texas instruments security & emergency services decontamination team south building – jaime...

8
Texas Instruments Security & Emergency Services Decontamination Team South Building – Jaime Garcia Kilby Center – Al Sherrill DMOS5 – Mauricio Ruiz (team leader) DMOS6 and Dallas Spill Control– Slade Maloney Off Site – Bryan Fussman WCC – Richard Woods and Chad Warden

Upload: josef-wilmott

Post on 31-Mar-2015

213 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Texas Instruments Security & Emergency Services Decontamination Team South Building – Jaime Garcia Kilby Center – Al Sherrill DMOS5 – Mauricio Ruiz (team

Texas InstrumentsSecurity & Emergency

ServicesDecontamination Team

South Building – Jaime GarciaKilby Center – Al Sherrill

DMOS5 – Mauricio Ruiz (team leader)DMOS6 and Dallas Spill Control– Slade Maloney

Off Site – Bryan FussmanWCC – Richard Woods and Chad Warden

Page 2: Texas Instruments Security & Emergency Services Decontamination Team South Building – Jaime Garcia Kilby Center – Al Sherrill DMOS5 – Mauricio Ruiz (team

Mandatory Pre-work Decon Activities

1. Walk through with customer

2. Identify safety considerations like LOTO, EMO’s, possible alarms…

3. Obtain all necessary permits, checklists, and authorizations prior to any work.

Page 3: Texas Instruments Security & Emergency Services Decontamination Team South Building – Jaime Garcia Kilby Center – Al Sherrill DMOS5 – Mauricio Ruiz (team

Right PPE and Controls for Right Conditions.

•Full face combo cartridge APR, Yellow Tyvek suit and TRIonic Gloves?

•Full face combo cartridge APR, CPF-2 suit, TRIonic and 4H Gloves and personal air sample pump?

•Area secured?

Page 4: Texas Instruments Security & Emergency Services Decontamination Team South Building – Jaime Garcia Kilby Center – Al Sherrill DMOS5 – Mauricio Ruiz (team

DECONTAMINATION SCOPE OF WORK TEAM LEADER : Mauricio Ruiz JOB NUMBER: DC # is pending

LOCATION: Expy BLDG: DM5 North. FLOOR: COORD:Chemical dock IO: Pending

PROJECT DESCRIPTION: Wreck out fiber glass duct in Dm5N chemical dock. DECON PROCESS: We will contact the control room operations prior to start and after completion of the project. Air liquide Tech will be contacted to ensure cabinets are isolated. We will then remove the fiber glass duct exhaust lines from the Dm5 North chemical dock using sawzall. We will place a metal or poly pro shield between duct being cut and others lines in the area if necessary. Decon team will place a temporary cap using poly and duct tape during this task. Ronny Henslee will be capping all the fiber glass duct exhaust right after we finished with the wreck out. Exhaust duct and waste generated from this project will transport them to the decon spill control area to clean and neutralize with kolorsafe neutralizer and DI water rinse into the IWW stream. We will be using ladders and fall protection during this project. We will follow Airliquide and Ronny Henslee approvals. PPE REQUIREMENTS: EYE PROTECTION: SAFETY GLASSES: XXX GOGGLES: n/a FACE SHIELD: n/a WELDER’S HOOD: n/a GLOVES: LEATHER: n/a CHEMASTER:n/a LATEX: n/a COTTON: n/a OTHER: Trionic XXX SUITS: WHITE TYVEK: n/a POLY-COATED TYVEK: XXX CPF-1: n/a CPF-2: n/a RESPIRATOR: FULL FACE DUAL CARTRIDGE: XXX FULL FACE APR: n/a SCBA: n/a OTHER: n/a CARTRIDGES: ORGANIC VAPOR: n/a ACID GAS: n/a HEPA: OV/HE: n/a AG/HE: n/a OV/AG/HE: XXX CONTAMINANTS PRESENT: Acid crystals ISOLATION METHOD: Red, Danger, Hazardous Materials, Do Not Enter - Tape VENTILATION METHOD: NEGATIVE AIR: n/a BUILDING EXHAUST: xxxxx AIR MONITORING: 37MM (ARSENIC, CADMIUM, LEAD): n/a CHARCOAL TUBE

(HG):n/a 25MM (ASBESTOS, FIBERGLASS):

OTHER: WASTE SHIPPING CONTAINERS: (TYPE): n/a Final Sampling: Lab: n/a wipe: n/a Coupon: n/a Ph: xxx Visual Test(s) to be Conducted: Decon Team DECON START DATE: 06-28-06 SHIFT:1st LOCKOUT TAGOUT REQUIREMENTS: We will follow BUSH and BOC LOTO check list. IDENTIFY THE POINTS TO BE LOCKED OUT: Pending XXX Point #1 Point #2 Point #3 Point #4 Point #5 Point #6 Point #7 Point #8 Point #9 Point #10 Point #11 Point #12 Point #13 Point #14

DECON LABOR $ on going ANALYSIS $

EQUIPMENT CONSUMABLES $ TOTAL $

APPROVED BY

SIGNATURE DATE

EE Nikki Sanders

SAFETY Paul Price

IH Paul Price

CUS. REP. Ronny Henslee

DECON REP. Mauricio Ruiz

All information is critical. If any

part of the process

changes, work will stop until the

change is evaluated.

We work Safe, Smart and Fast.

We strive to get it done right, the

first time.

Page 5: Texas Instruments Security & Emergency Services Decontamination Team South Building – Jaime Garcia Kilby Center – Al Sherrill DMOS5 – Mauricio Ruiz (team

Work as a Team.

Always use the Buddy System

Page 6: Texas Instruments Security & Emergency Services Decontamination Team South Building – Jaime Garcia Kilby Center – Al Sherrill DMOS5 – Mauricio Ruiz (team

DSC and Building Activities

Asbestos Area Containment with

Temp Wall

Exhaust Line Decon and Disposal

Page 7: Texas Instruments Security & Emergency Services Decontamination Team South Building – Jaime Garcia Kilby Center – Al Sherrill DMOS5 – Mauricio Ruiz (team

Tool Surplus Staging at Dallas Support Building

Tools and materials are crated for storage and shipment

All items are labeled for tracking

Packaged pallets and crates are stored until final

disposition

Page 8: Texas Instruments Security & Emergency Services Decontamination Team South Building – Jaime Garcia Kilby Center – Al Sherrill DMOS5 – Mauricio Ruiz (team

Texas InstrumentsSecurity & Emergency

ServicesDecontamination Team

South Building – Jaime GarciaKilby Center – Al Sherrill

DMOS5 – Mauricio Ruiz (team leader)DMOS6 and Dallas Spill Control– Slade Maloney

Off Site – Bryan FussmanWCC – Richard Woods and Chad Warden