KU-0007- PID-001 ID Guideword Deviation Causes Consequences Safeguards Recommendation Action # FCV not present 1. Install FCV Air inlet filter damage 2. Install block and bleed arrangement Possible liquid formation FCV not present Install FCV AIR inlet filter block C Flow Reverse N/A N/A Compressor control malfunction Inadvertent closing of any inline isolation valve E Pressure Low 1.FCV partially closed or malfuntion 2. Inadvertent handling 3.Blockage of air filter Line rupture 1. Deferred Production 2. Environmental Damage 1. Pressure transsmitter available 2. SOPs in place F Level High N/A G Level Low N/A N/A n/a 1. Deferred Production Flow 1. Deferred Production 2. High Pressure at upstream 1. Pressure Transmitter available 2. SOPs in place 3. Maintenance procedures incorporated B Location Ref. Drawings Karachi University Inlet of Compressor Node-1 Pressure High 1. High velocity may lead to Erosion 2. Production loss 1. Proper monitoring of pressure diffrential across filter HAZOP WORKSHEET REPORT WELLHEAD COMPRESSION PROJECT AT LATIF-06 AND LATIF NORTH-01 flow More A 1. SOP of pressure monitoring across air filter is present Temperature H Low / No High Low Temperature I D

Upload: zohaibfarooq

Post on 17-May-2017

218 views

Category:

Documents


0 download

TRANSCRIPT

KU-0007-

PID-001

ID Guideword Deviation Causes Consequences Safeguards Recommendation Action #

FCV not present 1. Install FCV

Air inlet filter damage2. Install block and bleed

arrangement

Possible liquid formation

FCV not present Install FCV

AIR inlet filter block

C Flow Reverse N/A N/A

Compressor control

malfunction

Inadvertent closing of any

inline isolation valve

E Pressure Low

1.FCV partially closed or

malfuntion

2. Inadvertent handling

3.Blockage of air filter

Line rupture

1. Deferred Production

2. Environmental Damage

1. Pressure transsmitter

available

2. SOPs in place

F Level High N/A

G Level Low N/A

N/A

n/a

1. Deferred Production

Flow

1. Deferred Production

2. High Pressure at

upstream

1. Pressure Transmitter

available

2. SOPs in place

3. Maintenance

procedures incorporated

B

Location

Ref. Drawings

Karachi University

Inlet of CompressorNode-1

Pressure High

1. High velocity may lead

to Erosion

2. Production loss

1. Proper monitoring of

pressure diffrential across

filter

HAZOP WORKSHEET REPORTWELLHEAD COMPRESSION PROJECT AT LATIF-06 AND LATIF NORTH-01

flow MoreA

1. SOP of pressure

monitoring across air filter

is present

TemperatureH

Low / No

High

LowTemperatureI

D

ID Guideword Deviation Causes Consequences Safeguards Recommendation Action #

E Pressure Low1.compressor triping

2.due to leakage

1. Deferred Production

2. Environmental Damage

1. Pressure transsmitter

available

2. SOPs in place

F Level High N/A

G Level Low N/A

1.temparature transmitter

available

compressor internal available

1. Deferred Production

2. production off spec.

1.Compresor trip

2.plant shutdown

3.chiller work not proper

1.SOP in line

2.chiller schedule

maintance in place.

I Temperature Low

1.TCV not working properly

2.chiller not working

properly

D Pressure High

1. High Pressure at

upstream

2. High velocity may lead

to Erosion

1.Compressor control

malfunction

2.HEX choke

1. Pressure Transmitter

available

2. SOPs in place

3. Maintenance

procedures incorporated

H Temperature High

1. inefficient working of

Chiller.

2.compersor malfunction

1.Compressor control

malfunction

2.antisurge valve

malfunction

3.may leads to leakage

KU-0007-PID-001

B Flow Low / No1. Production loss

2.plant shutdown1.SOP developed

A flow More

1. High velocity may lead

to Erosion

2. Production loss

3.comperssor tripping

1. Proper monitoring

2.high flow triping

available

1.Compressor control

malfunction

2.

