W ITH THE CONSTRUCTION START OF THE INTEGRATED SCIENCE
FACILITY (ISF) THIS OCTOBER , GENESEO COLLEGE IS EMBARKING ON
THE LARGEST SINGLE CONSTRUCTION PROJECT IN COLLEGE HISTORY.THE PIKE COMPANY OF ROCHESTER , NEW YORK HAS BEEN SELECTED
AS GENERAL CONTRACTOR TO BUILD THE 102,000 SQUARE FOOT ADDI-TION TO GREENE HALL. THE DESIGN IS BY HOK, ONE OF THE NATION'SLEADING ARCHITECTURAL DESIGNERS OF RESEARCH LABORATORY
BUILDINGS .
CONSTRUCTION WILL BEGIN WITH THE RAZING OF BLAKE “D” AND “E”AND CONTINUE WITH SITE WORK BETWEEN BLAKE , THE M ILNE L IBRARY,NEWTON HALL AND GREENE HALL . CONSTRUCTION DURATION IS
PROJECTED TO BE ABOUT 36 MONTHS . WHILE CONSTRUCTION IS
UNDERWAY, HOK SHALL DESIGN THE RENOVATION OF GREENE HALL,WHICH WILL COMPLETE THE ISF PROJECT.
ONCE THE CONSTRUCTION IS COMPLETED, WE WILL HAVE A STATE-OF-THE-ART SCIENCE RESEARCH CENTER FOR WESTERN NEW YORK STATE
THAT WILL ENHANCE OUR POSITION AS A CENTER OF EXCELLENCE FOR
SCIENCE TEACHING. GETTING TO THIS END, HOWEVER , WILL NOT BE
WITHOUT ITS CHALLENGES . CONSTRUCTION IS A NOISY AND COMPLEX
BUSINESS, LEADING TO SOME INCONVENIENCE DURING THE COMING
THREE YEARS. THIS PAMPHLET DESCRIBES THE DIFFERENT CONSTRUCTION
PHASES, WHAT ONE CAN EXPECT FROM EACH, AND HOW PEDESTRIAN
CIRCULATION WILL BE MAINTAINED.
NEW UPPER CAMPUS SITE PLAN
Newton Lecture Hall
ContractorStaging AreaLot A
Greene Hall
Site of New Integrated Science Facility
ContractorTraffic Route
ContractorParking and RemoteStaging Area
NewtonLecture
Hall
New IntegratedScience Facility
GreeneHall
BaileyHall
ErwinHall
Blake Hall
MilneLibrary
CONSTRUCTION SITE CIRCULATION - PHASE 1 - THRU DEMOLITION OF BLAKE CONSTRUCTION SITE CIRCULATION - PHASE 2
ConstructionStaging/GreeneService ONLY
exit
exit
exit
no exit
exit
exit
no exit
ConstructionStaging/GreeneService ONLY
exit
exit
exit
no exit
exit
exit
no exit
STUDENTS / FACULTY / STAFF / VISITORS
CONSTRUCTION SAFETY GUIDELINES
- ADHERE TO CLEARLY MARKED PEDESTRIAN PATHS
- OBSERVE POSTED CONSTRUCTION SIGNS AND INSTRUCTIONS
- DO NOT ENTER FENCED CONSTRUCTION AREAS
REPORT SAFETY CONCERNS:- BUSINESS HOURS - SUCF CONSTRUCTION TRAILER X 5135- NON-BUSINESS HOURS - CAMPUS POLICE X 5651
OVERSIGHT OF THE ISF CONSTRUCTION IS PROVIDED BY THE STATE UNIVERSITY
CONSTRUCTION FUND, NOT BY THE COLLEGE DIRECTLY. WE HAVE MADE EVERY EFFORT
TO MAKE THE CONSTRUCTION FUND AND CONTRACTOR AWARE OF THE COLLEGE'SSCHEDULE TO MINIMIZE DISRUPTION TO THE ACADEMIC ENTERPRISE . WE ASK THAT YOU
BEAR WITH US DURING CONSTRUCTION AND TRY TO BE AS FLEXIBLE AS POSSIBLE . IF YOU
HAVE ANY CONCERNS , PLEASE CALL THE FACILITIES PLANNING AND CONSTRUCTION
OFFICE (X5511), WHICH IS THE COLLEGE'S OFFICIAL LIAISON WITH THE CONTRACTOR
AND THE CONSTRUCTION FUND.
