annual inspections of first nation water and wastewater facilities

20
Annual Inspections of First Nation Water and Wastewater Facilities Derek Hill, P.Eng., Senior Engineer Mohammed Karim, P.Eng., Senior Engineer, Water\Wastewater 1

Upload: kamal-arnold

Post on 30-Dec-2015

29 views

Category:

Documents


0 download

DESCRIPTION

Annual Inspections of First Nation Water and Wastewater Facilities. Derek Hill, P.Eng., Senior Engineer Mohammed Karim, P.Eng., Senior Engineer, Water\Wastewater. Background. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Annual Inspections of First Nation Water and Wastewater Facilities

Annual Inspections of First Nation Water and Wastewater

Facilities

Derek Hill, P.Eng., Senior Engineer Mohammed Karim, P.Eng., Senior Engineer, Water\Wastewater

1

Page 2: Annual Inspections of First Nation Water and Wastewater Facilities

Background

• As part of the Aboriginal Affairs and Northern Development Canada (AANDC) documents “Protocol for Centralised Drinking Water Systems in First Nations Communities” and “Protocol for Centralised Wastewater Systems in First Nations Communities”, an annual performance inspection is to be completed.

• OFNTSC was approached by AANDC – HQ to administer and conduct the Annual Inspections of First Nation Water and Wastewater facilities in Ontario.

2

Page 3: Annual Inspections of First Nation Water and Wastewater Facilities

Objectives - Water Systems

The main objectives of the Water System Inspection are to ensure:

• The water treatment process performs to meet design standards,

• The operator level of certification meets the appropriate level of the treatment plant and distribution system,

• No potential for microbilogical contamination of the water works and to identify operational and physical improvements to mitigate any potential.

3

Page 4: Annual Inspections of First Nation Water and Wastewater Facilities

Objectives – Wastewater Systems

The main objectives of the Wastewater System Inspection are to ensure:• The wastewater treatment process performs as

designed and as per permits,• The operator level of certification meets the

appropriate level of the treatment plant and collection system.

4

Page 5: Annual Inspections of First Nation Water and Wastewater Facilities

Inspection and Reporting

• In response to AANDC’s request, OFNTSC has prepared and submitted a formal Proposal to oversee the completion of the Annual Inspections for the fiscal year 2011-2012.

• There is a total of 203 water (135) and wastewater (68) facilities in Ontario to be inspected.

• OFNTSC will provide overall project management and administration and will also inspect 76 facilities (45 water, 31 wastewater) and engage up to 4 consultants to inspect the remaining 127 facilities (90 water, 37 wastewater).

5

Page 6: Annual Inspections of First Nation Water and Wastewater Facilities

Inspection and Reporting

• OFNTSC will be inspecting all the fly-in communities (29).• The remaining 127 facilities are all accessible by car.• OFNTSC will utilize three (3) in-house engineers and six

(6) Senior CRTP trainers to complete the OFNTSC inspections.

• If the OFNTSC Proposal is accepted, the inspections will likely start before the end of October 2011 and be completed by February 29, 2012.

• All Final Reports are to be submitted to AANDC by March 31, 2012.

6

Page 7: Annual Inspections of First Nation Water and Wastewater Facilities

Water & Wastewater Plant Inspection TEMPLATES

• Water plant inspection template consists of collecting information following steps as follows:

• Water treatment system general questions• Water treatment system key performance

parameters (KPI)• Water treatment system Risks• Water treatment system deficiencies

7

Page 8: Annual Inspections of First Nation Water and Wastewater Facilities

Water System General

• Population• Number of hours/month the operator works• Latitude and longitude for the treatment plant• Inspection period (usually one year from last

date of inspection)• Treatment System Design• Distribution system (piped or trucked)

8

Page 9: Annual Inspections of First Nation Water and Wastewater Facilities

Water System General (contd.)

• Maintenance• Operations• Test equipment• Record keeping• Trucked water system

9

Page 10: Annual Inspections of First Nation Water and Wastewater Facilities

Water Treatment System Key Performance Indicators (KPI)

• General questions• Health Canada parameters• Operator parameters• Drinking water advisories• Source Water Protection Plan

10

Page 11: Annual Inspections of First Nation Water and Wastewater Facilities

Water Treatment System Key Performance Indicators (KPI) – Cont’d.

• Emergency Management Plan• Maintenance Management Plan• System Classification information• Operator Information• Health & Safety deficiencies if any

11

Page 12: Annual Inspections of First Nation Water and Wastewater Facilities

Water Treatment System Risks

• Water Source Risks• Design Risk• Operation Risk• Reporting Risk• Operator Risk evaluation

12

Page 13: Annual Inspections of First Nation Water and Wastewater Facilities

Water Treatment Systems Deficiencies

• Information to be provided by Plant operator/Supervisor

• ACRS report could be used as a reference for list of deficiencies

13

Page 14: Annual Inspections of First Nation Water and Wastewater Facilities

Wastewater Treatment Plants

• Wastewater plant inspection template consists of collecting information following steps as follows:

• Wastewater Systems General Questions• Wastewater Systems Key Performance

Indicators (KPIs)• Wastewater System Risks• Wastewater System Deficiencies

14

Page 15: Annual Inspections of First Nation Water and Wastewater Facilities

Wastewater Systems General Questions

• Population• Sensitivity of the receiving environment• Treatment System Design• Effluent quality criteria• Location of outfall (Latitude & longitude)

15

Page 16: Annual Inspections of First Nation Water and Wastewater Facilities

Wastewater Systems General Questions (Cont’d.)

• Maintenance• Operations• Test equipment• Record keeping

16

Page 17: Annual Inspections of First Nation Water and Wastewater Facilities

Wastewater System Key Performance Indicators (KPIs)

• Summary of test results• Emergency Management Plan• Maintenance Management Plan• System Classifications• Operator Certification status information• Health & Safety deficiencies if any

17

Page 18: Annual Inspections of First Nation Water and Wastewater Facilities

Wastewater System Risks

• Effluent Receiver Risk Evaluation• Design Risk• Operation Risk• Reporting Risk• Operator Risk Evaluation

18

Page 19: Annual Inspections of First Nation Water and Wastewater Facilities

Wastewater System Deficiencies

• Information to be provided by Plant operator/Supervisor on operational deficiencies

• ACRS report could be used as a reference for coming up with the list of deficiencies

19

Page 20: Annual Inspections of First Nation Water and Wastewater Facilities

Thank You

20