annexure e2 _ electrical load details-r3 - (09!09!2011)

Upload: vineshviswanathan3

Post on 14-Apr-2018

228 views

Category:

Documents


2 download

TRANSCRIPT

  • 7/30/2019 Annexure E2 _ Electrical Load Details-R3 - (09!09!2011)

    1/10

    Project: TCS Infopark,KochiTitle: Electrical Laod SummarDate: 09.09.2011Revision: R1

    Area Connected Load Demand Load

    kW kW Selection

    Electrical Load estimates -

    Phase 1

    Block - A, audi, reception, customercare

    4270 2926

    Service block ,Caf , MLCP, recreation,

    misc4110 2989

    11kV Chiller Plant 1446 1098

    Phase 2

    Block - B, training & library 3476 2450

    Service block 410 349

    11kV Chiller Plant 723 549

    Saggrigation of Loads on HT meters

    HT meter 1 - Block - A, audi,

    reception, customer care4270 2926 2926 3080 3850 3 x 2000 kVA ( n+1)

    HT meter 2 - Service block(phase 1+2)

    ,Caf, MLCP, recreation, misc, + 11kV

    chillers.

    6689 3709 3338 3514 4392 3 x 2000 kVA ( n+1)

    HT meter 3 - Block - B, training &

    library(Phase 2) 3476 2450 2450 2579 3223 3 x 1600 kVA ( n+1)

    LT load in kWLT load in

    kVA @ 0.8PF

    DG Selection -

    1. Demand Load during phase 1 4861 6076 5 x 2000 kVA (n+1)

    2. Demand Load during end of phase 2 7066 8832 6 x 2000 kVA (n+1)

    LT load in kW LT load in kVA

    @ 0.95 PF

    load in kVA

    @ 80 %

    Transformer selection

    Project:TCS Infopark,Kochi Spectral Services Consultant Pvt.Lt

  • 7/30/2019 Annexure E2 _ Electrical Load Details-R3 - (09!09!2011)

    2/10

    Project: TCS Infopark,Kochie: qupmen oa

    Date: 09.09.2011Revision: R0

    SR. NO. EQUIPMENT DESCRIPTION QTY CONNECTED LOAD DEMAND LOAD

    1 Phase-I 11 KV Chiller Load (KW) (KW)

    1.1 900 TR Water Cooled Chiller - 11 KV 2 1446 1098Total Load For 11 KV Chiller -Ph-I 1446 1098

    2 Phase-I 415 Volt High Side HVAC Load

    2.1 370 TR Air Cooled Chiller (In case of Water shortage) 3 1277 1277

    2.1 Primary CHW Pumps - W/C Chillers 4(3W+1S) 134 100.5

    2.2 Primary CHW Pumps - A/C Chillers 4(3W+1S) 60 -

    2.3 Cooling Towers 3(2W+1S) 165 110

    2.4 Condenser Water Pumps 5(4W+1S) 225 180

    2.5 Secondary Pumps - Block A 3(2W+1S) 270 180

    2.6 Secondary Pumps - Reception / Audi / Library 2(1W+1S) 30 15

    2.7 Secondary Pumps - Caf / Recreation 2(1W+1S) 74 37

    2.8 Secondary Pumps - Guesthouse 2(1W+1S) 18.6 9.3

    TOTAL 2253 1908

    * Maximum of Air Cooled Chiller and Water Cooled Chiller operations is considered for arrving at total load.

    SR. NO. EQUIPMENT DESCRIPTION QTY CONNECTED LOAD DEMAND LOAD

    1 Phase-II 11 KV Chiller Load (KW) (KW)

    1.1 900 TR Water Cooled Chiller - 11 KV 1 723 549

    Total Load For 11 KV Chiller -Ph-II 723 549

    2 Phase-II 415 Volt High Side HVAC Load

    2.1 Primary CHW Pumps - W/C Chillers 1 33.5 33.5

    2.2 Cooling Towers 2 110 110

    2.3 Condenser Water Pumps 2 90 90

    2.4 Secondary Pumps - Block B 3(2W+1S) 165 110

    2.5 Secondary Pumps - Training 2(1W+1S) 11 5.5

    TOTAL 409.5 349

    SR. NO. SPACE CONNECTED LOAD DEMAND LOAD

    (KW) (KW)