Location Karachi University

Node-3 Chiller upstream and downstream

HAZOP WORKSHEET REPORTWELLHEAD COMPRESSION PROJECT AT LATIF-06 AND LATIF NORTH-01

Ref. Drawings

ID Guideword Deviation Causes Consequences Safeguards Recommendation Action #

inlet FCV not present 1. Install FCV

Filter choke

Compressor control

malfunction

Inadvertent closing of any

inline isolation valve

E Pressure Low

1.inlet FCV partially closed

or malfuntion

2. Inadvertent handling

3.Blockage of air filter

Line rupture

1. Deferred Production

2. Environmental Damage

1. Pressure transsmitter

available

2. SOPs in place

F Level High N/A

G Level Low N/A

I Temperature Low n/a

1. Deferred Production

2. High Pressure at

upstream

1. Pressure Transmitter

available

2. SOPs in place

3. Maintenance

procedures incorporated

H Temperature High N/A

D Pressure High

A flow More

1. High velocity may lead

to Erosion

2. Production loss

1. Proper monitoring of

pressure diffrential across

filter

B Flow Low / No1. Production loss

2.plant shutdown

1. Proper monitoring of

pressure diffrential across

filter

2.SOP developed

HAZOP WORKSHEET REPORTWELLHEAD COMPRESSION PROJECT AT LATIF-06 AND LATIF NORTH-01

Location Karachi University

Node-2 compressor Upstream

Ref. Drawings KU-0007-PID-001

Session No.

System

ID Guideword Deviation Causes Consequences Safeguards Recommendation Action # Action

Choke valve FCV-612 fail

open

FIC-612 malfunction

Compressor overspeed

Compressor by-pass valve

leakage or passes

FIC-671 malfunction leads

to fully open (more than

required)

FCV-672 stuck close

Inadvertent opening of

isolation valve of vent/PSV-

617A/B passing

Line rupture

1. Fire Hazard

2. Production Loss

3. Environmental Damage

1. F&G Detection are in

place

2. Pressure alarm low low

& trip (16-PALL-615)

Choke valve FCV-612 fail

close

Inadvertent closing of any

inline isolation valve

Choking of Cooler(E-1660)

tubes

C Flow Reverse

1. Compressor by-pass

valve leakage or passes

2.

1. More flow at

compressor suction

2. Deferred Production

NRV located at by-pass

Choke valve FCV-612 fail

close

1. High Pressure at

upstream

Inadvertent closing of any

inline isolation valve

Choking of FE-612

Compressor control

malfunction

Water slugging

FCV-671/672 stuck close

Choking of Cooler tubes

E Pressure Low

1. Choke valve partially

(less than required)

closed/FIC-612 malfunction

2. Wellhead shutdown

3. Inadvertent opening of

isolation valve of vent/PSV-

617A/B passing

4. Choking of cooler tubes

5. FCV-672 stuck open

1. Deferred Production

2. More flow towards FCV-

671

1. Pressure alarm low low

& trip (16-PALL-615)

3. SOPs in place

Line rupture

1. Fire Hazard

2. Production Loss

3. Environmental Damage

1. F&G Detection are in

place

2. Pressure alarm low low

& trip (16-PALL-615)

3. Adequate piping design

F Level High N/A

G Level Low N/A

2. Deferred Production

1. Pressure alarm low low

& trip (16-PALL-615)

2. Pressure alarm high

high & trip (16-PAHH-615)

3. SOPs in place

4. Maintenance

procedures incorporated

5. Pigging procedures in

place

D Pressure High

Flow More

1. High velocity may lead

to Erosion

2. Production loss

3. Low pressure at

compressor suction (A-

480)

1. Erosion Probe Installed

2. Adequate piping design

3. Compressor overspeed

trip

4.

