activity for new project

2
Well Head 1 Grading and Site Drainage Plan and Details (Optional) 2 Foundation Layouts 3 Pipe Supports / Pipe Rack Structures Details Drawings 4 Pipe crossover Structural Details 5 Pipe Support Platforms Structural Detail Drawings 6 Pipe Supports/Pipe Rack/Pipe Sleepers/Pipe Crossover & etc. Founda 7 Corrosion Inhibitor Package Foundation Detail Drawing 8 Instrument Gas Scrubber Foundation Details Drawing 9 RTU Panel / WHCP Foundation Detail Drawings 10 Foundation Detail Drawing for Knockout Drum at WHSF 11 Fencing and Gates Details Drawings Valve Assembly 12 Pipe support steel structure details TIE IN AT CPF/GPF 13 Foundation layouts for Tie in points in GPF/CPF 14 Thrust slab details for road crossing at CPF/GPF 15 Pig Reciever Foundation details

Upload: g4gohar

Post on 12-Dec-2015

213 views

Category:

Documents


0 download

DESCRIPTION

1

TRANSCRIPT

Page 1: Activity for New Project

Well Head

1 Grading and Site Drainage Plan and Details (Optional)

2 Foundation Layouts

3 Pipe Supports / Pipe Rack Structures Details Drawings

4 Pipe crossover Structural Details

5 Pipe Support Platforms Structural Detail Drawings

6 Pipe Supports/Pipe Rack/Pipe Sleepers/Pipe Crossover & etc. Foundation Detail Drawings

7 Corrosion Inhibitor Package Foundation Detail Drawing

8 Instrument Gas Scrubber Foundation Details Drawing

9 RTU Panel / WHCP Foundation Detail Drawings

10 Foundation Detail Drawing for Knockout Drum at WHSF

11 Fencing and Gates Details Drawings

Valve Assembly

12 Pipe support steel structure details

TIE IN AT CPF/GPF

13 Foundation layouts for Tie in points in GPF/CPF

14 Thrust slab details for road crossing at CPF/GPF

15 Pig Reciever Foundation details

Page 2: Activity for New Project

Remarks2 I-N Combine activity

1816

88

Pipe Supports/Pipe Rack/Pipe Sleepers/Pipe Crossover & etc. Foundation Detail Drawings 48 I-N Combine activity8888 N Combine activity

6

24 I-N Combine activity28