    1 Blcok A - AHU & HRU 350 298

    2 Recp / Audi / Lib - AHU & HRU 50 43

    3 Cafeteria - AHU & HRU 80 68

    4 Guesthouse - AHU & HRU 30 26

    5 Blcok A - Fans 165 140 In fire mode

    6 Audi - Fans 30 26 In fire mode

    7 Cafeteria Kitchen - Fans 175 150

    8 Guesthouse - Fans 25 22

    9 Datacenter - Dual Fluid PAC 408 306

    10 UPS - Dual Fluid AHU 48 4111 HUB - VRV 80 68 Standby

    12 Utility - Fans 250 215

    TOTAL 1691 1403

    SR. NO. SPACE CONNECTED LOAD DEMAND LOAD

    (KW) (KW)

    1 Blcok B - AHU & HRU 275 235

    2 Training - AHU & HRU 30 26

    3 Blcok B - Fans 150 128 In fire mode

    4 Training - Fans 15 13

    5 Datacenter - Dual Fluid PAC 408 306

    6 UPS - Dual Fluid AHU 48 41

    7 HUB - VRV 40 34 StandbyTOTAL 966 783

    AHU/FANS - PHASE 1

    AHU/FANS - PHASE 2

    PLANT ROOM EQUIPMENTS - PHASE 2

    PLANT ROOM EQUIPMENTS - PHASE 1

  • 7/30/2019 Annexure E2 _ Electrical Load Details-R3 - (09!09!2011)

    3/10

    Spectral Services Consultants Pvt Ltd

    Connected Demand

    A. Substation 1 - Block-A ODC Block (GR+13) + Auditorium + Reception + Customer careA.1 Block A

    1 Lighting Load

    1.1Block A - ODC,IT DEPT,

    HR,Admin,Fin,Training Dept,Common

    Areas - 0.9 watt / sq ft

    421157 0.9 379 341As per Area Statement Received Da

    28.02.2011

    2 Power Load

    2.1 ODC,IT DEPT, HR,Admin,Fin,TrainingDept,Common Areas - 0.5 watt / sq ft

    421157 0.5 211 105 As per Area Statement Received Da28.02.2011

    3 IT Loads

    3.1Server Room Loads

    (Block-A )1 520 520 As per TCS confirmation

    3.2 Hub Room (ODC Block-A) 1 456 456 Refer ANNEXURE-E 1.1B

    3.3Workstations , Printer load & AV - (Block- A

    ) 200 watt/WS4976 0.8 1125 900

    No. of Workstations-4976 No's ( As

    Space matrix dated - 23rd August 24 HVAC Loads Block 'A'

