SHORTAGE MATERIAL for SHIPMENT NO : T1-4 IMIR NO-104
For DECLMaterials checked and recieved
on behalf of BGRESLFor TPCIL
THERMAL POWERTECH CORPORATION INDIA LTD.
3X660MW - SUPERCRITICAL THERMAL POWER PROJECT, NELATURE/PYNAMPURAM(V)
INCOMING MATERIAL INSPECTION & HANDING OVER REPORT
SUPPLIER'S NAME Donfeng Electric Corporation Limited IMIR No & Dt. TPCIL/IMIR/0104/04.08.2012
P.O NO & Dt. TPCIL/DECL/WO-2744787 PACKAGE BOILER STEEL STRUCTURE
CONTRACTOR BGR Energy systems Ltd., Shop IR No.
4th SHIPMENT SHORTAGE MATERIAL
Original Packing No DRAWING NO DescriptionQuantity(Nos) RECIEPT
REMARKSPacking no
1 114N5113-192 1 1 T1-8
2 114N5113-123 1 1 T1-8
3 114N5113-64 1
4 114N5113-39 1 1 T1-8
5 NUT M24 25 T1-9
6 NUT M22 5 T1-9
7 M24X120 25 T1-9
8 M24X110 2 T1-9
9 M24X100 25 T1-9
10 1000X484X30mm 1 T1-9
11 Bends 135°- Ø26.8 30 T1-9
12 Ø33.5 : L6000 2 T1-9
13 1203-013 M24×220 460 T1-9
14 1203-013 M24×220 460 T1-9
SL NO Shortage
qtyReceived
Shipment no
DECL-T-001-U1-114N5113-55/120
BEAM, L-903 H396X199X7X11,
DECL-T-001-U1-114N5113-
1/1
DECL-T-001-U1-114N5113-84/120
BEAM, L-1902 H700
X300X10X16,
DECL-T-001-U1-114N5113-1/1
DECL-T-001-U1-114N5113-33/120
BEAM, L-5480 H446X199X8X12,
DECL-T-001-U1-114N5113-76/120
BEAM, L- H582X300X12X17,
DECL-T-001-U1-114N5113-
1/1
DECL-T-001-U1-114N512-29/41
DECL-T-001-U2-114N512-45/45
DECL-T-001-U1-114N511-6/16
DECL-T-001-U2-114N512-45/45
DECL-T-001-U1-114N511-14/16
DECL-T-001-U2-114N512-45/45
DECL-T-001-U1-114N511-16/16
DECL-T-001-U2-114N512-45/45
DECL-T-001-U1-114N512-37/41
DECL-T-001-U2-114N512-45/45
DECL-T-001-U1-114N5631-13/126
DECL-T-001-U2-114N5611-136/242
DECL-T-001-U1-114N5622-29/36
DECL-T-001-U2-114N5622-31/36
DECL-T-001-U1-114N5622-36/36
DECL-T-001-U2-114N5622-36/36
DECL-T-001-U2-114N512-45/45
DECL-T-001-U2-114N512-44/45
SHORTAGE MATERIAL for SHIPMENT NO : T1-5 IMIR NO-0105
For DECLMaterials checked and recieved
on behalf of BGRESLFor TPCIL
THERMAL POWERTECH CORPORATION INDIA LTD.
3X660MW - SUPERCRITICAL THERMAL POWER PROJECT, NELATURE/PYNAMPURAM(V)
INCOMING MATERIAL INSPECTION & HANDING OVER REPORT
SUPPLIER'S NAME Donfeng Electric Corporation Limited IMIR No & Dt. TPCIL/IMIR/0105/04.08.2012
P.O NO & Dt. TPCIL/DECL/WO-2744787 PACKAGE BOILER STEEL STRUCTURE
CONTRACTOR BGR Energy systems Ltd., Shop IR No.
