annexure e2 _ electrical load details-r3 - (09!09!2011)
TRANSCRIPT
-
7/30/2019 Annexure E2 _ Electrical Load Details-R3 - (09!09!2011)
1/10
Project: TCS Infopark,KochiTitle: Electrical Laod SummarDate: 09.09.2011Revision: R1
Area Connected Load Demand Load
kW kW Selection
Electrical Load estimates -
Phase 1
Block - A, audi, reception, customercare
4270 2926
Service block ,Caf , MLCP, recreation,
misc4110 2989
11kV Chiller Plant 1446 1098
Phase 2
Block - B, training & library 3476 2450
Service block 410 349
11kV Chiller Plant 723 549
Saggrigation of Loads on HT meters
HT meter 1 - Block - A, audi,
reception, customer care4270 2926 2926 3080 3850 3 x 2000 kVA ( n+1)
HT meter 2 - Service block(phase 1+2)
,Caf, MLCP, recreation, misc, + 11kV
chillers.
6689 3709 3338 3514 4392 3 x 2000 kVA ( n+1)
HT meter 3 - Block - B, training &
library(Phase 2) 3476 2450 2450 2579 3223 3 x 1600 kVA ( n+1)
LT load in kWLT load in
kVA @ 0.8PF
DG Selection -
1. Demand Load during phase 1 4861 6076 5 x 2000 kVA (n+1)
2. Demand Load during end of phase 2 7066 8832 6 x 2000 kVA (n+1)
LT load in kW LT load in kVA
@ 0.95 PF
load in kVA
@ 80 %
Transformer selection
Project:TCS Infopark,Kochi Spectral Services Consultant Pvt.Lt
-
7/30/2019 Annexure E2 _ Electrical Load Details-R3 - (09!09!2011)
2/10
Project: TCS Infopark,Kochie: qupmen oa
Date: 09.09.2011Revision: R0
SR. NO. EQUIPMENT DESCRIPTION QTY CONNECTED LOAD DEMAND LOAD
1 Phase-I 11 KV Chiller Load (KW) (KW)
1.1 900 TR Water Cooled Chiller - 11 KV 2 1446 1098Total Load For 11 KV Chiller -Ph-I 1446 1098
2 Phase-I 415 Volt High Side HVAC Load
2.1 370 TR Air Cooled Chiller (In case of Water shortage) 3 1277 1277
2.1 Primary CHW Pumps - W/C Chillers 4(3W+1S) 134 100.5
2.2 Primary CHW Pumps - A/C Chillers 4(3W+1S) 60 -
2.3 Cooling Towers 3(2W+1S) 165 110
2.4 Condenser Water Pumps 5(4W+1S) 225 180
2.5 Secondary Pumps - Block A 3(2W+1S) 270 180
2.6 Secondary Pumps - Reception / Audi / Library 2(1W+1S) 30 15
2.7 Secondary Pumps - Caf / Recreation 2(1W+1S) 74 37
2.8 Secondary Pumps - Guesthouse 2(1W+1S) 18.6 9.3
TOTAL 2253 1908
* Maximum of Air Cooled Chiller and Water Cooled Chiller operations is considered for arrving at total load.
