Review of eStorage’s first year resultsWP3 Benefits of Storage and Regulatory Framework & Market Design
30 October 2013Wim van der Veen - DNV KEMA
© 2013 eStorage 2
WP3 review of first years resultsAgenda
WP3 overview
Tasks
Progress
Main results
30 October 2013 2
© 2013 eStorage 3
WP3 review of first years resultsAgenda
WP3 overview
Tasks
Progress
Main results
30 October 2013 3
© 2013 eStorage 4
General OverviewTitle and objective WP3
Title:
Benefits of Storage and Regulatory Framework & Market Design
Objective:
Quantify the economic and environmental value of variable speed PSP units;
Recommend Regulatory Framework & Market Design, enabling a massive roll out of flexible energy storage in the EU market context , necessary for the EU climate ambitions.
30 October 2013 4
© 2013 eStorage 5
WP3 review of first years resultsAgenda
WP3 overview
Tasks
Progress
Main results
30 October 2013 5
© 2013 eStorage 6
Tasks
30 October 2013 6
© 2013 eStorage 7
Task 3.1 ScenariosTitle
Formulating Development Scenarios and Identifying the Role of Storage for the Future EU Electricity System
30 October 2013 7
© 2013 eStorage 8
Task 3.1 ScenariosObjective
Quantification of impacts and value of energy storage requires
the formulation of plausible scenarios for future development of
the interconnected European system with incorporation of:
o the objective of expanding renewable capacity, as well as
o the expected development of electricity networks and
demand-side participation
The scenarios developed will describe how the electricity system
will change from the current state towards 2050 vision
30 October 2013 8
© 2013 eStorage 11
Task 3.2 – Value of Storage Title and objective
TASK 3.2: Economic and Environmental Value of Storage in the future EU electricity Systems
The intention of this task in particular is to make use of DNV KEMA
and Imperial’s models for analysing the integration of intermittent
renewables into the EU electricity system
30 October 2013 11
© 2013 eStorage 14
Task 3.2 – Value of Storage Sub tasks
Subtask 3.2.1: Fundamental economic evaluation of storage for system operation and design
Subtask 3.2.2: Value of storage for participation in competitive electricity markets
Subtask 3.2.3: Value of EU-wide deployment of variable speed retrofit of existing PSP schemes
30 October 2013 14
© 2013 eStorage 15
Task 3.3 Obstacles in EU FrameworkTitle and objective
TASK 3.3: Obstacles for the integration of Storage in Current EU Regulatory and Market Framework
Survey of current market and regulatory mechanisms pertaining to storage facilities in selected European countries
Creating a favourable regulatory and market framework for the use of storage systems.
30 October 2013 15
© 2013 eStorage 16
Task 3.4 – Regulatory RecommendationsTitle and objective
TASK 3.4: Regulatory Recommendations for Storage in European Market Rules which support efficient large scale integration of renewable electricity and energy storage on a European scale
Guidelines for efficient and non-discriminatory grid access
Include interactions with stakeholders
30 October 2013 16
© 2013 eStorage 17
WP3 review of first years resultsAgenda
WP3 overview
Tasks
Progress
Main results
30 October 2013 17
© 2013 eStorage 18
Work Package 3Progress
At the beginning of the project a detailed work plan has been drafted
Every month a telephone conference is held with all task leaders or representatives
The are no official deliverables due in the first year for all tasks and sub-tasks
Now progress per task
30 October 2013 18
© 2013 eStorage 19
Task 3.1 ScenariosProgress
Literature study
European policy and scenarios,
Demand development
Technology development
Development of fuel supply and fuel prices.
30 October 2013 19
© 2013 eStorage 20
Task 3.1 ScenariosProgress
Internal deliverable literature study:
Four reports on the subjects just mentioned
Reports were reviewed and commented by
o WP3 partners
o Other work package partners
30 October 2013 20
© 2013 eStorage 21
Task 3.2 Value of storageProgress
Survey of similar projects or studies recently conducted on a similar European-wide scale.
Exchange of input data templates to ensure consistency between inputs to both modelling tools and the scenarios developed in Task 3.1.
Feedback on literature study of Task 3.1
30 October 2013 21
© 2013 eStorage 22
Task 3.3 Obstacles for integration of storage Progress
Start of survey of current market and regulatory mechanisms pertaining to storage facilities in selected European countries
30 October 2013 22
© 2013 eStorage 23
Task 3.4 Regulatory recommendationsProgress
This task is only to start in month 36
Feedback on literature study of Task 3.1
30 October 2013 23
© 2013 eStorage 24
WP3 review of first years resultsAgenda
WP3 overview
Tasks
Progress
Main results
30 October 2013 24
© 2013 eStorage 25
WP3Main results
The most tangible results are on Task 3.1: Scenario development
Literature study on
Scenarios and studies
Demand
Fuel development
Technology
Internal deliverable: 4 reports on these items
Some highlights – further discussion in Break Out sessions this afternoon
30 October 2013 25
© 2013 eStorage 26
WP3 main resultsReport on recent scenario development
Inventory of recent roadmap studies
Comment on studies
Clustering
30 October 2013 26
© 2013 eStorage 27
WP3 main resultsReport on recent scenario development
Clusters to focus/enable choice
Cluster 1: High RES – high demand
Cluster 2: High RES – low demand
Cluster 3: Medium RES and Nuclear
Cluster 4: High Nuclear
30 October 2013 27
© 2013 eStorage 28
WP3 main resultsReport on demand development
Development from recent studies
Demand drivers
Demand response
30 October 2013 28
Source: Irene-40
© 2013 eStorage 29
WP3 main resultsReport on demand development
30 October 2013 29
Source: Irene-40
© 2013 eStorage 30
WP3 main resultsReport on fuel development
30 October 2013 30
Development of demand
Development of reserves and resources
Development of fuel prices
© 2013 eStorage 31
WP3 main resultsReport on fuel development – reserves and resources
30 October 2013 31
© 2013 eStorage 32
WP3 main resultsReport on fuel development – fuel prices
30 October 2013 32
© 2013 eStorage 33
Track B Technology development
Assess technology developments of:o renewable power generationo thermal power generation o electricity storage o transmission technologies.
Technologies that are analysed:
Aspects discussed per technologyo Current statuso Typical characteristicso Technological developmento Cost developmento Potential
30 October 2013 33
© 2013 eStorage 34
Questions?
30 October 2013 34
A consortium of energy-industry leaders
and academic researchersAlgoé, a management consultancy.
Alstom, a leading power generation and grid
equipment and solutions company.
DNV KEMA, the global expert in energy and
sustainability consultancy.
EDF, the world’s largest producer of
electricity.
Elia, one of Europe’s leading electricity
transmission system operators.
Imperial College, a provider of world-class
education and research. © 2013 eStorage 35
top related