norwalk p&z 12.15.14 state of connecticut department … · norwalk p&z 12.15.14 submittal...

Post on 24-Aug-2020

2 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

T-1.0

AS NOTED

Checked

Sheet

Job Number

Scale

Date

Drawn

L.F.O.

10.27.14

© ARIS CRIST AIA 2015.

TH

IS TECH

NICAL D

RAW

IN

G AN

D TH

E

ARCH

ITECTU

RAL W

ORK D

EPICTED

ARE

CO

PYRIG

HTED

BY

ARIS CRIST AIA

STATE OF CONNECTICUT DEPARTMENT OF HOUSINGCommunity Development Block GrantDisaster Recovery ProgramProject: B-13-DS-09-001

Merritt Construction Services, Inc.1177 High Ridge RoadStamford, Connecticut 06905

Applicant Number 126035 Harbor View AvenueNorwalk, Connecticut 06854

DRAWING LIST:T-1.0 TITLE SHEETSE-1 SITE PLANZLS ZONING LOCATION SURVEYA-1.0 FOUNDATION & FIRST FLOOR PLANA-2.0 SECOND FLOOR PLANA-3.0 ELEVATIONSA-4.0 ELEVATIONSS0 GENERAL STRUCTURAL NOTESS1 STRUCTURAL FLOOR PLANSS2 STRUCTURAL DETAILSDE-1.0 ELECTRICAL DEMOLITION PLANDM-1.0 MECHANICAL DEMOLITION PLANDP-1.0 PLUMBING DEMOLITION PLANE-1.0 ELECTRICAL PLANE-2.0 ELECTRICAL NOTESM-1.0 MECHANICAL PLANP-1.0 PLUMBING PLAN

CODES:THE DESIGN AND CONSTRUCTION DOCUMENTS PROVIDED WERE PREPARED INACCORDANCE WITH THE FOLLOWING CODES:THE 2009 INTERNATIONAL RESIDENTIAL CODE AS MODIFIED BY:2009 AND 2013 AMENDMENT TO THE STATE OF CONNECTICUT BUILDING CODE2009 INTERNATIONAL ENERGY CONSERVATION CODE2011 AMENDMENT TO THE 2009 INTERNATIONAL ENERGY CODE2008 CONNECTICUT STATE FIRE SAFETY CODE AND2009 AMENDMENT TO THE CONNECTICUT FIFE SAFETY CODE2003 INTERNATIONAL PLUMBING CODE2003 INTERNATIONAL MECHANICAL CODE2011 NATIONAL ELECTRICAL CODE

DateRevisions

Review 11.11.14

Norwalk P&Z 12.15.14

Submittal

Bid Set 01.20.15

Bid Set 03.03.15

Bid Set 04.16.15

NOT FORCONSTRUCTION

A-1.0

AS NOTED

Checked

Sheet

Job Number

Scale

Date

Drawn

L.F.O.

DateRevisions

10.27.14

© ARIS CRIST AIA 2015.

TH

IS TECH

NICAL D

RAW

IN

G AN

D TH

E

ARCH

ITECTU

RAL W

ORK D

EPICTED

ARE

CO

PYRIG

HTED

BY

ARIS CRIST AIA

Review 11.11.14

Norwalk P&Z 12.15.14

Submittal

Bid Set 01.20.15

Bid Set 03.03.15

Bid Set 04.16.15

PAINT SPECS:

SHERWIN WILLIAMS PRO MAR 400

CEILINGS, 1 COAT PRIMER, CEILING WHITE 2 COAT, FLAT

WALLS, 1 COAT PRIMER , 2 COATS BONE WHITE FLAT

TRIM & DOORS, 1 COAT PRIMER, BRITE WHITE SEMI GLOSS, 2 COATS

NOT FORCONSTRUCTION

A-2.0

AS NOTED

Checked

Sheet

Job Number

Scale

Date

Drawn

06.09.14

© ARIS CRIST AIA 2015.

TH

IS TECH

NICAL D

RAW

IN

G AN

D TH

E

ARCH

ITECTU

RAL W

ORK D

EPICTED

ARE

CO

PYRIG

HTED

BY

ARIS CRIST AIA

L.F.O.

DateRevisions

Review 11.11.14

Norwalk P&Z 12.15.14

Submittal

Bid Set 01.20.15

Bid Set 03.03.15

Bid Set 04.16.15

PAINT SPECS:

SHERWIN WILLIAMS PRO MAR 400

CEILINGS, 1 COAT PRIMER, CEILING WHITE 2 COAT, FLAT

WALLS, 1 COAT PRIMER , 2 COATS BONE WHITE FLAT

TRIM & DOORS, 1 COAT PRIMER, BRITE WHITE SEMI GLOSS, 2 COATS

NOT FORCONSTRUCTION

A-3.0

AS NOTED

Checked

Sheet

Job Number

Scale

Date

Drawn

10.27.14

L.F.O.

© ARIS CRIST AIA 2015.

TH

IS TECH

NICAL D

RAW

IN

G AN

D TH

E

ARCH

ITECTU

RAL W

ORK D

EPICTED

ARE

CO

PYRIG

HTED

BY

ARIS CRIST AIA

DateRevisions

Review 11.11.14

Norwalk P&Z 12.15.14

Submittal

Bid Set 01.20.15

Bid Set 03.03.15

Bid Set 04.16.15

NOT FORCONSTRUCTION

A-4.0

AS NOTED

Checked

Sheet

Job Number

Scale

Date

Drawn

10.27.14

L.F.O.

© ARIS CRIST AIA 2015.

TH

IS TECH

NICAL D

RAW

IN

G AN

D TH

E

ARCH

ITECTU

RAL W

ORK D

EPICTED

ARE

CO

PYRIG

HTED

BY

ARIS CRIST AIA

DateRevisions

Review 11.11.14

Norwalk P&Z 12.15.14

Submittal

Bid Set 01.20.15

Bid Set 03.03.15

Bid Set 04.16.15

NOT FORCONSTRUCTION

AS NOTED

Checked

Sheet

Job Number

Scale

Date

Drawn

DateRevisions

03.27.15

13288.00

AS NOTED

Checked

Sheet

Job Number

Scale

Date

Drawn

DateRevisions

03.27.15

13288.00

top related