5th SHIPMENT SHORTAGE MATERIAL
Original Packing No DRAWING NO DescriptionQuantity(Nos) RECIEPT
REMARKSPacking no
1 114N5161-133 1 1 T1-9 DECL-T-001-U1-114N5161-1/1
2 114N5123-29 1 1 T1-9 DECL-T-001-U1-114N5123-1/1
3 114N5123- 42 1 1 T1-9 DECL-T-001-U1-114N5123-1/1
4 114N5123-122 1 1 T1-9 DECL-T-001-U1-114N5123-1/1
5 114N5123-125 1 1 T1-9 DECL-T-001-U1-114N5123-1/1
6 114N5123-121 2 2 T1-9 DECL-T-001-U1-114N5123-1/1
7 114N5123-86 1 T1-9 DECL-T-001-U1-114N5123-1/1
8 114N5125-209 C10 1 1 T1-9 DECL-T-001-U1-114N5126-1/1
9
DECL-T-001-U1-114N5124
114N5124-76 H496X199X9X14 1
10 114N5124-120 H700X300X10X16 1
11 114N5124-108 H496X199X9X14 1
12 114N5124-169 HN446X199X8X12 1
13 114N5124-42 H396*199*7*11 1 T1-10 DECL-T-001-U1-114N5124-1a/1
14 114N5127-16 1 T1-9 DECL-T-001-U1-114N5127-1/1
15 114N5127-21 1 T1-9 DECL-T-001-U1-114N5127-1/1
16 114N5127- 127 1 T1-9 DECL-T-001-U1-114N5127-1/1
17 114N5127-79 1
18 114N5127-100 1
19 114N5127-43 1 T1-9 DECL-T-001-U1-114N5127-1/1
SL NO Shortag
e qtyReceived
Shipment no
DECL-T-001-U1-114N5161-10/12
MIDDLE HB(TIER-III) 2C25A
DECL-T-001-U1-114N5123-12/21
MIDDLE BEAM, H200X100X5.5X8
MIDDLE BEAM, H200X100X5.5X8
MIDDLE BEAM, H200X100X5.5X8
MIDDLE BEAM, H200X100X5.5X8
MIDDLE BEAM, H200X100X5.5X8
DECL-T-001-U1-114N5123- 7/21
MIDDLE BEAM, HN446X199X8X12
DECL-T-001-U1-114N5125 - 36/41
DECL-T-001-U1-114N5124 - 14/27
DECL-T-001-U1-114N5127-24/29
MIDDLE BEAM, H300X150X6.5X9
MIDDLE BEAM, H300X150X6.5X9
MIDDLE BEAM, H300X150X6.5X9
DECL-T-001-U1-114N5127-27/29
MIDDLE BEAM, H200X100X5.5X8
DECL-T-001-U1-114N5127-15/29
MIDDLE BEAM, H300X150X6.5X9
DECL-T-001-U1-114N5127-26/29
MIDDLE BEAM, H446X199X8X12
SHORTAGE MATERIAL for SHIPMENT NO : T1-5 IMIR NO-0105
For DECLMaterials checked and recieved
on behalf of BGRESLFor TPCIL
5th SHIPMENT SHORTAGE MATERIAL
Original Packing No DRAWING NO DescriptionQuantity(Nos) RECIEPT
REMARKSPacking no
SL NO Shortag
e qtyReceived
Shipment no
20 114N5127- 35 1 T1-9 DECL-T-001-U1-114N5127-1/1
21 1 1 T1-10 DECL-T-001-U1-114N5128-1/1 For damage
22 114N5162-129 MIDDLE HB(TIER-II) 2C25A 1 1 T1-9 DECL-T-001-U1-114N5162-1/1
23 114N5126-170 1 1 T1-9 DECL-T-001-U1-114N5126-1/1
24 114N5126- 171 1 1 T1-9 DECL-T-001-U1-114N5126-1/1
25 114N5126- 196 1 1 T1-9 DECL-T-001-U1-114N5126-1/1
26 114N5126 - 139 1 1 T1-9 DECL-T-001-U1-114N5126-1/1
27 114N5123-133 1 T1-9 DECL-T-001-U1-114N5126-1/1
28 114N5123- 9 1 T1-9 DECL-T-001-U1-114N5126-1/1
29 25 T2-3 DECL-T-OP-02-U1-PHHB3-29/30
30 M24X145- 14Nos 14 T2-3 DECL-T-OP-02-U1-PHHB3-29/30
31 M24X110 - 22Nos 22 T2-3 DECL-T-OP-02-U1-PHHB3-29/30
32 M24X90-13Nos 13 T2-3 DECL-T-OP-02-U1-PHHB3-29/30
33 M24X140 - 14Nos 14 T2-3 DECL-T-OP-02-U1-PHHB3-29/30
34 M24X90-13Nos 13 T2-3 DECL-T-OP-02-U1-PHHB3-29/30
35 45 T2-3 DECL-T-OP-02-U1-PHHB3-29/30
36 25Nos washer 25 T2-3 DECL-T-OP-02-U1-PHHB3-29/30
37 20 T2-3 DECL-T-OP-02-U1-PHHB3-29/30
38 5 5 T1-9 DECL-T-001-U1-114N5621-1/1
39 2 2 T1-9 DECL-T-001-U1-114N5621-1/1
40 PF GRATING 114N5621-147-5 Nos 5 5 T1-9 DECL-T-001-U1-114N5621-1/1
