T-1.0 AS NOTED Checked Sheet Job Number Scale Date Drawn L.F.O. 10.27.14 $5,6 &5,67 $,$ THIS TECHNICAL DRAWING AND THE ARCHITECTURAL WORK DEPICTED ARE COPYRIGHTED BY ARIS CRIST AIA STATE OF CONNECTICUT DEPARTMENT OF HOUSING Community Development Block Grant Disaster Recovery Program Project: B-13-DS-09-001 Merritt Construction Services, Inc. 1177 High Ridge Road Stamford, Connecticut 06905 Applicant Number 1260 35 Harbor View Avenue Norwalk, Connecticut 06854 DRAWING LIST: T-1.0 TITLE SHEET SE-1 SITE PLAN ZLS ZONING LOCATION SURVEY A-1.0 FOUNDATION & FIRST FLOOR PLAN A-2.0 SECOND FLOOR PLAN A-3.0 ELEVATIONS A-4.0 ELEVATIONS S0 GENERAL STRUCTURAL NOTES S1 STRUCTURAL FLOOR PLANS S2 STRUCTURAL DETAILS DE-1.0 ELECTRICAL DEMOLITION PLAN DM-1.0 MECHANICAL DEMOLITION PLAN DP-1.0 PLUMBING DEMOLITION PLAN E-1.0 ELECTRICAL PLAN E-2.0 ELECTRICAL NOTES M-1.0 MECHANICAL PLAN P-1.0 PLUMBING PLAN CODES: THE DESIGN AND CONSTRUCTION DOCUMENTS PROVIDED WERE PREPARED IN ACCORDANCE WITH THE FOLLOWING CODES: THE 2009 INTERNATIONAL RESIDENTIAL CODE AS MODIFIED BY: 2009 AND 2013 AMENDMENT TO THE STATE OF CONNECTICUT BUILDING CODE 2009 INTERNATIONAL ENERGY CONSERVATION CODE 2011 AMENDMENT TO THE 2009 INTERNATIONAL ENERGY CODE 2008 CONNECTICUT STATE FIRE SAFETY CODE AND 2009 AMENDMENT TO THE CONNECTICUT FIFE SAFETY CODE 2003 INTERNATIONAL PLUMBING CODE 2003 INTERNATIONAL MECHANICAL CODE 2011 NATIONAL ELECTRICAL CODE Date Revisions Review 11.11.14 Norwalk P&Z 12.15.14 Submittal Bid Set 01.20.15 Bid Set 03.03.15 Bid Set 04.16.15 NOT FOR CONSTRUCTION

Upload: others

Post on 24-Aug-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Norwalk P&Z 12.15.14 STATE OF CONNECTICUT DEPARTMENT … · norwalk p&z 12.15.14 submittal bid set 01.20.15 bid set 03.03.15 bid set 04.16.15 paint specs: sherwin williams pro mar

T-1.0

AS NOTED

Checked

Sheet

Job Number

Scale

Date

Drawn

L.F.O.

10.27.14

© ARIS CRIST AIA 2015.

TH

IS TECH

NICAL D

RAW

IN

G AN

D TH

E

ARCH

ITECTU

RAL W

ORK D

EPICTED

ARE

CO

PYRIG

HTED

BY

ARIS CRIST AIA

STATE OF CONNECTICUT DEPARTMENT OF HOUSINGCommunity Development Block GrantDisaster Recovery ProgramProject: B-13-DS-09-001

Merritt Construction Services, Inc.1177 High Ridge RoadStamford, Connecticut 06905

Applicant Number 126035 Harbor View AvenueNorwalk, Connecticut 06854

DRAWING LIST:T-1.0 TITLE SHEETSE-1 SITE PLANZLS ZONING LOCATION SURVEYA-1.0 FOUNDATION & FIRST FLOOR PLANA-2.0 SECOND FLOOR PLANA-3.0 ELEVATIONSA-4.0 ELEVATIONSS0 GENERAL STRUCTURAL NOTESS1 STRUCTURAL FLOOR PLANSS2 STRUCTURAL DETAILSDE-1.0 ELECTRICAL DEMOLITION PLANDM-1.0 MECHANICAL DEMOLITION PLANDP-1.0 PLUMBING DEMOLITION PLANE-1.0 ELECTRICAL PLANE-2.0 ELECTRICAL NOTESM-1.0 MECHANICAL PLANP-1.0 PLUMBING PLAN

