18 sureshrege mailhem 101209
DESCRIPTION
hTRANSCRIPT
Biogas PlantsBiogas Plants
MAILHEM ENGINEERS PVT. LTD.MAILHEM ENGINEERS PVT. LTD.PunePune
Lt Col (Retd.) Suresh Rege,Lt Col (Retd.) Suresh Rege,ChairmanChairman
IN SANSKRIT
MAIL is WASTE
HEM is GOLD
We are in the business of
CONVERTING WASTE TO GOLD
MAILHEM GROUP
ISO 9001:2000
We are the only
ISO 9001:2000 Certified Company
in Waste Management – Biogas Plants
in India.
MAILHEM EXPERTISERESIDENTIAL BIOGAS PLANTS
• KITCHEN WASTE• SEWAGE WASTE WATER (Grey Water)• COMBINED SEWAGE (Grey Water) & KITCHEN
INDUSTRIAL BIOGAS PLANTS• CANTEEN WASTE• FOOD PROCESSING WASTE• LEATHER SHAVINGS WASTE• POULTRY WASTE• SLAUGHTER HOUSE WASTE • COMBINED SEWAGE (Grey Water) AND CANTEEN
WASTE• DAIRY EFFLUENT • STARCH EFFLUENT
MAILHEM EXPERTISE contd…
MUNICIPAL/MIXED SOLID WASTE BASED WASTE TO ENERGY PROJECTS
MIXED WASTE FROM:-• VEGETABLE MARKET YARD• FRUIT & FLOWER MARKET • ANIMAL DROPPINGS• LARGE HOTELS AND INDUSTRIAL CANTEEN• UNIQUE COMBINED SEWAGE AND MSW
TREATMENT PLANTS FOR MUNICIPAL BODIES
Delhi
Bangalore
Thiruvanthapuram
Biogas Plants by Mailhem
EXISTING MANDATES
Pune
Ahmedabad
Mangalore
Mumbai
*Map not to scale
GoaHyderabad
Vijayawada
Chennai
Dewas
Nashik
Sirohi
Cochin
Ranchi
Rewa
Belgaum
PROJECTS EXECUTED AT……
Pune Delhi Chennai Indore Ranchi Mahabaleshwar Agra Trivandrum
Ahmedabad Hyderabad Vijayawada Bangalore Mangalore Panji Belgaum Cochin
Nashik Satara Rajnandgaon Sirohi, Rajasthan Amravati Solapur Ahmednagar Nadiad, Gujarat
BIOMETHANATIONBIOMETHANATION
(BIOGAS PLANTS)(BIOGAS PLANTS)
BAJAJ AUTO LTD., AKURDI, PUNE, MAHARASHTRA
1998-99Year3.
Cooking in Canteen
End Use6.4 yearsPayback Period5.Rs. 6.4 LacProject Cost4.
60 Sq.mArea2.500 kg/dayCapacity1.
MTR FOODS LTD., MANGALORE, KARNATAKA
2005-06Year3.
Cooking in Canteen
End Use6.4.0 yearsPayback Period5.12 LacProject Cost4.
100 Sq.mArea2.500 kg/dayCapacity1.
MAGARPATTA CITY, PUNE, MAHARASHTRA
2005-06Year3.
Power Generation and Cooking
End Use6.3.8 YearsPayback Period5.19.25 LacProject Cost4.
160 Sq.mArea2.2000 kg/dayCapacity1.
HSBC SOFTWARE SOLUTIONS, PUNE, MAHARASHTRA
2007-08Year3.
Cooking in Canteen on 7th
Floor
End Use6.5.2 yearsPayback Period5.4.8 LacProject Cost4.
9 Sq.m.Area2.100 kg/dayCapacity1.
ZYDUS CADILA, AHMEDABAD, GUJARAT
2007-08year3.
Cooking in Canteen
End Use6.4.1 yearsPayback Period5.12.71 LacProject Cost4.
