co-op at west [autosaved].pptx final

Post on 21-Feb-2017

21 Views

Category:

Documents

2 Downloads

Preview:

Click to see full reader

TRANSCRIPT

West Team - Carl Crist (Engineering Manager) - William Johnson (Manufacturing Engineer) - Chris Glenn (Machinist) - Bryan Bower (Machinist) - Michael Dincher (Process Engineer)

Michael OverdorfCo-Op at

West Pharmaceutical

Credit Mr. Wheeland and West Pharmaceutical Services

What Brought Me To West

Gather “on the Job” Experience

Introduce MasterCam

Goals

Orientation/Safety – Unit 100 Performing Layout Work – Unit 200 Part Inspection – Unit 300 Operation Lathes – Unit 700 Milling Machines – Unit 800 Maintaining Machines and Tools – Unit 1000 Metallurgy – Unit 1100 Use of Charts and References – Unit 1200 Blueprint Reading – Unit 1300 CNC Programming – Unit 1400

Goals

Covered In Orientation

Daily Performance

Safety

Mold Storage Rack – Units (200, 300, 700, 800, Welding)

Projects

Bruderer Ram Lock Slides – Unit (200, 300, 800)

Projects

Thor wrenches – Units (200, 300, 700, 800, 1300, 1400)

Projects

Conveyer Idler Roller – Units (300, 700)

Projects

Jing Day Mold Press Cart – TIG Welding

Projects

BD1ML Die Plate Holder – Units (300, 800, 1200, 1400)

Projects

Probe

On the job experience

A higher level of skill and education

Preparation for future jobs

What have I gained?

l

top related