Form 1 Amendment in Environment Clearance for Group Housing Project “Sikka Kaamya Greens” At Plot No. GH-02B, Sec-10, Greater Noida West, U.P. Project Proponent: M/s Ecogreen Buildtech Pvt. Ltd. May 2017 2017 Prepared by: EQMS India Pvt. Ltd. 304-305, Rishabh Corporate Tower Community Centre, Karkardooma Delhi - 110092 Email: [email protected] Phone: +91 11 3000 3200 Fax: +91 11 2237 4775

Upload: others

Post on 27-May-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

FORM 1

Amendment in Environment Clearance for Group Housing Project “Sikka

Kaamya Greens” At Plot No. GH-02B, Sector-10, Greater Noida West,

Gautam Budh Nagar, U.P.

1

1 | P a g e

Form 1 Amendment in Environment Clearance

for Group Housing Project “Sikka Kaamya Greens”

At Plot No. GH-02B, Sec-10, Greater Noida

West, U.P.

Project Proponent:

M/s Ecogreen Buildtech Pvt. Ltd. May 2017

2017

Prepared by: EQMS India Pvt. Ltd. 304-305, Rishabh Corporate Tower Community Centre, Karkardooma Delhi - 110092 Email: [email protected] Phone: +91 11 3000 3200 Fax: +91 11 2237 4775

FORM 1

Amendment in Environment Clearance for Group Housing Project “Sikka

Kaamya Greens” At Plot No. GH-02B, Sector-10, Greater Noida West,

Gautam Budh Nagar, U.P.

1

M/s Ecogreen Buildtech Pvt. Ltd.

FORM- I

(I) Basic Information

S No. Item Details

1. Name of The Project Amendment in Environment Clearance for

Group Housing Project “Sikka Kaamya

Greens” at Plot No. GH-02B, Sector-10,

Greater Noida West, U.P.

2. S. No. in the Schedule 8 (a) Large Building & Construction Projects

3. Proposed capacity / area / length / tonnage

to be handled / command area / lease area

/ numbers of wells to be drilled.

Amendment

Plot Area: 22565.44 m2

FAR: 80611.95 m2

Built-up Area: 129847.64 m2

4. New / Expansion / Modernization Amendment in Environment Clearance

5. Existing Capacity / Area etc. Existing (As per EC accorded in 2009)

Plot Area: 22565.44 m2

FAR: 78920.49 m2

Built-up Area: 126862.27 m2

6. Category of Project i.e ‘A’ or ‘B’ A (SEIAA, U.P. is not formed after

dissolution in Feb, 2016)

7. Does it attract the general condition? If

yes, please specify.

No

8. Does it attract the specific condition? If

yes, please specify.

No

9. Location 28°34'8.39"N & 77°28'42.65"E

Plot / survey / Khasra No. GH-02B

Village Sector-10, Greater Noida West

Tehsil Bisrakh

District Gautam Budh Nagar

State Uttar Pradesh

10. Nearest railway station / airport along

with distance in kms.

Nearest railway station

Dadri railway Station (6.7 km, SE)

Ghaziabad Railway Station (10.0 km,

N)

Sec-71 proposed metro station (11.0

km, NW)

Nearest Airport

Indira Gandhi International Airport

(35 km, W)

11. Nearest Town, city, District headquarters

along with the distance in kms.

Nearest City

Site is located within Greater Noida

Ghaziabad (8.5 km, N)District

FORM 1

Amendment in Environment Clearance for Group Housing Project “Sikka

Kaamya Greens” At Plot No. GH-02B, Sector-10, Greater Noida West,

Gautam Budh Nagar, U.P.

2

M/s Ecogreen Buildtech Pvt. Ltd.

S No. Item Details

headquarter

12. Village Panchayats, Zilla Parishad,

Municipal Corporation, Local body

(complete postal address with telephone

nos. to be given)

Greater Noida Industrial Development

Authority

169 Chitvan Estate, Sector Gamma-II,

Greater Noida, Gautam Budh Nagar, Uttar

Pradesh-201308

Tel: 0120-2326150/51, 0120-2326335-7

Fax: 0120-2326143

E-mail: [email protected]

13. Name of the Applicant M/s Ecogreen Buildtech Pvt. Ltd.

14. Registered Address M/s Eco-green Buildtech Pvt. Ltd

38, C Block DDA Market, Surajmal Vihar,

Delhi-92

15. Address for correspondence

Name Suman Kumar Guha

Designation GM Planning

Address Sikka House, C-60, Preet Vihar, Vikas Marg,

Delhi-92

Pin Code 110092

E-mail [email protected]

Telephone No. 9650090989

Fax No. --

16. Details of Alternative Sites examined, if

any. Location of these sites should be

shown on a toposheet.