    4.1 AHUs & HRUs 622 446 AHUs & HRUs for ODC blocks

    4.2 Ventilation fans 59 5Includes stairwell, liftwell pressurizat

    etc.4.3 Datacentre \ UPS \ HUB room 464 326

    5 Elevators Block 'A'

    5.1 Passenger Elevator 0.8 250 200 8 nos , 20 pax , 2.5 MPS Pass.Eleva

    5.2 Service Elevator 0.8 25 20 1 nos 1500 Kg,1 MPS Service Eleva

    Total Load Block-A 4085 3299

    A.2

    1 Lighting Load

    1.1Secuirty,Waiting & Discussion Room Area -

    1 Watt/Sq.ft2698 0.9 3 2

    2 Power Load

    2.2Secuirty,Waiting & Discussion Room Area -

    0.5 watt/Sq.ft2698 0.5 1 1

    2.3 HVAC Load 6 1 As per Heat Load calculation3 IT Loads

    3.1Workstations, Printer load - .200 watt/WS -

    LS0.8 2 2

    Total Load Reception Block 12 6 0

    A.3

    1 Lighting Load

    1.1 Lighting Load @-1 Watt/Sq.ft 7536 0.9 8 7

    2 Power Load

    2.2 Convenience Power - 0.5 watt/Sq.ft 7536 0.5 4 2

    2.3 Equipment load LS 0.85 25 21

    2.4 Ventilation fans Auditorium 0.85 13 11Toilet Exhaust fans, HRW's, Fire

    Emergency loads etc..2.5 Air conditioning loads 6 6 As per Heat Load Calculation

    Total Load Auditorium 49 41 0

    A.4

    1 Lighting Load

    1.1Meetng Rooms,Discussion Rooms,Board

    Rooms,Waiting Lobbies23751 0.9 24 21

    2 Power Load

    2.1Meetng Rooms,Discussion Rooms,Board

    Rooms,Waiting Lobbies23751 0.5 12 6

    2.2HVAC Loads Customer care centre and

    Ex.Dining1 24 24 As per Heat Load Calculation

    2.3 Dining Electrical Load - LS 0.65 40 26 Assumed Misc Kitchen load

    3 IT Loads

    3.1Workstations , AV & Printer load - .200

    watt/WS0.8 24 19

    Considered 120 Workstation Points

    to clarify

    Total Load for Customer Care Centre 124 97

    C Total For substation 1 4270 3442 KW

    RECEPTION BLOCK (GR)

    Auditorium ( GR+1)

    As per Area Statement Received Da

    28.02.2011

    Customer Care Centre ( GR+2)

    Diversity

    Phase-I

    As per Area Statement Received Da

    28.02.2011

    Sr.

    No.

    Area

    (Sq. ft.) \

    workstations

    Load in KW

    Detail Electrical Load Calculation-Phase I &II

    Project : TCS Infopark ,Kochi

    ANNEXURE-E1Title: Electrical Load Details

    Date : 09.09.2011

    Revision:R0

    As per Area Statement Received Da

    28.02.2011

    RemarksDescription

  • 7/30/2019 Annexure E2 _ Electrical Load Details-R3 - (09!09!2011)

    4/10

    Spectral Services Consultants Pvt Ltd

    Connected Demand

    DiversitySr.

    No.

