up to five (5) 2.0 MW wind turbines and
associated access roads and cabling, is to be located within the Municipality of Grey Highlands, near the
community of Badjeros, Ontario.
A Notice of Final Public Meeting is enclosed. This notice is also available on the project website
(www.zeroemissionpeople.com), along with a copy of the draft Renewable Energy Approval reports and
technical studies for the proposed Skyway 126 Wind Energy project. In addition, a hard copy of the
notice was sent to your address via mail last week.
We encourage you to contact us with any questions or concerns regarding the proposed Skyway 126
Wind Energy project. Thank you for your assistance and cooperation. We look forward to your response.
Sincerely,
M. K. INCE AND ASSOCIATES LTD.
Katie Meyer-Beck
Encl.
cc. Bill York c/o Cloudy Ridge Wind Park LP
NOTICE OF FINAL PUBLIC MEETING Distributed by Cloudy Ridge Wind Park LP regarding a
Proposal to Engage in a Renewable Energy Project
Project Name: Skyway 126 Wind Energy Proponent Name: Cloudy Ridge Wind Park LP Project website: www.zeroemissionpeople.com Project Location: On privately-owned agricultural lands within the Municipality of Grey Highlands, near the community of Badjeros,
Ontario Dated at the Municipality of Grey Highlands this the 20th of February, 2013
The proponent, Cloudy Ridge Wind Park LP, is planning to engage in a renewable energy project in respect of which the issuance of a Renewable Energy Approval (REA) is required. The proposal to engage in the project and the project itself is subject to the provisions of the Environmental Protection Act (Act) Part V.0.1 and Ontario Regulation 359/09 (Regulation). This notice must be distributed in accordance with section 15 of the Regulation prior to an application being submitted and assessed for completeness by the Ontario Ministry of the Environment. On Wednesday, April 24th, 2013, a public meeting will be held related to the Skyway 126 Wind Energy project:
Project Description: Pursuant to the Act and Regulation, the facility, in respect of which this project is to be engaged in, is considered to be a Class 4 Wind Energy Generation Facility. If approved, this facility would have a total maximum name plate capacity of 10 MW. The project location is described in the map below. Documents for Public Inspection: The Draft Project Description Report entitled Skyway 126 Wind Energy Description Report (Draft) describes the project as consisting of
of up to five (5) REpower MM92 wind turbines of 2 MW per turbine, wind turbine foundations, transformers, gravel access roads, underground electrical cabling, substation and other ancillary works. Further, the applicant has prepared the following documents in order to comply with the requirements under subsection 16 (5) of O. Reg. 359/09:
Project Description Report
Natural Heritage Assessment Reports, including: Records Review, Site Investigation Report,
Evaluation of Significance Report, Environmental Impact Study; Ministry of Natural
Resources (MNR) confirmation letter
Construction Plan Report
Decommissioning Plan Report
Water Bodies Assessment Report
Water Bodies Impact Assessment Report
Wind Turbine Specifications Report
Environmental Noise Impact Report
Design and Operations Report, including: Site Plan, Heritage Assessment Report with Ministry of Tourism, Culture and Sport (MTCS) confirmation letter, Shadow Flicker Report, Radar and Radio Communications Impact Assessment, Natural Heritage Environmental Effects Monitoring Plan, Archaeological Assessment Report with MTCS confirmation letter
The reports may be found online at www.zeroemissionpeople.com. Hard copies are available for viewing at:
Project Contacts and Information:
Project Contacts and Information:
To learn more about the project proposal, public meetings, or to communicate concerns, please contact: Bill York, Project Manager Cloudy Ridge Wind Park LP c/o Zero Emission People 346 Waverley Street Ottawa, ON K2P 0W5 Phone: (613) 827-7605 Email: [email protected]
OR
Katie Meyer-Beck, Project Manager M.K. Ince and Associates, Ltd. 11 Cross Street Dundas, Ontario L9H 2R3 Tel: (905) 628-0077 E-mail: [email protected]
Municipal Office of Grey Highlands 206 Toronto St S., Unit 1 POBox 409 Markdale, ON N0C 1H0
Flesherton Public Library 101 Highland Drive POBox 280 Flesherton, Ontario N0C 1E0
AND
Meeting Location: DATE: Wednesday, April 24th, 2013
TIME: 6:00 p.m. to 9:00 p.m. PLACE: Osprey Community Hall
494196 Grey Road 2 Maxwell, Ontario
FORMAT: Presentations, and Question and Answer 6:00 p.m. Presentation by the Proponent 6:15 p.m. Questions and Answers - the audience will have an opportunity to ask questions and receive answers in
a public forum. A moderator will be on hand to act as a neutral facilitator and ensure that all voices and viewpoints are heard. While we cannot guarantee that all questions can be answered at that time, we do guarantee that all questions submitted at the public meeting will be addressed in the Consultation Report, to be submitted as part of the Renewable Energy Approval application. 8:30 p.m. Open House - posters and one-on-one discussion
Please note, correspondence will form part of the public record related to the project and will be included in the Public Consultation Report. Please let us know if you would like correspondence kept confidential. We encourage comments, questions,
and concerns to be raised in written form and sent via e-mail.