41 8 8 T1-9 DECL-T-001-U1-114N5621-1/1
42 114N5621-482 : 1No 1 1 T1-9 DECL-T-001-U1-114N5621-1/1
43 PF GRATING 114N5621-507-8nos 8 8 T1-9 DECL-T-001-U1-114N5621-1/1
44 PF GRATING 80
DECL-T-001-U1-114N5127-26/29 MIDDLE BEAM,
H446X199X8X12
DECL-T-001-U1-114N5128-21/54
114N5128-75 (supplied for
5124-57)MIDDLE BEAM,
H446X199X8X12
DECL-T-001-U1-114N5162-3/9
DECL-T-001-U1-114N5126-18/44
MIDDLE BEAM, H200X100X5.5X8
MIDDLE BEAM, H200X100X5.5X8
MIDDLE BEAM, H200X100X5.5X8
DECL-T-001-U1-114N5126-28/44
MIDDLE BEAM, H300X150X6.5X9
DECL-T-001-U1-114N5123-14/21
MIDDLE BEAM, H300X150X6.5X9
MIDDLE BEAM, H300X150X6.5X9
DECL-T-OP-02-U1-PHHB1 - 1/22
HS BOLT 10.9S M24
M24X85-15Nos & M22X60-10Nos
DECL-T-OP-02-U1-PHHB1 - 2/22
HS BOLT 10.9S M24
DECL-T-OP-02-U1-PHHB1 - 3/22
HS BOLT 10.9S M24
DECL-T-OP-02-U1-PHHB1 - 8/22
HS BOLT 10.9S M24X90
DECL-T-OP-02-U1-PHHB1 - 9/22
HS BOLT 10.9S M24
DECL-T-OP-02-U1-PHHB1 - 10/22
HS BOLT 10.9S M24
DECL-T-OP-02-U1-PHHB1 - 14/22
HS BOLT 10.9S M24
M24X110 - 13Nos, M24X80-10Nos & M22X65-22Nos
DECL-T-OP-02-U1-PHHB1 - 16/22
HS BOLT 10.9S M24
DECL-T-OP-02-U1-PHHB1 - 22/22
HS BOLT 10.9S M24
M24X100-9NOS, M24X145-6NOS &
M16X50-5NOS
DECL-T-001-U1-114N5621-034/248
PF GRATING
5 Nos shortage (114N5621-57)
DECL-T-001-U1-114N5621-039/248
PF GRATING (9 items)
114N5621-68 & 71 : Each 1No
DECL-T-001-U1-114N5621-062/248
DECL-T-001-U1-114N5621-0137/248
PF GRATING (14 items)
114N5621-398, 402, 403, 405, 410 & 411(Each
1No), 399(2Nos)
DECL-T-001-U1-114N5621-145/248
PF GRATING (8 items)
DECL-T-001-U1-114N5621-150/248
DECL-T-001-U1-114N5621-240/248
114N5621-踏步 - 80Nos shortage.
SHORTAGE MATERIAL for SHIPMENT NO : T1-5 IMIR NO-0105
For DECLMaterials checked and recieved
on behalf of BGRESLFor TPCIL
5th SHIPMENT SHORTAGE MATERIAL
Original Packing No DRAWING NO DescriptionQuantity(Nos) RECIEPT
REMARKSPacking no
SL NO Shortag
e qtyReceived
Shipment no
45 PF GRATING 4 4 T1-9 DECL-T-001-U1-114N5621-1/1
46 9 T1-9(6Nos) DECL-T-001-U1-114N5621-1/1
47 6 T2-3 DECL-T-OP-02-U1-PHSS5-24/24
48 12 T1-9
49 Embedded parts 4
9 T1-9(5Nos)
5 T1-9
34 T1-9
DECL-T-001-U1-114N5621-248/248
114N5621-踏步 -4Nos shortage.
DECL-T-001-U1-114N5123-13/21
PLANTS (JOINT PLANTS)
JP57-4Nos, JP23-3Nos, JP51-2Nos
JP57-2Nos, JP23-1Nos
DECL-T-OP-02-U1-PHSS1-357/357
PLANK - 14 ITEMS
Pl. 14X670X710 - 6Nos shortage.
DECL-T-001-U1-114N5126-42/44
PLANKS ( 36 ITEMS)
Pl.8X140X170-2Nos(JP-27), Pl.8X210X260-
6Nos(JP-54) & Pl.10X210X420-4Nos(JP-
72)
DECL-T-001-U2-114N5129-32/32
DECL-T-OP-02-U1-PHEP1-22/34
4Nos shortage (A3074a-DJ-015-BP10-
1)
DECL-T-001-U1-114N5125-37/41
JP80-1No, JP82-4Nos, JP83-2Nos,JP72-2Nos
DECL-T-001-U2-114N5129-32/32
DECL-T-001-U1-114N5125-38/41
JP27-2Nos, JP11-1No, JP153-2Nos,
DECL-T-001-U2-114N5129-32/32
DECL-T-001-U1-114N5125-39/41
JP73-4Nos, JP11-4Nos,JP17-8Nos, JP80-10Nos & JP-89-8Nos
DECL-T-001-U2-114N5129-32/32
SHORTAGE MATERIAL for SHIPMENT NO : T1-6 IMIR NO-0106
For DECLMaterials checked and recieved
on behalf of BGRESLFor TPCIL
THERMAL POWERTECH CORPORATION INDIA LTD.