    Area

    (Sq. ft.) \

    workstations

    Load in KW

    Detail Electrical Load Calculation-Phase I &II

    Project : TCS Infopark ,Kochi

    ANNEXURE-E1Title: Electrical Load Details

    Date : 09.09.2011

    Revision:R0

    RemarksDescription

    B. Substation 2 - Service block, caf, MLCP, recreation, miscB.1 Services Block

    1 Lighting Load

    1.1 Lighting Load 1 Watt/Sq.ft 21521 0.9 22 19

    2 Power Load

    2.1 Power Load @0.5 Watt/Sq.ft 21521 0.5 11 5

    3 HVAC Loads High Side Phase-I 2253 1908Air Cooled

    Chillers,Primary,Secondary,Conden

    Pumps & Cooling Towers

    3.2 Ventilation fans 40 32stairwell, liftwell pressurization etc.-

    loads

    4 Plumbing & Firefighting

    4.1 Plumbing & Drainage 101 80

    4.2 Fire fighting 485 40

    5 External Lighting Load 0.8 60 48

    6 STP Load 1 100 100

    Total Load for Services Block 3071 2233

    B.2

    1 Lighting Load

    1.1 Lighting Load -0.25 Watt/Sq.ft 274544 0.5 69 34

    2 Power Load

    2.2 Convenience Power @ - 0.25 watt/Sq.f t 274544 0.5 69 34Total Load MLCP 137 69 0

    B.3

    1 Lighting Load

    1.1 Lighting Load -0.5 Watt/Sq.ft 6073 0.5 3 2

    2 Power Load

    2.2 Convenience Power - 0.25 watt/Sq.ft 6073 0.5 2 1

    Total Load Misc Bldg 5 2 0

    B.4

    1 Lighting Load

    1.1 Lighting Load @-1 Watt/Sq.ft 16561 0.9 17 15

    2 Power Load

    2.2 Convenience Power - 0.5 watt/Sq.ft 16561 0.5 8 4

    2.3 Equipment loads - LS 0.8 25 20

    2.4 Ventilation fans load 0.85 13 11 As per Calculation

    2.5 Air conditioning loads 0.85 29 25 As per Heat load calculationTotal Load Recreation Centre 63 50 0

    B.5

    1 Lighting Load

    1.1 Siting & Kitchen Area @ 1Watt/Sq.Ft. 77678 0.9 78 70As per Area Statement Received Da

    28.02.20112 Power Load

    2.1Kitchen Electrical Equipment Load For

    Cafeteria - LS0.7 450 315 Assumed Kitchen Load

    3 HVAC Loads Cafeteria

    3.1 AHUs & HRUs 0.85 60 51 AHUs & HRUs for ODC blocks

    3.2 Cafeteria fans 0.85 140 119HRW's, Kitchen Ventilation fans, To

    Exhausts Etc

    Total Load for Cafeteria 728 555

    F.

    1 Lighting Load

    1.1 Lighting Load 1 Watt/Sq.ft 18166 0.9 18 16

    2 Power Load

    2.1 Power Load @2 Watt/Sq.ft 18166 0.6 36 22

    3 HVAC Loads Guest House

    3.1 AHUs & HRUs 12 10 AHUs & HRUs for ODC blocks

    5 Elevators - 0.8 40 32

    Total Load for Guest House 106 80

    B. Total For substation 2 (1) 4110 2989 kW

    Add phase 2 Service block load for transformer selection (2) 410 349 kW

    Guest House (GR+2)

    As per Area Statement Received Da

    28.02.2011

    Recreation Centre

    As per Area Statement Received Da

    28.02.2011

    Cafeteria (GR+1)

    As per Area Statement Received Da

    28.02.2011

    As per Area Statement Received Da

    28.02.2011

    MISCELLANIOUS BLDG

    MLCP (GR+7)

    As per Area Statement Received Da

    28.02.2011

  • 7/30/2019 Annexure E2 _ Electrical Load Details-R3 - (09!09!2011)

    5/10

    Spectral Services Consultants Pvt Ltd

    Connected Demand

    DiversitySr.

    No.

    Area

    (Sq. ft.) \

    workstations

    Load in KW

    Detail Electrical Load Calculation-Phase I &II

    Project : TCS Infopark ,Kochi

    ANNEXURE-E1Title: Electrical Load Details

    Date : 09.09.2011

    Revision:R0

    RemarksDescription

    D Substation 3- Block-B , training + libraryD.1

    1 Lighting Load

    1.1 Lighting Load -1 Watt/Sq.ft 6016 0.9 6 5

    2 Power Load

    2.2 Convenience Power - 0.5 watt/Sq.ft 6016 0.5 3 2

    Total Load Library 9 7 0

    D.2

    1 Lighting Load

    1.1 ODC & Common Areas - 0.9 watt / sq ft 315652 0.9 284 256

    2 Power Load

    2.1 ODC & Common Areas - 0.5 watt / sq ft 315652 0.5 158 79

    3 IT Loads

    3.1Server Room Loads

    (Block-B )1 520 520 As per TCS confirmation

    3.2 Hub Room (ODC Block-B) 1 312 312 Refer ANNEXURE-E 1.1B

    3.3Workstations , Printer load & AV - (Block-

    B) 200 watt/WS3817 0.8 860 688

    No. of Workstations- 3817 No's ( As

    Space matrix dated - 23rd August 2

    4

    4.1 AHUs & HRUs 367 328 AHUs & HRUs for ODC blocks

    4.2 Ventilation fans 51 4Includes kitchen & Plant room ventil

    stairwell, liftwell pressurization etc.

