metro rail
DESCRIPTION
THIS IS ABOUT THE ON GOING PROJECT DETAILS OF HYD. METRO RAIL.TRANSCRIPT
K.ANANDINI,11E11A0103,CIVIL-A,IV YEAR.
CIVIL ENGINEERING(HYDERABAD METRO RAIL PROJECT)
2
Heavy engineeringü
Power - Water, Solar, Windü
Infra - Roads, Bridges, R’waysü
Buildings & Factoriesü
Fields of Civil Engineering
3
Engineering
Surveying
ü Planning (Q’tity Checking)
Execution
ü
Architectureü
ü
ü
ü
Nature & Type of jobs involved in Civil Engineering
ü Quality
ARCHITECTURE STRUCTURE MEP
AUTOCAD Design, Drafting, Modelling and
Engineering CAD Software
STAAD PRO
3D Structural Analysis & Design Engineering Software
DIALUX
Professional Lighting Design Software
REVITBuilding Information Modelling Software
ETABSExtended 3D Analysis of
Building Systems
ELEVATEElevator Traffic Analysis and
Simulation Software
NAVISBuilding Information Modelling Software
SAFEStructural Analysis by Finite
Elements
ETAPPower System Analysis
Software
RAILWAY SYSTEMSCUSTOMISED SOFTWARE Design Automation for
Beams, Columns and Footings
PIPENET
Fluid Flow Analysis
ETAPPower System Analysis
Software VIADUCTHAP
Estimation of Cooling and Heat Load Analysis of a
Building
PSCAD Power System Simulation
Software
MIDASIntegrated Analysis and
Design System.
EPANETWater Distribution Piping
System
BENTLEY RAIL TRACK3D Rail Infrastructure
Design Software
ADSEC
Structural Analysis
CUSTOMISED SOFTWARE Design Automation for
Egress, Compressed Air Design
MULTI PLATFORM DESIGN TECHNOLOGY
5
Timber (Lumber)ü
PSCü
Steel – PEB,General Bdngs
RCC
ü
ü
Type o f const ruc t ions invo lved in C iv i l Eng ineer ing
AECOM/ FeedBack Infra- Concessionaire’s Engineer
L&T Metro Rail Hyderabad Limited - Concessionaire
Parsons Brinckerhoff – Project Control
Hyderabad Metro Rail Limited
- Owner
Indian Railway
Barsyl- Lender’s Engineer
Lenders led by SBI
Louis Berger- Owner’s Engineer
Utility Providers
STAKE HOLDERS
7
Employee Engage-ment
CREATION OF HIGH PERFORMANCE TEAM
DESIGN COMPETITORS
• ABB Ltd.• Aakriti• AECOM Asia• BARSYL• Egis India• Halcrow Consulting• L T Ramboll• Mott MacDonald• Oriental Consultants Co.Ltd. (OCCL), Japan• Parsons Brinkerhoff International,Inc. (PBI),USA• Reliance Infrastructure• Rail India Technical & Economic Services Ltd. (RITES), India• Siemens• Systra, France• Yachiyo Engineering Co. Ltd., Japan
Global Engineering Project of the Year Award, 2013 by the
Sixth Global Infrastructure Leadership Forum - New York.
GLOBAL ENGINEERING AWARD
MILES TO GO……!
Viaduct Viaduct
PROGRESS HIGHLIGHTS
Uppal Station – Bracket Erection Works
Uppal Station – Bracket Erection works
PROGRESS HIGHLIGHTS
Uppal Depot – External works Main Workshop @ Uppal Depot
PROGRESS HIGHLIGHTS
Track work @ Uppal Depot OETS – Mast @ Uppal Depot
PROGRESS HIGHLIGHTS
Station view - Concourse Level Unpaid area
Station view - Concourse Level Paid area
PROGRESS HIGHLIGHTS
VIADUCT
16
17
Heavy engineeringü
Power - Water, Solar, Windü
Building & Factoriesü
Fields of Civil Engineering
Infra - Roads, Bridges, R’waysü
ü
CONSTRUCTION
18
19
Apr 15, 2023
TYPICAL PIER 9M HEIGHT
20
Apr 15, 2023
21
TYPICAL PIER 12M HEIGHTApr 15, 2023
TYPICAL SPAN ARRANGEMENT DRAWING
22
VIADUCT CROSS-SECTION - STRAIGHT
23
VIADUCT CROSS-SECTION - CURVED
24
Apr 15, 2023
31M VIADUCT STRAIGHT SPAN
25
Apr 15, 2023
DECK SEGMENT
26
Apr 15, 2023
STATIONS CONSTRUCTION SEQUENCE
STAGE 1 Taking over from Viaduct
contractor
CONSTRUCTION METHODOLOGY
Barrication
29
STAGE 2 Construction of Cast in situ cross girder at Platform level with cantilever
support from pier
Cast in-situ cross girder
Cantilever bracket
CONSTRUCTION METHODOLOGY
30
STAGE 3 Completed view of Cast in situ cross girder at Platform level
Cast in-situ cross girder
CONSTRUCTION METHODOLOGY
31
STAGE 4 Erection of spine beam at concourse level using launching girder
Launching girder
Spine beam
CONSTRUCTION METHODOLOGY
32
STAGE 5 Erection of spine beam at concourse level in progress using
launching girder
Launching girder
CONSTRUCTION METHODOLOGY
33
CONSTRUCTION METHODOLOGY
34
STAGE 6 Erection of spine beam at concourse level completed for a bay
and stressing is done. After stressing, Launching girder moves to next bay.
