bpm body machining

Post on 30-Dec-2015

19 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

DESCRIPTION

BPM Body. BPM Body & End Caps. Waveguide Transitions. BPM Body Machining. Main Cavity: Designed: Dia. 29.874 Tol: +0/-.015 Depth: 3.000 Tol: +0/-.015 Actuals: Dia: 29.859 Depth: 2.998/2.978 Ref Cavity: Designed: Dia. 23.476 Tol: +0/-.015 Depth: 2.000 Tol: +0/-.015 - PowerPoint PPT Presentation

TRANSCRIPT

Jan. 31, 2006RF BPM Status Review

1 L. Morrison

lhm@aps.anl.gov

BPM Body Machining

BPM Body & End Caps

BPM Body

Waveguide Transitions

Main Cavity: Designed: Dia. 29.874 Tol: +0/-.015 Depth: 3.000 Tol: +0/-.015

Actuals: Dia: 29.859 Depth: 2.998/2.978

Ref Cavity: Designed: Dia. 23.476 Tol: +0/-.015 Depth: 2.000 Tol: +0/-.015

Actuals: Dia.23.461 Depth: 2.011/1.998

Beam Path: Designed: 10.000 Tol: +/-.015

Actual: 9.995

Waveguide Ports: Designed: 3.00 x 19.05 Tol: +/-.08

Actuals: 3.004/2.972 : 3.002/2.985 and 19.009/19.005

Jan. 31, 2006RF BPM Status Review

2 L. Morrison

lhm@aps.anl.gov

Brazing

Test Braze Body & End Caps

50/50 Au/Cu Filler Metal

56/42/2 Ag/Cu/Ni Filler Metal

Jan. 31, 2006RF BPM Status Review

3 L. Morrison

lhm@aps.anl.gov

Windows Soldered Joint

RF Window Soldered to Transition

93%Sn/4.7%Ag/1.7%Cu Solder

Jan. 31, 2006RF BPM Status Review

4 L. Morrison

lhm@aps.anl.gov

Mechanical Supports

Ultra-Fine Adjustment Screws

Compound Adjustment Screws

Jan. 31, 2006RF BPM Status Review

5 L. Morrison

lhm@aps.anl.gov

BPM – Cold Test Assembly

Jan. 31, 2006RF BPM Status Review

6 L. Morrison

lhm@aps.anl.gov

Cold Test Fixturing

Initial Manual Set-up

Motorized High Precision Set-up

Jan. 31, 2006RF BPM Status Review

7 L. Morrison

lhm@aps.anl.gov

ITS Test

Jan. 31, 2006RF BPM Status Review

8 L. Morrison

lhm@aps.anl.gov

ITS Test

top related