    4.3 Datacentre \ UPS \ HUB room 464 326

    5 Elevators Block B

    5.1 Passenger Elevator 0.8 250 200 8 nos , 20 pax , 2.5 MPS Pass.Eleva5.2 Service Elevator 0.8 25 20 1 nos 1500 Kg,1 MPS Service Eleva6 External Lighting Load 0.8 60 48

    Total Load For Block 'B' 3351 2780

    D.3

    1 Lighting Load

    1.1Training Rooms, Lounge, Lobby, w/s,

    Common Areas @ 1watt/sq.ft18941 0.9 19 17

    As per Area Statement Received D

    28.02.2011

    2 Power Load

    2.1Training

    Rooms,Lounge,Lobby,w/s,Common Areas

    0.5 watt/sq.ft

    18941 0.5 9 5As per Area Statement Received D

    28.02.2011

    3 IT Loads

    3.3Workstations , Printer load & AV - (Training

    Centre) @150 watt/WS0 0.8 53 42

    Considered 350 Workstations based

    the Space Matrix Details ( 10 Room

    with Cap of 33 Person) received on

    01.03.2011 Needs to be confirmed

    4

    4.1 AHUs & HRUs 35 31 AHUs & HRUs for ODC blocks

    Total Load For Training Centre Block 116 95

    D. Total For substation 3 3476 2882 kW

    Demand Load in KW with simultaneity factor of 0.85 2450 kWMaximum Demand on HT meter 3

    end of phase 2

    I. TRANSFORMER SELECTION

    a. Total Demand Load in KVA with 0.95 PF 2579 kVA

    b. Transformer capacity in KVA with 80% loading. 3223 kVA

    Selected 3 x 1600 kVA transformers ( n+1) configuration

    II. DG SELECTION For Phase 1 + 2

    HVAC Loads-Block B

    Block- 'B' ODC Block ( GR+13)

    HVAC Loads-Training Block

    Training Block ( GR+1)

    As per Area Statement Received Da

    28.02.2011

    Phase-II

    Library ( GR)

    As per Area Statement Received Da

    28.02.2011

  • 7/30/2019 Annexure E2 _ Electrical Load Details-R3 - (09!09!2011)

    6/10

    Spectral Services Consultants Pvt Ltd

    Sr.

    No.

    Description Workstations CL Diversity DL UPS selection * Proposed Selection Remark

    kW \ kVA* kW \ kVA* KVA

    1

    IWorkstations

    and Printers **4976 1125 0.8 900 1111

    4 Nos. ( 3N+N) 400 KVA UPS,

    each with 15 Min. battery backup

    No. of Workstations-4976 No's

    As per Space matrix dated -

    23rd August 2011)

    IIHub Room-BPO

    & IT ***456 1.0 456 570

    2 Sets of 300 kVA (N+N)

    Configuration, each UPS with 15

    Min. battery backup

    6 kVA \ Hub room,Mux room

    1/Block(6kVA) and 24kVA /bloc

    for distribution room as confirm

    by TCS.

    B BLOCK B

    1Workstations

    and Printers **3817 860 0.8 688 849

    3 Nos. ( 2N+N) 400 KVA UPS,

    each with 15 Min. battery backup

    No. of Workstations- 3817 No's

    As per Space matrix dated -

    23rd August 2011)

    2Hub Room-BPO

    & IT ***312 1.0 312 390

    2 Nos of 400kVA (N+N)

    Configuration, each UPS with 15

    Min. battery backup

    6 kVA \ Hub room,Mux room

    1/Block(6kVA) and 24kVA /bloc

    for distribution room as confirm

    by TCS.

    C

    1 BLOCK A 520 1.0 520 658

    2 Sets of 300kVA (N+N)

    Configuration, each UPS with 30

    Min. battery backup

    based on TCS confirmation to

    include future loads

    D

    1 BLOCK B 520 1.0 520 658

    2 Sets of 300kVA (N+N)

    Configuration, each UPS with 30

    Min. battery backup

    based on TCS confirmation to

    include future loads

    Project : TCS Infopark,Kochi

    BPO - BLOCK A

    * UPS Load in kVA for Hub room & server room. Ups load for work station is kW. Selection for Workstation load with 90 % Loading & HUB room UPS selection w

    80 % loading .

    * * Kindly refer Annexure E 1.1A attached for Workstation UPS calculation.

