calling for development dream land city

3
Project name Area (ha) DreamLand City Long Hung City 227 Water Front City 366 Aqua City 305 Phuoc Hung City 286 Phuoc Tan City 110 1,294 Development Partner Invitation Our strategic partner is Donacoop – the big developer in Dong Nai Donacoop owns a large area at along Dong Nai river Location of project: Long Hung Commune, Bien Hoa City, Dong Nai Province For more detail, please contact: RIM Land – Strategic Partner of Donacoop Add: 23 Phung Khac Khoan, Dist 1, HCMC Tel: 0919 636 589 (Mr Luan) Email: [email protected] Calling for Development

Upload: luan-chau

Post on 23-Jan-2018

117 views

Category:

Real Estate


1 download

TRANSCRIPT

Page 1: Calling for development Dream Land City

Project name Area (ha)

DreamLand City

Long Hung City 227 Water Front City 366 Aqua City 305 Phuoc Hung City 286 Phuoc Tan City 110 1,294

Development Partner Invitation • Our strategic partner is Donacoop – the big

developer in Dong Nai • Donacoop owns a large area at along Dong Nai

river • Location of project: Long Hung Commune, Bien

Hoa City, Dong Nai Province

For more detail, please contact:

RIM Land – Strategic Partner of Donacoop Add: 23 Phung Khac Khoan, Dist 1, HCMC Tel: 0919 636 589 (Mr Luan) Email: [email protected]

Calling for Development

Page 2: Calling for development Dream Land City

3. AQUACITY- JV with

VINACAPITAL (USA)

Pentago Group (Malaysia): 1/500 VINA Project (USA): 1/500 Nikken Sekkei (Japan), 1/500

1.LONG HUNG-NEW URBAN

RESIDENTIAL AREA NIKKEN SEKKEI (Japan): 1/500

No. Items Areas (ha) Rate (%)

1 Residential land 103 45.4

2 Municipal service land 18 7.8

3 Greenbelt, water surface area and athletics area 28 12.4

4 Transportation Area 73 32.1

5 Technical infrastructure land 1 0.4

6 Others 4 1.9

Total 228 100%

1. Project design

- Apartments: 2,040 units

- Town houses: 2,479 units

- Detached villas: 784 units

- Semi-detached villas: 250 units

- Municipal service land: 18ha

(Decision no.296/QĐ-UBND dated 30/01/2012)

2. Partner structures:

- Complete site clearance and compensation

- Complete 100% of total project at the

end of 2015 and has commercial sales

since late 2013

- Selling price: TBC

3. Legal documents:

- Land handed over 100%

- Approved 1/500 arrangement

- Land using right certificate

2.WATERFRONT CITY- JV with

KEPPEL LAND (Singapore)

No. Items Areas (ha) Rate (%)

1 Residential land 139 37.9

2 Municipal service land 65 17.6

3 Greenbelt, water surface area and athletics area 57 15.5

4 Transportation Area 72 19.6

5 Technical infrastructure land 2 0.5

6 Others 33 8.9

Total 367 100%

1. Project design

- Apartment: 4,864 to 5,610 units

- Terraced houses with garden in front: 676 units

- Villas: 624 units

- Terraced houses: 5,086 units

( Decision dated 27/01/2014)

2. Partners structures:

- Complete site clearance and compensation

- Owning:

+ Donacoop

+ An Phu Long

+ Keppel Land

3. Legal documents:

- Land handed over 100%

- Approved 1/500 arrangement

- Land using right certificate

No. Items Areas (ha) Rate (%)

1 Residential land 137 45.0

2 Municipal service land 25 8.1

3 Greenbelt, water surface area and athletics area 56 18.3

4 Transportation Area 85 27.9

5 Technical infrastructure land 2 0.5

6 Others 0 0.1

Total 305 100%

1. project design

- Apartments: 3,945 units

- Terraced houses including town houses:

880 units

- Semi-detached houses: 459 units

- Villas including semi-detached and detached

villas: 1,715

(Decision no.491/QĐ-UBND dated 20/02/2012)

2. Partners structures:

- Owning:

+ Donacoop (30%)

+ An Phu Long (20%)

+ Vinacapital (50%)

