cadac bim congres 2015 autodesk bim 360 - cadac group · pdf filecadac bim congres 2015 ......

Post on 16-Mar-2018

226 Views

Category:

Documents

7 Downloads

Preview:

Click to see full reader

TRANSCRIPT

© 2015 Autodesk

Autodesk® BIM 360®

Sander Lijbers

AEC Industry Manager

CADAC BIM Congres 2015

© 2015 Autodesk

BIM 360: Common misunderstandings

1. “BIM 360 is only for the BIM Manager…”

2. “BIM 360 is a series of point solutions with a fancy name…”

3. “BIM 360 is only for contractors using 3D and BIM

processes…”

4. “BIM 360 is a collection of iOS apps that need WiFi

connections to function…”

5. “BIM 360 is just Glue, right?”

© 2015 Autodesk

BIM 360 accelerates project delivery and reduces

risk for companies by enabling the office to easily

coordinate and connect while empowering the

field to anticipate and act.

What is Autodesk BIM 360?

© 2015 Autodesk

1. Enabling anytime, anywhere access to

project data

2. Delivering information for easy

consumption by anyone on the project

3. Connecting multidisciplinary project

teams across AEC

4. Providing a shared database of project

information spanning pre-construction

through handover

5. Analyzing data for future planning and

execution

How does BIM 360 accelerate project delivery?

© 2015 Autodesk

1. Deliver projects that are at or under budget

2. Maximize your resources (people/equipment)

3. Increase your profitability

4. No sacrifice in your construction quality

How can you benefit by deploying BIM 360?

