iv&v program supporting project management with amf jeremy fienhold don kranz

16
IV&V Program AMF Supporting Project Management with AMF Jeremy Fienhold Don Kranz

Upload: peregrine-shields

Post on 18-Jan-2016

218 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: IV&V Program Supporting Project Management with AMF Jeremy Fienhold Don Kranz

IV&V Program

AMF

Supporting Project Management with AMF

Jeremy FienholdDon Kranz

Page 2: IV&V Program Supporting Project Management with AMF Jeremy Fienhold Don Kranz

IV&V Program

AMF

Introductions

• Don Kranz– Lead Architect for AMF & AWB

• Jeremy Fienhold– Lead Analyst on a project using AWB

2

Page 3: IV&V Program Supporting Project Management with AMF Jeremy Fienhold Don Kranz

IV&V Program

AMF

Analysis & Management Framework

• Provides a high level assurance based ontology that allows information to be shared between IV&V tools.

• Too much decomposition reduces flexibility, modularity and portability of design.

• At the simplest level we deal with:– Projects– Participants

3

– Artifacts– Assessments– Actions

Page 4: IV&V Program Supporting Project Management with AMF Jeremy Fienhold Don Kranz

IV&V Program

AMF

IVV 09-1 Manage Responsibilities

• “A continual review of the IV&V effort• Revision of the IPEP as necessary based upon updated Mission

Project schedules and development status• Coordination of the IV&V results with the developer and other

appropriate management groups• Promotion of technical exchange between IV&V and the

developer (to improve technical knowledge transfer and increase IV&V effectiveness)

• Identification of process improvement opportunities in the conduct of IV&V”

4

Page 5: IV&V Program Supporting Project Management with AMF Jeremy Fienhold Don Kranz

IV&V Program

AMF

Project Organization

5

Page 6: IV&V Program Supporting Project Management with AMF Jeremy Fienhold Don Kranz

IV&V Program

AMF

Superior Tracing

Any Artifact

Any ActionAny Assessment

6

Page 7: IV&V Program Supporting Project Management with AMF Jeremy Fienhold Don Kranz

IV&V Program

AMF

Scoping

7

Behaviors

Scoping Modules

Page 8: IV&V Program Supporting Project Management with AMF Jeremy Fienhold Don Kranz

IV&V Program

AMF

Scoping

8

Page 9: IV&V Program Supporting Project Management with AMF Jeremy Fienhold Don Kranz

IV&V Program

AMF

Coverage

9

Page 10: IV&V Program Supporting Project Management with AMF Jeremy Fienhold Don Kranz

IV&V Program

AMF

Assessing Completion

10

Page 11: IV&V Program Supporting Project Management with AMF Jeremy Fienhold Don Kranz

IV&V Program

AMF

Change Impact

11

Modified Artifact(s)

Previous Assessment(s)

Page 12: IV&V Program Supporting Project Management with AMF Jeremy Fienhold Don Kranz

IV&V Program

AMF

Tasking ground work

12

Page 13: IV&V Program Supporting Project Management with AMF Jeremy Fienhold Don Kranz

IV&V Program

AMF

Future of Architecture

13

Page 14: IV&V Program Supporting Project Management with AMF Jeremy Fienhold Don Kranz

IV&V Program

AMF

Future Functionality

• Improve ORBIT integration• Add reporting capabilities• Add Admin UI for project configuration• Improve support of EBA & TR• Integration with COMPASS

14

Page 15: IV&V Program Supporting Project Management with AMF Jeremy Fienhold Don Kranz

IV&V Program

AMF 15

Thank You

Page 16: IV&V Program Supporting Project Management with AMF Jeremy Fienhold Don Kranz

IV&V Program

AMF

References

• IVV 09-1 Version O: Independent Verification and Validation Technical Framework, June 06, 2012

• IVV 09-4 Version AF: Project Management, May 2, 2013

• T2103 Version D: Project Execution Plan (IPEP) Template, May 15, 2013

• S3106 Version D: PBRA and RBA Process, October 4, 2012

• AWB User’s Guide• AMF Architecture & Design document