Project name Area (ha)
DreamLand City
Long Hung City 227 Water Front City 366 Aqua City 305 Phuoc Hung City 286 Phuoc Tan City 110 1,294
Development Partner Invitation • Our strategic partner is Donacoop – the big
developer in Dong Nai • Donacoop owns a large area at along Dong Nai
river • Location of project: Long Hung Commune, Bien
Hoa City, Dong Nai Province
For more detail, please contact:
RIM Land – Strategic Partner of Donacoop Add: 23 Phung Khac Khoan, Dist 1, HCMC Tel: 0919 636 589 (Mr Luan) Email: trieuluan@gmail.com
Calling for Development
3. AQUACITY- JV with
VINACAPITAL (USA)
Pentago Group (Malaysia): 1/500 VINA Project (USA): 1/500 Nikken Sekkei (Japan), 1/500
1.LONG HUNG-NEW URBAN
RESIDENTIAL AREA NIKKEN SEKKEI (Japan): 1/500
No. Items Areas (ha) Rate (%)
1 Residential land 103 45.4
2 Municipal service land 18 7.8
3 Greenbelt, water surface area and athletics area 28 12.4
4 Transportation Area 73 32.1
5 Technical infrastructure land 1 0.4
6 Others 4 1.9
Total 228 100%
1. Project design
- Apartments: 2,040 units
- Town houses: 2,479 units
- Detached villas: 784 units
- Semi-detached villas: 250 units
- Municipal service land: 18ha
(Decision no.296/QĐ-UBND dated 30/01/2012)
2. Partner structures:
- Complete site clearance and compensation
- Complete 100% of total project at the
end of 2015 and has commercial sales
since late 2013
- Selling price: TBC
3. Legal documents:
- Land handed over 100%
- Approved 1/500 arrangement
- Land using right certificate
2.WATERFRONT CITY- JV with
KEPPEL LAND (Singapore)
No. Items Areas (ha) Rate (%)
1 Residential land 139 37.9
2 Municipal service land 65 17.6
3 Greenbelt, water surface area and athletics area 57 15.5
4 Transportation Area 72 19.6
5 Technical infrastructure land 2 0.5
6 Others 33 8.9
Total 367 100%
1. Project design
- Apartment: 4,864 to 5,610 units
- Terraced houses with garden in front: 676 units
- Villas: 624 units
- Terraced houses: 5,086 units
( Decision dated 27/01/2014)
2. Partners structures:
- Complete site clearance and compensation
- Owning:
+ Donacoop
+ An Phu Long
+ Keppel Land
3. Legal documents:
- Land handed over 100%
- Approved 1/500 arrangement
- Land using right certificate
No. Items Areas (ha) Rate (%)
1 Residential land 137 45.0
2 Municipal service land 25 8.1
3 Greenbelt, water surface area and athletics area 56 18.3
4 Transportation Area 85 27.9
5 Technical infrastructure land 2 0.5
6 Others 0 0.1
Total 305 100%
1. project design
- Apartments: 3,945 units
- Terraced houses including town houses:
880 units
- Semi-detached houses: 459 units
- Villas including semi-detached and detached
villas: 1,715
(Decision no.491/QĐ-UBND dated 20/02/2012)
2. Partners structures:
- Owning:
+ Donacoop (30%)
+ An Phu Long (20%)
+ Vinacapital (50%)
- Complete site clearance and compensation
4.PHOENIX ISLAND (PHUOC HUNG
ISLAND)
No. Items Areas (ha) Rate (%)
1 Residential land 138 48.3
2 Municipal service land 20 7.0
3 Greenbelt, water surface area and athletics area 47 16.3
4 Transportation Area 80 28.0
5 Technical infrastructure land 0 0.2
6 Others 1 0.2
Total 286 100%
1. Project design
- Villas: 3,107 units
- Apartment: 624 units
(Decision no.35/QĐ-UBND dated 04/01/2012)
2. Partner structures:
- Owning:
+Donacoop (100%)
- Legal License:
+Long Hung (Donacoop)
- Complete site clearance and compensation
- Construction in progress
- Selling price: TBC
- Commercial sales is planned to start in 2016
3. Legal documents:
- Land handed over 100%
- Arrange 1/500 approved
- Land use right certificates
3. Legal documents
- Land handed over 100%
- Approved 1/500 arrangement
- Land using right certificate
KHANH TUONG (VN): 1/500 THANH BINH GROUP (Vietnam): 1/500
5.CUONG HUNG RESIDENTIAL PROJECT
No. Items Areas (ha) Rate (%)
1 Residential land 50.05 54.55
2 Municipal service land 5.34 5.82
3 Greenbelt, water surface area and athletics area 12.04 13.12
4 Transportation Area 23.88 26.03
5 Technical infrastructure land 0.44 0.48
6 Others 0.00 -
Total 91.75 100
LAND USE RATIO TABLE
1. Project design
- Town houses: 686 units
- Villas: 787 units
- Apartments: 1870 units
- Social apartments: 407 units
2. Partner structures:
- Owning:
+ Donacoop
+ Cuong Hung
- Legal License:
+ Cuong Hung
- Complete site clearance and compensation
- Construction in progress
3. Legal documents:
- Land handed over 100%
- Approved 1/500 arrangement
- Land using right certificate
6.TRANG AN URBAN REGION PROJECT
No. Items Areas (ha) Rate (%)
1 Residential land 2.5 4.81
2 Municipal service land 1.5 2.88
3 Greenbelt, water surface area and athletics area24 46.15
4 Transportation Area 15 28.85
5 Technical infrastructure land 9 17.31
6 Others 0 0.00
Total 52 100
LAND USE RATIO TABLE
3. Project performance
- Estimated revenue (USD): TBC to TBC mil
- Investment cost (USD): 80 mil
- Capital requirement: DONACOOP injects capital
by its cash surplus from other projects
1. Project design
- Not updated yet
2. Partner structures:
- Complete site clearance and compensation
- Construction in progress
- Selling price: TBC (semi- detached and detached
house); TBC(villas)
- Commercial sales is planned to start in
2016
No. Items Areas (ha) Rate (%)
1 Residential land 50.72 43.63
2 Municipal service land 9.10 7.83
3 Greenbelt, water surface area and athletics area39.16 33.69
4 Transportation Area 17.08 14.69
5 Technical infrastructure land 0.19 0.16
6 Others 0.00 0.00
Total 116.24 100
1. Project design
- 37,700 lots with 60,400 to 65,000 graves
- 47,000 caskets placed at Tay Thien Pagoda,
Buddha Statues (can be extended up to
more than 300,000 caskets upon actual
demand)
2. Partner structures:
- Complete site clearance and compensation
- Construction in progress only 15%, 85%
already done and had commercial trading
in 2013.
- Average selling price: VND 200 million per grave
(USD$ 10,000) - Worship house will be deployed in 2015 3. Project performance
- Estimated revenue (USD): 1.2 bil – 1.4 bil
- Capital requirement: DONACOOP injects capital
by its cash surplus from other projects.
7.VINH HANG MEMORIAL PARK
Phase 1
LOCAL CONSULTANCY: 1/500
8.LONG THANH PLAZA
LOCAL CONSULTANCY: 1/500
1. Land area: 14,694 m2
2. Construction area : 6,003 m2
3. Design: 642 apartment, 22 floor (19
apartment floors, 3 commercial
floors)
4. Status: finish crude part of the
building and waiting for completion
as well as fitting out