B Flow Low / No

1. Deferred Production

2. High Pressure at

upstream

1. Pressure alarm low low

& trip (16-PALL-615)

2. Pressure alarm high

high & trip (16-PAHH-615)

3. SOPs in place

4. Maintenance

procedures incorporated

5. Pigging procedures in

place

Ref. Drawings 5007-11-16-10-PD-603-01, 5007-11-16-10-PD-604-01, 5010-11-16-10-PD-116-01

A

HAZOP WORKSHEET REPORTWELLHEAD COMPRESSION PROJECT AT LATIF-06 AND LATIF NORTH-01

Location ENAR Head Office

Node-2 Downstream of Wellhead Latif-6 to the Suction of Wellhead Compressor A-470 & A-480 (FCV-671)

01 1ST OCT - 2012

Resp.Target

DatesStatus Remarks

5007-11-16-10-PD-603-01, 5007-11-16-10-PD-604-01, 5010-11-16-10-PD-116-01

HAZOP WORKSHEET REPORTWELLHEAD COMPRESSION PROJECT AT LATIF-06 AND LATIF NORTH-01

Date:

Wellhead compression for LATIF-06 AND LATIF NORTH-01

Session No.

System

ID Guideword Deviation Causes Consequences Safeguards Recommendation Action # Action

Choke valve FCV-612 fail

open

FIC-612 malfunction

Compressor overspeed

Compressor by-pass valve

leakage or passes

FIC-672 malfunction leads

to fully open (more than

required)

FCV-671 stuck close

Inadvertent opening of

isolation valve of vent/PSV-

617A/B passing

Line rupture

1. Fire Hazard

2. Production Loss

3. Environmental Damage

1. F&G Detection are in

place

2. Pressure alarm low low

& trip (16-PALL-615)

Choke valve FCV-612 fail

close

Inadvertent closing of any

inline isolation valve

Choking of Cooler(E-1660)

tubes

C Flow Reverse

1. Compressor by-pass

valve leakage or passes

2.

1. More flow at

compressor suction

2. Deferred Production

NRV located at by-pass

B Flow Low / No

1. Deferred Production

2. High Pressure at

upstream

1. Pressure alarm low low

& trip (16-PALL-615)

2. Pressure alarm high

high & trip (16-PAHH-615)

3. SOPs in place

4. Maintenance

procedures incorporated

5. Pigging procedures in

place

Ref. Drawings 5007-11-16-10-PD-603-01, 5007-11-16-10-PD-604-01, 5010-11-16-10-PD-116-01

A Flow More

1. High velocity may lead

to Erosion

2. Production loss

3. Low pressure at

compressor suction (A-

480)

1. Erosion Probe Installed

2. Adequate piping design

3. Compressor overspeed

trip

4.

HAZOP WORKSHEET REPORTWELLHEAD COMPRESSION PROJECT AT LATIF-06 AND LATIF NORTH-01

Location ENAR Head Office

Node-2 Downstream of Wellhead Latif-6 to the Suction of Wellhead Compressor A-470 & A-480 (FCV-672)

Session No.

System

ID Guideword Deviation Causes Consequences Safeguards Recommendation Action # Action

Ref. Drawings 5007-11-16-10-PD-603-01, 5007-11-16-10-PD-604-01, 5010-11-16-10-PD-116-01

HAZOP WORKSHEET REPORTWELLHEAD COMPRESSION PROJECT AT LATIF-06 AND LATIF NORTH-01

Location ENAR Head Office

Node-2 Downstream of Wellhead Latif-6 to the Suction of Wellhead Compressor A-470 & A-480 (FCV-672)

Choke valve FCV-612 fail

close

1. High Pressure at

upstream

Inadvertent closing of any

inline isolation valve

Choking of FE-612

Compressor control

malfunction

Water slugging

FCV-671/672 stuck close

Choking of Cooler tubes

E Pressure Low

1. Choke valve partially

(less than required)

closed/FIC-612 malfunction

2. Wellhead shutdown

3. Inadvertent opening of

isolation valve of vent/PSV-

617A/B passing

4. Choking of cooler tubes

5. FCV-672 stuck open

1. Deferred Production

2. More flow towards FCV-

671

1. Pressure alarm low low

& trip (16-PALL-615)