3X660MW - SUPERCRITICAL THERMAL POWER PROJECT, NELATURE/PYNAMPURAM(V)
INCOMING MATERIAL INSPECTION & HANDING OVER REPORT
SUPPLIER'S NAME Donfeng Electric Corporation Limited IMIR No & Dt. TPCIL/IMIR/0106/04.08.2012
P.O NO & Dt. TPCIL/DECL/WO-2744787 PACKAGE BOILER STEEL STRUCTURE
CONTRACTOR BGR Energy systems Ltd., Shop IR No.
6th SHIPMENT SHORTAGE MATERIAL
Original Packing No DRAWING NO DescriptionQuantity(Nos) RECIEPT
REMARKSPacking no
1 114N543 - 48 3 3 T1-9 DECL-T-001-U1-114N543-1/1
2 H300X150X6.5X9: L2341 1
3 114N5137-126 H446X199X8X12: L511 1 1 T1-9 DECL-T-001-U1-114N5137-1/1
4 114N5137- 25 H446X199X8X12: L550 1 1 T1-9 DECL-T-001-U1-114N5137-1/1
5 114N5137- 43 H300X150X6.5X9: L1505 1 T1-9 DECL-T-001-U1-114N5137-1/1
6 3 3 T1-9 DECL-T-001-U1-114N5137-1/1
7 1 1 T1-9
8 JP 39(Pl.20mm) - 2Nos 2 T1-10 DECL-T-001-U1-114N542-1/1
9 9 10 T1-10 DECL-T-001-U1-114N542-1/1
11 (Rib 275-1No) 1 1 T1-9
12 M22X140 30 30 T1-9
13 M24X110-11Nos 11 11 T1-9
14 PL.1mm & 2mm - 397Nos 397 158 T1-9 250
15 19 16 T1-9
SL NO Shortag
e qtyReceived
Shipment no
DECL-T-001-U1-114N543-37/39
TOP BEAM - C30A 6 ITEMS
DECL-T-001-U1-114N5137-45/52
114N5137-31 ( 114N5137-21 Extra)
DECL-T-001-U1-114N5137-48/52
DECL-T-001-U1-114N5137-51/52
JP141-1No & JP232-2Nos
DECL-T-001-U1-114N541-6/12
PL. 323, 16X200X600-1No
DECL-T-001-U1-114N5133-1/1
DECL-T-001-U1-114N542-56/57
DECL-T-001-U1-114N542-57/57
(JP243-2Nos, JP240-2Nos, NP1962-2Nos, NP2269-1No,NP2274-2Nos)
DECL-T-001-U1-114N5131-33/39
DECL-T-001-U1-114N5133-1/1
DECL-T-001-U1-114N5131-38/39
DECL-T-001-U1-114N5133-1/1
DECL-T-001-U1-114N5131-39/39
DECL-T-001-U1-114N5133-1/1
DECL-T-001-U1-114N5133-1/1
DECL-T-001-U1-114N5133-31/33
(JP-124-4Nos, JP221-6Nos, JP105-3Nos, Rib278-1 No, JP36-1No)
DECL-T-001-U1-114N5133-1/1
SHORTAGE MATERIAL for SHIPMENT NO : T1-6 IMIR NO-0106
For DECLMaterials checked and recieved
on behalf of BGRESLFor TPCIL
6th SHIPMENT SHORTAGE MATERIAL
Original Packing No DRAWING NO DescriptionQuantity(Nos) RECIEPT
REMARKSPacking no
SL NO Shortag
e qtyReceived
Shipment no
SHORTAGE MATERIAL for SHIPMENT NO : T1-7 IMIR NO-0107
For DECLMaterials checked and recieved
on behalf of BGRESLFor TPCIL
THERMAL POWERTECH CORPORATION INDIA LTD.
3X660MW - SUPERCRITICAL THERMAL POWER PROJECT, NELATURE/PYNAMPURAM(V)
INCOMING MATERIAL INSPECTION & HANDING OVER REPORT
SUPPLIER'S NAME Donfeng Electric Corporation Limited IMIR No & Dt. TPCIL/IMIR/0107/04.08.2012
P.O NO & Dt. TPCIL/DECL/WO-2744787 PACKAGE BOILER STEEL STRUCTURE
CONTRACTOR BGR Energy systems Ltd., Shop IR No.