    Data Centre ( PH-I)

    Data Centre ( PH-II)

    Title: UPS selection for Workstation , Hub room & Server room

    ANNEXURE-E 1.1

    Date : 09.09.2011

    Revision: R0

  • 7/30/2019 Annexure E2 _ Electrical Load Details-R3 - (09!09!2011)

    7/10

    Spectral Services Consultants Pvt Ltd

    Sr.No Description

    I Block

    Zone.a

    No of Racks -50 (As per TCS Confirmation) 50

    (6kVA /Rack)

    Power Consumption (kVA) Zone.a 300

    Zone.b

    No of Rack - 10(As per TCS Confirmation) 10

    (16kVA /Rack)

    Power Consumption (kVA) Zone.b 160

    Zone.c

    No of Rack (Network/Voice Equipment) - 10(As per

    TCS Confirmation)10

    (6kVA /Rack)

    Power Consumption (kVA) Zone.c 60

    Total UPS Load - kVA 520

    UPS selection @ 80 % loading 650

    2 Sets of 300kVA (N+N) Configuration, each UPS

    with 30 Min. battery backup

    UPS SELECTION -DATA CENTER

    Project : TCS Infopark,Kochi

    ANNEXURE-E 1.1A

    Title: Data Center Load Calculations

    Date : 09.09.2011

    Revision:R1

    Project: TCS Infopark,Kochi Spectral Services Consultant Pvt.Ltd.

  • 7/30/2019 Annexure E2 _ Electrical Load Details-R3 - (09!09!2011)

    8/10

    Spectral Services Consultants Pvt Ltd

    Sr. Description

    No.

    I Block A

    1No of distribution / Voice room- 4No's

    (Considered 1 room for every Four Floors)4

    (24kVA / DR)

    2No of ODC Hubrooms-59No's (6No's Per Floor-

    As per revised Interior layout Dated-12.08.02011)59

    (6kVA / Hubroom)

    3 Mux room ( 1 per Block) 1

    4Power Consumption (kVA) for Distribution/Voice

    rooms96

    24kVA / DR

    5 Power Consumption (kVA) for ODC Hubrooms 354

    6kVA / Rack

    6 Power consumption for Mux room 6

    (6kVA / Room)

    Total UPS Load - kVA 456

    UPS selection @ 80 % loading 570

    2 Sets of 300 kVA (N+N) Configuration, each UPS

    with 15 Min. battery backup

    I Block B

    1 No of distribution / Voice room- 4No's(Considered 1 room for every Four Floors)

    4

    (24kVA / DR)

    2No of ODC Hubrooms-35No's (3No's Per Floor-

    As per revised Interior layout Dated-(12.08.02011)35

    (6kVA / Hubroom)

    3 Mux room ( 1 per Block) 1

    4Power Consumption (kVA) for Distribution/Voice

    rooms96

    6kVA / DR

    5 Power Consumption (kVA) for ODC Hubrooms 2106kVA / Rack

    6 Power consumption for Mux room 6

    (6kVA / Room)

    Total UPS Load - kVA 312

    UPS selection @ 80 % loading 390

    2 Nos of 400kVA (N+N) Configuration, each UPS

    with 15 Min. battery backup

    UPS SELECTION -FOR HUB ROOM

    Project : TCS Infopark,Kochi

    ANNEXURE-E 1.1B

    Title: Hubroom Load Calculations

    Date : 09.09.2011

    Revision:R1

    Project: TCS Infopark,Kochi Spectral Services Consultant Pvt.Ltd.

  • 7/30/2019 Annexure E2 _ Electrical Load Details-R3 - (09!09!2011)

    9/10

    Spectral Services Consultants Pvt Ltd

    Sr. Description

    No.

    I Block A, ODCs

    No. of Workstations-4976 No's ( As per Space matrix

    dated - 23rd August 2011)4976

    1 Power Consumption(KW) 995.2

    @ 200 Watts/ workstation

    2Printer Load ( One Printer per group of 50

    workstation and 1 KW per printer as per TCS )100

    3AV load , field power outlets for BAS & Security -

    Assumed30

    Total UPS Load - KW 1125

    Total Demand Load - KW @0.8 diversity 900

    UPS selection @ 0.9 PF & 90 % loading 1111

    4 Nos. ( 3N+N) 400 KVA UPS, each with 15 Min.

    battery backup

    IV BLOCK B O.D.C.

