1/19. 2/19 wp6 conclusions 3/19 wp6 relation with other wps wp6 based on populated with delivered...

Post on 20-Jan-2016

216 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

1/19

2/19

WP6 Conclusions

3/19

WP6 relation with other WPs

WP6

based on

populated with delivered

through

using

addressing needs of

Scenarios

Tools

Specifications

WP2: Use Cases

WP5: KnowledgeResources

WP3: Communicationand Collaboration

Services

WP4: TenCompetence

Pilotsusing

for connectionwith

4/19

WP6 Internal Structure

designed with

playedin

use

T1: Units of Learning

T2: Authoring Tools T2: Runtime Engines

T3: Assessment Model

T4: Services ConnectionProtocol

T5: Usability Test

validatedthrough

validatedthrough

T6: UoL Quality Rating

assessedthrough

use

connectedwith

5/19

WP6 18M Open Issues

• Units of Learning (Scenarios)– Bridge with WP4 TenCompetence Pilots UPF– Bridge with WP5 Knowledge Resources Giunti

• Connection Protocol– Bridge with WP3 Services WHO + HOW?– Bridge with WP5 Tools Giunti

6/19

WP6 Action Plan until Jan. Meeting

• Each partner approve:– distribution of effort across WP6 tasks

• Each partner prepare:– description of 18m work for each task– a short presentation on WP6 involvement

• OUNL:– Prepare a briefing document on the Assessment Model (open problems

and/or problems occurred)

• UPF (as WP4 Leaders):– Prepare a briefing document for discussion on the Units of Learning

(Scenarios) requirements for the TenCompetence pilots

• CERTH:– Prepare an analytic task plan and timetable for 1st Year WP6 activities

with issues to be investigated, analyzed and solved

top related