SR. NO. EQUIPMENT DESCRIPTION QTY CONNECTED LOAD DEMAND LOAD
1 Phase-II 11 KV Chiller Load (KW) (KW)
1.1 900 TR Water Cooled Chiller - 11 KV 1 723 549
Total Load For 11 KV Chiller -Ph-II 723 549
2 Phase-II 415 Volt High Side HVAC Load
2.1 Primary CHW Pumps - W/C Chillers 1 33.5 33.5
2.2 Cooling Towers 2 110 110
2.3 Condenser Water Pumps 2 90 90
2.4 Secondary Pumps - Block B 3(2W+1S) 165 110
2.5 Secondary Pumps - Training 2(1W+1S) 11 5.5
TOTAL 409.5 349
SR. NO. SPACE CONNECTED LOAD DEMAND LOAD
(KW) (KW)
1 Blcok A - AHU & HRU 350 298
2 Recp / Audi / Lib - AHU & HRU 50 43
3 Cafeteria - AHU & HRU 80 68
4 Guesthouse - AHU & HRU 30 26
5 Blcok A - Fans 165 140 In fire mode
6 Audi - Fans 30 26 In fire mode
7 Cafeteria Kitchen - Fans 175 150
8 Guesthouse - Fans 25 22
9 Datacenter - Dual Fluid PAC 408 306
10 UPS - Dual Fluid AHU 48 4111 HUB - VRV 80 68 Standby
12 Utility - Fans 250 215
TOTAL 1691 1403
SR. NO. SPACE CONNECTED LOAD DEMAND LOAD
(KW) (KW)
1 Blcok B - AHU & HRU 275 235
2 Training - AHU & HRU 30 26
3 Blcok B - Fans 150 128 In fire mode
4 Training - Fans 15 13
5 Datacenter - Dual Fluid PAC 408 306
6 UPS - Dual Fluid AHU 48 41
7 HUB - VRV 40 34 StandbyTOTAL 966 783
AHU/FANS - PHASE 1
AHU/FANS - PHASE 2
PLANT ROOM EQUIPMENTS - PHASE 2
PLANT ROOM EQUIPMENTS - PHASE 1
-
7/30/2019 Annexure E2 _ Electrical Load Details-R3 - (09!09!2011)
3/10
Spectral Services Consultants Pvt Ltd
Connected Demand
A. Substation 1 - Block-A ODC Block (GR+13) + Auditorium + Reception + Customer careA.1 Block A
1 Lighting Load
1.1Block A - ODC,IT DEPT,
HR,Admin,Fin,Training Dept,Common
Areas - 0.9 watt / sq ft
421157 0.9 379 341As per Area Statement Received Da
28.02.2011
2 Power Load
2.1 ODC,IT DEPT, HR,Admin,Fin,TrainingDept,Common Areas - 0.5 watt / sq ft
421157 0.5 211 105 As per Area Statement Received Da28.02.2011
3 IT Loads
3.1Server Room Loads
(Block-A )1 520 520 As per TCS confirmation
3.2 Hub Room (ODC Block-A) 1 456 456 Refer ANNEXURE-E 1.1B
3.3Workstations , Printer load & AV - (Block- A
) 200 watt/WS4976 0.8 1125 900
No. of Workstations-4976 No's ( As
Space matrix dated - 23rd August 24 HVAC Loads Block 'A'
4.1 AHUs & HRUs 622 446 AHUs & HRUs for ODC blocks
4.2 Ventilation fans 59 5Includes stairwell, liftwell pressurizat
etc.4.3 Datacentre \ UPS \ HUB room 464 326
5 Elevators Block 'A'
5.1 Passenger Elevator 0.8 250 200 8 nos , 20 pax , 2.5 MPS Pass.Eleva
5.2 Service Elevator 0.8 25 20 1 nos 1500 Kg,1 MPS Service Eleva
Total Load Block-A 4085 3299
A.2
1 Lighting Load
1.1Secuirty,Waiting & Discussion Room Area -
1 Watt/Sq.ft2698 0.9 3 2
2 Power Load
2.2Secuirty,Waiting & Discussion Room Area -
0.5 watt/Sq.ft2698 0.5 1 1
2.3 HVAC Load 6 1 As per Heat Load calculation3 IT Loads
3.1Workstations, Printer load - .200 watt/WS -
LS0.8 2 2
Total Load Reception Block 12 6 0
A.3
1 Lighting Load
1.1 Lighting Load @-1 Watt/Sq.ft 7536 0.9 8 7
2 Power Load
2.2 Convenience Power - 0.5 watt/Sq.ft 7536 0.5 4 2
2.3 Equipment load LS 0.85 25 21
2.4 Ventilation fans Auditorium 0.85 13 11Toilet Exhaust fans, HRW's, Fire
Emergency loads etc..2.5 Air conditioning loads 6 6 As per Heat Load Calculation
Total Load Auditorium 49 41 0
A.4
1 Lighting Load
1.1Meetng Rooms,Discussion Rooms,Board
Rooms,Waiting Lobbies23751 0.9 24 21
2 Power Load
2.1Meetng Rooms,Discussion Rooms,Board
Rooms,Waiting Lobbies23751 0.5 12 6
2.2HVAC Loads Customer care centre and
Ex.Dining1 24 24 As per Heat Load Calculation
2.3 Dining Electrical Load - LS 0.65 40 26 Assumed Misc Kitchen load
3 IT Loads
3.1Workstations , AV & Printer load - .200
watt/WS0.8 24 19
Considered 120 Workstation Points
to clarify
Total Load for Customer Care Centre 124 97
C Total For substation 1 4270 3442 KW
RECEPTION BLOCK (GR)
Auditorium ( GR+1)
As per Area Statement Received Da
28.02.2011
Customer Care Centre ( GR+2)
Diversity
Phase-I
As per Area Statement Received Da
28.02.2011
Sr.