© 2015 Autodesk

REDUCE RISK

Customer Sat

Cost

QualitySafety

Data

Reliability

BIM 360: Minimizing your risk in key areas

Time

© 2015 Autodesk

BIM 360: Aligning your plan to future performance

Plan Perform

Construction Today

Plan=

Perform

Misaligned Aligned

© 2015 Autodesk

BIM 360 reporting provides project performance transparency

to executives and project managers

© 2015 Autodesk

BIM 360: Spanning the Building Lifecyle

Connecting Project Teams & Project Data

Via A Common Cloud Database

Construction Execution Commissioning/HandoverPre-construction

Glue Layout

Field

Plan

Building Ops

© 2013 Autodesk

Centralized project data source

Access to data offline

BIM 360: Anytime, Anywhere Access

Office/Browser Access Field/iPad (iOS App) Access

Enterprise-class

data reliability

© 2015 Autodesk

Construction Execution Commissioning/HandoverPre-construction

Streamlines BIM project reviews &

coordination workflows

© 2015 Autodesk

Engage the extended team with

“One-click to BIM” collaboration

anywhere--on the web and iPAD

Accelerate coordination by making

it easy for the team to continuously

resolve conflicts before the

coordination meeting

Connect the model with field data

and external business systems for

more intelligent workflows

Autodesk® BIM 360™ Glue™

Jenea Brenner, Project Engineer at Bernards, using BIM 360

Glue on the Mira Costa High School Project. Image courtesy of

Sebastian Choularton, Bernards

A Typical Week in a Coordination Process

Monday Tuesday Wednesday

Model

Files

Thursday Friday

Design

Structural

Interiors

BIM Manager

BIM Manage

r

Design

Interiors

BIM Manage

r

Design

Structural

Interiors

BIM Manage

r

A week in a Glue-enabled coordination process

Monday Tuesday Wednesday Thursday Friday

BIM Manager

Design

Structural Structural

MEP

Structural

Design

On

e S

ha

red

Mo

de

l

Structural

Design

BIM Manager

MEP

© 2015 Autodesk

Construction Execution Commissioning/HandoverPre-construction

+

Connects the

coordinated model to the

construction layout

process

© 2015 Autodesk

Point Creation to Layout (QA/QC) Workflow

Coordinated Model/Point Creation

2

Upload to BIM 360 Glue

3

Sync to BIM 360 LayoutAs-built Collection

Deviation Analysis

1

© 2015 Autodesk

Task/Issue Creation from Field

Deviation Analysis

4

Task/Issue Creation in APL from Deviation

User syncs with BIM 360 Field Web

to view task/issue on iPad

6

5

Upload issue/task from APL into

BIM 360 Field Web

© 2015 Autodesk

Construction Execution Commissioning/HandoverPre-construction

®

Building reliable work

plans through

cloud and mobile

collaboration

© 2015 Autodesk

Autodesk BIM®

360™

Plan

Image courtesy of DPR Construction

Key Features:

Collaborative short-term planning

Instant updates to the shared plan

Mobile tracking of commitments

Built-in real-time performance

metrics

Key Benefits:

Protect profits with higher labor

productivity

Build a culture of accountability and

buy-in to the plan

Reinforce Lean construction

practices

Measure performance and drive

continuous improvement

© 2015 Autodesk

Construction Execution Commissioning/HandoverPre-construction

Decision making at the point of

work--improving quality, safety

& profitability

© 2015 Autodesk

Designed for the entire construction

project team

Manage Quality, Safety, Documents

to the Field, Progress Photos,

Commissioning & Handover

Enable model-based workflows on

the job site, and link field data to

models

Get real-time project insight through

analytical reporting and dashboards

Autodesk® BIM 360™ Field

© 2015 Autodesk

Autodesk BIM 360 Field: Daily Updates

Gain insight into trends and analytics that can

expose root cause detail

© 2015 Autodesk

Construction Execution Commissioning/HandoverPre-construction

Streamlines handover,

limits warranty expenses,

expands service offerings

© 2013 Autodesk

Autodesk Building Ops

Mobile-first maintenance management

solution with mobile and web clients

For maintenance managers,

technicians, and building occupants

Connects BIM 360 Field asset data to

the people who need it most, when they

need it, where they need it

© 2013 Autodesk

Benefits of Autodesk Building Ops

Improves the handover

experience by delivering data

from BIM 360 Field in a way that

makes it immediately actionable

Enables owners to begin

operations on day one with a

turnkey maintenance and asset

management solution

Helps contractors better

service warranty requests and

reduce expenses from

unmaintained equipment

With Panoramic Power, makes

Predictive Maintenance

accessible to everyone

© 2015 Autodesk

Connecting Energy Insights with Maintenance Outcomes

Panoramic Power

Wireless, self-powered sensors

Generate alerts about sub-performing

assets

Provides advanced failure detection for

equipment through visualization and

analysis

+Predictive

Maintenance

Program

Autodesk Building Ops

Mobile-first maintenance & asset

management

Panoramic Power alerts automatically create

maintenance tickets

Maintains asset record and performance

history

© 2015 Autodesk

BIM 360: Gaining Momentum (Data As of Jan ’15)

Monthly Active

Unique Users

23K

Number of Active

Projects Managed

4.4K

Number of Unique

Models Managed:

76K

© 2015 Autodesk

Images courtesy of Daqri

LLC

© 2015 Autodesk

BIM 360 generates alignment between planning

and performance, while helping to minimize the

risks associated with outdated or inaccurate

project data.

© 2015 Autodesk

BIM 360: Customer Metrics

9.1

Hours/User/Week

of time savings

Advanced

Project Schedule

by 50%

Reduced time

spent in the

office by 20%

70% site efficiency

savings

300% ROI on

BIM360

investment

© 2015 Autodesk

© 2015 Autodesk

Autodesk is a registered trademark of Autodesk, Inc., and/or its subsidiaries and/or affiliates in the USA and/or other countries. All other brand names, product names, or

trademarks belong to their respective holders. Autodesk reserves the right to alter product and services offerings, and specifications and pricing at any time without notice,

and is not responsible for typographical or graphical errors that may appear in this document.

© 2015 Autodesk, Inc. All rights reserved.

top related