3. SOPs in place

Line rupture

1. Fire Hazard

2. Production Loss

3. Environmental Damage

1. F&G Detection are in

place

2. Pressure alarm low low

& trip (16-PALL-615)

3. Adequate piping design

F Level High N/A

G Level Low N/A

D Pressure High

1. Pressure alarm low low

& trip (16-PALL-615)

2. Pressure alarm high

high & trip (16-PAHH-615)

3. SOPs in place

4. Maintenance

procedures incorporated

5. Pigging procedures in

place

2. Deferred Production

01 1ST OCT - 2012

Resp.Target

DatesStatus Remarks

5007-11-16-10-PD-603-01, 5007-11-16-10-PD-604-01, 5010-11-16-10-PD-116-01

HAZOP WORKSHEET REPORTWELLHEAD COMPRESSION PROJECT AT LATIF-06 AND LATIF NORTH-01

Date:

Wellhead compression for LATIF-06 AND LATIF NORTH-01

01 1ST OCT - 2012

Resp.Target

DatesStatus Remarks

5007-11-16-10-PD-603-01, 5007-11-16-10-PD-604-01, 5010-11-16-10-PD-116-01

HAZOP WORKSHEET REPORTWELLHEAD COMPRESSION PROJECT AT LATIF-06 AND LATIF NORTH-01

Date:

Wellhead compression for LATIF-06 AND LATIF NORTH-01

Session No.

System

ID Guideword Deviation Causes Consequences Safeguards Recommendation Action # Action

2. Pipeline rupture

2. Production Loss

3. Fire Hazard

4. Environmental

Consequences

2. Adequate piping design

1. Compressor trip1. Deferred Production

2. Water slugging

2. High Pressure at

upstream

Possibility of high level at

inlet separator (V-1,V-2)

PAHH-3932 alarm & trip

High level tripping

3. Inadvertent closing of

valve at manifold/tie-insDeferred Production

4. Line rupture

1. Production Loss

2. Fire Hazard

3. Environmental

Consequences

Adequate piping design

C Flow Reverse Refer reverse flow node-1

Refer to High pressure

node-1

Inadvertent closure of any

manual valve upto tie-in

High pressure leads to line

rupture

PAHH-3932 alarm & trip

1. Compressor overspeed1. Deferred Production

1. Compressor Trip

Pressure High

HAZOP WORKSHEET REPORTWELLHEAD COMPRESSION PROJECT AT LATIF-06 AND LATIF NORTH-01

Location ENAR Head Office

Node-3 Discharge Flow Line of wellhead Compressor A-490

Ref. Drawings 5010-11-16-10-PD-115-01, 5003-11-16-10-PD-102-00,

A Flow More

B Flow Low / No

D

Session No.

System

ID Guideword Deviation Causes Consequences Safeguards Recommendation Action # Action

HAZOP WORKSHEET REPORTWELLHEAD COMPRESSION PROJECT AT LATIF-06 AND LATIF NORTH-01

Location ENAR Head Office

Node-3 Discharge Flow Line of wellhead Compressor A-490

Ref. Drawings 5010-11-16-10-PD-115-01, 5003-11-16-10-PD-102-00,

Compressor trip Deferred Production

Low Compressor speed

Line rupture

1. Production Loss

2. Fire Hazard

3. Environmental

Consequences

Adequate piping design

F Level High N/A

G Level Low N/A

Temperature securities

available in vendor

package (Annex-01)

Consider installation of

Temperature Transmitter

at discharge of

compressor

Pressure LowE

High

I Temperature Low

H Temperature

02 2nd OCT - 2012

Resp.Target

DatesStatus Remarks

HAZOP WORKSHEET REPORTWELLHEAD COMPRESSION PROJECT AT LATIF-06 AND LATIF NORTH-01

Date:

Wellhead compression for LATIF-06 AND LATIF NORTH-01

5010-11-16-10-PD-115-01, 5003-11-16-10-PD-102-00,

02 2nd OCT - 2012

Resp.Target

DatesStatus Remarks

HAZOP WORKSHEET REPORTWELLHEAD COMPRESSION PROJECT AT LATIF-06 AND LATIF NORTH-01

Date:

Wellhead compression for LATIF-06 AND LATIF NORTH-01

5010-11-16-10-PD-115-01, 5003-11-16-10-PD-102-00,

Session No.

