white house utility district · 2017. 10. 31. · white house utility district 1) 600 sq mile,...

Post on 23-Aug-2020

0 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

© Copyright 2017 OSIsoft, LLCREGIONAL SEMINARS 2017

White House Utility DistrictPresented by Simon Wick of Matchpoint

1

Maximiz ing Operat ions

Ut i l i z ing Real Time Spat ia l In format ion

in Non-Revenue Water Loss

© Copyright 2017 OSIsoft, LLCREGIONAL SEMINARS 2017 2

Matchpoint…about us

Serviced 24 states as well as the

Caribbean

• Founded in 2005

• Installed over 1,000,000 AMR/AMI end points

• 2007- NRW Management Company

• 2 x National & Exclusive distributorships of innovative equipment

• Seek global technology partners to bring to the US

• HQ and Service center in Wilmington NC

• Dedicated support and service personnel

3

T H E S I T U A T I O N

4

The water crisis is the #1

global risk based on impact

to society.

(as a measure of devastation), as announced by the World Economic Forum in January 2015.

WaterOrg.com

5

$3 BILLION IN

LOST REVENUE /

YEAR

* B a s e d o n a v g . p r i c e o f $ 1 . 5 0 / t h o u s a n d g a l l o n s

6

30%

50%

OVER HALF OF ALL

LEAKS GO

UNNOTICED

W I T H O U T A P R O A C T I V E P L A N

V I S I B L E

L E A K S

U N D E R G R O U N D

L E A K S

6 b i l l ion gal lons of water wasted each day that wi l l

cont inue to leak unless we ACT.

50%

7

How do you

effectively

manage water?

BE PROACTIVE.

8

NetworkMonitoring

Cont inual Data

Remote communicat ion

Reduces r isk

Enables decis ionmaking

NETWORK MONITORING

M A I N P R I N C I P L E S O F

Tw o m e t h o d s :1 . D M A M a n a g e m e n t

2 . A c o u s t i c n o i s e l o g g i n g

9

D I S T R I C T M E T E R E D A R E A

( D M A )

M A N A G E M E N T

10

DMA MANAGEMENT

D I S T R I C T M E T E R E D A R E A S

Using f low & p ressure da ta to loca te leakage w i th in the wate r ne twork .

M e t h o d o l o g y :• U s e f l o w / p r e s s u r e m e t e r s t o

b r e a k t h e s y s t e m i n t o m o r e

m a n a g e a b l e a r e a s

• U s e s h i s t o r i c a l d a t a

• C a p a b i l i t y o f v e r i f y i n g o t h e r

s y s t e m d a t a ( i . e S o u r c e

m e t e r s , S C A D A , e t c . )

• Ty p i c a l l y l e s s t h a n 1 , 5 0 0

p r o p e r t i e s

11

Assessment: Should you consider

DMA Management?

Consideration for your system:

• Age o f p ipe

• Type o f p ipe

• Urban v. ru ra l

• NRW

• Data Accuracy

• Size o f u t i l i t y

• DMA s t ruc tu re requ i red

Consideration for your personnel:

• I n -house : Ava i lab i l i t y, sk i l l l eve l , t ra in ing requ i red OR …

• Cont rac t ou t se rv ices

Address Apparent losses:

• Paper /da ta inaccurac ies and /o r meter inaccurac ies

12

DMA MANAGEMENT

N E T W O R K

M O N I T O R I N G

GPRS da ta loggers can p rov ide 15 m inu te f low data , wh ich can be d isp layed fo r

each revenue meter.

Minimum Night Flow (MNF)

Sent from meters to PI

13

C A S E S T U D Y

W H I T E H O U S E

U T I L I T Y D I S T R I C T

14

T H E S Y S T E M

A n r u r a l u t i l i t y.

1,000MILES OF PIPE

600

SQUARE MILES

30,000

CUSTOMERS

33DMAs

WHITE HOUSE UTILITY DISTRICT

16

WHUD’s PROGRAM

A N O V E R V I E W O F

THE CHALLENGE

• Used flows from SCADA: 7 metering

zones to track water loss progress

zones were too large

• RURAL: too much area and pipe to

effectively monitor

• High Non-Revenue Water ~ 30% in 2014

• Goal is NRW target of 15%

• Leverage SCADA & ESRI

17

WHUD’s PROGRAM

A N O V E R V I E W O F

THE SOLUTION

• Establishment of 30 DMAs in 2

Phases

• Incorporation into GIS system

• 76 new insertion meters

• OSIsoft PI System integration

• Data into Esri

18

WHUD’s PROGRAM

A N O V E R V I E W O F

MT. OLIVET LEAK

• This DMA zone had 25 GPM more

than expected for MNF

• Zone cut into Sub DMAs to

narrow leak search

• Underground leak proven at 80

GPM NO VISIBLE WATER

• Install 1 isolation valve to narrow

even further

• This is just ONE leak!

• 80gpm x $0.00738/gal =

$0.5904/min or $306,063/year

19

Architecture and Data Flow

GPRS (ce l lu la r )

Pressure & f low

sensors

Acous t i c

sensors

3 SCADA Sys tems

Fla t f i l es v ia

PI Un iversa l F i le Loader

PI -Re la t iona l Da tabase

In te r face

Conso l ida te f rom many to one sys tem

Ar range in to asse ts

Calcu la te KPI ’s

Add loca t ion da ta

View t rends , repor ts , dashboards

PI Integrator

For ArcGIS

St ream rea l - t ime da ta to

ArcGIS

In tu i t i ve User In te r face

Automated work f lows

Geospat ia l ana ly t i cs

20

RESULTS & CURRENT STATUS

W H U D ’ S

• Complete vision of their system daily via PI/Esri

• Reduction in system demand by over 2 MGD Despite

increase in Sales

• 100’s of leaks pinpointed, confirmed and repaired

• Average size leak smaller than before

• $millions of dollars saved already from reduced NRW

• Very quick ROI

• Deferred capital costs of $20 million; deferred by 11

years! No interest to pay until then…

• Improved customer perception

21

Picture /

Image

RESULTSCHALLENGE SOLUTION

COMPANY and GOAL

Company

Logo

Integrated Water Loss Identification System

White House Utility District

1) 600 sq mile, mostly rural, service area in Tennessee

2) Striving to reduce non-revenue water losses

Large geography made manual leak surveys impractical

Automate monitoring with Matchpoint metering

Automate KPI’s with PI

Intuitive interface with ArcGIS

Real-time, enterprise-wide view of identified leaks

• The entire data flow was automated and presented so that anyone can understand when and where leaks need to be fixed

• $300k/yr leak found in first week

• Reduced system demand

• Deferring new $20M plant by 11

years, saving $600k/yr interest

• Data that was available was in multiple systems

• Data had to be compiled from multiple systems

• Only an expert could do the job

9

© Copyright 2017 OSIsoft, LLCREGIONAL SEMINARS 2017

Contact Information

Simon WickSimon.wick@matchpointinc.us

Vice President

Matchpoint Water Asset Management

Thanks To

Pat Harrell Pharrell@whud.org

Lead Engineer

White House Utility District

10

© Copyright 2017 OSIsoft, LLCREGIONAL SEMINARS 2017 23

Questions

Please wait for the

microphone before asking

your questions

Please don’t forget to…

complete the Post

Event Survey

State your

name & company

© Copyright 2017 OSIsoft, LLCREGIONAL SEMINARS 2017

Thank You

top related