annexure a – public participationannexure inventory annexure a – public participation appendix...
TRANSCRIPT
ANNEXURE INVENTORY
Annexure A – Public Participation Appendix A1 – Text of Newspaper Advertisements
Appendix A2 – Text of Site Notice and Flyers
Appendix A3 – Background Information Document
Appendix A4 – List of Registered I&APs
Appendix A5 – Issues Register
Appendix A6 – Map of Scoping Phase I&APs
Appendix A7 – Map of EIR Phase I&APs
Appendix A8 – Minutes of Public Meetings
Appendix A9 – Minutes of Focus Group Meetings
Appendix A10 – Correspondence
Appendix A11 – Petition
Appendix A12 – Mobile displays
Appendix A13 – Presentations
Annexure B – Technical Information Appendix B1 – Map of Study Area
Appendix B2 – Map of Proposed Corridor
Appendix B3 – Technical Specifications of the 400kV Transmission Line
Appendix B4 – Electromagnetic Fields Report
Appendix B5 – Need for the Mercury – Perseus 400kV Transmission Line
Appendix B6 – Environmental Management Plan (Draft)
Annexure C – Specialist Reports Appendix C1 – Agricultural Economic Impact of the Mercury
Appendix C2 – Socio-Economic Impact Assessment
Appendix C3 – Visual Impact Assessment
Appendix C4 – Ecological Assessment
Appendix C5 – Impacts on Soil and Landform
Appendix C6– Impacts on Bird Life
Appendix C7 – Engineering Geological Study
Appendix C8 – Impacts on Hydrology and Surface Water Resources
Appendix C9 – Impact on Tourism
Appendix C10– Impact on Cultural and Heritage Resources
ANNEXURE A – PUBLIC PARTICIPATION
Appendix A1 – Text of Newspaper Advertisements
Appendix A2 – Text of Site Notice and Flyers
Appendix A3 – Background Information Document
Appendix A4 – List of Registered I&APs
Appendix A5 – Issues Register
Appendix A6 – Map of Scoping Phase I&APs
Appendix A7 – Map of EIR Phase I&APs
Appendix A8 – Minutes of Public Meetings
Appendix A9 – Minutes of Focus Group Meetings
Appendix A10 – Correspondence
Appendix A11 – Petition
Appendix A12 – Mobile displays
Appendix A13 – Presentations
APPENDIX A1 TEXT OF NEWSPAPER ADVERTISEMENT
Prepared by Strategic Environmental Focus
APPENDIX A2 SITE NOTICE AND FLYERS
Prepared by Strategic Environmental Focus
APPENDIX A3 BACKGROUND INFORMATION DOCUMENT
Prepared by Strategic Environmental Focus
APPENDIX A4 LIST OF REGISTERED I&APS
Prepared by Strategic Environmental Focus
APPENDIX A5 ISSUES REGISTER
Prepared by Strategic Environmental Focus
APPENDIX A6 MAP OF SCOPING PHASE I&APS
Prepared by Strategic Environmental Focus
APPENDIX A7 MAP OF EIR PHASE I&APS
Prepared by Strategic Environmental Focus
APPENDIX A8 MINUTES OF PUBLIC MEETING
Prepared by Strategic Environmental Focus
APPENDIX A9 MINUTES OF FOCUS GROUPS
Prepared by Strategic Environmental Focus
APPENDIX A10 CORRESPONDENCE
Prepared by Strategic Environmental Focus
APPENDIX A11 PETITION
Prepared by Strategic Environmental Focus
APPENDIX A12 MOBILE DISPLAYS
Prepared by Strategic Environmental Focus
APPENDIX A13 PRESENTATIONS
Prepared by Strategic Environmental Focus
ANNEXURE B – TECHNICAL INFORMATION
Appendix B1 – Map of Study Area
Appendix B2 – Map of Proposed Alignment
Appendix B3 – Technical Specifications of the 400kV Transmission Line
Appendix B4 – Electromagnetic Fields Report
Appendix B5 – Need for the Mercury – Perseus 400kV Transmission Line
Appendix B6 – A generic Environmental Management Plan
APPENDIX B1 STUDY AREA MAP
Prepared by Strategic Environmental Focus
APPENDIX B2 MAP OF PROPOSED CORRIDOR
Prepared by Strategic Environmental Focus
APPENDIX B3 TECHNICAL SPECIFICATIONS OF THE 400 KV TRANSMISSION LINE
Drawing 1: Cross rope suspension type
Drawing 2: Compact cross rope type
Drawing 3: Guyed suspension type
Drawing 4: Self-supporting type
Drawing 5: Self-supporting strain tower type
Drawing 6: Comparison drawing and servitude of two 400 kV Transmission Lines
(Strain tower type).
Drawing 7: Comparison drawing and servitude of two 400 kV Transmission Lines
(Guyed suspension type).
Prepared by Strategic Environmental Focus
APPENDIX B4 ELECTROMAGNETIC FIELDS REPORT
Prepared by Strategic Environmental Focus
APPENDIX B5 THE NEED FOR THE MERCURY – PERSEUS 400 KV TRANSMISSION LINE
Prepared by Strategic Environmental Focus
APPENDIX B6 A GENERIC ENVIRONMENTAL MANAGEMENT PLAN
Prepared by Strategic Environmental Focus
ANNEXURE C – SPECIALIST REPORTS
Appendix C1 – Agricultural Economic Impact of the Mercury – Perseus Transmission Line
Appendix C2 – Socio-Economic Impact Assessment
Appendix C3 – Visual Impact Assessment
Appendix C4 – Ecological Assessment
Appendix C5 – Impacts on Soil and Landform
Appendix C6– Impacts on Bird Life
Appendix C7 – Engineering Geological Study
Appendix C8 – Impacts on Hydrology and Surface Water Resources
Appendix C9 – Impact on Tourism
Appendix C10– Impact on Cultural and Heritage Resources
APPENDIX C1 AGRICULTURAL ECONOMIC IMPACT
Prepared by Strategic Environmental Focus
APPENDIX C2 SOCIO-ECONOMIC IMPACT ASSESSMENT
Prepared by Strategic Environmental Focus
APPENDIX C3 VISUAL IMPACT ASSESSMENT
Prepared by Strategic Environmental Focus
APPENDIX C4 ECOLOGICAL ASSESSMENT
Prepared by Strategic Environmental Focus
APPENDIX C5 IMPACTS ON SOILS AND LANDFORM
Prepared by Strategic Environmental Focus
APPENDIX C6 IMPACTS ON BIRD-LIFE
Prepared by Strategic Environmental Focus
APPENDIX C7 ENGINEERING GEOLOGICAL STUDY
Prepared by Strategic Environmental Focus
APPENDIX C8 IMPACTS ON HYDROLOGY AND SURFACE WATER RESOURCES
Prepared by Strategic Environmental Focus
APPENDIX C9 IMPACT ON TOURISM
Prepared by Strategic Environmental Focus
APPENDIX C10 IMPACT ON CULTURAL AND HERITAGE RESOURCES
Prepared by Strategic Environmental Focus