System

ID Guideword Deviation Causes Consequences Safeguards Recommendation Action # Action

2. Pipeline rupture1. F&G Detection system

2. Adequate piping design

3. Inadvertent opening of

any bleed valve1. SOPs in place

1. Compressor trip1. Deferred Production

2. Water slugging/High

level at inlet separator (V-

1)

2. High Pressure at

upstream

Possibility of high level at

inlet separator (V-1,V-2)

PAHH-3932 alarm & trip

High level tripping

3. Inadvertent closing of

valve at manifold/tie-insDeferred Production

4. Line rupture (will cause

no/low flow at

downstream)

Adequate piping design

5. Inadvertent opening of

any bleed valve

6. Malfunction of

compressor recycle valve

1. Deferred Production 1. Low pressure alarm at

compressor discharge

To be checked with

vendor for further

safeguards

C Flow Reverse No credible scenario

1. Water slugging

1. High Pressure at

upstream

Possibility of high level at

inlet separator (V-1,V-2)

PAHH-3932 alarm & trip

High level tripping

2. Inadvertent closing of

valve at manifold/tie-insDeferred Production

1. Compressor overspeedHigh velocity may lead to

erosion in piping

1. Compressor Overspeed

Tripping

2. Adequate piping design

HAZOP WORKSHEET REPORTWELLHEAD COMPRESSION PROJECT AT LATIF-06 AND LATIF NORTH-01

Location ENAR Head Office

Node-4 Discharge Flow Line of wellhead Compressor A-470/A-480

D

B

Ref. Drawings 5010-11-16-10-PD-116-01, 5007-11-16-10-PD-604-01

A Flow

1. Production Loss

2. Fire Hazard/Asset loss

3. Environmental

Consequences

Flow Low / No

1. Production Loss

2. Fire Hazard

3. Environmental

Consequences

HighPressure

More

Session No.

System

ID Guideword Deviation Causes Consequences Safeguards Recommendation Action # Action

HAZOP WORKSHEET REPORTWELLHEAD COMPRESSION PROJECT AT LATIF-06 AND LATIF NORTH-01

Location ENAR Head Office

Node-4 Discharge Flow Line of wellhead Compressor A-470/A-480

Ref. Drawings 5010-11-16-10-PD-116-01, 5007-11-16-10-PD-604-01

E 1. Compressor trip1. Deferred Production

2. Inadvertent closing of

valve at compressor

discharge

Deferred Production

3. Line rupture (will cause

no/low flow at

downstream)

Adequate piping design

4. Inadvertent opening of

any bleed valveSOPs in place

5. Malfunction of

compressor recycle valve

1. Deferred Production 1. Low pressure alarm at

compressor discharge

To be checked with

vendor for further

safeguards

F Level High N/A

G Level Low N/A

Temperature securities

available in vendor

package (Annex-01)

Consider installation of

Temperature Transmitter

at individual discharge of

compressors

Pressure Low

H Temperature High

I Temperature Low

1. Production Loss

2. Fire Hazard

3. Environmental

Consequences

01 1ST OCT - 2012

Resp.Target

DatesStatus Remarks

Wellhead compression for LATIF-06 AND LATIF NORTH-01

HAZOP WORKSHEET REPORTWELLHEAD COMPRESSION PROJECT AT LATIF-06 AND LATIF NORTH-01

Date:

5010-11-16-10-PD-116-01, 5007-11-16-10-PD-604-01

01 1ST OCT - 2012

Resp.Target

DatesStatus Remarks

Wellhead compression for LATIF-06 AND LATIF NORTH-01

HAZOP WORKSHEET REPORTWELLHEAD COMPRESSION PROJECT AT LATIF-06 AND LATIF NORTH-01

Date:

5010-11-16-10-PD-116-01, 5007-11-16-10-PD-604-01

Session No.

