awning replacement civic design review phase 3 · and condensation, shade to the interior spaces to...

13
Awning Replacement | Civic Design Review Phase 3 | May 18, 2015 Design- Bid- Build Project Building 930 Oceanside Water Pollution Control Plant Building Design and Construction SF Deptartment of Public Works

Upload: others

Post on 22-Jun-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Awning Replacement Civic Design Review Phase 3 · and condensation, shade to the interior spaces to avoid glare. The profi le of the canopy replacement shall slop back to the existing

Awning Replacement | Civic Design Review Phase 3 | May 18, 2015 Design- Bid- Build Project

Building 930

Oceanside Water Pollution Control Plant

Building Design and Construction

SF Deptartment of Public Works

Page 2: Awning Replacement Civic Design Review Phase 3 · and condensation, shade to the interior spaces to avoid glare. The profi le of the canopy replacement shall slop back to the existing

BUILDING DESIGN & CONSTRUCTION

S.F. DEPARTMENT OF PUBLIC WORKSA R C H I T E C T U R E

2 Awning Replacement - Building 930

Design-Build Project Oceanside Water Pollution Control Plant

Civic Design Review Phase 3 May 18, 2015

Existing Site Aerial Image

Project Location Aerial MapOceanside Wastewater

Treatment Plant

Page 3: Awning Replacement Civic Design Review Phase 3 · and condensation, shade to the interior spaces to avoid glare. The profi le of the canopy replacement shall slop back to the existing

BUILDING DESIGN & CONSTRUCTION

S.F. DEPARTMENT OF PUBLIC WORKSA R C H I T E C T U R E

3 Awning Replacement - Building 930

Design-Build Project Oceanside Water Pollution Control Plant

Civic Design Review Phase 3 May 18, 2015

Project Description

CANOPY DESIGN CRITERIA

The goal of this project is to maintain the identity, character, and dimensional integrity of original awning design. The new awning will replace corroded carbon steel frame and defunct glass block cover with stainless steel framing and plastic glazing for increased corrosion resistivity, safety, and rain barrier to the building pedestrian access areas.

Replace corroded steel frame and glass block canopy assembly at second fl oor of building 930, and add a new canopy at main en-trance at fi rst fl oor.

Canopy at second fl oor shall follow the same design concept, dimensions, and suspended structural support engineered to with-stand weight, seismic and uplift and related loads using same design system concept as existing.

New canopy at entrance shall be inspired on the second fl oor canopy replacment for a unifi ed design.

New metal frames, metal plates, tabs, bracing, fasteners, and rod connections supports shall consist of Duplex Stainless Steel 2205 to withstand the corrossive environment of the coastal/marine zone while providing highier strength of the metal.

Cover shall consist of lightweight transluscent point supported Polytcarbonate panels to provide provide protection against rain and condensation, shade to the interior spaces to avoid glare.

The profi le of the canopy replacement shall slop back to the existing concrete wall and shall be equipped with gutter to drain into the existing drain ports. New metal gutter shall possess the same corrossion resistivity as the new metal frame.

New Canopy at fi rst fl oor entrance shall slope away from building with no gutter at front.

Page 4: Awning Replacement Civic Design Review Phase 3 · and condensation, shade to the interior spaces to avoid glare. The profi le of the canopy replacement shall slop back to the existing

BUILDING DESIGN & CONSTRUCTION

S.F. DEPARTMENT OF PUBLIC WORKSA R C H I T E C T U R E

4 Awning Replacement - Building 930

Design-Build Project Oceanside Water Pollution Control Plant

Civic Design Review Phase 3 May 18, 2015

Existing Building Elevation

Page 5: Awning Replacement Civic Design Review Phase 3 · and condensation, shade to the interior spaces to avoid glare. The profi le of the canopy replacement shall slop back to the existing

BUILDING DESIGN & CONSTRUCTION

S.F. DEPARTMENT OF PUBLIC WORKSA R C H I T E C T U R E

5 Awning Replacement - Building 930

Design-Build Project Oceanside Water Pollution Control Plant

Civic Design Review Phase 3 May 18, 2015

Existing Awning at Second Level Looking North-

Page 6: Awning Replacement Civic Design Review Phase 3 · and condensation, shade to the interior spaces to avoid glare. The profi le of the canopy replacement shall slop back to the existing