M.K. Ince and Associates Ltd.
February 15, 2013
Transport Canada, Civil Aviation
Ontario Region
300-4900 Yonge Street
Toronto ON M2N 6A5
Reference: Notice of Final Public Meeting for Skyway 126 Wind Energy, near Badjeros in the
Municipality of Grey Highlands
To Whom It May Concern:
M.K. Ince and Associates Ltd., on behalf of the project proponent Cloudy Ridge Wind Park LP, informs
you of a Final Public Meeting under the Renewable Energy Approval (REA) process for the Skyway 126
Wind Energy project. The project, which will consist of up to five (5) 2.0 MW wind turbines and
associated access roads and cabling, is to be located within the Municipality of Grey Highlands, near the
community of Badjeros, Ontario.
A Notice of Final Public Meeting is enclosed. This notice is also available on the project website
(www.zeroemissionpeople.com), along with a copy of the draft Renewable Energy Approval reports and
technical studies for the proposed Skyway 126 Wind Energy project.
We encourage you to contact us with any questions or concerns regarding the proposed Skyway 126
Wind Energy project. Thank you for your assistance and cooperation. We look forward to your response.
Sincerely,
M. K. INCE AND ASSOCIATES LTD.
Katie Meyer-Beck
Encl.
cc. Bill York c/o Cloudy Ridge Wind Park LP
Skyway 126 <[email protected]>
Notice of Draft Site Plan for Skyway 126 Wind Energy
Katie Meyer-Beck <[email protected]> Wed, Jan 30, 2013 at 4:10 PM
Cc: [email protected], Skyway 126 <[email protected]>
To whom it may concern:
Please find attached in this email the following with regards to the Skyway 126 Wind Energy project:
1. Cover letter
2. Notice of Draft Site Plan for Skyway 126 Wind Energy
This notice has also been sent to your office earlier this week. Please do not hesitate to respond with any further
questions.
Best regards,
Katie
[Quoted text hidden]
2 attachments
Skyway 126 Wind Energy Notice of Draft Site Plan_2013-01-30 FINAL updated.pdf
136K
Transport Canada Notice of Draft Site Plan letter EMAIL copy_2013-01-24 -FINAL.pdf
74K
M.K. Ince and Associates Ltd.
January 30, 2013
Transport Canada, Civil Aviation
Ontario Region
300-4900 Yonge Street
Toronto ON M2N 6A5
Sent via email:
Reference: Notice of Draft Site Plan for Skyway 126 Wind Energy, near Badjeros in the
Municipality of Grey Highlands
To Whom It May Concern:
The proponent, Cloudy Ridge Wind Park LP, submits this Notice of Draft Site Plan under the Renewable
Energy Approval (REA) process for Skyway 126 Wind Energy. The project, which will consist of up to
five (5) wind turbines with a total maximum name plate capacity of up to 10 MW, along with associated
access roads and cabling, is to be located within the Municipality of Grey Highlands, near the
community of Badjeros, Ontario.
As per Ontario Regulation 359/09 (consolidated version, November 2, 2012), a Notice of Draft Site Plan
is enclosed to clarify the locations of turbines and other project infrastructure for Skyway 126 Wind
Energy. This notice is also available on the project website (www.zeroemissionpeople.com), along with a
copy of the Draft Site Plan and associated appendices. In addition, a copy of the notice was sent to your
address earlier this week via mail.
We encourage you to contact us with any questions or concerns regarding the proposed Skyway 126
Wind Energy. Thank you for your assistance and cooperation. We look forward to your response.
