iv&v program supporting project management with amf jeremy fienhold don kranz

Post on 18-Jan-2016

218 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

IV&V Program

AMF

Supporting Project Management with AMF

Jeremy FienholdDon Kranz

IV&V Program

AMF

Introductions

• Don Kranz– Lead Architect for AMF & AWB

• Jeremy Fienhold– Lead Analyst on a project using AWB

2

IV&V Program

AMF

Analysis & Management Framework

• Provides a high level assurance based ontology that allows information to be shared between IV&V tools.

• Too much decomposition reduces flexibility, modularity and portability of design.

• At the simplest level we deal with:– Projects– Participants

3

– Artifacts– Assessments– Actions

IV&V Program

AMF

IVV 09-1 Manage Responsibilities

• “A continual review of the IV&V effort• Revision of the IPEP as necessary based upon updated Mission

Project schedules and development status• Coordination of the IV&V results with the developer and other

appropriate management groups• Promotion of technical exchange between IV&V and the

developer (to improve technical knowledge transfer and increase IV&V effectiveness)

• Identification of process improvement opportunities in the conduct of IV&V”

4

IV&V Program

AMF

Project Organization

5

IV&V Program

AMF

Superior Tracing

Any Artifact

Any ActionAny Assessment

6

IV&V Program

AMF

Scoping

7

Behaviors

Scoping Modules

IV&V Program

AMF

Scoping

8

IV&V Program

AMF

Coverage

9

IV&V Program

AMF

Assessing Completion

10

IV&V Program

AMF

Change Impact

11

Modified Artifact(s)

Previous Assessment(s)

IV&V Program

AMF

Tasking ground work

12

IV&V Program

AMF

Future of Architecture

13

IV&V Program

AMF

Future Functionality

• Improve ORBIT integration• Add reporting capabilities• Add Admin UI for project configuration• Improve support of EBA & TR• Integration with COMPASS

14

IV&V Program

AMF 15

Thank You

IV&V Program

AMF

References

• IVV 09-1 Version O: Independent Verification and Validation Technical Framework, June 06, 2012

• IVV 09-4 Version AF: Project Management, May 2, 2013

• T2103 Version D: Project Execution Plan (IPEP) Template, May 15, 2013

• S3106 Version D: PBRA and RBA Process, October 4, 2012

• AWB User’s Guide• AMF Architecture & Design document

16

top related