project data - rudy bruner award for urban excellence__ facebook __ social media __ bruner/loeb...

Post on 16-Oct-2020

0 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

8

PROJECT DATA

2019RUDY BRUNER AWARD

9

Pleaseanswerquestionsinspaceprovided.Ifpossible,answerstoallquestionsshouldbetypedorwrittendirectlyontheforms.Iftheformsarenotusedandanswers are typed on a separate page, each answer must be preceded by the question to which it responds, and the length of each answer should be limited to the area provided on the original form.

PROJECTDATA

ProjectName Location City State

Owner

ProjectUse(s)

Project Size TotalDevelopmentCost

AnnualOperatingBudget(ifappropriate)

DateInitiated PercentCompletedbyDecember1,2016

ProjectCompletionDate(ifappropriate) ProjectWebsite(ifappropriate)

Attach, if you wish, a list of relevant project dates

Application submitted by:

Name Title

Organization

Address City/State/Zip

Telephone() E-mail

Perspective Sheets:

Organization Name Telephone/e-mail

Public Agencies

Architect/Designer

Developer

Professional Consultant

CommunityGroup

Other

Please indicate how you learned of the Rudy Bruner Award for Urban Excellence.(Checkallthatapply).

__DirectMailing __DirectEmail __ Previous Selection Committee member

__ Professional __PreviousRBAentrant __ Online Notice

__ Facebook __SocialMedia __Bruner/LoebForum

TheundersignedgrantstheBrunerFoundationpermissiontouse,reproduce,ormakeavailableforreproductionorusebyothers,andtopostontheBruner

Foundationwebsites,thematerialssubmitted.Theapplicantwarrantsthattheapplicanthasfullpowerandauthoritytosubmittheapplicationandallattached

materials and to grant these rights and permissions.

Signature Date

__Professional Organization

__Other(pleasespecify)

__________________________________

Two Annual Street Art Festivals July 13-23 2017 and August 6-19, 2018
MassDevelopment
Joseph Mulligan
jmulligan@massdevelopment.com
12/11/18

10

2019RUDY BRUNER AWARDPROJECT AT-A-GLANCE

11

Pleaseanswerquestionsinspaceprovided.Ifpossible,answerstoallquestionsshouldbetypedorwrittendirectlyontheforms.Iftheformsarenotusedandanswers are typed on a separate page, each answer must be preceded by the question to which it responds, and the length of each answer should be limited to the

area provided on the original form.

Thissheet,theProjectDatasheet,andtherepresentativephotowillbesenttotheCommitteeinadvanceastheProject Overview.

Project Name

Address City/State/ZIP

1.Giveabriefoverviewoftheproject. A .

2. Why does the project merit the Rudy Bruner Award for Urban Excellence ?Youmaywishtoconsidersuchfactorsas:effectontheurbanenvironment;innovativeoruniqueapproachestoanyaspectofprojectdevelopment;newandcreativeapproachestourbanissues;designquality. A

.

PROJECTAT-A-GLANCE

12

PROJECT DESCRIPTION

2019RUDY BRUNER AWARD

13

PROJECTDESCRIPTIONPleaseanswerquestionsinspaceprovided.Ifpossible,answerstoallquestionsshouldbetypedorwrittendirectlyontheforms.Iftheformsarenotusedandanswers are typed on a separate page, each answer must be preceded by the question to which it responds, and the length of each answer should be limited to the area provided on the original form.

1. Describe the underlying values and goals of the project. What, if any, signifcant trade-offs were required to implement the project A .

2. Brieflydescribetheproject’surbancontext.Howhastheprojectimpactedthelocalcommunity?Whodoestheprojectserve?How many people are served by the project A .

14

3. Describe the key elements of the development process, including community participation where appropriate. A .

5. Istheprojectuniqueand/ordoesitaddresssignificanturbanissues?Isthemodeladaptabletootherurbansettings? A .

PROJECTDESCRIPTION(CONT’D)

4.Describethefinancingoftheproject.Pleaseincludeallfundingsourcesandsquarefootcostswhereapplicable. A .

24

PROFESSIONAL CONSULTANTPERSPECTIVE

2019RUDY BRUNER AWARD

25

PROFESSIONALCONSULTANTPERSPECTIVEPleaseanswerquestionsinspaceprovided.Ifpossible,answerstoallquestionsshouldbetypedorwrittendirectlyontheforms.Iftheformsarenotusedandanswers are typed on a separate page, each answer must be preceded by the question to which it responds, and the length of each answer should be limited to the area provided on the original form.