Sincerely,
M. K. INCE AND ASSOCIATES LTD.
Katie Meyer-Beck
Encl.
cc. Cloudy Ridge Wind Park LP
NOTICE OF DRAFT SITE PLAN SECTION 54.1 ONTARIO REGULATION 359/09
Distributed by Cloudy Ridge Wind Park LP regarding a Proposal to Engage in a Renewable Energy Project
Project Name: Skyway 126 Wind Energy Proponent Name: Cloudy Ridge Wind Park LP Project website: www.zeroemissionpeople.com Project Location: On privately-owned agricultural lands within the Municipality of Grey Highlands, near the community of Badjeros, Ontario Dated at the Municipality of Grey Highlands this the 30th of January, 2013 The proponent, Cloudy Ridge Wind Park LP, is planning to engage in a renewable energy project in respect of which the issuance of a Renewable Energy Approval (REA) is required. The distribution of this Notice of Draft Site Plan (Notice) is subject to the provisions of the Environmental Protection Act (Act) Part V.0.1 and Ontario Regulation 359/09 (Regulation). This Notice is being distributed in accordance with sections 54 and 54.1 of the Regulation prior to an application being submitted and assessed for completeness by the Ministry of the Environment. For the purposes of the 550 meter setback prohibition (subsection 54(1) in O. Reg. 359/09) for the Skyway 126 Wind Energy project, Cloudy Ridge Wind Park LP has considered all noise receptors (as that term is defined in O. Reg. 359/09) existing on the day before this notice of draft site plan is published. The legal effect of this publication is that Cloudy Ridge Wind Park LP is not required to consider any new noise receptors that come into existence after this day. This notice was first published January 30, 2013. Project Description: Pursuant to the Act and Regulation, the renewable energy generation facility, in respect of which this project is to be engaged in, is a Wind Facility, Class 4. If approved, this facility would have a total maximum name plate capacity of up to 10 megawatts (MW). The project location is described in the map below.The project would consist of up to five (5) REpower MM92 wind turbines of 2 MW per turbine. Documents for Public Inspection: The Draft Project Description Report entitled Skyway 126 Wind Energy Draft Project Description Report describes the project as consisting of up to five (5) wind turbine generators, wind turbine foundations, step-up transformers, gravel access roads, underground and/or overhead electrical collection system, substation to connect to Hydro One power line, and temporary construction work spaces, as shown in the map below. The Draft Site Plan, associated appendices, and Environmental Noise Impact Report will be made available for public inspection at the Flesherton Public Library (101 Highland Drive, Flesherton, Ontario N0C 1E0) and on the Project website at www.zeroemissionpeople.com. Project Contacts and Information: To learn more about the project proposal, or to communicate concerns please contact: Bill York, Project Manager Cloudy Ridge Wind Park LP c/o Zero Emission People 346 Waverley Street Ottawa, ON, K2P 0W5 Phone: (613) 827-7605 E-mail: [email protected] OR Katie Meyer-Beck, Project Manager M.K. Ince and Associates Ltd. 11 Cross Street Dundas, Ontario, L9H 2R3 Phone: (905) 628-0077 E-mail: [email protected]
Skyway 126 Wind Energy
Please note, correspondence will form part of the public record related to the project and will be included in the Public Consultation Report. Please let us know if you would like correspondence kept confidential. We encourage comments, questions, and concerns to be raised in written form and sent via e-mail.
M.K. Ince and Associates Ltd.
January 28, 2013
Transport Canada, Civil Aviation
Ontario Region
300-4900 Yonge Street
Toronto ON M2N 6A5
Reference: Notice of Draft Site Plan for Skyway 126 Wind Energy, near Badjeros in the
Municipality of Grey Highlands
To Whom It May Concern:
The proponent, Cloudy Ridge Wind Park LP, submits this Notice of Draft Site Plan, Draft Site Plan, and
associated appendices under the Renewable Energy Approval (REA) process for Skyway 126 Wind
Energy. The project, which will consist of up to five (5) wind turbines with a total maximum name plate
capacity of up to 10 MW, along with associated access roads and cabling, is to be located within the
Municipality of Grey Highlands, near the community of Badjeros, Ontario.
As per Ontario Regulation 359/09 (consolidated version, November 2, 2012), s. 54.1, a Notice of Draft
Site Plan is enclosed to clarify the locations of turbines and other project infrastructure for Skyway 126
Wind Energy. This notice is also available on the project website (www.zeroemissionpeople.com), along
with a copy of the Draft Site Plan and associated appendices.
We encourage you to contact us with any questions or concerns regarding the proposed Skyway 126
Wind Energy. Thank you for your assistance and cooperation. We look forward to your response.
Sincerely,
M. K. INCE AND ASSOCIATES LTD.
Katie Meyer-Beck
Encl.
cc. Cloudy Ridge Wind Park LP