2

Introduction to Incheon Ⅰ

Our efforts to mitigate natural disaster Ⅱ

Closing Ⅲ

3

1. Key Indicators of Incheon

Population : 295 million

Area : 1,041㎢ (1.7times of Seoul)

Temperature : 11.4℃/annual average

(-13degree ∼ + 35degree)

Precipitation : 1,170mm/year

Snowfall : 10∼30cm/year

Typhoon/Heavy Rain : 1∼ 6times/year

Tide difference: Maximum 9m

4

2. The world’s best Infrastructure

Incheon International Airport

Incheon Port

Convenient Transport

- Airport service World 1st for 9 years

- World Int’l Cargo Tranportation 2nd

- World int’l Passenger Transport 9th

- 89 Routing Airline, 194 Routing Cities

- Transfer Passenger 771million

- New Port based on Yellow See Rim

* 2006~2020

* Sea of Song-do International city

- 2013 Goods Transported Records

* Cargo : 150 million tones

* Container : 216 million TEU

- 1,2,3 Gyeongin Highway

- Aeoul Ring Expressway

- Seoul Subway Line 1

- Incheon Subway Line 1

- KTX, GTX, BRT

- Incheon and Yoeng-jong Bridges

5

Songdo

▪ Knowledge industries - Knowledge Information

- Bio industry

- Medical Industry

▪ 13,159 acres (53km2)

Yeongjong

▪ Logistics & Tourism

- Air & Port Logistics

- Free Trade Area

- Exhibition Industry

- Marine Torism

▪ 34,177 acres (138km2)

Cheongna

▪ Global finance and leisure.

- Global Finance

- International Trade

- Sports & Leisure

- 2014 AG main stadium

▪ 4,391 acres (18km2)

3. Incheon Free Econmy Zone

4. Organization and Equipment for Disaster Management

• Organization : 1 Headquarters, 8 Firestations , Fire Academy , Air Force

• personnel : 2,285 persons

Disaster Management Organization

• Fire Fighting : 264 Fire trucks, 2 Fire Helicopter, 2 Fire Ship

• Restoration : 106 Dump trucks, 57 Excavators, 9 Cranes

• Flooding : 6,301 Pumps, 145 Generators, 3,221 Water pumps

Status of Equipment

• Integrated operation for disaster, fire prevention and civil defence

• Swiftly dealing with social and natural disasters and accidents

Features

7

5. Facilities and Level for Safety Management

(2014. Unit : Places)

Status of Facilities for special safety management

Safety Management Level

Sum Bridge Tunnel Port Building Water and

Sewer

Retaining

Wall

Water

gate

3,394 58 62 14 3,037 13 5 96

Sum Intense management facility Disaster vulnerable facility

Sum A B C Sum D E

5,153 5,013 2,219 2,269 425 140 84 56

(2014. Unit : Places)

8

Sum Disaster Risk district Area prone to Flood Steep

slope-Lands

250 2 18 230

Sum Local

Stream Small Stream Floodgate Reservoir

Drainage

Pump Station Dike

542 31 117 215 21 12 146

Vulernable Area

Disaster Reduction Facility

6. Areas vulnerable to disaster & Damage prevention

(2014. Unit : Places)

(2014. Unit : Places)

9

7. Type of disaster and damage over 10 years

List Sum 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013

Death 6 5 1

Victims 22,003 6 - 21 6 1,435 145 14,524 4,677 1,000 189

Damages 28,678 225 108 1,547 1,818 425 1,678 13,215 4,239 5,149 270

(damages : Million won)

Death

Typhoonghdn Torrential Rains Heavy Snow Strong Wind Heavy seas

Victims Damage

10

3. Multipurpose development of a flood-prone area (Essential 4)

2. Disaster prevention project with central government (Essential 4)

1. Solution to flooding in a low land in coastal area (Essential 4)

Our efforts to mitigate natural disaster Ⅱ

4. 3 systems for disaster risk reduction (Essential 3 and 6)

5. 3 preparedness of early warning and respond (Essential 9)

11

1-1. Solution to flooding in low land in coastal area

• An area prone to flooding from overflowing seawater due to high tide with heavy

summer rain

• The landfill comprises comprises residence, commerce and industry

15㏊

5㏊

5㏊

20㏊

8㏊

Coastal landfill below sea level

Flood Damage

• One death, Flooded houses, 1,689 houses, Flooded Area 53㏊ , drain back flow etc.

• Damage happened from 1997 to 2002

12

1-2. Solution to flooding in low land in coastal area (’04~’09)

Length 1.7km, Area 68 Football stadiums

13

1-3. Solution to flooding in low lind in coastal area

Fishing place Arts Center

Paths Artificial Island

14

2-1. Disaster prevention project with Central government

Habitual flooding around small river

• Combination of Urban and Rural city with small rivers and farmland. Formed with

rural houses area losing river banks from downpours.