No

17. Interlinked Project No

18. Whether separate application of

interlinked projects has been submitted?

No

19. If yes, Date of submission Not applicable

20. If no, reason Not applicable

21. Whether the proposal involves

approval/clearance under if yes, details of

the same and their status to be given.)

a) The Forest (Conservation) Act, 1980?

b) The Wildlife (Protection) Act, 1972?

c) The C.R.Z Notification, 1991?

No

No

No

22. Whether there is any Government Order /

Policy relevant / relating to the site?

NBC guidelines

Greater Noida Building bye-laws

23. Forest land involved (hectares) Not involved

24. Whether there is any litigation pending

against the project and/or land in which

the project id proposed to be set up?

No

FORM 1

Amendment in Environment Clearance for Group Housing Project “Sikka

Kaamya Greens” At Plot No. GH-02B, Sector-10, Greater Noida West,

Gautam Budh Nagar, U.P.

3

M/s Ecogreen Buildtech Pvt. Ltd.

S No. Item Details

a) Name of the court

b) Case No.

c) Orders / directions of the Court, if

any, and its relevance with the

proposed project.

(II) Activity

1. Construction, operation or decommissioning of the Project involving actions, which will

cause physical changes in the locality (topography, land use, changes in water bodies,

etc.)

S.

No.

Information/Checklist

confirmation

Yes/

No

Details thereof (with approximate

quantities /rates, wherever possible) with

source of information data

1.1 Permanent or temporary

change in land use, land cover

or topography including

increase in intensity of land

use (with respect to local land

use plan)

No Land use of the project site is residential as

per the Master Plan of Greater Noida, 2021.

GNIDA has given the permission for

development of the project and accordingly

the plans were sanctioned in 2014. Plans are

re-submitted to GNIDA for approval as per

amendment

1.2 Clearance of existing land,

vegetation and buildings?

No Site did not support any vegetation

1.3 Creation of new land uses? No Land use of the project site is residential as

per the Master Plan of Greater Noida, 2021.

GNIDA has given the permission for

development of the project and accordingly

the plans were sanctioned in 2014. Plans are

re-submitted to GNIDA for approval as per

amendment

1.4 Preconstruction investigations

e.g. bore holes, soil testing?

No Soil investigation study and quality study has

already undertaken for the project and no soil

pollution is reported at the site.

1.5 Construction works?

Yes Project involves construction of residential

towers, commercial, community building and

support facilities. All activities are confined

to project site only.

Measures are and will be taken to minimize

the pollution and disturbance which may

result due to project during construction

phase as per the EMP submitted for the

project.

1.6 Demolition works? No No demolition is involved. Temporary

structures like shed for guard and material

storage etc will be dismantled after

FORM 1

Amendment in Environment Clearance for Group Housing Project “Sikka

Kaamya Greens” At Plot No. GH-02B, Sector-10, Greater Noida West,

Gautam Budh Nagar, U.P.

4

M/s Ecogreen Buildtech Pvt. Ltd.

S.

No.

Information/Checklist

confirmation

Yes/

No

Details thereof (with approximate

quantities /rates, wherever possible) with

source of information data

completion of the construction of project

1.7 Temporary sites used for

construction works or housing

of construction workers?

No All the construction activity including

stocking of raw materials is and will be

confined within the project site only. No

temporary labor hutments are proposed.

Local labors from nearby area are hired. If

any hutment required, will be built within the

site, sanitation and other basic facilities are

developed at site for workers.

1.8 Above ground buildings,

structures or earthworks

including linear structures, cut

and fill or excavations

Yes Excavation is carried out for foundation of

buildings and basements. The total excavated

quantity of earth material is estimated to be

57774 m3. Excavated top soil is stored

separately and will be used for landscaping at

site. Remaining soil will be used for

landscaping, filling, leveling and road

construction.