F INALLY, LET ME THANK YOU IN ADVANCE FOR YOUR PATIENCE , UNDERSTANDING, AND
PERSEVERANCE DURING THE NEXT FEW YEARS . I THINK WE WILL ALL FEEL THAT THE MINOR
INCONVENIENCES WE SHALL ENDURE WILL HAVE BEEN WELL WORTH IT ONCE WE ARE
ABLE TO OCCUPY THIS WONDERFUL NEW BUILDING .
KENNETH H. LEVISON
VICE PRESIDENT FOR ADMINISTRATION
NewtonLecture
Hall
GreeneHall
BaileyHall
ErwinHall
Blake Hall
MilneLibrary
NewtonLecture
Hall
GreeneHall
BaileyHall
ErwinHall
Blake Hall
MilneLibrary
construction fencespedestrian walkways
HOK - ARHCITECTURE AND INTERIOR DESIGN; SYSKA HENNESSY GROUP - MEP; LESLIE E. ROBERTSON, RLLP- STRUCTURAL ENGINEER; WATTS ENGINEERS, CIVIL ENGINEERING AND HAZARDOUS MATERIALS; WENDELL DUCHSCHERER, SURVEYING
2ND & 3RD FLOOR FIRST FLOOR
INTEGRATED SCIENCE FACILITY STATE UNIVERSITY OF NEW YORK AT GENESEO
new class rooms
faculty loungeteaching labs
student lounge
faculty/studentresearch labs
teaching labs
chair’s offices
new class rooms
faculty offices
atrium
YEAR 03 04 05 06MONTH S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D
1 Mobilization and Site Prep1 Sep-7 Nov 03
2 Demoliton of Blake D & E 3 Nov-12 Dec 03
3 Site Utilities22 Oct- 22 Mar 04
4 Foundations and Rock Removal2 Dec- 28 Jul 04
5 Steel Erection29 Jul- 8 Sep 04
6 Slabs & Roof9 Sep- 13 Oct 04
7 Enclose West Half of ISF30 Sep- 15 Dec 04
8 Interior Finishes West Half of ISF16 Dec- 21 Sep 05
9 Enclose East Half of ISF2 May- 19 Aug 05
10 Interior Finishes East Half of ISF18 Jul-21 May 06
11 Landscape and Site Work1 May- 15 Sep 06
12 Commissioning1 Dec 05- 2 Oct 06
13 Move-in2-Oct-06
Sept 03
Oct 06
2 week exam quiet period
RockRemoval!Expect Noise!
SteelErection!
YEAR 03 04 05 06MONTH S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D
1 Mobilization and Site Prep1 Sep-7 Nov 03
2 Demoliton of Blake D & E 3 Nov-12 Dec 03
3 Site Utilities22 Oct- 22 Mar 04
4 Foundations and Rock Removal2 Dec- 28 Jul 04
5 Steel Erection29 Jul- 8 Sep 04
6 Slabs & Roof9 Sep- 13 Oct 04
7 Enclose West Half of ISF30 Sep- 15 Dec 04
8 Interior Finishes West Half of ISF16 Dec- 21 Sep 05
9 Enclose East Half of ISF2 May- 19 Aug 05
10 Interior Finishes East Half of ISF18 Jul-21 May 06
11 Landscape and Site Work1 May- 15 Sep 06
12 Commissioning1 Dec 05- 2 Oct 06
13 Move-in2-Oct-06
Sept 03Sept 03
Oct 06
2 week exam quiet period
RockRemoval!Expect Noise!
SteelErection!
FINAL DESIGN