Thissheetistobefilledoutbyaprofessionalwhoworkedasaconsultantontheproject,providingdesign,planning,legal,orotherservices.Copiesmaybegivento other professionals if desired.

Name Title

Organization Telephone()

Address City/State/ZIP

E-mail Website

TheundersignedgrantstheBrunerFoundationpermissiontouse,reproduce,ormakeavailableforreproductionorusebyothers,foranypurposewhatsoever,thematerialssubmitted.Theapplicantwarrantsthattheapplicanthasfullpowerandauthoritytosubmittheapplicationandallattachedmaterialsandtograntthese rights and permissions.

Signature Date

1. What role did you or your organization play in the development of this project? Approximately 400 words.

2.Describetheproject’simpactonitscommunity.Pleasebeasspecificaspossible. Approximately 400 words.

26

3. How might this project be instructive to others in your profession? Approximately 400 words.

4. What do you consider to be the most and least successful aspects of this project? Approximately 400 words.

PROFESSIONALCONSULTANTPERSPECTIVE(CONT’D)

18

PUBLIC AGENCY PERSPECTIVE

2019RUDY BRUNER AWARD

19

Pleaseanswerquestionsinspaceprovided.Ifpossible,answerstoallquestionsshouldbetypedorwrittendirectlyontheforms.Iftheformsarenotusedandanswers are typed on a separate page, each answer must be preceded by the question to which it responds, and the length of each answer should be limited to the area provided on the original form.

Thissheetistobefilledoutbystaffrepresentative(s)ofpublicagency(ies)whoweredirectlyinvolvedinthefinancing,designreview,orpublicapprovalsthataffected this project.

Name Title

Organization Telephone()

Address City/State/ZIP

E-mail Website

TheundersignedgrantstheBrunerFoundationpermissiontouse,reproduce,ormakeavailableforreproductionorusebyothers,foranypurposewhatsoever,thematerialssubmitted.Theapplicantwarrantsthattheapplicanthasfullpowerandauthoritytosubmittheapplicationandallattachedmaterialsandtograntthese rights and permissions.

Signature Date

1. What role did your agency play in the development of this project? Describe any requirements made of this project by your agency (e.g.,zoning,publicparticipation,publicbenefits,impactstatements). A .

2. Howwasthisprojectintendedtobenefityourcity?Whattrade-offsandcompromiseswererequiredtoimplementtheproject?How did your agency participate in making them? A

PUBLICAGENCYPERSPECTIVE

12/10/18

20

3.Describetheproject’simpactonyourcity.Pleasebeasspecificaspossible. A .

4.Didthisprojectresultinnewmodelsofpublic/privatepartnerships?Arethereaspectsofthisprojectthatwouldbeinstructivetoagencieslikeyoursin other cities? A .

5.Whatdoyouconsidertobethemostandleastsuccessfulaspectsofthisproject? A .

PUBLICAGENCYPERSPECTIVE(CONT’D)

27

ARCHITECT OR DESIGNERPERSPECTIVE

2019RUDY BRUNER AWARD

28

ARCHITECTORDESIGNERPERSPECTIVEPleaseanswerquestionsinspaceprovided.Ifpossible,answerstoallquestionsshouldbetypedorwrittendirectlyontheforms.Iftheformsarenotusedandanswers are typed on a separate page, each answer must be preceded by the question to which it responds, and the length of each answer should be limited to

the area provided on the original form.

Thissheetistobefilledoutbyadesignprofessionalwhoworkedasaconsultantontheproject,providingdesign,planning,orotherservices.Copiesmaybe

given to other design professionals if desired.

Name Title

Organization Telephone()

Address City/State/ZIP

E-mail Website

TheundersignedgrantstheBrunerFoundationpermissiontouse,reproduce,ormakeavailableforreproductionorusebyothers,foranypurposewhatsoever,thematerialssubmitted.Theapplicantwarrantsthattheapplicanthasfullpowerandauthoritytosubmittheapplicationandallattachedmaterialsandtograntthese rights and permissions.

Signature Date

1. Describe the design concept of this project, including urban design considerations, choice of materials, scale, etc. Approximately 400 words.

