K.ANANDINI,11E11A0103,CIVIL-A,IV YEAR.

CIVIL ENGINEERING(HYDERABAD METRO RAIL PROJECT)

2

Heavy engineeringü

Power - Water, Solar, Windü

Infra - Roads, Bridges, R’waysü

Buildings & Factoriesü

Fields of Civil Engineering

3

Engineering

Surveying

ü Planning (Q’tity Checking)

Execution

ü

Architectureü

ü

ü

ü

Nature & Type of jobs involved in Civil Engineering

ü Quality

ARCHITECTURE STRUCTURE MEP

AUTOCAD Design, Drafting, Modelling and

Engineering CAD Software

STAAD PRO

3D Structural Analysis & Design Engineering Software

DIALUX

Professional Lighting Design Software

REVITBuilding Information Modelling Software

ETABSExtended 3D Analysis of

Building Systems

ELEVATEElevator Traffic Analysis and

Simulation Software

NAVISBuilding Information Modelling Software

SAFEStructural Analysis by Finite

Elements

ETAPPower System Analysis

Software

RAILWAY SYSTEMSCUSTOMISED SOFTWARE Design Automation for

Beams, Columns and Footings

PIPENET

Fluid Flow Analysis

ETAPPower System Analysis

Software VIADUCTHAP

Estimation of Cooling and Heat Load Analysis of a

Building

PSCAD Power System Simulation

Software

MIDASIntegrated Analysis and

Design System.

EPANETWater Distribution Piping

System

BENTLEY RAIL TRACK3D Rail Infrastructure

Design Software

ADSEC

Structural Analysis

CUSTOMISED SOFTWARE Design Automation for

Egress, Compressed Air Design

MULTI PLATFORM DESIGN TECHNOLOGY

5

Timber (Lumber)ü

PSCü

Steel – PEB,General Bdngs

RCC

ü

ü

Type o f const ruc t ions invo lved in C iv i l Eng ineer ing

AECOM/ FeedBack Infra- Concessionaire’s Engineer

L&T Metro Rail Hyderabad Limited - Concessionaire

Parsons Brinckerhoff – Project Control

Hyderabad Metro Rail Limited

- Owner

Indian Railway

Barsyl- Lender’s Engineer

Lenders led by SBI

Louis Berger- Owner’s Engineer

Utility Providers

STAKE HOLDERS

7

Employee Engage-ment

CREATION OF HIGH PERFORMANCE TEAM

DESIGN COMPETITORS

• ABB Ltd.• Aakriti• AECOM Asia• BARSYL• Egis India• Halcrow Consulting• L T Ramboll• Mott MacDonald• Oriental Consultants Co.Ltd. (OCCL), Japan• Parsons Brinkerhoff International,Inc. (PBI),USA• Reliance Infrastructure• Rail India Technical & Economic Services Ltd. (RITES), India• Siemens• Systra, France• Yachiyo Engineering Co. Ltd., Japan

Global Engineering Project of the Year Award, 2013 by the

Sixth Global Infrastructure Leadership Forum - New York.

GLOBAL ENGINEERING AWARD

MILES TO GO……!

Viaduct Viaduct

PROGRESS HIGHLIGHTS

Uppal Station – Bracket Erection Works

Uppal Station – Bracket Erection works

PROGRESS HIGHLIGHTS

Uppal Depot – External works Main Workshop @ Uppal Depot

PROGRESS HIGHLIGHTS

Track work @ Uppal Depot OETS – Mast @ Uppal Depot

PROGRESS HIGHLIGHTS

Station view - Concourse Level Unpaid area

Station view - Concourse Level Paid area

PROGRESS HIGHLIGHTS

VIADUCT

16

17

Heavy engineeringü

Power - Water, Solar, Windü

Building & Factoriesü

Fields of Civil Engineering

Infra - Roads, Bridges, R’waysü

ü

CONSTRUCTION

18

19

Apr 15, 2023

TYPICAL PIER 9M HEIGHT

20

Apr 15, 2023

21

TYPICAL PIER 12M HEIGHTApr 15, 2023

TYPICAL SPAN ARRANGEMENT DRAWING

22

VIADUCT CROSS-SECTION - STRAIGHT

23

VIADUCT CROSS-SECTION - CURVED

24

Apr 15, 2023

31M VIADUCT STRAIGHT SPAN

25

Apr 15, 2023

DECK SEGMENT

26

Apr 15, 2023

STATIONS CONSTRUCTION SEQUENCE

STAGE 1 Taking over from Viaduct

contractor

CONSTRUCTION METHODOLOGY

Barrication

29

STAGE 2 Construction of Cast in situ cross girder at Platform level with cantilever

