Awning Replacement | Civic Design Review Phase 3 | May 18, 2015 Design- Bid- Build Project
Building 930
Oceanside Water Pollution Control Plant
Building Design and Construction
SF Deptartment of Public Works
BUILDING DESIGN & CONSTRUCTION
S.F. DEPARTMENT OF PUBLIC WORKSA R C H I T E C T U R E
2 Awning Replacement - Building 930
Design-Build Project Oceanside Water Pollution Control Plant
Civic Design Review Phase 3 May 18, 2015
Existing Site Aerial Image
Project Location Aerial MapOceanside Wastewater
Treatment Plant
BUILDING DESIGN & CONSTRUCTION
S.F. DEPARTMENT OF PUBLIC WORKSA R C H I T E C T U R E
3 Awning Replacement - Building 930
Design-Build Project Oceanside Water Pollution Control Plant
Civic Design Review Phase 3 May 18, 2015
Project Description
CANOPY DESIGN CRITERIA
The goal of this project is to maintain the identity, character, and dimensional integrity of original awning design. The new awning will replace corroded carbon steel frame and defunct glass block cover with stainless steel framing and plastic glazing for increased corrosion resistivity, safety, and rain barrier to the building pedestrian access areas.
Replace corroded steel frame and glass block canopy assembly at second fl oor of building 930, and add a new canopy at main en-trance at fi rst fl oor.
Canopy at second fl oor shall follow the same design concept, dimensions, and suspended structural support engineered to with-stand weight, seismic and uplift and related loads using same design system concept as existing.
New canopy at entrance shall be inspired on the second fl oor canopy replacment for a unifi ed design.
New metal frames, metal plates, tabs, bracing, fasteners, and rod connections supports shall consist of Duplex Stainless Steel 2205 to withstand the corrossive environment of the coastal/marine zone while providing highier strength of the metal.
Cover shall consist of lightweight transluscent point supported Polytcarbonate panels to provide provide protection against rain and condensation, shade to the interior spaces to avoid glare.
The profi le of the canopy replacement shall slop back to the existing concrete wall and shall be equipped with gutter to drain into the existing drain ports. New metal gutter shall possess the same corrossion resistivity as the new metal frame.
New Canopy at fi rst fl oor entrance shall slope away from building with no gutter at front.
BUILDING DESIGN & CONSTRUCTION
S.F. DEPARTMENT OF PUBLIC WORKSA R C H I T E C T U R E
4 Awning Replacement - Building 930
Design-Build Project Oceanside Water Pollution Control Plant
Civic Design Review Phase 3 May 18, 2015
Existing Building Elevation
BUILDING DESIGN & CONSTRUCTION
S.F. DEPARTMENT OF PUBLIC WORKSA R C H I T E C T U R E
5 Awning Replacement - Building 930
Design-Build Project Oceanside Water Pollution Control Plant
Civic Design Review Phase 3 May 18, 2015
Existing Awning at Second Level Looking North-
BUILDING DESIGN & CONSTRUCTION
S.F. DEPARTMENT OF PUBLIC WORKSA R C H I T E C T U R E
6 Awning Replacement - Building 930
Design-Build Project Oceanside Water Pollution Control Plant
Civic Design Review Phase 3 May 18, 2015
Existing Awning
Existing BuildingEntrance
BUILDING DESIGN & CONSTRUCTION
S.F. DEPARTMENT OF PUBLIC WORKSA R C H I T E C T U R E
7 Awning Replacement - Building 930
Design-Build Project Oceanside Water Pollution Control Plant
Civic Design Review Phase 3 May 18, 2015
Existing South Elevation and Roof Plan
BUILDING DESIGN & CONSTRUCTION
S.F. DEPARTMENT OF PUBLIC WORKSA R C H I T E C T U R E
8 Awning Replacement - Building 930
Design-Build Project Oceanside Water Pollution Control Plant
Civic Design Review Phase 3 May 18, 2015
New Awning South Elevation and Roof Plan
BUILDING DESIGN & CONSTRUCTION
S.F. DEPARTMENT OF PUBLIC WORKSA R C H I T E C T U R E
9 Awning Replacement - Building 930
Design-Build Project Oceanside Water Pollution Control Plant
Civic Design Review Phase 3 May 18, 2015
. Existing and New Awning Sections
PROPOSED - AWNINGPROPOSED - AWNINGEXISTING -AWNING SECTION
BUILDING DESIGN & CONSTRUCTION
S.F. DEPARTMENT OF PUBLIC WORKSA R C H I T E C T U R E
10 Awning Replacement - Building 930
Design-Build Project Oceanside Water Pollution Control Plant
Civic Design Review Phase 3 May 18, 2015
New Awning Perspective
BUILDING DESIGN & CONSTRUCTION
S.F. DEPARTMENT OF PUBLIC WORKSA R C H I T E C T U R E
11 Awning Replacement - Building 930
Design-Build Project Oceanside Water Pollution Control Plant
Civic Design Review Phase 3 May 18, 2015
New Awning Perspective
BUILDING DESIGN & CONSTRUCTION
S.F. DEPARTMENT OF PUBLIC WORKSA R C H I T E C T U R E
12 Awning Replacement - Building 930
Design-Build Project Oceanside Water Pollution Control Plant
Civic Design Review Phase 3 May 18, 2015
New Awning at Main Entrance
BUILDING DESIGN & CONSTRUCTION
S.F. DEPARTMENT OF PUBLIC WORKSA R C H I T E C T U R E
13 Awning Replacement - Building 930
Design-Build Project Oceanside Water Pollution Control Plant
Civic Design Review Phase 3 May 18, 2015
Street Level View
top related