2. Describe the most important social and programmatic functions of the design. Approximately 400 words.

Dec. 12, 2018

29

3. Describe the major challenges of designing this project and any design trade-offs or compromises required to complete the project. Approximately 400 words.

4. Describe the ways in which the design relates to its urban context. Approximately 400 words.

ARCHITECTORDESIGNERPERSPECTIVE(CONT’D)

27

ARCHITECT OR DESIGNERPERSPECTIVE

2019RUDY BRUNER AWARD

28

ARCHITECTORDESIGNERPERSPECTIVEPleaseanswerquestionsinspaceprovided.Ifpossible,answerstoallquestionsshouldbetypedorwrittendirectlyontheforms.Iftheformsarenotusedandanswers are typed on a separate page, each answer must be preceded by the question to which it responds, and the length of each answer should be limited to

the area provided on the original form.

Thissheetistobefilledoutbyadesignprofessionalwhoworkedasaconsultantontheproject,providingdesign,planning,orotherservices.Copiesmaybe

given to other design professionals if desired.

Name Title

Organization Telephone()

Address City/State/ZIP

E-mail Website

TheundersignedgrantstheBrunerFoundationpermissiontouse,reproduce,ormakeavailableforreproductionorusebyothers,foranypurposewhatsoever,thematerialssubmitted.Theapplicantwarrantsthattheapplicanthasfullpowerandauthoritytosubmittheapplicationandallattachedmaterialsandtograntthese rights and permissions.

Signature Date

1. Describe the design concept of this project, including urban design considerations, choice of materials, scale, etc. Approximately 400 words.

2. Describe the most important social and programmatic functions of the design. Approximately 400 words.

12/10/18

29

3. Describe the major challenges of designing this project and any design trade-offs or compromises required to complete the project. Approximately 400 words.

4. Describe the ways in which the design relates to its urban context. Approximately 400 words.

ARCHITECTORDESIGNERPERSPECTIVE(CONT’D)

21

DEVELOPER PERSPECTIVE

2019RUDY BRUNER AWARD

22

Pleaseanswerquestionsinspaceprovided.Ifpossible,answerstoallquestionsshouldbetypedorwrittendirectlyontheforms.Iftheformsarenotusedandanswers are typed on a separate page, each answer must be preceded by the question to which it responds, and the length of each answer should be limited to the area provided on the original form.

Thissheetistobefilledoutbythepersonwhotookprimaryresponsibilityforprojectfinancingorisarepresentativeofthegroupwhichdid.

Name Title

Organization Telephone()

Address City/State/ZIP

E-mail Website

TheundersignedgrantstheBrunerFoundationpermissiontouse,reproduce,ormakeavailableforreproductionorusebyothers,foranypurposewhatsoever,thematerialssubmitted.Theapplicantwarrantsthattheapplicanthasfullpowerandauthoritytosubmittheapplicationandallattachedmaterialsand to grant these rights and permissions.

Signature Date

1. What role did you or your company play in the development of this project? Describe the scope of involvement. A .

2. What trade-offs or compromises were required during the development of the project? A .

DEVELOPERPERSPECTIVE

23

3.Howwastheprojectfinanced?What,ifany,innovativemeansoffinancingwereused? A .

4. What do you consider to be the most and least successful aspects of the project? A .

DEVELOPERPERSPECTIVE(CONT’D)

Photo Credit: Isaac Subillaga

Photo Credit: Item Live

Photo Credit: Isaac Subilaga

Photo Credit: Beyond Walls

Photo Credit: Lynn Happens

Photo Credit: Lynn Happens

Photo Credit: Creative Collective

Photo Credit: Isaac Subilaga

Photo Credit: Isaac Subilaga

Photo Credit: Isaac Subilaga

Photo Credit: Beyond Walls

Photo Credit: Beyond Walls

Photo Credit: Beyond Walls

Photo Credit: Beyond Walls

Photo Credit: Beyond Walls

Photo Credit: Beyond Walls

Photo Credit: Sam Worthington

Photo Credit: Beyond Walls

Photo Credit: Beyond Walls

Photo Credit: Leon Keer

Photo Credit: Eric Skotnes

Photo Credit:Beyond Walls

Photo Credit:Beyond Walls

Photo Credit:Lynn Happens

Photo Credit:Item Live

Photo Credit:Beyond Walls

Photo Credit:Beyond Walls

top related