18 sureshrege mailhem 101209

Post on 24-Dec-2015

216 Views

Category:

Documents

2 Downloads

Preview:

Click to see full reader

DESCRIPTION

h

TRANSCRIPT

Biogas PlantsBiogas Plants

MAILHEM ENGINEERS PVT. LTD.MAILHEM ENGINEERS PVT. LTD.PunePune

Lt Col (Retd.) Suresh Rege,Lt Col (Retd.) Suresh Rege,ChairmanChairman

IN SANSKRIT

MAIL is WASTE

HEM is GOLD

We are in the business of

CONVERTING WASTE TO GOLD

MAILHEM GROUP

ISO 9001:2000

We are the only

ISO 9001:2000 Certified Company

in Waste Management – Biogas Plants

in India.

MAILHEM EXPERTISERESIDENTIAL BIOGAS PLANTS

• KITCHEN WASTE• SEWAGE WASTE WATER (Grey Water)• COMBINED SEWAGE (Grey Water) & KITCHEN

INDUSTRIAL BIOGAS PLANTS• CANTEEN WASTE• FOOD PROCESSING WASTE• LEATHER SHAVINGS WASTE• POULTRY WASTE• SLAUGHTER HOUSE WASTE • COMBINED SEWAGE (Grey Water) AND CANTEEN

WASTE• DAIRY EFFLUENT • STARCH EFFLUENT

MAILHEM EXPERTISE contd…

MUNICIPAL/MIXED SOLID WASTE BASED WASTE TO ENERGY PROJECTS

MIXED WASTE FROM:-• VEGETABLE MARKET YARD• FRUIT & FLOWER MARKET • ANIMAL DROPPINGS• LARGE HOTELS AND INDUSTRIAL CANTEEN• UNIQUE COMBINED SEWAGE AND MSW

TREATMENT PLANTS FOR MUNICIPAL BODIES

Delhi

Bangalore

Thiruvanthapuram

Biogas Plants by Mailhem

EXISTING MANDATES

Pune

Ahmedabad

Mangalore

Mumbai

*Map not to scale

GoaHyderabad

Vijayawada

Chennai

Dewas

Nashik

Sirohi

Cochin

Ranchi

Rewa

Belgaum

PROJECTS EXECUTED AT……

Pune Delhi Chennai Indore Ranchi Mahabaleshwar Agra Trivandrum

Ahmedabad Hyderabad Vijayawada Bangalore Mangalore Panji Belgaum Cochin

Nashik Satara Rajnandgaon Sirohi, Rajasthan Amravati Solapur Ahmednagar Nadiad, Gujarat

BIOMETHANATIONBIOMETHANATION

(BIOGAS PLANTS)(BIOGAS PLANTS)

BAJAJ AUTO LTD., AKURDI, PUNE, MAHARASHTRA

1998-99Year3.

Cooking in Canteen

End Use6.4 yearsPayback Period5.Rs. 6.4 LacProject Cost4.

60 Sq.mArea2.500 kg/dayCapacity1.

MTR FOODS LTD., MANGALORE, KARNATAKA

2005-06Year3.

Cooking in Canteen

End Use6.4.0 yearsPayback Period5.12 LacProject Cost4.

100 Sq.mArea2.500 kg/dayCapacity1.

MAGARPATTA CITY, PUNE, MAHARASHTRA

2005-06Year3.

Power Generation and Cooking

End Use6.3.8 YearsPayback Period5.19.25 LacProject Cost4.

160 Sq.mArea2.2000 kg/dayCapacity1.

HSBC SOFTWARE SOLUTIONS, PUNE, MAHARASHTRA

2007-08Year3.

Cooking in Canteen on 7th

Floor

End Use6.5.2 yearsPayback Period5.4.8 LacProject Cost4.

9 Sq.m.Area2.100 kg/dayCapacity1.

ZYDUS CADILA, AHMEDABAD, GUJARAT

2007-08year3.

Cooking in Canteen

End Use6.4.1 yearsPayback Period5.12.71 LacProject Cost4.

