(iwmp-xii)watershed.cg.gov.in/success story/success story pmksy-wdc... · 2019. 8. 22. · s.no....

Post on 16-Dec-2020

5 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

(IWMP-XII)

(IWMP-XII)

% %

mbgl

mbgl

<7.0 lps

IWMP

PRA

FGD

Picture No.1 : Check Dam no. 01

Picture No.2 : Check Dam no. 02

Picture No. 3 Grassland Development near Check Dam

Picture No.4: Plantation of Horticulture plants

Picture No.5: Plantation of Horticulture plants

S.No. Critical Inputs Cost (In Lakh) Convergence

1

Fencing with RCC Pole and barbed

wire 2

IWMP (5.28 lakhs) Ring Well 3

Pitcher System 0.18

Fertilizers & Pesticide 0.1

2

Mango Plants (300) 0.09

KVK-Bastar (0.62 lakh)

Litchi Plants (55) 0.03

Citrus Plants (150) 0.04

Coconut Plants (70) 0.04

Banana (50) 0.02

Pump Diesel/Electric (Shakambari) 0.16

Sprinkler System (NHM) 0.1

3 Crop Production & Vegetables 0.15

Total 5.9

Table No. 01 Details of Convergence between IWMP programme and KVK Jagdalpur

S.No. Crop Area Yield(qt./1000sq.m) Cost of

Cultivation

Gross

Income

(in Rs.)

Net

Income

(in Rs.) (sq.m)

1 Brinjal 1000 12 5500 12000 6500

2 Tomato 1000 14 5400 11200 5800

3 Onion 1000 10 4500 12000 7500

4 Chilli 1000 15 5600 12000 6400

5 Okra 1000 8 3000 6400 3400

Table No. 02 Details of Vegetable production in the Watershed Area

Graph No. 01 Graph showing Vegetable Production in the Watershed area

0

2000

4000

6000

8000

10000

12000

14000

Brinjal Tomato Onion Chilli Okra

Area

(in Sq.m)

Cost of Cultivation

Gross Income (in Rs.)

Net Income (in Rs.)

Picture No.6: Sprinkler Irrigation

Picture No.7: Sprinkler Irrigation

roho, katla, mringal, silver-carp

Picture No.8: Fishery done by User Group

Picture No.9. PIA gone for monitoring at Oyster Mushroom Production Centre by

Rama Female SHG (12 members)

Picture No. 10 Rama Female SHG (12 members)

IWMP

Picture No. 11 Vermi-Compost Shed

Picture No. 12 SHG making Vermi-compost