BUILDING DESIGN & CONSTRUCTION

S.F. DEPARTMENT OF PUBLIC WORKSA R C H I T E C T U R E

6 Awning Replacement - Building 930

Design-Build Project Oceanside Water Pollution Control Plant

Civic Design Review Phase 3 May 18, 2015

Existing Awning

Existing BuildingEntrance

Page 7: Awning Replacement Civic Design Review Phase 3 · and condensation, shade to the interior spaces to avoid glare. The profi le of the canopy replacement shall slop back to the existing

BUILDING DESIGN & CONSTRUCTION

S.F. DEPARTMENT OF PUBLIC WORKSA R C H I T E C T U R E

7 Awning Replacement - Building 930

Design-Build Project Oceanside Water Pollution Control Plant

Civic Design Review Phase 3 May 18, 2015

Existing South Elevation and Roof Plan

Page 8: Awning Replacement Civic Design Review Phase 3 · and condensation, shade to the interior spaces to avoid glare. The profi le of the canopy replacement shall slop back to the existing

BUILDING DESIGN & CONSTRUCTION

S.F. DEPARTMENT OF PUBLIC WORKSA R C H I T E C T U R E

8 Awning Replacement - Building 930

Design-Build Project Oceanside Water Pollution Control Plant

Civic Design Review Phase 3 May 18, 2015

New Awning South Elevation and Roof Plan

Page 9: Awning Replacement Civic Design Review Phase 3 · and condensation, shade to the interior spaces to avoid glare. The profi le of the canopy replacement shall slop back to the existing

BUILDING DESIGN & CONSTRUCTION

S.F. DEPARTMENT OF PUBLIC WORKSA R C H I T E C T U R E

9 Awning Replacement - Building 930

Design-Build Project Oceanside Water Pollution Control Plant

Civic Design Review Phase 3 May 18, 2015

. Existing and New Awning Sections

PROPOSED - AWNINGPROPOSED - AWNINGEXISTING -AWNING SECTION

Page 10: Awning Replacement Civic Design Review Phase 3 · and condensation, shade to the interior spaces to avoid glare. The profi le of the canopy replacement shall slop back to the existing

BUILDING DESIGN & CONSTRUCTION

S.F. DEPARTMENT OF PUBLIC WORKSA R C H I T E C T U R E

10 Awning Replacement - Building 930

Design-Build Project Oceanside Water Pollution Control Plant

Civic Design Review Phase 3 May 18, 2015

New Awning Perspective

orecinos
Callout
typical uplift bracing added
orecinos
Line
Page 11: Awning Replacement Civic Design Review Phase 3 · and condensation, shade to the interior spaces to avoid glare. The profi le of the canopy replacement shall slop back to the existing

BUILDING DESIGN & CONSTRUCTION

S.F. DEPARTMENT OF PUBLIC WORKSA R C H I T E C T U R E

11 Awning Replacement - Building 930

Design-Build Project Oceanside Water Pollution Control Plant

Civic Design Review Phase 3 May 18, 2015

New Awning Perspective

Page 12: Awning Replacement Civic Design Review Phase 3 · and condensation, shade to the interior spaces to avoid glare. The profi le of the canopy replacement shall slop back to the existing

BUILDING DESIGN & CONSTRUCTION

S.F. DEPARTMENT OF PUBLIC WORKSA R C H I T E C T U R E

12 Awning Replacement - Building 930

Design-Build Project Oceanside Water Pollution Control Plant

Civic Design Review Phase 3 May 18, 2015

New Awning at Main Entrance

orecinos
Callout
typical uplift bracing added
orecinos
Line
Page 13: Awning Replacement Civic Design Review Phase 3 · and condensation, shade to the interior spaces to avoid glare. The profi le of the canopy replacement shall slop back to the existing

BUILDING DESIGN & CONSTRUCTION

S.F. DEPARTMENT OF PUBLIC WORKSA R C H I T E C T U R E

13 Awning Replacement - Building 930

Design-Build Project Oceanside Water Pollution Control Plant

Civic Design Review Phase 3 May 18, 2015

Street Level View