support from pier

Cast in-situ cross girder

Cantilever bracket

CONSTRUCTION METHODOLOGY

30

STAGE 3 Completed view of Cast in situ cross girder at Platform level

Cast in-situ cross girder

CONSTRUCTION METHODOLOGY

31

STAGE 4 Erection of spine beam at concourse level using launching girder

Launching girder

Spine beam

CONSTRUCTION METHODOLOGY

32

STAGE 5 Erection of spine beam at concourse level in progress using

launching girder

Launching girder

CONSTRUCTION METHODOLOGY

33

CONSTRUCTION METHODOLOGY

34

STAGE 6 Erection of spine beam at concourse level completed for a bay

and stressing is done. After stressing, Launching girder moves to next bay.

STAGE 7 Completed view of Spine beam at concourse level

Spine beam

CONSTRUCTION METHODOLOGY

35

STAGE 8 (Option– 1) Erection of Precast longitudinal girders at platform level using

mobile crane

Precast longitudinal girder

CONSTRUCTION METHODOLOGY

36

Precast longitudinal girder

STAGE 8 (Option– 2) Erection of Precast longitudinal girders at platform level using

Lifting tackle

CONSTRUCTION METHODOLOGY

37

STAGE 9 Completed view of Precast longitudinal girders at platform level

Precast longitudinal girder

CONSTRUCTION METHODOLOGY

38

STAGE 10 Erection of wings with Strand jack mounted on Platform level

girders and wings are locked by Macalloy bars Stitch beam is casted between the wings Stressing is done

Wings

CONSTRUCTION METHODOLOGY

39

STAGE 11 Erection of wings in progress

Stitch slab

Wings

CONSTRUCTION METHODOLOGY

40

STAGE 12 Structural completion of station

CONSTRUCTION METHODOLOGY

41

STAGE 11 Fixing of columns/Rafters/Purlins for

roof erection

CONSTRUCTION METHODOLOGY

42

STAGE 12 Fixing of columns/Rafters/Purlins for

roof erection in progress

CONSTRUCTION METHODOLOGY

43

STAGE 13 Fixing of Roof sheathing

CONSTRUCTION METHODOLOGY

44

ARCHITECTURE MODEL BY BIM SOFTWARE

Apr 15, 2023 46

Apr 15, 2023 47

Apr 15, 2023 48

Apr 15, 2023 49

Apr 15, 2023 50

Apr 15, 2023 51

Apr 15, 2023 52

Apr 15, 2023 53

Apr 15, 2023

GLOBAL BENCHMARKING

TYPICAL STATION DESIGN PROOF CHECKED BY A GLOBAL CONSULTANT

OPTIONEERING IN STATION DESIGN

EARLIER PROPOSAL

IMPROVISED DESIGN

OPTIONEERING IN STATION DESIGN

EARLIER PROPOSAL

IMPROVISED DESIGN

PORTAL OPTION (EARLIER PROPOSAL)

SPINE & WING SYSTEM(ADOPTED PROPOSAL)

OPTIONEERING IN STATION DESIGN

CONVENTIONAL METHOD

PRECAST SYSTEM

PUBLICE CONVINIENCE

PRECAST FAÇADE ENGG.

SPECIALISED LIGHTING

FIRE ENGINEERING

• Segmental• Spine & Wing

• Segmental• Spine & Wing• Standardization

• Admin OCC • LED Systems• BMS

• CFD Analysis

Fire Equipment Area (FEA)

Fire Area (FEA)

Manual Call Point

Sounder

Fire Equipment Area (FEA) (1no. – Hydrant valve 2nos. – Hoses 1no. – Hose reel 1no. – Branch pipe 1no. – CO

2 Extinguisher)

Fire Equipment Area (FEA)

E dZzH y/d

E dZzH y/d

ENHANCE CAPABILITY IN..

NFPA 130:

NBCI : ( ( ( (

( ( ( (

<100 m

(

(

(

(

Fire Safety – Egress Requirement

PASSENGER FLOW AT STREET LEVEL

65Apr 15, 2023

PASSENGER FLOW AT CONCOURSE LEVEL

66Apr 15, 2023

PASSENGER FLOW AT PLAT FORM LEVEL

67Apr 15, 2023

LEVELS 30M 36M & 45M 60M

STREET LEVEL - 26 26

CONCOURSE LEVEL

2795 2795 2795

PLATFORM LEVEL

2298 2298 2298

TOTAL (Sq.m) 5093 5119 5119

AREA STATEMENT