CODES:THE DESIGN AND CONSTRUCTION DOCUMENTS PROVIDED WERE PREPARED INACCORDANCE WITH THE FOLLOWING CODES:THE 2009 INTERNATIONAL RESIDENTIAL CODE AS MODIFIED BY:2009 AND 2013 AMENDMENT TO THE STATE OF CONNECTICUT BUILDING CODE2009 INTERNATIONAL ENERGY CONSERVATION CODE2011 AMENDMENT TO THE 2009 INTERNATIONAL ENERGY CODE2008 CONNECTICUT STATE FIRE SAFETY CODE AND2009 AMENDMENT TO THE CONNECTICUT FIFE SAFETY CODE2003 INTERNATIONAL PLUMBING CODE2003 INTERNATIONAL MECHANICAL CODE2011 NATIONAL ELECTRICAL CODE

DateRevisions

Review 11.11.14

Norwalk P&Z 12.15.14

Submittal

Bid Set 01.20.15

Bid Set 03.03.15

Bid Set 04.16.15

NOT FORCONSTRUCTION

Page 2: Norwalk P&Z 12.15.14 STATE OF CONNECTICUT DEPARTMENT … · norwalk p&z 12.15.14 submittal bid set 01.20.15 bid set 03.03.15 bid set 04.16.15 paint specs: sherwin williams pro mar
Page 3: Norwalk P&Z 12.15.14 STATE OF CONNECTICUT DEPARTMENT … · norwalk p&z 12.15.14 submittal bid set 01.20.15 bid set 03.03.15 bid set 04.16.15 paint specs: sherwin williams pro mar
Page 4: Norwalk P&Z 12.15.14 STATE OF CONNECTICUT DEPARTMENT … · norwalk p&z 12.15.14 submittal bid set 01.20.15 bid set 03.03.15 bid set 04.16.15 paint specs: sherwin williams pro mar

A-1.0

AS NOTED

Checked

Sheet

Job Number

Scale

Date

Drawn

L.F.O.

DateRevisions

10.27.14

© ARIS CRIST AIA 2015.

TH

IS TECH

NICAL D

RAW

IN

G AN

D TH

E

ARCH

ITECTU

RAL W

ORK D

EPICTED

ARE

CO

PYRIG

HTED

BY

ARIS CRIST AIA

Review 11.11.14

Norwalk P&Z 12.15.14

Submittal

Bid Set 01.20.15

Bid Set 03.03.15

Bid Set 04.16.15

PAINT SPECS:

SHERWIN WILLIAMS PRO MAR 400

CEILINGS, 1 COAT PRIMER, CEILING WHITE 2 COAT, FLAT

WALLS, 1 COAT PRIMER , 2 COATS BONE WHITE FLAT

TRIM & DOORS, 1 COAT PRIMER, BRITE WHITE SEMI GLOSS, 2 COATS

NOT FORCONSTRUCTION

Page 5: Norwalk P&Z 12.15.14 STATE OF CONNECTICUT DEPARTMENT … · norwalk p&z 12.15.14 submittal bid set 01.20.15 bid set 03.03.15 bid set 04.16.15 paint specs: sherwin williams pro mar

A-2.0

AS NOTED

Checked

Sheet

Job Number

Scale

Date

Drawn

06.09.14

© ARIS CRIST AIA 2015.

TH

IS TECH

NICAL D

RAW

IN

G AN

D TH

E

ARCH

ITECTU

RAL W

ORK D

EPICTED

ARE

CO

PYRIG

HTED

BY

ARIS CRIST AIA

L.F.O.

DateRevisions

Review 11.11.14

Norwalk P&Z 12.15.14

Submittal

Bid Set 01.20.15

Bid Set 03.03.15

Bid Set 04.16.15

PAINT SPECS:

SHERWIN WILLIAMS PRO MAR 400

CEILINGS, 1 COAT PRIMER, CEILING WHITE 2 COAT, FLAT

WALLS, 1 COAT PRIMER , 2 COATS BONE WHITE FLAT

TRIM & DOORS, 1 COAT PRIMER, BRITE WHITE SEMI GLOSS, 2 COATS

NOT FORCONSTRUCTION

Page 6: Norwalk P&Z 12.15.14 STATE OF CONNECTICUT DEPARTMENT … · norwalk p&z 12.15.14 submittal bid set 01.20.15 bid set 03.03.15 bid set 04.16.15 paint specs: sherwin williams pro mar

A-3.0

AS NOTED

Checked

Sheet

Job Number

Scale

Date

Drawn

10.27.14

L.F.O.