No.
Area
(Sq. ft.) \
workstations
Load in KW
Detail Electrical Load Calculation-Phase I &II
Project : TCS Infopark ,Kochi
ANNEXURE-E1Title: Electrical Load Details
Date : 09.09.2011
Revision:R0
As per Area Statement Received Da
28.02.2011
RemarksDescription
-
7/30/2019 Annexure E2 _ Electrical Load Details-R3 - (09!09!2011)
4/10
Spectral Services Consultants Pvt Ltd
Connected Demand
DiversitySr.
No.
Area
(Sq. ft.) \
workstations
Load in KW
Detail Electrical Load Calculation-Phase I &II
Project : TCS Infopark ,Kochi
ANNEXURE-E1Title: Electrical Load Details
Date : 09.09.2011
Revision:R0
RemarksDescription
B. Substation 2 - Service block, caf, MLCP, recreation, miscB.1 Services Block
1 Lighting Load
1.1 Lighting Load 1 Watt/Sq.ft 21521 0.9 22 19
2 Power Load
2.1 Power Load @0.5 Watt/Sq.ft 21521 0.5 11 5
3 HVAC Loads High Side Phase-I 2253 1908Air Cooled
Chillers,Primary,Secondary,Conden
Pumps & Cooling Towers
3.2 Ventilation fans 40 32stairwell, liftwell pressurization etc.-
loads
4 Plumbing & Firefighting
4.1 Plumbing & Drainage 101 80
4.2 Fire fighting 485 40
5 External Lighting Load 0.8 60 48
6 STP Load 1 100 100
Total Load for Services Block 3071 2233
B.2
1 Lighting Load
1.1 Lighting Load -0.25 Watt/Sq.ft 274544 0.5 69 34
2 Power Load
2.2 Convenience Power @ - 0.25 watt/Sq.f t 274544 0.5 69 34Total Load MLCP 137 69 0
B.3
1 Lighting Load
1.1 Lighting Load -0.5 Watt/Sq.ft 6073 0.5 3 2
2 Power Load
2.2 Convenience Power - 0.25 watt/Sq.ft 6073 0.5 2 1
Total Load Misc Bldg 5 2 0
B.4
1 Lighting Load
1.1 Lighting Load @-1 Watt/Sq.ft 16561 0.9 17 15
2 Power Load
2.2 Convenience Power - 0.5 watt/Sq.ft 16561 0.5 8 4
2.3 Equipment loads - LS 0.8 25 20
2.4 Ventilation fans load 0.85 13 11 As per Calculation
2.5 Air conditioning loads 0.85 29 25 As per Heat load calculationTotal Load Recreation Centre 63 50 0
B.5
1 Lighting Load
1.1 Siting & Kitchen Area @ 1Watt/Sq.Ft. 77678 0.9 78 70As per Area Statement Received Da
28.02.20112 Power Load
2.1Kitchen Electrical Equipment Load For
Cafeteria - LS0.7 450 315 Assumed Kitchen Load
3 HVAC Loads Cafeteria
3.1 AHUs & HRUs 0.85 60 51 AHUs & HRUs for ODC blocks
3.2 Cafeteria fans 0.85 140 119HRW's, Kitchen Ventilation fans, To
Exhausts Etc
Total Load for Cafeteria 728 555
F.
1 Lighting Load
1.1 Lighting Load 1 Watt/Sq.ft 18166 0.9 18 16
2 Power Load
2.1 Power Load @2 Watt/Sq.ft 18166 0.6 36 22
3 HVAC Loads Guest House
3.1 AHUs & HRUs 12 10 AHUs & HRUs for ODC blocks
5 Elevators - 0.8 40 32
Total Load for Guest House 106 80
B. Total For substation 2 (1) 4110 2989 kW
Add phase 2 Service block load for transformer selection (2) 410 349 kW
Guest House (GR+2)
As per Area Statement Received Da
28.02.2011
Recreation Centre
As per Area Statement Received Da
28.02.2011
Cafeteria (GR+1)
As per Area Statement Received Da
28.02.2011
As per Area Statement Received Da
28.02.2011
MISCELLANIOUS BLDG
MLCP (GR+7)
As per Area Statement Received Da
28.02.2011
-
7/30/2019 Annexure E2 _ Electrical Load Details-R3 - (09!09!2011)
5/10
Spectral Services Consultants Pvt Ltd
Connected Demand
DiversitySr.
No.