System

ID Guideword Deviation Causes Consequences Safeguards Recommendation Action # Action

C Flow ReverseD Pressure HighE Pressure Low

HAZOP WORKSHEET REPORTWELLHEAD COMPRESSION PROJECT AT LATIF-06 AND LATIF NORTH-01

Location ENAR Head Office

Node-5 Latif-North-1 Sour Gas Conditioning Skid

Ref. Drawings 5003-11-16-10-PD-101-00, 5003-11-16-10-PD-105-00,

A Flow More

B Flow Low / No

Session No.

System

ID Guideword Deviation Causes Consequences Safeguards Recommendation Action # Action

HAZOP WORKSHEET REPORTWELLHEAD COMPRESSION PROJECT AT LATIF-06 AND LATIF NORTH-01

Location ENAR Head Office

Node-5 Latif-North-1 Sour Gas Conditioning Skid

Ref. Drawings 5003-11-16-10-PD-101-00, 5003-11-16-10-PD-105-00,

F Level High

G Level Low

J Corrosion SS tubing shall be used

K Fire / Explosion

LPigging

Operation

M Maintenance

N Design Concern

The tie-in connection

from sour gas skid to be

taken of 1/2 inch for

compressor package

High

I Temperature Low

H Temperature

01 1ST OCT - 2012

Resp.Target

DatesStatus Remarks

HAZOP WORKSHEET REPORTWELLHEAD COMPRESSION PROJECT AT LATIF-06 AND LATIF NORTH-01

Date:

Wellhead compression for LATIF-06 AND LATIF NORTH-01

5003-11-16-10-PD-101-00, 5003-11-16-10-PD-105-00,

01 1ST OCT - 2012

Resp.Target

DatesStatus Remarks

HAZOP WORKSHEET REPORTWELLHEAD COMPRESSION PROJECT AT LATIF-06 AND LATIF NORTH-01

Date:

Wellhead compression for LATIF-06 AND LATIF NORTH-01

5003-11-16-10-PD-101-00, 5003-11-16-10-PD-105-00,

Session No.

System

ID Guideword Deviation Causes Consequences Safeguards Recommendation Action # Action

Instrument Gas FailureLow flow alram (FSL-

302,303)

PSV Passing

Inadvertent closure of

isolation valves for pumpsSOPs incorporated

Choking of strainerMaintenance procedures

incorporated/SOPs

C Flow ReverseTripping of low pressure

pumps (P-1608 A/B)

NRV installed at pumps

discharge

D Pressure HighInadvertent closure of

isolation valves for pumpsPSV available at discharge

Choking of strainer

Pump failure

Compressor trip

Inadvertent opening of any

bleed valveSOPs incorporated

Low

CI layer shall not be

formed leading to

corrosion in line

Preventive maintenance

HAZOP WORKSHEET REPORTWELLHEAD COMPRESSION PROJECT AT LATIF-06 AND LATIF NORTH-01

Location ENAR Head Office

Node-6 Latif-North-1 Corrosion Inhibitor System

B Low / No

Ref. Drawings 5003-11-16-10-PD-102-00, 5003-11-16-10-PD-104-00,

A Flow More

Flow

CI layer shall not be

formed leading to

corrosion in line

PressureE

Session No.

System

ID Guideword Deviation Causes Consequences Safeguards Recommendation Action # Action

HAZOP WORKSHEET REPORTWELLHEAD COMPRESSION PROJECT AT LATIF-06 AND LATIF NORTH-01

Location ENAR Head Office

Node-6 Latif-North-1 Corrosion Inhibitor System

Ref. Drawings 5003-11-16-10-PD-102-00, 5003-11-16-10-PD-104-00,

F Level High

G Level Low

I Temperature Low

H Temperature High

01 1ST OCT - 2012

Resp.Target

DatesStatus Remarks

HAZOP WORKSHEET REPORTWELLHEAD COMPRESSION PROJECT AT LATIF-06 AND LATIF NORTH-01

Date:

