Integration of Demand Resources within ISO/RTO Operations. November 20, 2008 Peter Friedland Operations Solutions Manager. Agenda. Project Status Development of DR Integration Business Requirements (Dec 31 st ) - PowerPoint PPT Presentation

TRANSCRIPT

Integration of Demand Resources within ISO/RTO Operations

November 20, 2008Peter FriedlandOperations Solutions Manager

DRITWG November 20, 2008 Integration of Demand Resources

© 2008 ISO New England Inc.

Agenda

1. Project Status– Development of DR Integration Business Requirements

(Dec 31st)

– Develop Software Functional Requirements/Specifications for RT Dispatch Functions

– Develop Software Functional Requirements/Specifications for Asset Registration and Settlements functions

2. Continue October 23, 2008 Discussion– Communication Circuits

– DR Model Synchronization

2

DRITWG November 20, 2008 Integration of Demand Resources

© 2008 ISO New England Inc.

Project Status• ISO Project Team is busy drafting updated Business

Requirements for Dec 31st

• Project On-track for November 2008 Approval• SOW with external software vendor is in progress with work

expected to begin in January 2009• ISO-NE Real-Time Dispatch Software Development

activities will start in November 2008• Software Functional Requirements will start in November

2008 – concurrent with Business Requirements• Settlements and Asset Registration Software

Development activities TBD

3

DRITWG November 20, 2008 Integration of Demand Resources

© 2008 ISO New England Inc.

Real-Time Dispatch Timeline

4

DRITWG November 20, 2008 Integration of Demand Resources

© 2008 ISO New England Inc.

High-Level Software Development Activities• ISO-NE responsibilities include:

– All DNP3 communication-related software including DDE model synchronization

– EMS User Interfaces and Dispatch Interfaces to Settlements

– Customer Asset Management (CAMS) Enhancements

– Settlements System

• Outside Vendor responsibilities include:– DR Model Management including monthly model update capabilities

within the EMS

– Various Real-Time Dispatch functions including security-constrained study tools

– Various real-time prediction tools

– Training/Testing simulator enhancements

– Software interfaces to ISO Systems

5

DRITWG November 20, 2008 Integration of Demand Resources

© 2008 ISO New England Inc.

Q4 2008-Q2 2009 ISO/DDE Activities

• Review of Asset Registration through DDE Model Synchronization Business Requirements – 1/31/2009

• Communication Software Functional Requirements - 2/28/2009

• DR RTU Specification, similar to existing RIG Replacement RTU Specification – 3/31/2009

• Software RTU Reference Implementation – 4/30/2009• Coordinated Testing and refinement of RTU Reference

Implementation – Q2 through Q3 2009

6

DRITWG November 20, 2008 Integration of Demand Resources

© 2008 ISO New England Inc.

Integration of DR Assets within SCADA

7

DRITWG November 20, 2008 Integration of Demand Resources

© 2008 ISO New England Inc.

Integration of DR within SCADA – Logical View

8

1. RTU connections are initiated from ISO; no inbound connections allowed to CFE

2. Once a connection is established to RTU, ISO efficiently polls the RTU for changes; no unsolicited data is allowed from the RTU

3. ISO pushes dispatch instructions to the RTU in the form of Analog and Binary Outputs

DRITWG November 20, 2008 Integration of Demand Resources

© 2008 ISO New England Inc.

Frame Relay Circuit Cost and Availability

• Within continental US, 56K circuit costs about $200/month or $400/month for two circuits – Update: Request for Quotes for about ½ of the DDE’s have been received. It is expected that DDE’s will have the required Router and Frame Relay circuits no later than 11/1/2009 for testing.– Atlanta, Bethlehem (PA), Boston, Buffalo, Dallas, Middletown

(CT)• $431/month

• Installation time approximately 1 month

9

DRITWG November 20, 2008 Integration of Demand Resources

© 2008 ISO New England Inc.

Frame Relay Circuit Cost and Availability

• ISO-NE telecommunication vendor is currently establishing availability and quotes for Frame Relay outside of continental US – Update: Quotes have been received and will need to be discussed with affected DDE’s outside of this meeting

• Monthly charges are higher– Single frame relay– Single Canada private line

10

DRITWG November 20, 2008 Integration of Demand Resources

© 2008 ISO New England Inc.

DR Model Synchronization and Testing1. DR Resource/Assets can change on a monthly basis2. ISO-NE and DDE’s will establish an efficient means for

exchanging DR ‘meta-data’ for the purpose of regular RTU configuration and testing prior to the start of each month

3. ‘Meta-Data’ will consist of information needed to establish identity and other attributes of Resource and Assets

4. ‘Meta-Data’ will consist of information needed to establish mapping between the Resource/Assets and DNP objects within the RTU Master and Slave

5. ‘Meta-Data’ will be automatically be generated by ISO-NE DR Model Management System based upon information derived from CAMS

6. DR ‘Meta-Data’ will also include test data to automatically test the integrity of the new model within the RTU Master and Slave

11

DRITWG November 20, 2008 Integration of Demand Resources

© 2008 ISO New England Inc.

DR Model Synchronization and Testing

12

DRITWG November 20, 2008 Integration of Demand Resources

© 2008 ISO New England Inc.

DR Model Synchronization and Testing

13