Flood damage (5 years)

• River Bank Lost 500m, Farmland flooding 2.7㏊

• Houses damaged from flooding 150 houses

15

2015 2012

• Natural disaster risk district desination

• Collabolation with the central government (Budget support up to 50%)

• Prolongation 860m, width twice extended

• Maintenance by forming an eco-friendly vegetation block

2-2. Disaster prevention project with Central government

Flood countmeasure (‘12~‘15)

Lower than the flood stage of the Han River

• A low-lying area with an average elevation of under 10 meters and a gradient of

less than 2 degree

• About 2,000 houses were habitually flooded whenever heavy rain occured

3-1. multipurpose development of a flood-prone area

Great flood damage occurred in 1987

• Death 16, victim 5,247, property damage KRW 420 hundred million

• Normal : emit to Han River

• Flood : emit to the Yellow sea

3-3. multipurpose development of a flood-prone area

East Sea

INCHEON

SEOUL

Han River

Gulpo

River

14km

1 step : drain construction 14㎞ (‘93~‘03)

18

4km

East Sea

INCHEON

SEOUL

Han River

Gulpo

River

14km • Normal : Logistic & Tourism·culture·leisure etc

• Flood : Flood control channel

EL 4.96 ~ 6.55m

3-4. multipurpose development of a flood-prone area

2 step : Arabaegil construction 18㎞ (‘03~‘13)

• Aracheon cross section and passing condition

19

3-5. multipurpose development of a flood-prone area

Terminal and convenient facilities

20

4. Three disaster risk reduction systems

Pre-disaster Effect review Committee

Master plan for reducing storm and

flood damage

Earthquake prevention

and Reinforcement

Making cities resilient from Disaster risk and Climate change

21

4-1-1. Pre-disaster Effect Review Committee

Pre-disaster Effect review committee

Reduction measure

Object

Major review points

• Administrative planning and development analysis factors in advance about the

disaster and predict and reduction measures

• Outstanding leakage reduction facility, storm drainage expansion and establish new

drainage pump station etc.

• Plottage more than 5,000㎡, length more than 2km

• Injurious factor according to environment surrounding such as geographic condition

etc.

• Catastrophic effect on nearby area or facilities due to current business

• Disaster mitigation plan submitted by the concessionaire, etc.

4-1-2. Pre-disaster Effect Review Committee

Consistution

Operation

• Administrative plan : prior to establishing a plan

• Development work : enforcement plan or business plan before approval

• Public officials, Prfessors, private sector experts, corporation employees

91

16 27

20 18 10

계 2010년 2011년 2012년 2013년 2014년

Review the running of the Committee

23

4-1-3. Pre-disaster Effect Review Committee

Cutting area (mat seat) Permanent of the Detention

Facility

2014 Asian Game Main Stadium

24

4-2. Master Plan for reducing storm and flood damage

Storm and flood damage reduction master plan

Establishment range

On the use of

• Comprehensive research local wind and flood damage risk → Various structural

and non-structural mitigation measures for establishing prevention and harm

reduction

• Spatial : Entire region of Incheon

• Destination Disaster : Typhoons, flooding, heavy rains, strong winds, wind

waves, tides, heavy snow etc.

• Period : 10 years (Renew every five years)

• If any of various planning or change, apply established disaster prevention

and reduction plan

25

4-3-1. Earthquake Prevention and Reinforcement

Seismic design of new facilities apply

Seismic retrofit of existing facilities and evaluation

• Scale : 5.4~6.2 : Airports, underground structures,

dams, floodgates

• Scale : 6.0∼7.0 : building(higher than 3 floors,

total ground area more than 1,000㎡), subway,

bridge, tunnel

• Public Buildings, Urban railway, water facilities, public sewage treatment facilities,

and Eastern Europe, razor and track facilities, organic facilities etc.

• High-rise building → Installation for refuge safety zone(30floors) : reinforced in

2012

• Small buildings retrofit manual issued → Voluntary retrofit induction

26

4-3-2. Earthquake Prevention and Reinforcement

Monitoring

Site preparation manual

• Fire and disaster control room and 24-hour joint station room

• Earthquake acceleration monitoring instrumentation 8 places

• When symptom is discovered, disaster forecast and alert system is spread

• Step 1 : Situational awareness and early response

• Step 2 : Corresponding organizational and operational(Disaster Safety Task Force

operations)

• Step 3 : Emergency response measures(Rescue and Safety Inspection etc.)

• Step 4 : Post probation and recovery activities(Earthquake Mission Operations)

27

5-1. 3 preparedness of early warning and response

• for real-time transmission of the status of snow removal work in winter to

smartphones smartphones and disaster status control centers

• To provide fast information on quick contingency plans and snow removal work.

Snow removal information through Cloud

28

5-2. 3 preparedness of early warning and response

Disaster forecasting and warning system

• A system that sends out the emergency by text message or broadcasting to people

when there is a sudden extreme weather event and when rapid evacuation is needed

such as steep sloped-land, landslide vulnerable area, low lands and etc.

29

5-3. 3 preparedness of early warning and response

• Personnel : 50 persons, 17 Situation equipments

• One-Stop Control tower to deal with complex disaster

• Report reception → First Response → Taking over

The operation of 119 general situation room for complex disaster

30