PRESENTATIONERA MODULE ASSEMBLY PROJECT

ERA Brine Concentrator System

Energy Resources of Australia (Rio Tinto)

OVERVIEW OF THE ERA PROJECT (AUSTRALIA)

Port of Darwin

PORT OF DISCHARGE---DARWIN, AUSTRALIA

ERA OWNED BY RIO TINTO PRODUCES DRUMMED URANIUM OXIDE AT ITS RANGER MINE IN AUSTRALIA’S NORTHERN TERRITORY

CLEANING THE LARGE POND / PRODUCING CLEAN DISTILLED WATER

ENERGY RESOURCES OF AUSTRALIA

ERA – GENERAL ARRANGEMENTS FRONT VIEW

≈ 15 Meters

≈ 25 Meters

ERA – GENERAL ARRANGEMENTS SIDE VIEW

≈ 8 Meters

≈ 25 Meters

ERA – GENERAL ARRANGEMENTS TOP VIEW

≈ 50 Meters

OVERALL WATER TREATMENT PLANT

BRINE CONCENTRATOR AREA

BRINE CONCENTRATORS (AL6XN, DUPLEX)

LARGE VAPOR WASHERS(AL6XN, DUPLEX)

LARGE DIAMETER DUCTING (DUPLEX & 316L SS)

MODULARIZED SKIDS, FULLY PIPED / INSULATED WITH INSTRUMENTATION & CONTROL VALVES

1) Vapour Washer 3 Units (JF-1517)

2) Tank (in the skid)5 Tanks(JF-1517)

3) Ducting Work 1 Set (JF-1517)

4) Skid Module 1 Set (JF-1543)

Including; Structure, Platform, Handrail , Piping, Duct support, Insulation, Electrical & Instrument

Delivery Condition:CIF at Darwin Port (NT),AustraliaDelivery date:On Sep. 30,2012 for Item 1) and 3) On Dec. 01,2012 for Item 2) and 4)

SCOPE OF WORK

Unit3Vapour Washer

Unit2Vapour Washer

Unit1Vapour Washer

DUCTING(VWH)Evap to Vapour Body

DUCTING(FHT)Fan to Evap

DUCTING(VWF)Vapour Body to Fan

DUCTING(REC)Recirculation

Tanks in skid

VAPOUR WASHER 3 UNITS

DUCTING

Vent Separator Tank

CIP Tank

Hot Water DayTank

Start-Up Seed&Chem Mix Tank

Distillate Collection Tank

5 TANKS IN MODULE

Vent Separator Tank

Distillate Collection Tank

Start-Up Seed&Chem Mix Tank

CIP Tank

Hot Water DayTank

A

B

D

C

F

E

H

G

L

K

J

M

STRUCTURE & FRAME

TOTAL 12 MODULES

MODULE A

MODULE B

MODULE C

MODULE D

MODULE E

MODULE F

MODULE G

MODULE H

MODULE J

MODULE K

MODULE L

MODULE M

STRUCTURE SHOP FABRICATION AREA

TRACABILITY CONTROL

ERRECTION STARTED AT STRUCTURE SHOP

ERRECTION STARTED AT STRUCTURE SHOP

TOTAL ASSEMBLY AT STRUCTURE SHOP

M

A

K

J

H

G

F

E C

DB

L

STRUCTURE LAID DOWN IN MODULE SHOP

TOP VIEW

STRUCTURE LAYED DOWN IN MODULE SHOP

SAFETY CONTROL

STRICT INDOCTRINATION

SAFETY CONTROL

PIPING

PIPE RACK

STORING

PIPE RACK

STORING SMALL PARTS NEATLY

STORING SMALL PARTS

DUCTING

DUCTING

DUCTING

COLLABORATION OF PIPING E & I INSULATION

PUMP INSTALLED

VALVE PUNCH-LISTED

INSULATING PIPE

GRATING

INSTALLING PLATE HEAT EXCHANGERS

INSTALLING PLATE HEAT EXCHANGERS

CABLE INSTALLATION

WORKING ON UPPER MODULE

SCAFFOLDING

INSULATING PIPES

STEAM LINE VALVE ON TOP OF MODULES

INSULATING VALVE PART

INSULATING BY MATRESS

EYE WASHERDRAIN PIPING

FINALIZING

PUNCH LISTING

START PACKING

BLUE SHEET + NETTING

PIPE SHUE CLAMP & LASHING

PIPE SHUE CLAMP & LASHING

READY FOR TRANSPORT

CENTER OF GRAVITY

TRANSPORTATION BEAM

LIFTING LUG

TRANSPORTATION TO LCB PORT

TRANSPORTING VAPOR WASHERS

LIFTING POWER LINE

TRANSPORTING VAPOR WASHERS

TRANSPORTING VAPOR WASHERS

LIFTING AT THE PORT OF THAILAND

LIFTING AT THE PORT OF THAILAND

UNDER DECK BREAK BULK

UNDER DECK BREAK BULK

TRANSPORTING DUCTING

TRANSPORTING DUCTING

UNDER DECK BREAK BULK

UNDER DECK BREAK BULK

LASHING INSIDE VESSEL

RIGGING OPERATION

LIFTING OPERATION

UNDER DECK BREAK BULK

LASHING INSIDE VESSEL

LASHING INSIDE VESSEL

CARGO LOADING COMPLETED--SAILING

DELIVERED TO JOBSITE ON 1ST DEC'12