Page 1: Integration of Demand Resources within ISO/RTO Operations

Integration of Demand Resources within ISO/RTO Operations

November 20, 2008Peter FriedlandOperations Solutions Manager

Page 2: Integration of Demand Resources within ISO/RTO Operations

DRITWG November 20, 2008 Integration of Demand Resources

© 2008 ISO New England Inc.

Agenda

1. Project Status– Development of DR Integration Business Requirements

(Dec 31st)

– Develop Software Functional Requirements/Specifications for RT Dispatch Functions

– Develop Software Functional Requirements/Specifications for Asset Registration and Settlements functions

2. Continue October 23, 2008 Discussion– Communication Circuits

– DR Model Synchronization

2

Page 3: Integration of Demand Resources within ISO/RTO Operations

DRITWG November 20, 2008 Integration of Demand Resources

© 2008 ISO New England Inc.

Project Status• ISO Project Team is busy drafting updated Business

Requirements for Dec 31st

• Project On-track for November 2008 Approval• SOW with external software vendor is in progress with work

expected to begin in January 2009• ISO-NE Real-Time Dispatch Software Development

activities will start in November 2008• Software Functional Requirements will start in November

2008 – concurrent with Business Requirements• Settlements and Asset Registration Software

Development activities TBD

3

Page 4: Integration of Demand Resources within ISO/RTO Operations

DRITWG November 20, 2008 Integration of Demand Resources

© 2008 ISO New England Inc.

Real-Time Dispatch Timeline

4

Page 5: Integration of Demand Resources within ISO/RTO Operations

DRITWG November 20, 2008 Integration of Demand Resources

© 2008 ISO New England Inc.

High-Level Software Development Activities• ISO-NE responsibilities include:

– All DNP3 communication-related software including DDE model synchronization

– EMS User Interfaces and Dispatch Interfaces to Settlements

– Customer Asset Management (CAMS) Enhancements

– Settlements System

• Outside Vendor responsibilities include:– DR Model Management including monthly model update capabilities

within the EMS

– Various Real-Time Dispatch functions including security-constrained study tools

– Various real-time prediction tools

– Training/Testing simulator enhancements

– Software interfaces to ISO Systems

5

Page 6: Integration of Demand Resources within ISO/RTO Operations

DRITWG November 20, 2008 Integration of Demand Resources

© 2008 ISO New England Inc.

Q4 2008-Q2 2009 ISO/DDE Activities

• Review of Asset Registration through DDE Model Synchronization Business Requirements – 1/31/2009

• Communication Software Functional Requirements - 2/28/2009

• DR RTU Specification, similar to existing RIG Replacement RTU Specification – 3/31/2009

• Software RTU Reference Implementation – 4/30/2009• Coordinated Testing and refinement of RTU Reference

Implementation – Q2 through Q3 2009

6

Page 7: Integration of Demand Resources within ISO/RTO Operations

DRITWG November 20, 2008 Integration of Demand Resources

© 2008 ISO New England Inc.

Integration of DR Assets within SCADA

7

Page 8: Integration of Demand Resources within ISO/RTO Operations

DRITWG November 20, 2008 Integration of Demand Resources

© 2008 ISO New England Inc.

Integration of DR within SCADA – Logical View

8

1. RTU connections are initiated from ISO; no inbound connections allowed to CFE

2. Once a connection is established to RTU, ISO efficiently polls the RTU for changes; no unsolicited data is allowed from the RTU

3. ISO pushes dispatch instructions to the RTU in the form of Analog and Binary Outputs

Page 9: Integration of Demand Resources within ISO/RTO Operations

DRITWG November 20, 2008 Integration of Demand Resources

© 2008 ISO New England Inc.

Frame Relay Circuit Cost and Availability

• Within continental US, 56K circuit costs about $200/month or $400/month for two circuits – Update: Request for Quotes for about ½ of the DDE’s have been received. It is expected that DDE’s will have the required Router and Frame Relay circuits no later than 11/1/2009 for testing.– Atlanta, Bethlehem (PA), Boston, Buffalo, Dallas, Middletown

(CT)• $431/month

• Installation time approximately 1 month

9

Page 10: Integration of Demand Resources within ISO/RTO Operations

DRITWG November 20, 2008 Integration of Demand Resources

© 2008 ISO New England Inc.

Frame Relay Circuit Cost and Availability

• ISO-NE telecommunication vendor is currently establishing availability and quotes for Frame Relay outside of continental US – Update: Quotes have been received and will need to be discussed with affected DDE’s outside of this meeting

• Monthly charges are higher– Single frame relay– Single Canada private line

10

Page 11: Integration of Demand Resources within ISO/RTO Operations

DRITWG November 20, 2008 Integration of Demand Resources

© 2008 ISO New England Inc.

DR Model Synchronization and Testing1. DR Resource/Assets can change on a monthly basis2. ISO-NE and DDE’s will establish an efficient means for

exchanging DR ‘meta-data’ for the purpose of regular RTU configuration and testing prior to the start of each month

3. ‘Meta-Data’ will consist of information needed to establish identity and other attributes of Resource and Assets

4. ‘Meta-Data’ will consist of information needed to establish mapping between the Resource/Assets and DNP objects within the RTU Master and Slave

5. ‘Meta-Data’ will be automatically be generated by ISO-NE DR Model Management System based upon information derived from CAMS

6. DR ‘Meta-Data’ will also include test data to automatically test the integrity of the new model within the RTU Master and Slave

11

Page 12: Integration of Demand Resources within ISO/RTO Operations

DRITWG November 20, 2008 Integration of Demand Resources

© 2008 ISO New England Inc.

DR Model Synchronization and Testing

12

Page 13: Integration of Demand Resources within ISO/RTO Operations

DRITWG November 20, 2008 Integration of Demand Resources

© 2008 ISO New England Inc.

DR Model Synchronization and Testing

13