7th SHIPMENT SHORTAGE MATERIAL
Original Packing No DRAWING NO DescriptionQuantity(Nos) RECIEPT
REMARKSPacking no
1 FRAME BEAM 3
2 3
3 BRACINGS 3
4 6Nos BRACINGS 6
5 5
6 FRAME BEAM 3
7 FRAME BEAM 2
87
9 2
10 43
11 87
12 50
13 M24X180-2Nos 2
14 M24X95-11SETS 11
15 M24X70 - 9 SETS 9
SL NO Shortage
qtyReceived
Shipment no
DECL-T-OP-02-U1-PHSS2-228/448
A3074a-0595-FB-223 - 3Nos
DECL-T-OP-02-U1-PHSS2-237/448
A3074a-0862-SB-476 - 3Nos
SECONDARY BEAM
DECL-T-OP-02-U1-PHSS2-242/448
A3074a-0942-SC-167 - 3Nos
DECL-T-OP-02-U1-PHSS2-243/448
DECL-T-OP-02-U1-PHSS2-277/448
A3074a-0968-VB-53 - 5Nos
VERTICAL BRACING
DECL-T-OP-02-U1-PHSS2-428/448
A3074a-0603-FB-250 - 3Nos
DECL-T-OP-02-U1-PHSS2-431/448
A3074a-0661-FB-439 : 2Nos
DECL-T-OP-02-U1-PHSS2-434/448
VB129-2Nos, VB204-5Nos
VERTICAL BRACING
DECL-T-OP-02-U1-PHSS2-435/448
A3074a-0965-VB-40 -2 Nos
VERTICAL BRACING
DECL-T-OP-02-U1-PHSS2-26/26
F279-4Nos, F34-1No, F38-3Nos, F52-10Nos, F59-2Nos, F87-2Nos, X15-
4Nos, X37-1No, X38-2Nos, F161-2Nos, F182-2Nos, F184-4Nos, F198-2Nos, F227-1No, F220-2Nos, F232-
1No.
DECL-T-OP-02-U1-PHSS2-294/448
X28(9Nos), F541(2Nos), F368(2Nos), X27(12Nos), X20(2Nos), X19(4Nos),
X18(7Nos), X5(12Nos) & EXTRA : X6(7Nos) &
X16(30Nos).
DECL-T-OP-02-U1-PHSS2-295/448
A3074-F40(15Nos), F230(13Nos), F434(21Nos) & F251(1No)
DECL-T-OP-02-U1-PHHB2-2/25
DECL-T-OP-02-U1-PHHB2-7/25
DECL-T-OP-02-U1-PHHB2-18/25
SHORTAGE MATERIAL for SHIPMENT NO : T1-7 IMIR NO-0107
For DECLMaterials checked and recieved
on behalf of BGRESLFor TPCIL
7th SHIPMENT SHORTAGE MATERIAL
Original Packing No DRAWING NO DescriptionQuantity(Nos) RECIEPT
REMARKSPacking no
SL NO Shortage
qtyReceived
Shipment no
16 M24X80 - 2 SETS 2
17 Pl.20X100X870-24Nos 24
18 PL16X330X750 - 1No 1
19 Pl.12X270X330 - 1No 1
20 1
DECL-T-OP-02-U1-PHHB2-19/25
DECL-T-OP-02-U1-PHSS2-292/448
DECL-T-OP-02-U1-PHSS2-293/448
DECL-T-OP-02-U1-PHSS2-298/448
DECL-T-OP-02-U1-PHSS2-300/448
Pl.25X80X430-1No short
SHORTAGE MATERIAL for SHIPMENT NO : T1-8 IMIR NO-0108
For DECLMaterials checked and recieved
on behalf of BGRESLFor TPCIL
THERMAL POWERTECH CORPORATION INDIA LTD.
3X660MW - SUPERCRITICAL THERMAL POWER PROJECT, NELATURE/PYNAMPURAM(V)
INCOMING MATERIAL INSPECTION & HANDING OVER REPORT
SUPPLIER'S NAME Donfeng Electric Corporation Limited IMIR No & Dt. TPCIL/IMIR/0108/04.08.2012
P.O NO & Dt. TPCIL/DECL/WO-2744787 PACKAGE BOILER STEEL STRUCTURE
CONTRACTOR BGR Energy systems Ltd., Shop IR No.