STAGE 7 Completed view of Spine beam at concourse level
Spine beam
CONSTRUCTION METHODOLOGY
35
STAGE 8 (Option– 1) Erection of Precast longitudinal girders at platform level using
mobile crane
Precast longitudinal girder
CONSTRUCTION METHODOLOGY
36
Precast longitudinal girder
STAGE 8 (Option– 2) Erection of Precast longitudinal girders at platform level using
Lifting tackle
CONSTRUCTION METHODOLOGY
37
STAGE 9 Completed view of Precast longitudinal girders at platform level
Precast longitudinal girder
CONSTRUCTION METHODOLOGY
38
STAGE 10 Erection of wings with Strand jack mounted on Platform level
girders and wings are locked by Macalloy bars Stitch beam is casted between the wings Stressing is done
Wings
CONSTRUCTION METHODOLOGY
39
STAGE 11 Erection of wings in progress
Stitch slab
Wings
CONSTRUCTION METHODOLOGY
40
STAGE 12 Structural completion of station
CONSTRUCTION METHODOLOGY
41
STAGE 11 Fixing of columns/Rafters/Purlins for
roof erection
CONSTRUCTION METHODOLOGY
42
STAGE 12 Fixing of columns/Rafters/Purlins for
roof erection in progress
CONSTRUCTION METHODOLOGY
43
STAGE 13 Fixing of Roof sheathing
CONSTRUCTION METHODOLOGY
44
ARCHITECTURE MODEL BY BIM SOFTWARE
Apr 15, 2023 46
Apr 15, 2023 47
Apr 15, 2023 48
Apr 15, 2023 49
Apr 15, 2023 50
Apr 15, 2023 51
Apr 15, 2023 52
Apr 15, 2023 53
Apr 15, 2023
GLOBAL BENCHMARKING
TYPICAL STATION DESIGN PROOF CHECKED BY A GLOBAL CONSULTANT
OPTIONEERING IN STATION DESIGN
EARLIER PROPOSAL
IMPROVISED DESIGN
OPTIONEERING IN STATION DESIGN
EARLIER PROPOSAL
IMPROVISED DESIGN
PORTAL OPTION (EARLIER PROPOSAL)
SPINE & WING SYSTEM(ADOPTED PROPOSAL)
OPTIONEERING IN STATION DESIGN
CONVENTIONAL METHOD
PRECAST SYSTEM
PUBLICE CONVINIENCE
PRECAST FAÇADE ENGG.
SPECIALISED LIGHTING
FIRE ENGINEERING
• Segmental• Spine & Wing
• Segmental• Spine & Wing• Standardization
• Admin OCC • LED Systems• BMS
• CFD Analysis
Fire Equipment Area (FEA)
Fire Area (FEA)
Manual Call Point
Sounder
Fire Equipment Area (FEA) (1no. – Hydrant valve 2nos. – Hoses 1no. – Hose reel 1no. – Branch pipe 1no. – CO
2 Extinguisher)
Fire Equipment Area (FEA)
E dZzH y/d
E dZzH y/d
ENHANCE CAPABILITY IN..
NFPA 130:
NBCI : ( ( ( (
( ( ( (
<100 m
(
(
(
(
Fire Safety – Egress Requirement
PASSENGER FLOW AT STREET LEVEL
65Apr 15, 2023
PASSENGER FLOW AT CONCOURSE LEVEL
66Apr 15, 2023
PASSENGER FLOW AT PLAT FORM LEVEL
67Apr 15, 2023
LEVELS 30M 36M & 45M 60M
STREET LEVEL - 26 26
CONCOURSE LEVEL
2795 2795 2795
PLATFORM LEVEL
2298 2298 2298
TOTAL (Sq.m) 5093 5119 5119
AREA STATEMENT
THANK YOU…!