Wellhead compression for LATIF-06 AND LATIF NORTH-01

5003-11-16-10-PD-102-00, 5003-11-16-10-PD-104-00,

01 1ST OCT - 2012

Resp.Target

DatesStatus Remarks

HAZOP WORKSHEET REPORTWELLHEAD COMPRESSION PROJECT AT LATIF-06 AND LATIF NORTH-01

Date:

Wellhead compression for LATIF-06 AND LATIF NORTH-01

5003-11-16-10-PD-102-00, 5003-11-16-10-PD-104-00,

Session No.

System

ID Guideword Deviation Causes Consequences Safeguards Recommendation Action # Action

C Flow ReverseD Pressure HighE Pressure Low

HAZOP WORKSHEET REPORTWELLHEAD COMPRESSION PROJECT AT LATIF-06 AND LATIF NORTH-01

Location ENAR Head Office

Node-7 Latif-06 Sour Gas Conditioning Skid

Ref. Drawings 5007-11-16-10-PD-603-01, 5007-11-16-10-PD-605-01,

A Flow More

B Flow Low / No

Session No.

System

ID Guideword Deviation Causes Consequences Safeguards Recommendation Action # Action

HAZOP WORKSHEET REPORTWELLHEAD COMPRESSION PROJECT AT LATIF-06 AND LATIF NORTH-01

Location ENAR Head Office

Node-7 Latif-06 Sour Gas Conditioning Skid

Ref. Drawings 5007-11-16-10-PD-603-01, 5007-11-16-10-PD-605-01,

F Level High

G Level Low

J Corrosion SS tubing shall be usedK Fire / Explosion

LPigging

Operation

M Maintenance

N Design Concern

The tie-in connection

from sour gas skid to be

taken of 1/2 inch for

compressor package

High

I Temperature Low

H Temperature

02 2nd OCT - 2012

Resp.Target

DatesStatus Remarks

HAZOP WORKSHEET REPORTWELLHEAD COMPRESSION PROJECT AT LATIF-06 AND LATIF NORTH-01

Date:

Wellhead compression for LATIF-06 AND LATIF NORTH-01

5007-11-16-10-PD-603-01, 5007-11-16-10-PD-605-01,

02 2nd OCT - 2012

Resp.Target

DatesStatus Remarks

HAZOP WORKSHEET REPORTWELLHEAD COMPRESSION PROJECT AT LATIF-06 AND LATIF NORTH-01

Date:

Wellhead compression for LATIF-06 AND LATIF NORTH-01

5007-11-16-10-PD-603-01, 5007-11-16-10-PD-605-01,

Session No.

System

ID Guideword Deviation Causes Consequences Safeguards Recommendation Action # Action

Instrument Gas FailureLow flow alram (FSL-

639,640)

PSV Passing

Inadvertent closure of

isolation valves for pumpsSOPs incorporated

Choking of strainerMaintenance procedures

incorporated/SOPs

C Flow ReverseTripping of low pressure

pumps (P-1661 A/B)

NRV installed at pumps

discharge

D Pressure HighInadvertent closure of

isolation valves for pumpsPSV available at discharge

Choking of strainer

Pump failure

Compressor trip

Inadvertent opening of any

bleed valveSOPs incorporated

Preventive maintenance

Flow Low / No

CI layer shall not be

formed leading to

corrosion in line

E Pressure Low

CI layer shall not be

formed leading to

corrosion in line

HAZOP WORKSHEET REPORTWELLHEAD COMPRESSION PROJECT AT LATIF-06 AND LATIF NORTH-01

Location ENAR Head Office

Node-8 Latif-06 Corrosion Inhibitor System

Ref. Drawings 5007-11-16-10-PD-604-01, 5007-11-16-10-PD-606-01,

A Flow More

B

Session No.