82 Sq.mArea2.300 kg/dayCapacity1.
MANGALORE REFINERIES & PETROCHEMICALS LTD., MANGALORE, KARNATAKA
2007-08Year3.
Cooking in Canteen at a distance of approx. 0.8 km
End Use6.3.4 yearsPayback Period5.Rs. 35.54 LacProject Cost4.
100 Sq.mArea2.1000 kg/dayCapacity1.
WIPRO TECHNOLOGIES LTD., BANGALORE, KARNATAKA
2007-08Year3.
Cooking in Canteen
End Use6.3.5 yearsPayback Period5.Rs. 47.72 LacProject Cost4.
260 Sq.mArea2.3000 kg/dayCapacity1.
Laketown Developers, Pune
2008-09Year3.
Cooking in canteen
End Use6.4.2 yearsPayback Period5.Rs. 15.41 LacProject Cost4.
55 Sq.mArea2.600 kg/dayCapacity1.
Ready to Install Ready to Install Package Biogas PlantPackage Biogas Plant
FLOWSHEET
Biogas Storage (Balloon type holder)
Biogas for Use / Flare
Shredder / Crusher
Inlet Chamber
Mailhem™ Anaerobic Digester
Periodic Sludge Removal
Recycle
Overflow(liquid discharge)
Food / Kitchen WasteFresh Water
Package Biogas Plant
Package Biogas Plant
Salient Features of Package Biogas Plant
13.0 Lac
9.0 Lac
6.0 Lac
BasePrice*
Quantity of Food waste (kg/day)
Equivalent LPG
(kg/month)
Biomanure(ton/annum)
Area(sq.ft)
150 130 - 140 5 150
300 260 - 280 10 300
500 440 - 470 17 350
*These prices are subject to change depending upon site conditions and constraints.
Advantages of Package Biogas Plant over Conventional Biogas Plants
No civil construction required.
Pre assembled & factory tested, hence can be installed &
commissioned immediately.
Very Compact, hence conservation of space. Only one trained operator is required. Can be installed in the basement, parking area or even on the
terraces - if structure can take the load.
Easy to relocate, if required.
Saving in power consumption.
Modular type, hence capacity enhancement is possible.
Requirements for Installing Package Biogas Plant from Client -
Plain level platform which can take up a load of nearly
15 ton.
Additional biogas storage if required can be made
available.
Biogas Plant Installation Cost to UserBiogas Plant Installation Cost to User
Our Society(approx. 300 flats)
If treated
If not treated
• Savings in Transportation
• Biogas
• Biomanure
Cost of Biogas Plant
Rs. 8 Lac
Waste Generation
Cost per FlatRs. 3000/-
Ways & Means of PromotionWays & Means of Promotion
Capital Subsidy from Ministry of New and Renewable Energy.
Mandatory inhouse treatment of organic waste for large
housing societies, educational institutions, large hotels and
marriage halls.
Offer 5% rebate on property tax as incentives to the above
clients.
Soft Loans and/or Interest Subsidy should be given.
Note: It must be ensured that suppliers & client sign minimum 5 years Operation & Maintenance contract for smooth running of plant.
Benefits to Urban Local BodiesBenefits to Urban Local Bodies
Savings in collection & transportation cost of Municipal
solid Wastes.
Avoid double handling, thus further saving in manpower
and transport.
Reduced burden on Landfills.
Mitigation of Green House Gas emissions.
Mailhem Engineers Pvt. Ltd.Mailhem Engineers Pvt. Ltd.#401, Abhinav Sankul, 4th Floor, ITI Road, #401, Abhinav Sankul, 4th Floor, ITI Road, Aundh, Pune Aundh, Pune –– 411 007, Maharashtra, INDIA411 007, Maharashtra, INDIA
Tel : +91Tel : +91--2020--25880301, Fax : +9125880301, Fax : +91--2020--2588030225880302Email : [email protected] Email : [email protected]
URL : www.mailhem.comURL : www.mailhem.com
Contact Details
THANK YOU !