Area
(Sq. ft.) \
workstations
Load in KW
Detail Electrical Load Calculation-Phase I &II
Project : TCS Infopark ,Kochi
ANNEXURE-E1Title: Electrical Load Details
Date : 09.09.2011
Revision:R0
RemarksDescription
D Substation 3- Block-B , training + libraryD.1
1 Lighting Load
1.1 Lighting Load -1 Watt/Sq.ft 6016 0.9 6 5
2 Power Load
2.2 Convenience Power - 0.5 watt/Sq.ft 6016 0.5 3 2
Total Load Library 9 7 0
D.2
1 Lighting Load
1.1 ODC & Common Areas - 0.9 watt / sq ft 315652 0.9 284 256
2 Power Load
2.1 ODC & Common Areas - 0.5 watt / sq ft 315652 0.5 158 79
3 IT Loads
3.1Server Room Loads
(Block-B )1 520 520 As per TCS confirmation
3.2 Hub Room (ODC Block-B) 1 312 312 Refer ANNEXURE-E 1.1B
3.3Workstations , Printer load & AV - (Block-
B) 200 watt/WS3817 0.8 860 688
No. of Workstations- 3817 No's ( As
Space matrix dated - 23rd August 2
4
4.1 AHUs & HRUs 367 328 AHUs & HRUs for ODC blocks
4.2 Ventilation fans 51 4Includes kitchen & Plant room ventil
stairwell, liftwell pressurization etc.
4.3 Datacentre \ UPS \ HUB room 464 326
5 Elevators Block B
5.1 Passenger Elevator 0.8 250 200 8 nos , 20 pax , 2.5 MPS Pass.Eleva5.2 Service Elevator 0.8 25 20 1 nos 1500 Kg,1 MPS Service Eleva6 External Lighting Load 0.8 60 48
Total Load For Block 'B' 3351 2780
D.3
1 Lighting Load
1.1Training Rooms, Lounge, Lobby, w/s,
Common Areas @ 1watt/sq.ft18941 0.9 19 17
As per Area Statement Received D
28.02.2011
2 Power Load
2.1Training
Rooms,Lounge,Lobby,w/s,Common Areas
0.5 watt/sq.ft
18941 0.5 9 5As per Area Statement Received D
28.02.2011
3 IT Loads
3.3Workstations , Printer load & AV - (Training
Centre) @150 watt/WS0 0.8 53 42
Considered 350 Workstations based
the Space Matrix Details ( 10 Room
with Cap of 33 Person) received on
01.03.2011 Needs to be confirmed
4
4.1 AHUs & HRUs 35 31 AHUs & HRUs for ODC blocks
Total Load For Training Centre Block 116 95
D. Total For substation 3 3476 2882 kW
Demand Load in KW with simultaneity factor of 0.85 2450 kWMaximum Demand on HT meter 3
end of phase 2
I. TRANSFORMER SELECTION
a. Total Demand Load in KVA with 0.95 PF 2579 kVA
b. Transformer capacity in KVA with 80% loading. 3223 kVA
Selected 3 x 1600 kVA transformers ( n+1) configuration
II. DG SELECTION For Phase 1 + 2
HVAC Loads-Block B
Block- 'B' ODC Block ( GR+13)
HVAC Loads-Training Block
Training Block ( GR+1)
As per Area Statement Received Da
28.02.2011
Phase-II
Library ( GR)
As per Area Statement Received Da
28.02.2011
-
7/30/2019 Annexure E2 _ Electrical Load Details-R3 - (09!09!2011)
6/10
Spectral Services Consultants Pvt Ltd
Sr.
No.
Description Workstations CL Diversity DL UPS selection * Proposed Selection Remark
kW \ kVA* kW \ kVA* KVA
1
IWorkstations
and Printers **4976 1125 0.8 900 1111
4 Nos. ( 3N+N) 400 KVA UPS,
each with 15 Min. battery backup
No. of Workstations-4976 No's
As per Space matrix dated -
23rd August 2011)
IIHub Room-BPO
& IT ***456 1.0 456 570
2 Sets of 300 kVA (N+N)
Configuration, each UPS with 15
Min. battery backup
6 kVA \ Hub room,Mux room
1/Block(6kVA) and 24kVA /bloc
for distribution room as confirm
by TCS.
