project cameo shenzhen technical center (stc) whirlpool ... · completion of a preliminary design...

Post on 31-Jul-2018

217 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

Project Value: Confidential

Project Overview:

ACS provided design and construction phase

services to fit-out a new appliance and electronics

R & D laboratory.

Key Performance Features:

• The facility includes fit-out of 5,000 square

meter floor for R & D laboratories and offices.

• ACS led architectural and engineering

programming/preliminary design resulting in

completion of a Preliminary Design Report.

This report was used as the basis to solicit

proposals from local Hong Kong, PRC A/E firms

to complete final construction documents.

• Jones, Lang, LaSalle led contractor pre-

qualification short listing, bidding and

construction phase management with ACS’

input to ensure conformance with the design

requirements.

P R O J E C T C A M E O

S H E N Z H E N T E C H N I C A L C E N T E R ( S T C ) / W H I R L P O O L / S H E N Z H E N , C H I N A

ACS Services: Owner’s Representative for

Leadership of Design and Construction Phase

Management

Project Duration: 10 months

Completion Date: February 2006

Headquar ters : ACS3330Univers i ty Ave. Suite 200 / Madison, WI / 53705 • P 608.663.1590 • acs-us@acscm.com • www.acscm.com

top related