Well Head
1 Grading and Site Drainage Plan and Details (Optional)
2 Foundation Layouts
3 Pipe Supports / Pipe Rack Structures Details Drawings
4 Pipe crossover Structural Details
5 Pipe Support Platforms Structural Detail Drawings
6 Pipe Supports/Pipe Rack/Pipe Sleepers/Pipe Crossover & etc. Foundation Detail Drawings
7 Corrosion Inhibitor Package Foundation Detail Drawing
8 Instrument Gas Scrubber Foundation Details Drawing
9 RTU Panel / WHCP Foundation Detail Drawings
10 Foundation Detail Drawing for Knockout Drum at WHSF
11 Fencing and Gates Details Drawings
Valve Assembly
12 Pipe support steel structure details
TIE IN AT CPF/GPF
13 Foundation layouts for Tie in points in GPF/CPF
14 Thrust slab details for road crossing at CPF/GPF
15 Pig Reciever Foundation details
Remarks2 I-N Combine activity
1816
88
Pipe Supports/Pipe Rack/Pipe Sleepers/Pipe Crossover & etc. Foundation Detail Drawings 48 I-N Combine activity8888 N Combine activity
6
24 I-N Combine activity28