C270 (HK BIODIESEL PLANT) Safety Report

Month: Apr 2012 May 2012Total Accumulated man-hour: 167,151 201,951Man-hour without lost time injury: 167,151 201,951Days worked since project commenced: 173 204Days since last Time lost accident : N/A N/ACumulative Accident Frequency Rate: 0 % 0 %

Safety is everyone’sResponsibility.

You are an important stakeholder !

SAFETY STATISTICS

SAFETY INSPECTION / MEETING

Physical site safety walks Weekly Safety Meetings

HOUSEKEEPINGStorage of equipment close to floor edge

Improvement – equipment stored at safe distant from floor edge

PROMPT RECTIFICATION

AREA NEED IMPROVEMENT

HOUSEKEEPINGSharp end of reinforce bar prone to bodily injury

Improvement – sharp end of reinforce bar protected by reused plastic bottle

PROMPT RECTIFICATION

AREA NEED IMPROVEMENT

ELECTRIC SHOCK HAZARDNo safety warning sign and information of responsible electrician

Improvement – safety warning and name and contact no. of responsible electrician clearly displayed

PROMPT RECTIFICATION

AREA NEED IMPROVEMENT

POSITIVE POINTERS

All workers using safety harness attached to safe anchorage points at work

Team work / Signal man deployed for safe lifting work

POSITIVE POINTERS

Provision of safe access and safety sign Provision of safe working platform for working at height

SAFETY TRAINING

INDUCTION

TRAINING

Site Specific Safety Induction

Current MonthAccumulate

(Oct 2011 – May 2012)

No. of class 19 142

No. of Attendee 84 712

TOOL BOX TALKTRAININGSAFETY TRAINING

Topic No. of attendee

Occupational Safety Prevention of Slip & Trip 66 nos.

Occupational Safety Site Housekeeping 38 nos.

Occupational Safety Accident Reporting 63 nos.

Occupational Safety Emergency Procedures 71 nos.

Occupational Safety Safe Use of Ladder 64 nos.

Current Month Total 305 nos.

Accumulated Total : 1,724 nos.

GUEST VISIT

Introduction seminar held by Project Director and Project Manager

Visitors accompanied by Project Management Team

NO reported injury accident recorded in May 2012; all subcontractors reported neither site accident nor dangerous occurrence happened in their subcontracted responsible area at the Weekly Safety Meetings with CHEC / AECOM / Jacob.

GOVERNMENT / AUTHORITIES VISIT

BD conduct testingBD inspection on 17/5/2012

Safety & Health Audit – at interval of every 6 months by Independent Registered Safety Auditor

Environmental Monitoring – monthly by Independent Environmental Checker

Environmental Audit – at interval of every 6 months by CHEC Environmental Officer

SAFETY & HEALTH & ENVIRONMENTAL ASSURANCE

Environmental Audit conducted by Independent Environmental Checker on 22/5/2012

Safety Audit conducted by Independent Safety Auditor on 15/5/2012