- Complete site clearance and compensation

4.PHOENIX ISLAND (PHUOC HUNG

ISLAND)

No. Items Areas (ha) Rate (%)

1 Residential land 138 48.3

2 Municipal service land 20 7.0

3 Greenbelt, water surface area and athletics area 47 16.3

4 Transportation Area 80 28.0

5 Technical infrastructure land 0 0.2

6 Others 1 0.2

Total 286 100%

1. Project design

- Villas: 3,107 units

- Apartment: 624 units

(Decision no.35/QĐ-UBND dated 04/01/2012)

2. Partner structures:

- Owning:

+Donacoop (100%)

- Legal License:

+Long Hung (Donacoop)

- Complete site clearance and compensation

- Construction in progress

- Selling price: TBC

- Commercial sales is planned to start in 2016

3. Legal documents:

- Land handed over 100%

- Arrange 1/500 approved

- Land use right certificates

3. Legal documents

- Land handed over 100%

- Approved 1/500 arrangement

- Land using right certificate

Page 3: Calling for development Dream Land City

KHANH TUONG (VN): 1/500 THANH BINH GROUP (Vietnam): 1/500

5.CUONG HUNG RESIDENTIAL PROJECT

No. Items Areas (ha) Rate (%)

1 Residential land 50.05 54.55

2 Municipal service land 5.34 5.82

3 Greenbelt, water surface area and athletics area 12.04 13.12

4 Transportation Area 23.88 26.03

5 Technical infrastructure land 0.44 0.48

6 Others 0.00 -

Total 91.75 100

LAND USE RATIO TABLE

1. Project design

- Town houses: 686 units

- Villas: 787 units

- Apartments: 1870 units

- Social apartments: 407 units

2. Partner structures:

- Owning:

+ Donacoop

+ Cuong Hung

- Legal License:

+ Cuong Hung

- Complete site clearance and compensation

- Construction in progress

3. Legal documents:

- Land handed over 100%

- Approved 1/500 arrangement

- Land using right certificate

6.TRANG AN URBAN REGION PROJECT

No. Items Areas (ha) Rate (%)

1 Residential land 2.5 4.81

2 Municipal service land 1.5 2.88

3 Greenbelt, water surface area and athletics area24 46.15

4 Transportation Area 15 28.85

5 Technical infrastructure land 9 17.31

6 Others 0 0.00

Total 52 100

LAND USE RATIO TABLE

3. Project performance

- Estimated revenue (USD): TBC to TBC mil

- Investment cost (USD): 80 mil

- Capital requirement: DONACOOP injects capital

by its cash surplus from other projects

1. Project design

- Not updated yet

2. Partner structures:

- Complete site clearance and compensation

- Construction in progress

- Selling price: TBC (semi- detached and detached

house); TBC(villas)

- Commercial sales is planned to start in

2016

No. Items Areas (ha) Rate (%)

1 Residential land 50.72 43.63

2 Municipal service land 9.10 7.83

3 Greenbelt, water surface area and athletics area39.16 33.69

4 Transportation Area 17.08 14.69

5 Technical infrastructure land 0.19 0.16

6 Others 0.00 0.00

Total 116.24 100

1. Project design

- 37,700 lots with 60,400 to 65,000 graves

- 47,000 caskets placed at Tay Thien Pagoda,

Buddha Statues (can be extended up to

more than 300,000 caskets upon actual

demand)

2. Partner structures:

- Complete site clearance and compensation

- Construction in progress only 15%, 85%

already done and had commercial trading

in 2013.

- Average selling price: VND 200 million per grave

(USD$ 10,000) - Worship house will be deployed in 2015 3. Project performance

- Estimated revenue (USD): 1.2 bil – 1.4 bil

- Capital requirement: DONACOOP injects capital

by its cash surplus from other projects.

7.VINH HANG MEMORIAL PARK

Phase 1

LOCAL CONSULTANCY: 1/500

8.LONG THANH PLAZA

LOCAL CONSULTANCY: 1/500

1. Land area: 14,694 m2

2. Construction area : 6,003 m2

3. Design: 642 apartment, 22 floor (19

apartment floors, 3 commercial

floors)

4. Status: finish crude part of the

building and waiting for completion

as well as fitting out