(iwmp-xii)watershed.cg.gov.in/success story/success story pmksy-wdc... · 2019. 8. 22. · s.no....

8
(IWMP-XII) (IWMP-XII) % %

Upload: others

Post on 16-Dec-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: (IWMP-XII)watershed.cg.gov.in/success story/SUCCESS STORY PMKSY-WDC... · 2019. 8. 22. · S.No. Critical Inputs Cost (In Lakh) Convergence 1 Fencing with RCC Pole and barbed wire

(IWMP-XII)

(IWMP-XII)

% %

Page 2: (IWMP-XII)watershed.cg.gov.in/success story/SUCCESS STORY PMKSY-WDC... · 2019. 8. 22. · S.No. Critical Inputs Cost (In Lakh) Convergence 1 Fencing with RCC Pole and barbed wire

mbgl

mbgl

<7.0 lps

IWMP

PRA

FGD

Picture No.1 : Check Dam no. 01

Picture No.2 : Check Dam no. 02

Page 3: (IWMP-XII)watershed.cg.gov.in/success story/SUCCESS STORY PMKSY-WDC... · 2019. 8. 22. · S.No. Critical Inputs Cost (In Lakh) Convergence 1 Fencing with RCC Pole and barbed wire

Picture No. 3 Grassland Development near Check Dam

Picture No.4: Plantation of Horticulture plants

Picture No.5: Plantation of Horticulture plants

Page 4: (IWMP-XII)watershed.cg.gov.in/success story/SUCCESS STORY PMKSY-WDC... · 2019. 8. 22. · S.No. Critical Inputs Cost (In Lakh) Convergence 1 Fencing with RCC Pole and barbed wire

S.No. Critical Inputs Cost (In Lakh) Convergence

1

Fencing with RCC Pole and barbed

wire 2

IWMP (5.28 lakhs) Ring Well 3

Pitcher System 0.18

Fertilizers & Pesticide 0.1

2

Mango Plants (300) 0.09

KVK-Bastar (0.62 lakh)

Litchi Plants (55) 0.03

Citrus Plants (150) 0.04

Coconut Plants (70) 0.04

Banana (50) 0.02

Pump Diesel/Electric (Shakambari) 0.16

Sprinkler System (NHM) 0.1

3 Crop Production & Vegetables 0.15

Total 5.9

Table No. 01 Details of Convergence between IWMP programme and KVK Jagdalpur

S.No. Crop Area Yield(qt./1000sq.m) Cost of

Cultivation

Gross

Income

(in Rs.)

Net

Income

(in Rs.) (sq.m)

1 Brinjal 1000 12 5500 12000 6500

2 Tomato 1000 14 5400 11200 5800

3 Onion 1000 10 4500 12000 7500

4 Chilli 1000 15 5600 12000 6400

5 Okra 1000 8 3000 6400 3400

Table No. 02 Details of Vegetable production in the Watershed Area

Graph No. 01 Graph showing Vegetable Production in the Watershed area

0

2000

4000

6000

8000

10000

12000

14000

Brinjal Tomato Onion Chilli Okra

Area

(in Sq.m)

Cost of Cultivation

Gross Income (in Rs.)

Net Income (in Rs.)

Page 5: (IWMP-XII)watershed.cg.gov.in/success story/SUCCESS STORY PMKSY-WDC... · 2019. 8. 22. · S.No. Critical Inputs Cost (In Lakh) Convergence 1 Fencing with RCC Pole and barbed wire

Picture No.6: Sprinkler Irrigation

Picture No.7: Sprinkler Irrigation

roho, katla, mringal, silver-carp

Page 6: (IWMP-XII)watershed.cg.gov.in/success story/SUCCESS STORY PMKSY-WDC... · 2019. 8. 22. · S.No. Critical Inputs Cost (In Lakh) Convergence 1 Fencing with RCC Pole and barbed wire

Picture No.8: Fishery done by User Group

Picture No.9. PIA gone for monitoring at Oyster Mushroom Production Centre by

Rama Female SHG (12 members)

Page 7: (IWMP-XII)watershed.cg.gov.in/success story/SUCCESS STORY PMKSY-WDC... · 2019. 8. 22. · S.No. Critical Inputs Cost (In Lakh) Convergence 1 Fencing with RCC Pole and barbed wire

Picture No. 10 Rama Female SHG (12 members)

IWMP

Picture No. 11 Vermi-Compost Shed

Page 8: (IWMP-XII)watershed.cg.gov.in/success story/SUCCESS STORY PMKSY-WDC... · 2019. 8. 22. · S.No. Critical Inputs Cost (In Lakh) Convergence 1 Fencing with RCC Pole and barbed wire

Picture No. 12 SHG making Vermi-compost