project cameo shenzhen technical center (stc) whirlpool ... · completion of a preliminary design...
TRANSCRIPT
Project Value: Confidential
Project Overview:
ACS provided design and construction phase
services to fit-out a new appliance and electronics
R & D laboratory.
Key Performance Features:
• The facility includes fit-out of 5,000 square
meter floor for R & D laboratories and offices.
• ACS led architectural and engineering
programming/preliminary design resulting in
completion of a Preliminary Design Report.
This report was used as the basis to solicit
proposals from local Hong Kong, PRC A/E firms
to complete final construction documents.
• Jones, Lang, LaSalle led contractor pre-
qualification short listing, bidding and
construction phase management with ACS’
input to ensure conformance with the design
requirements.
P R O J E C T C A M E O
S H E N Z H E N T E C H N I C A L C E N T E R ( S T C ) / W H I R L P O O L / S H E N Z H E N , C H I N A
ACS Services: Owner’s Representative for
Leadership of Design and Construction Phase
Management
Project Duration: 10 months
Completion Date: February 2006