texas instruments security & emergency services decontamination team south building – jaime...
Post on 31-Mar-2015
213 Views
Preview:
TRANSCRIPT
Texas InstrumentsSecurity & Emergency
ServicesDecontamination Team
South Building – Jaime GarciaKilby Center – Al Sherrill
DMOS5 – Mauricio Ruiz (team leader)DMOS6 and Dallas Spill Control– Slade Maloney
Off Site – Bryan FussmanWCC – Richard Woods and Chad Warden
Mandatory Pre-work Decon Activities
1. Walk through with customer
2. Identify safety considerations like LOTO, EMO’s, possible alarms…
3. Obtain all necessary permits, checklists, and authorizations prior to any work.
Right PPE and Controls for Right Conditions.
•Full face combo cartridge APR, Yellow Tyvek suit and TRIonic Gloves?
•Full face combo cartridge APR, CPF-2 suit, TRIonic and 4H Gloves and personal air sample pump?
•Area secured?
DECONTAMINATION SCOPE OF WORK TEAM LEADER : Mauricio Ruiz JOB NUMBER: DC # is pending
LOCATION: Expy BLDG: DM5 North. FLOOR: COORD:Chemical dock IO: Pending
PROJECT DESCRIPTION: Wreck out fiber glass duct in Dm5N chemical dock. DECON PROCESS: We will contact the control room operations prior to start and after completion of the project. Air liquide Tech will be contacted to ensure cabinets are isolated. We will then remove the fiber glass duct exhaust lines from the Dm5 North chemical dock using sawzall. We will place a metal or poly pro shield between duct being cut and others lines in the area if necessary. Decon team will place a temporary cap using poly and duct tape during this task. Ronny Henslee will be capping all the fiber glass duct exhaust right after we finished with the wreck out. Exhaust duct and waste generated from this project will transport them to the decon spill control area to clean and neutralize with kolorsafe neutralizer and DI water rinse into the IWW stream. We will be using ladders and fall protection during this project. We will follow Airliquide and Ronny Henslee approvals. PPE REQUIREMENTS: EYE PROTECTION: SAFETY GLASSES: XXX GOGGLES: n/a FACE SHIELD: n/a WELDER’S HOOD: n/a GLOVES: LEATHER: n/a CHEMASTER:n/a LATEX: n/a COTTON: n/a OTHER: Trionic XXX SUITS: WHITE TYVEK: n/a POLY-COATED TYVEK: XXX CPF-1: n/a CPF-2: n/a RESPIRATOR: FULL FACE DUAL CARTRIDGE: XXX FULL FACE APR: n/a SCBA: n/a OTHER: n/a CARTRIDGES: ORGANIC VAPOR: n/a ACID GAS: n/a HEPA: OV/HE: n/a AG/HE: n/a OV/AG/HE: XXX CONTAMINANTS PRESENT: Acid crystals ISOLATION METHOD: Red, Danger, Hazardous Materials, Do Not Enter - Tape VENTILATION METHOD: NEGATIVE AIR: n/a BUILDING EXHAUST: xxxxx AIR MONITORING: 37MM (ARSENIC, CADMIUM, LEAD): n/a CHARCOAL TUBE
(HG):n/a 25MM (ASBESTOS, FIBERGLASS):
OTHER: WASTE SHIPPING CONTAINERS: (TYPE): n/a Final Sampling: Lab: n/a wipe: n/a Coupon: n/a Ph: xxx Visual Test(s) to be Conducted: Decon Team DECON START DATE: 06-28-06 SHIFT:1st LOCKOUT TAGOUT REQUIREMENTS: We will follow BUSH and BOC LOTO check list. IDENTIFY THE POINTS TO BE LOCKED OUT: Pending XXX Point #1 Point #2 Point #3 Point #4 Point #5 Point #6 Point #7 Point #8 Point #9 Point #10 Point #11 Point #12 Point #13 Point #14
DECON LABOR $ on going ANALYSIS $
EQUIPMENT CONSUMABLES $ TOTAL $
APPROVED BY
SIGNATURE DATE
EE Nikki Sanders
SAFETY Paul Price
IH Paul Price
CUS. REP. Ronny Henslee
DECON REP. Mauricio Ruiz
All information is critical. If any
part of the process
changes, work will stop until the
change is evaluated.
We work Safe, Smart and Fast.
We strive to get it done right, the
first time.
Work as a Team.
Always use the Buddy System
DSC and Building Activities
Asbestos Area Containment with
Temp Wall
Exhaust Line Decon and Disposal
Tool Surplus Staging at Dallas Support Building
Tools and materials are crated for storage and shipment
All items are labeled for tracking
Packaged pallets and crates are stored until final
disposition
Texas InstrumentsSecurity & Emergency
ServicesDecontamination Team
South Building – Jaime GarciaKilby Center – Al Sherrill
DMOS5 – Mauricio Ruiz (team leader)DMOS6 and Dallas Spill Control– Slade Maloney
Off Site – Bryan FussmanWCC – Richard Woods and Chad Warden
top related