8th SHIPMENT SHORTAGE MATERIAL
Original Packing No DRAWING NO DescriptionQuantity(Nos) RECIEPT
REMARKSPacking no
1 2Nos 2 **
2 B75 & B76 - Each 2Nos 4
3 B26-1No 1
4 B106 - 1No 1
5 7
6 114N5112 : 160 -2Nos 2
7 114N5113-175 1
8 B50, B58 - Each 1No 2
9 114N5114 - 18: 2Nos HOR. BRACING - 2C20A 2
10 114N5114-23 - 1NO HOR. BRACING - 2C20A 1
11 B3 - 1No HOR. BRACING - 2C20A 1
12 HOR. BRACING - 2C20A 2 **
13 114N5114 : B58 -2no HOR. BRACING - 2C25A 2
14 114N5114-39 & 44 HOR. BRACING - 2C25A 2 **
15 HOR. BRACING - 2C25A 2
16 B127-1NO HOR. BRACING - 2C25A 1 **
17 B110-1No shortage. 1
18 B172 - 1No 1
SL NO Shortag
e qtyReceived
Shipment no
DECL-T-001-U2-114N5112-19/46
LOWER BEAM H446X199X8X12
DECL-T-001-U2-114N5112-31/46
LOWER BEAM H300X150X6.5X9
DECL-T-001-U2-114N5112-32/46
LOWER BEAM H300X150X6.5X9
DECL-T-001-U2-114N5112-36/46
LOWER BEAM H200X100X5.5X8
DECL-T-001-U2-114N5112-37/46
114N5112 - 109, 129, 164 (EACH 1No) & 86-4Nos
LOWER BEAM H200X100X5.5X8
DECL-T-001-U2-114N5112-46/46
LOWER BEAM H200X100X5.5X8
DECL-T-001-U2-114N5113 - 25/68
LOWER BEAM H396X199X7X11
DECL-T-001-U2-114N5113 - 40/68
LOWER BEAM H200X100X5.5X8
DECL-T-001-U2-114N5114 - 2/24
DECL-T-001-U2-114N5114 - 3/24
DECL-T-001-U2-114N5114 - 5/24
DECL-T-001-U2-114N5114 - 6/24
DECL-T-001-U2-114N5114 - 9/24
DECL-T-001-U2-114N5114 - 16/24
DECL-T-001-U2-114N5114 - 21/24
114N5114- 113, 115 -1No each
DECL-T-001-U2-114N5114 - 24/24
DECL-T-001-U1-114N5136-2/29
UPPER STRUCTURE HN200X100X5.5X8
DECL-T-001-U1-114N5134-8/35
Upper steel structure H596X199X10X15
SHORTAGE MATERIAL for SHIPMENT NO : T1-8 IMIR NO-0108
For DECLMaterials checked and recieved
on behalf of BGRESLFor TPCIL
8th SHIPMENT SHORTAGE MATERIAL
Original Packing No DRAWING NO DescriptionQuantity(Nos) RECIEPT
REMARKSPacking no
SL NO Shortag
e qtyReceived
Shipment no
19 B24, B44-1No each 2
20 114N5134 - 43 - 1NO 1 **
21 2 B18 - To be checked **
22 114N5134 - 190 1
23 114N5134-67 1 DEC SPARE
24 B9 - 1No shortage. 1
25 114N5138- 113 1
26 B18 - 1NO. 1
27 B47, B131 & EACH 2
47
28 19
29 18
30 17
31 5
32 1
33 32
34 2
35 PF Gratings 114N5621 -590 1
36 17
37 15
38 100
39 GB/T6170-2000 Nut M10 190
40 69
41 9
42 GB/T6170-2000 Nut M10 29
43 NUT - 25 Nos shortage HS BOLT M24X7525
DECL-T-001-U1-114N5134-15/35
Upper steel structure HN300X150X6.5X9(7),
DECL-T-001-U1-114N5134-16/35
Upper steel structure HN300X150X6.5X9
114N5134 - 18 & 146 : 1No each
Upper steel structure H446X199X8X12
DECL-T-001-U1-114N5134-17/35
Upper steel structure HN596X199X10X15
DECL-T-001-U1-114N5134-19/35
Upper steel structure HM582X300X12X17
DECL-T-001-U1-114N5134-23/35
Upper steel structure HN300X150X6.5X9
DECL-T-001-U1-114N5138-3/25
UPPER STRUCTURE HN200X100X5.5X8
DECL-T-001-U1-114N5138-9/25
UPPER STRUCTURE HN446X199X8X12
UPPER STRUCTURE HN300X150X6.5X9
DECL-T-001-U2-114N5111 - 35/39
JOINT PLATES, JP27 - 19NOS
DECL-T-001-U2-114N5111 - 36/39
JP39-16Nos, JP5-1No & JP13-1No