    No. of Workstations- 3817 No's ( As per Space

    matrix dated - 23rd August 2011)3817

    1 Power Consumption(KW) 763.4

    @ 200 Watts/ workstation

    2Printer Load ( One Printer per group of 50

    workstation and 1 KW per printer as per TCS )76

    3AV load , field power outlets for BAS & Security -

    Assumed20

    Total UPS Load - KW 860

    Total Demand Load - KW @0.8 diversity 688

    UPS selection @ 0.9 PF & 90 % loading 849

    3 Nos. ( 2N+N) 400 KVA UPS, each with 15 Min.

    battery backup

    Project : TCS Infopark,Kochi

    UPS SELECTION -FOR Work station

    Title: UPS Load calculation for Workstation area,Data Centre & Hub Rooms

    Date : 09.09.2011

    Revision:R0

    ANNEXURE-E 1.1A

    Project: TCS Infopark,Kochi Spectral Services Consultant Pvt.Ltd.

  • 7/30/2019 Annexure E2 _ Electrical Load Details-R3 - (09!09!2011)

    10/10

    Spectral Services Consultants Pvt Ltd

    Title: UPS Load calculation for EMERGENCY LTG.

    Sl.No Load Description

    Connected

    Lighting/Power

    Load in kW

    DiversityDemand

    Load in kW

    20% of Lighting

    Load on UPS.

    1 Reception 3 0.9 2.7 0.54

    2

    Customer Care Lighitng

    Load 24 0.9 21.6 4.32

    3

    Power load (15

    Workstations

    Considered) 3 0.8 2.4 2.4

    7.26

    Sl.No Load Description

    Connected

    Lighting/Power

    Load in kW

    DiversityDemand

    Load in kW

    20% of Lighting

    Load on UPS.

    1 GF Lighting load 3 0.9 2.7 0.54

    2 1stF Lighting load 4 0.9 3.6 0.72

    3 2ndF Lighting load 1 0.8 0.8 0.16

    4 UPS Load for Auditorium 3 0.8 2.4 2.4

    4.775

    Sl.No Load Description

    Connected

    Lighting/Power

    Load in kW

    DiversityDemand

    Load in kW

    20% of Lighting

    Load on UPS.

    1 Total Lighting load 17 0.9 15.3 3.06

    2 Assumed Gym

    Equipment load on UPS 4 0.8 3.2 3.2

    3Assumed IT equipments 3 0.8 2.4 2.4

    8.66

    Sl.No Load Description

    Connected

    Lighting/Power

    Load in kW

    DiversityDemand

    Load in kW

    20% of Lighting

    Load on UPS.

    1 Total Lighting load 69 0.5 34.5 6.9

    2

    Assumed Equipment

    load on UPS 2 0.8 1.6 1.68.5

    Sl.No Load Description

    Connected

    Lighting Load in

    kW

    DiversityDemand

    Load in kW

    10% of Lighting

    Load on UPS.

    1 Lighting Load 379 0.9 341.1 34.11

    34.11

    Sl.No Load Description

    Connected

    Lighting Load in

    kW

    DiversityDemand

    Load in kW

    10% of Lighting

    Load on UPS.

    1 Lighting Load 284 0.9 255.6 25.5625.56

    UPS Calculation for MLCP

    UPS Calculation for Reception & Customer care

    Total Load on UPS in kVA

    UPS Selected : 1x10kVA

    UPS Calculation for Auditorium

    UPS Selected in kVA

    Total Load on UPS in kVA

    Selected UPS: 1x5kVA

    Total Load on UPS in kVA

    UPS Selected: 1x40kVA

    Project : TCS Infopark,Kochi

    ANNEXURE-E 1.1A

    Date : 09.09.2011

    Revision:R0

    UPS Selected: 1x10kVA

    Emergency UPS Calculation for Block-A

    Total Load on UPS in kVA

    UPS Selected: 1x60kVA

    Emergency UPS Calculation for Block-B

    UPS Calculation for Recreation

    Total Load on UPS in kVA

    UPS Selected: 1x10kVA

    Project:TCS Infopark,Kochi

    Spectral Services Consultant Pvt.Ltd.