1/19. 2/19 wp6 conclusions 3/19 wp6 relation with other wps wp6 based on populated with delivered...
TRANSCRIPT
1/19
2/19
WP6 Conclusions
3/19
WP6 relation with other WPs
WP6
based on
populated with delivered
through
using
addressing needs of
Scenarios
Tools
Specifications
WP2: Use Cases
WP5: KnowledgeResources
WP3: Communicationand Collaboration
Services
WP4: TenCompetence
Pilotsusing
for connectionwith
4/19
WP6 Internal Structure
designed with
playedin
use
T1: Units of Learning
T2: Authoring Tools T2: Runtime Engines
T3: Assessment Model
T4: Services ConnectionProtocol
T5: Usability Test
validatedthrough
validatedthrough
T6: UoL Quality Rating
assessedthrough
use
connectedwith
5/19
WP6 18M Open Issues
• Units of Learning (Scenarios)– Bridge with WP4 TenCompetence Pilots UPF– Bridge with WP5 Knowledge Resources Giunti
• Connection Protocol– Bridge with WP3 Services WHO + HOW?– Bridge with WP5 Tools Giunti
6/19
WP6 Action Plan until Jan. Meeting
• Each partner approve:– distribution of effort across WP6 tasks
• Each partner prepare:– description of 18m work for each task– a short presentation on WP6 involvement
• OUNL:– Prepare a briefing document on the Assessment Model (open problems
and/or problems occurred)
• UPF (as WP4 Leaders):– Prepare a briefing document for discussion on the Units of Learning
(Scenarios) requirements for the TenCompetence pilots
• CERTH:– Prepare an analytic task plan and timetable for 1st Year WP6 activities
with issues to be investigated, analyzed and solved