B BLOCK B
1Workstations
and Printers **3817 860 0.8 688 849
3 Nos. ( 2N+N) 400 KVA UPS,
each with 15 Min. battery backup
No. of Workstations- 3817 No's
As per Space matrix dated -
23rd August 2011)
2Hub Room-BPO
& IT ***312 1.0 312 390
2 Nos of 400kVA (N+N)
Configuration, each UPS with 15
Min. battery backup
6 kVA \ Hub room,Mux room
1/Block(6kVA) and 24kVA /bloc
for distribution room as confirm
by TCS.
C
1 BLOCK A 520 1.0 520 658
2 Sets of 300kVA (N+N)
Configuration, each UPS with 30
Min. battery backup
based on TCS confirmation to
include future loads
D
1 BLOCK B 520 1.0 520 658
2 Sets of 300kVA (N+N)
Configuration, each UPS with 30
Min. battery backup
based on TCS confirmation to
include future loads
Project : TCS Infopark,Kochi
BPO - BLOCK A
* UPS Load in kVA for Hub room & server room. Ups load for work station is kW. Selection for Workstation load with 90 % Loading & HUB room UPS selection w
80 % loading .
* * Kindly refer Annexure E 1.1A attached for Workstation UPS calculation.
Data Centre ( PH-I)
Data Centre ( PH-II)
Title: UPS selection for Workstation , Hub room & Server room
ANNEXURE-E 1.1
Date : 09.09.2011
Revision: R0
-
7/30/2019 Annexure E2 _ Electrical Load Details-R3 - (09!09!2011)
7/10
Spectral Services Consultants Pvt Ltd
Sr.No Description
I Block
Zone.a
No of Racks -50 (As per TCS Confirmation) 50
(6kVA /Rack)
Power Consumption (kVA) Zone.a 300
Zone.b
No of Rack - 10(As per TCS Confirmation) 10
(16kVA /Rack)
Power Consumption (kVA) Zone.b 160
Zone.c
No of Rack (Network/Voice Equipment) - 10(As per
TCS Confirmation)10
(6kVA /Rack)
Power Consumption (kVA) Zone.c 60
Total UPS Load - kVA 520
UPS selection @ 80 % loading 650
2 Sets of 300kVA (N+N) Configuration, each UPS
with 30 Min. battery backup
UPS SELECTION -DATA CENTER
Project : TCS Infopark,Kochi
ANNEXURE-E 1.1A
Title: Data Center Load Calculations
Date : 09.09.2011
Revision:R1
Project: TCS Infopark,Kochi Spectral Services Consultant Pvt.Ltd.
-
7/30/2019 Annexure E2 _ Electrical Load Details-R3 - (09!09!2011)
8/10
Spectral Services Consultants Pvt Ltd
Sr. Description
No.
I Block A
1No of distribution / Voice room- 4No's
(Considered 1 room for every Four Floors)4
(24kVA / DR)
2No of ODC Hubrooms-59No's (6No's Per Floor-
As per revised Interior layout Dated-12.08.02011)59
(6kVA / Hubroom)
3 Mux room ( 1 per Block) 1
4Power Consumption (kVA) for Distribution/Voice
rooms96
24kVA / DR
5 Power Consumption (kVA) for ODC Hubrooms 354
6kVA / Rack
6 Power consumption for Mux room 6
(6kVA / Room)
Total UPS Load - kVA 456
UPS selection @ 80 % loading 570
2 Sets of 300 kVA (N+N) Configuration, each UPS
with 15 Min. battery backup
I Block B
1 No of distribution / Voice room- 4No's(Considered 1 room for every Four Floors)
4
(24kVA / DR)
2No of ODC Hubrooms-35No's (3No's Per Floor-
As per revised Interior layout Dated-(12.08.02011)35
(6kVA / Hubroom)
3 Mux room ( 1 per Block) 1
4Power Consumption (kVA) for Distribution/Voice
rooms96
6kVA / DR
5 Power Consumption (kVA) for ODC Hubrooms 2106kVA / Rack
6 Power consumption for Mux room 6
(6kVA / Room)
Total UPS Load - kVA 312
UPS selection @ 80 % loading 390
2 Nos of 400kVA (N+N) Configuration, each UPS
with 15 Min. battery backup
UPS SELECTION -FOR HUB ROOM
Project : TCS Infopark,Kochi
ANNEXURE-E 1.1B
Title: Hubroom Load Calculations
Date : 09.09.2011
Revision:R1
Project: TCS Infopark,Kochi Spectral Services Consultant Pvt.Ltd.
-
7/30/2019 Annexure E2 _ Electrical Load Details-R3 - (09!09!2011)
9/10
Spectral Services Consultants Pvt Ltd
Sr. Description
No.
