nfx schedule delay analysis 21dec11.ppt [read-only] · waffle slab schedule sample. hse cpm...
Post on 05-Mar-2020
13 Views
Preview:
TRANSCRIPT
2 © M+W GroupM+W U.S., Inc.
NFX Delay Analysis Report
Critical Status:• >25D Delay
• Overall duration affected
Caution Status:• >5D Delay
• <25D Delay
Controlled Status:• On ScheduleSAMPLESAMPLESAMPLEControlled Status:SAMPLEControlled Status:SAMPLE•SAMPLE• On ScheduleSAMPLEOn Schedule
top related