DECL-T-001-U2-114N5111 -37/39
JP49-16Nos & JP11-1No
DECL-T-001-U1-114N5611-020/242
PF Grating 114N5611- 16
DECL-T-001-U1-114N5611-148/242
PF Grating 114N5611 - 225
DECL-T-001-U1-114N5611-236/242
PF Grating 114N5611-踏步
DECL-T-001-U2-114N5621-095/248
PF Gratings 114N5621 - 269,
800X994X30
DECL-T-001-U2-114N5621-188/248
DECL-T-001-U2-114N5621-236/248
PF Grating 114N5621-踏步
800X214X30
DECL-T-001-U2-114N5621-248/248
PF Grating 114N5621-踏步
800X214X30
DECL-T-001-U1-114N562-2/2
GB/T5783-2000 Bolt M10X35 Gr8.8
GB/T95-2002 Washer Ø16
DECL-T-001-U2-114N562-2/2
GB/T5783-2000 Bolt M10X35 Gr8.8
DECL-T-001-U1-114N54-3/17
SHORTAGE MATERIAL for SHIPMENT NO : T1-8 IMIR NO-0108
For DECLMaterials checked and recieved
on behalf of BGRESLFor TPCIL
8th SHIPMENT SHORTAGE MATERIAL
Original Packing No DRAWING NO DescriptionQuantity(Nos) RECIEPT
REMARKSPacking no
SL NO Shortag
e qtyReceived
Shipment no
44 HS BOLT M24X80
213
45 BOLT M24X90-1No HS BOLT M24X90 1
46 HS BOLT M24, M22 105
47
HS BOLT M16, M22 71
48
** indicates the material is received in good condition as packed.
DECL-T-001-U1-114N54-5/17
BOLT - 169NOS, NUT - 201NOS & WASHER-213NOS
DECL-T-001-U1-114N54-10/17
DECL-T-001-U1-114N54-16/17
BOLT M24X65-105Nos, NUT M24 - 95Nos, Washer M24-100Nos
DECL-T-001-U1-114N54-17/17
BOLT M22X65 - 44 NOS, NUT M22 - 51 NOS & WASHER -55 NOS
BOLT M16X50 - 3 NOS, NUT M16 - 3 NOS & WASHER -16 NOS
SHORTAGE MATERIAL for SHIPMENT NO : T1-8 IMIR NO-0108
For DECLMaterials checked and recieved
on behalf of BGRESLFor TPCIL
THERMAL POWERTECH CORPORATION INDIA LTD.
3X660MW - SUPERCRITICAL THERMAL POWER PROJECT, NELATURE/PYNAMPURAM(V)
INCOMING MATERIAL INSPECTION & HANDING OVER REPORT
SUPPLIER'S NAME Donfeng Electric Corporation Limited IMIR No & Dt. TPCIL/IMIR/0108/04.08.2012
P.O NO & Dt. TPCIL/DECL/WO-2744787 PACKAGE BOILER STEEL STRUCTURE
CONTRACTOR BGR Energy systems Ltd., Shop IR No.
8th SHIPMENT SHORTAGE MATERIAL
Original Packing No DRAWING NO DescriptionQuantity(Nos) RECIEPT
REMARKSPacking no
1 2Nos 2 **
2 B75 - 2Nos 2
3 B26-1No 1
4 B106 - 1No 1
5 7
6 114N5112 : 160 -2Nos 2
7 114N5113-175 1
8 114N5114 - 18: 2Nos HOR. BRACING - 2C20A 2
9 B3 - 1No HOR. BRACING - 2C20A 1
10 HOR. BRACING - 2C20A 2 **
11 114N5114 : B58 -2no HOR. BRACING - 2C25A 2
12 114N5114-39 & 44 HOR. BRACING - 2C25A 2 **
13 HOR. BRACING - 2C25A 2
14 B127-1NO HOR. BRACING - 2C25A 1 **
15 B110-1No shortage. 1
16 B172 - 1No 1
17 B24, B44-1No each 2
18 0 **
SL NO Shortag
e qtyReceived
Shipment no
DECL-T-001-U2-114N5112-19/46
LOWER BEAM H446X199X8X12
DECL-T-001-U2-114N5112-31/46
LOWER BEAM H300X150X6.5X9
DECL-T-001-U2-114N5112-32/46
LOWER BEAM H300X150X6.5X9
DECL-T-001-U2-114N5112-36/46
LOWER BEAM H200X100X5.5X8
DECL-T-001-U2-114N5112-37/46
114N5112 - 109, 129, 164 (EACH 1No) & 86-4Nos
LOWER BEAM H200X100X5.5X8
DECL-T-001-U2-114N5112-46/46
LOWER BEAM H200X100X5.5X8
DECL-T-001-U2-114N5113 - 25/68
LOWER BEAM H396X199X7X11