I Block A, ODCs
No. of Workstations-4976 No's ( As per Space matrix
dated - 23rd August 2011)4976
1 Power Consumption(KW) 995.2
@ 200 Watts/ workstation
2Printer Load ( One Printer per group of 50
workstation and 1 KW per printer as per TCS )100
3AV load , field power outlets for BAS & Security -
Assumed30
Total UPS Load - KW 1125
Total Demand Load - KW @0.8 diversity 900
UPS selection @ 0.9 PF & 90 % loading 1111
4 Nos. ( 3N+N) 400 KVA UPS, each with 15 Min.
battery backup
IV BLOCK B O.D.C.
No. of Workstations- 3817 No's ( As per Space
matrix dated - 23rd August 2011)3817
1 Power Consumption(KW) 763.4
@ 200 Watts/ workstation
2Printer Load ( One Printer per group of 50
workstation and 1 KW per printer as per TCS )76
3AV load , field power outlets for BAS & Security -
Assumed20
Total UPS Load - KW 860
Total Demand Load - KW @0.8 diversity 688
UPS selection @ 0.9 PF & 90 % loading 849
3 Nos. ( 2N+N) 400 KVA UPS, each with 15 Min.
battery backup
Project : TCS Infopark,Kochi
UPS SELECTION -FOR Work station
Title: UPS Load calculation for Workstation area,Data Centre & Hub Rooms
Date : 09.09.2011
Revision:R0
ANNEXURE-E 1.1A
Project: TCS Infopark,Kochi Spectral Services Consultant Pvt.Ltd.
-
7/30/2019 Annexure E2 _ Electrical Load Details-R3 - (09!09!2011)
10/10
Spectral Services Consultants Pvt Ltd
Title: UPS Load calculation for EMERGENCY LTG.
Sl.No Load Description
Connected
Lighting/Power
Load in kW
DiversityDemand
Load in kW
20% of Lighting
Load on UPS.
1 Reception 3 0.9 2.7 0.54
2
Customer Care Lighitng
Load 24 0.9 21.6 4.32
3
Power load (15
Workstations
Considered) 3 0.8 2.4 2.4
7.26
Sl.No Load Description
Connected
Lighting/Power
Load in kW
DiversityDemand
Load in kW
20% of Lighting
Load on UPS.
1 GF Lighting load 3 0.9 2.7 0.54
2 1stF Lighting load 4 0.9 3.6 0.72
3 2ndF Lighting load 1 0.8 0.8 0.16
4 UPS Load for Auditorium 3 0.8 2.4 2.4
4.775
Sl.No Load Description
Connected
Lighting/Power
Load in kW
DiversityDemand
Load in kW
20% of Lighting
Load on UPS.
1 Total Lighting load 17 0.9 15.3 3.06
2 Assumed Gym
Equipment load on UPS 4 0.8 3.2 3.2
3Assumed IT equipments 3 0.8 2.4 2.4
8.66
Sl.No Load Description
Connected
Lighting/Power
Load in kW
DiversityDemand
Load in kW
20% of Lighting
Load on UPS.
1 Total Lighting load 69 0.5 34.5 6.9
2
Assumed Equipment
load on UPS 2 0.8 1.6 1.68.5
Sl.No Load Description
Connected
Lighting Load in
kW
DiversityDemand
Load in kW
10% of Lighting
Load on UPS.
1 Lighting Load 379 0.9 341.1 34.11
34.11
Sl.No Load Description
Connected
Lighting Load in
kW
DiversityDemand
Load in kW
10% of Lighting
Load on UPS.
1 Lighting Load 284 0.9 255.6 25.5625.56
UPS Calculation for MLCP
UPS Calculation for Reception & Customer care
Total Load on UPS in kVA
UPS Selected : 1x10kVA
UPS Calculation for Auditorium
UPS Selected in kVA
Total Load on UPS in kVA
Selected UPS: 1x5kVA
Total Load on UPS in kVA
UPS Selected: 1x40kVA
Project : TCS Infopark,Kochi
ANNEXURE-E 1.1A
Date : 09.09.2011
Revision:R0
UPS Selected: 1x10kVA
Emergency UPS Calculation for Block-A
Total Load on UPS in kVA
UPS Selected: 1x60kVA
Emergency UPS Calculation for Block-B
UPS Calculation for Recreation
Total Load on UPS in kVA
UPS Selected: 1x10kVA
Project:TCS Infopark,Kochi
Spectral Services Consultant Pvt.Ltd.