System

ID Guideword Deviation Causes Consequences Safeguards Recommendation Action # Action

HAZOP WORKSHEET REPORTWELLHEAD COMPRESSION PROJECT AT LATIF-06 AND LATIF NORTH-01

Location ENAR Head Office

Node-8 Latif-06 Corrosion Inhibitor System

Ref. Drawings 5007-11-16-10-PD-604-01, 5007-11-16-10-PD-606-01,

F Level High

G Level Low

J Corrosion

K Fire / Explosion

LPigging

Operation

M Maintenance

N Design Concern

I Temperature Low

H Temperature High

02 2nd OCT - 2012

Resp.Target

DatesStatus Remarks

HAZOP WORKSHEET REPORTWELLHEAD COMPRESSION PROJECT AT LATIF-06 AND LATIF NORTH-01

Date:

Wellhead compression for LATIF-06 AND LATIF NORTH-01

5007-11-16-10-PD-604-01, 5007-11-16-10-PD-606-01,

02 2nd OCT - 2012

Resp.Target

DatesStatus Remarks

HAZOP WORKSHEET REPORTWELLHEAD COMPRESSION PROJECT AT LATIF-06 AND LATIF NORTH-01

Date:

Wellhead compression for LATIF-06 AND LATIF NORTH-01

5007-11-16-10-PD-604-01, 5007-11-16-10-PD-606-01,

Session No.

System

ID Guideword Deviation Causes Consequences Safeguards Recommendation Action # Action

A Flow More

Inadverdent opening of

Isolation Valves on

depressuring line

1. High Velocity

1.Globe valve at

depressing line in locked

closed.

2. SOPs are in placeN/AN/AN/AN/A

C Flow Reverse No credible sceniros

D Pressure High

E Pressure Low

F Level High

G Level Low

HAZOP WORKSHEET REPORTWELLHEAD COMPRESSION PROJECT AT LATIF-06 AND LATIF NORTH-01

Location ENAR Head Office

Node-9 Latif North-01 & Latif-06 vent stack. (for Tie-ins)

Ref. Drawings 5007-11-16-10-PD-603-01, 5010-11-16-10-PD-116-01,5003-11-16-10-PD-101-00,5010-11-16-10-PD-115-01,

B Flow Low / No

Session No.

System

ID Guideword Deviation Causes Consequences Safeguards Recommendation Action # Action

HAZOP WORKSHEET REPORTWELLHEAD COMPRESSION PROJECT AT LATIF-06 AND LATIF NORTH-01

Location ENAR Head Office

Node-9 Latif North-01 & Latif-06 vent stack. (for Tie-ins)

Ref. Drawings 5007-11-16-10-PD-603-01, 5010-11-16-10-PD-116-01,5003-11-16-10-PD-101-00,5010-11-16-10-PD-115-01,

Low temperature due to

depressurization

1.Hydrate formation in

vent & drain line.1.SOP

J Corrosion

K Fire / ExplosionLightening occurs at the

time of venting.

1.Asset damage.

2. Loss of production.

1. SOP available.

2. Stack has been sized on

API-521 considering

radiation and dispersion.

LPigging

Operation

M Maintenance SOP

N Design Concern

1. Adequacy of existing

vent stack of latif-North-1

and Latif 06 to be

checked.

2. Back pressure as a

result of Venting of

Compressor at wellhead

PSV shall also be

checked.

High

I Temperature Low

H Temperature

02 2nd OCT - 2012

Resp.Target

DatesStatus Remarks

HAZOP WORKSHEET REPORTWELLHEAD COMPRESSION PROJECT AT LATIF-06 AND LATIF NORTH-01

Date:

Wellhead compression for LATIF-06 AND LATIF NORTH-01

5007-11-16-10-PD-603-01, 5010-11-16-10-PD-116-01,5003-11-16-10-PD-101-00,5010-11-16-10-PD-115-01,

02 2nd OCT - 2012

Resp.Target

DatesStatus Remarks

HAZOP WORKSHEET REPORTWELLHEAD COMPRESSION PROJECT AT LATIF-06 AND LATIF NORTH-01

Date:

Wellhead compression for LATIF-06 AND LATIF NORTH-01