82 Sq.mArea2.300 kg/dayCapacity1.

MANGALORE REFINERIES & PETROCHEMICALS LTD., MANGALORE, KARNATAKA

2007-08Year3.

Cooking in Canteen at a distance of approx. 0.8 km

End Use6.3.4 yearsPayback Period5.Rs. 35.54 LacProject Cost4.

100 Sq.mArea2.1000 kg/dayCapacity1.

WIPRO TECHNOLOGIES LTD., BANGALORE, KARNATAKA

2007-08Year3.

Cooking in Canteen

End Use6.3.5 yearsPayback Period5.Rs. 47.72 LacProject Cost4.

260 Sq.mArea2.3000 kg/dayCapacity1.

Laketown Developers, Pune

2008-09Year3.

Cooking in canteen

End Use6.4.2 yearsPayback Period5.Rs. 15.41 LacProject Cost4.

55 Sq.mArea2.600 kg/dayCapacity1.

Ready to Install Ready to Install Package Biogas PlantPackage Biogas Plant

FLOWSHEET

Biogas Storage (Balloon type holder)

Biogas for Use / Flare

Shredder / Crusher

Inlet Chamber

Mailhem™ Anaerobic Digester

Periodic Sludge Removal

Recycle

Overflow(liquid discharge)

Food / Kitchen WasteFresh Water

Package Biogas Plant

Package Biogas Plant

Salient Features of Package Biogas Plant

13.0 Lac

9.0 Lac

6.0 Lac

BasePrice*

Quantity of Food waste (kg/day)

Equivalent LPG

(kg/month)

Biomanure(ton/annum)

Area(sq.ft)

150 130 - 140 5 150

300 260 - 280 10 300

500 440 - 470 17 350

*These prices are subject to change depending upon site conditions and constraints.

Advantages of Package Biogas Plant over Conventional Biogas Plants

No civil construction required.

Pre assembled & factory tested, hence can be installed &

commissioned immediately.

Very Compact, hence conservation of space. Only one trained operator is required. Can be installed in the basement, parking area or even on the

terraces - if structure can take the load.

Easy to relocate, if required.

Saving in power consumption.

Modular type, hence capacity enhancement is possible.

Requirements for Installing Package Biogas Plant from Client -

Plain level platform which can take up a load of nearly

15 ton.

Additional biogas storage if required can be made

available.

Biogas Plant Installation Cost to UserBiogas Plant Installation Cost to User

Our Society(approx. 300 flats)

If treated

If not treated

• Savings in Transportation

• Biogas

• Biomanure

Cost of Biogas Plant

Rs. 8 Lac

Waste Generation

Cost per FlatRs. 3000/-

Ways & Means of PromotionWays & Means of Promotion

Capital Subsidy from Ministry of New and Renewable Energy.

Mandatory inhouse treatment of organic waste for large

housing societies, educational institutions, large hotels and

marriage halls.

Offer 5% rebate on property tax as incentives to the above

clients.

Soft Loans and/or Interest Subsidy should be given.

Note: It must be ensured that suppliers & client sign minimum 5 years Operation & Maintenance contract for smooth running of plant.

Benefits to Urban Local BodiesBenefits to Urban Local Bodies

Savings in collection & transportation cost of Municipal

solid Wastes.

Avoid double handling, thus further saving in manpower

and transport.

Reduced burden on Landfills.

Mitigation of Green House Gas emissions.

Mailhem Engineers Pvt. Ltd.Mailhem Engineers Pvt. Ltd.#401, Abhinav Sankul, 4th Floor, ITI Road, #401, Abhinav Sankul, 4th Floor, ITI Road, Aundh, Pune Aundh, Pune –– 411 007, Maharashtra, INDIA411 007, Maharashtra, INDIA

Tel : +91Tel : +91--2020--25880301, Fax : +9125880301, Fax : +91--2020--2588030225880302Email : marketing@mailhem.com Email : marketing@mailhem.com

URL : www.mailhem.comURL : www.mailhem.com

Contact Details

THANK YOU !

top related