© ARIS CRIST AIA 2015.

TH

IS TECH

NICAL D

RAW

IN

G AN

D TH

E

ARCH

ITECTU

RAL W

ORK D

EPICTED

ARE

CO

PYRIG

HTED

BY

ARIS CRIST AIA

DateRevisions

Review 11.11.14

Norwalk P&Z 12.15.14

Submittal

Bid Set 01.20.15

Bid Set 03.03.15

Bid Set 04.16.15

NOT FORCONSTRUCTION

Page 7: Norwalk P&Z 12.15.14 STATE OF CONNECTICUT DEPARTMENT … · norwalk p&z 12.15.14 submittal bid set 01.20.15 bid set 03.03.15 bid set 04.16.15 paint specs: sherwin williams pro mar

A-4.0

AS NOTED

Checked

Sheet

Job Number

Scale

Date

Drawn

10.27.14

L.F.O.

© ARIS CRIST AIA 2015.

TH

IS TECH

NICAL D

RAW

IN

G AN

D TH

E

ARCH

ITECTU

RAL W

ORK D

EPICTED

ARE

CO

PYRIG

HTED

BY

ARIS CRIST AIA

DateRevisions

Review 11.11.14

Norwalk P&Z 12.15.14

Submittal

Bid Set 01.20.15

Bid Set 03.03.15

Bid Set 04.16.15

NOT FORCONSTRUCTION

Page 8: Norwalk P&Z 12.15.14 STATE OF CONNECTICUT DEPARTMENT … · norwalk p&z 12.15.14 submittal bid set 01.20.15 bid set 03.03.15 bid set 04.16.15 paint specs: sherwin williams pro mar
Page 9: Norwalk P&Z 12.15.14 STATE OF CONNECTICUT DEPARTMENT … · norwalk p&z 12.15.14 submittal bid set 01.20.15 bid set 03.03.15 bid set 04.16.15 paint specs: sherwin williams pro mar

AS NOTED

Checked

Sheet

Job Number

Scale

Date

Drawn

DateRevisions

03.27.15

13288.00

Page 10: Norwalk P&Z 12.15.14 STATE OF CONNECTICUT DEPARTMENT … · norwalk p&z 12.15.14 submittal bid set 01.20.15 bid set 03.03.15 bid set 04.16.15 paint specs: sherwin williams pro mar

AS NOTED

Checked

Sheet

Job Number

Scale

Date

Drawn

DateRevisions

03.27.15

13288.00

Page 11: Norwalk P&Z 12.15.14 STATE OF CONNECTICUT DEPARTMENT … · norwalk p&z 12.15.14 submittal bid set 01.20.15 bid set 03.03.15 bid set 04.16.15 paint specs: sherwin williams pro mar
Page 12: Norwalk P&Z 12.15.14 STATE OF CONNECTICUT DEPARTMENT … · norwalk p&z 12.15.14 submittal bid set 01.20.15 bid set 03.03.15 bid set 04.16.15 paint specs: sherwin williams pro mar
Page 13: Norwalk P&Z 12.15.14 STATE OF CONNECTICUT DEPARTMENT … · norwalk p&z 12.15.14 submittal bid set 01.20.15 bid set 03.03.15 bid set 04.16.15 paint specs: sherwin williams pro mar
Page 14: Norwalk P&Z 12.15.14 STATE OF CONNECTICUT DEPARTMENT … · norwalk p&z 12.15.14 submittal bid set 01.20.15 bid set 03.03.15 bid set 04.16.15 paint specs: sherwin williams pro mar
Page 15: Norwalk P&Z 12.15.14 STATE OF CONNECTICUT DEPARTMENT … · norwalk p&z 12.15.14 submittal bid set 01.20.15 bid set 03.03.15 bid set 04.16.15 paint specs: sherwin williams pro mar
Page 16: Norwalk P&Z 12.15.14 STATE OF CONNECTICUT DEPARTMENT … · norwalk p&z 12.15.14 submittal bid set 01.20.15 bid set 03.03.15 bid set 04.16.15 paint specs: sherwin williams pro mar
Page 17: Norwalk P&Z 12.15.14 STATE OF CONNECTICUT DEPARTMENT … · norwalk p&z 12.15.14 submittal bid set 01.20.15 bid set 03.03.15 bid set 04.16.15 paint specs: sherwin williams pro mar