DECL-T-001-U2-114N5114 - 2/24
DECL-T-001-U2-114N5114 - 5/24
DECL-T-001-U2-114N5114 - 6/24
DECL-T-001-U2-114N5114 - 9/24
DECL-T-001-U2-114N5114 - 16/24
DECL-T-001-U2-114N5114 - 21/24
114N5114- 113, 115 -1No each
DECL-T-001-U2-114N5114 - 24/24
DECL-T-001-U1-114N5136-2/29
UPPER STRUCTURE HN200X100X5.5X8
DECL-T-001-U1-114N5134-8/35
Upper steel structure H596X199X10X15
DECL-T-001-U1-114N5134-15/35
Upper steel structure HN300X150X6.5X9(7),
DECL-T-001-U1-114N5134-16/35
Upper steel structure HN300X150X6.5X9
SHORTAGE MATERIAL for SHIPMENT NO : T1-8 IMIR NO-0108
For DECLMaterials checked and recieved
on behalf of BGRESLFor TPCIL
8th SHIPMENT SHORTAGE MATERIAL
Original Packing No DRAWING NO DescriptionQuantity(Nos) RECIEPT
REMARKSPacking no
SL NO Shortag
e qtyReceived
Shipment no
19 1 B18 - To be checked **
21 114N5134-67 1 DEC SPARE
23 114N5138- 113 1
24 B18 - 1NO. 1
25 B131-1No 1
37
28 19
29 18
30 17
31 5
32 1
33 32
34 2
35 PF Gratings 114N5621 -590 1
36 17
37 15
38 100
39 GB/T6170-2000 Nut M10 190
40 69
41 9
42 GB/T6170-2000 Nut M10 29
43 NUT - 25 Nos shortage HS BOLT M24X7525
44 HS BOLT M24X80
213
45 BOLT M24X90-1No HS BOLT M24X90 1
46 HS BOLT M24, M22 105
DECL-T-001-U1-114N5134-16/35 114N5134 - 18 -1No
eachUpper steel structure
H446X199X8X12
DECL-T-001-U1-114N5134-19/35
Upper steel structure HM582X300X12X17
DECL-T-001-U1-114N5138-3/25
UPPER STRUCTURE HN200X100X5.5X8
DECL-T-001-U1-114N5138-9/25
UPPER STRUCTURE HN446X199X8X12
UPPER STRUCTURE HN300X150X6.5X9
DECL-T-001-U2-114N5111 - 35/39
JOINT PLATES, JP27 - 19NOS
DECL-T-001-U2-114N5111 - 36/39
JP39-16Nos, JP5-1No & JP13-1No
DECL-T-001-U2-114N5111 -37/39
JP49-16Nos & JP11-1No
DECL-T-001-U1-114N5611-020/242
PF Grating 114N5611- 16
DECL-T-001-U1-114N5611-148/242
PF Grating 114N5611 - 225
DECL-T-001-U1-114N5611-236/242
PF Grating 114N5611-踏步
DECL-T-001-U2-114N5621-095/248
PF Gratings 114N5621 - 269,
800X994X30
DECL-T-001-U2-114N5621-188/248
DECL-T-001-U2-114N5621-236/248
PF Grating 114N5621-踏步
800X214X30
DECL-T-001-U2-114N5621-248/248
PF Grating 114N5621-踏步
800X214X30
DECL-T-001-U1-114N562-2/2
GB/T5783-2000 Bolt M10X35 Gr8.8
GB/T95-2002 Washer Ø16
DECL-T-001-U2-114N562-2/2
GB/T5783-2000 Bolt M10X35 Gr8.8
DECL-T-001-U1-114N54-3/17
DECL-T-001-U1-114N54-5/17
BOLT - 169NOS, NUT - 201NOS & WASHER-213NOS
DECL-T-001-U1-114N54-10/17
DECL-T-001-U1-114N54-16/17
BOLT M24X65-105Nos, NUT M24 - 95Nos, Washer M24-100Nos
SHORTAGE MATERIAL for SHIPMENT NO : T1-8 IMIR NO-0108
For DECLMaterials checked and recieved
on behalf of BGRESLFor TPCIL
8th SHIPMENT SHORTAGE MATERIAL
Original Packing No DRAWING NO DescriptionQuantity(Nos) RECIEPT
REMARKSPacking no
SL NO Shortag
e qtyReceived
Shipment no
47
HS BOLT M16, M22 71
48
** indicates the material is received in good condition as packed.
DECL-T-001-U1-114N54-17/17
BOLT M22X65 - 44 NOS, NUT M22 - 51 NOS & WASHER -55 NOS
BOLT M16X50 - 3 NOS, NUT M16 - 3 NOS & WASHER -16 NOS
top related