1.9 Underground works including

mining or tunneling?

No No underground works including mining/

tunneling is required except excavation of

earth for basements and building foundation.

1.10 Reclamation works? No No reclamation work required.

1.11 Dredging? No No dredging required.

1.12 Offshore structures? No No offshore structure is required.

1.13 Production and manufacturing

processes?

No No production/manufacturing process

involved as the project is a group housing

project.

1.14 Facilities for storage of goods

or materials?

Yes Raw material is stored within the site in a

covered area. Cement is separately stored

under cover in bales. Sand is stacked neatly

under tarpaulin cover. Bricks and steel are

laid in open.

1.15 Facilities for treatment or

disposal of solid waste or

liquid effluents?

Yes Solid Waste:

Type of waste to be generated may vary with

the stage of development, i.e. construction

and operation. Details of waste generation

during construction and operation phase are

given below

Construction Waste:

Solid waste generated during construction

phase is majorly excavated materials, cement

bags, bricks, concrete, MS rods, tiles, wood

etc. Management plan for construction waste

FORM 1

Amendment in Environment Clearance for Group Housing Project “Sikka

Kaamya Greens” At Plot No. GH-02B, Sector-10, Greater Noida West,

Gautam Budh Nagar, U.P.

5

M/s Ecogreen Buildtech Pvt. Ltd.

S.

No.

Information/Checklist

confirmation

Yes/

No

Details thereof (with approximate

quantities /rates, wherever possible) with

source of information data

is given below Solid waste Solid waste Management

Waste

materials

like MS

Rods, bricks,

concrete,

broken tiles,

wood pieces,

cement bags

etc.

Material is segregated into

recyclable and rejects. Recyclable

material is sold to authorize

dealers. Remaining is sent for

disposal through government

authorized vendors on regular

basis.

Excavated

Soil

Top soil is stripped off and kept in

covered area and will be used for

landscaping in later stage.

Remaining soil will be used for

filling and road construction.

Remaining soil will be disposed off

at designated locations by GNIDA.

Domestic

waste

Domestic waste is composted in pit

within the site and the compost

may be used for landscaping later

Operational Phase:

The solid waste to be generated from project

during operation phase will be mainly

domestic in nature and the estimated quantity

of the waste is 2546 kg/day as per

amendment. Solid wastes generated will be

segregated into compostable, recyclable and

inert wastes. Compostable waste will be

composted in organic waste convertor within

the project site. Recyclable waste will be sold

to authorized vendors and inert waste will

disposed off through the local vendor hired

for waste management at site.

Liquid effluents:

During construction phase, sewage is

disposed through septic tanks & soak pits.

The sewage in operation phase will treated

up to tertiary level in STP proposed in the

project premises and is used in horticulture,

flushing & DG cooling purposes. Remaining

treated water can be used for construction

within the site or construction sites in nearby

areas or can be disposed off to the sewer.

1.16 Facilities for long term

housing of operational

workers?

No This is group housing project

FORM 1

Amendment in Environment Clearance for Group Housing Project “Sikka

Kaamya Greens” At Plot No. GH-02B, Sector-10, Greater Noida West,

Gautam Budh Nagar, U.P.

6

M/s Ecogreen Buildtech Pvt. Ltd.

S.

No.

Information/Checklist

confirmation

Yes/

No

Details thereof (with approximate

quantities /rates, wherever possible) with

source of information data

1.17 New road, rail or sea traffic

during construction or

operation?

Yes Traffic of 1013 ECS is expected to be

generated from the project site. No rail or sea

traffic will be generated from project site.

1.18 New road, rail, air waterborne

or other transport

infrastructure including new

or altered routes and stations,

ports, airports etc?

No Project site is well connected by roads.

Railway station and airport is also in

reachable limits. Thus no new road, rail, air

waterborne or other transport infrastructure

including new or altered routes and stations,

ports, airports is involved

1.19 Closure or diversion of

existing transport routes or

infrastructure leading to

changes in traffic movements?

No No closure or diversion of existing

transportation route or infrastructure will be

there.

1.20 New or diverted transmission

lines or pipelines?

No There will not be any new/diverted

transmission lines or pipelines around the

proposed project.

1.21 Impoundment, damming,

culverting, realignment or

other changes to the

hydrology of watercourses or

aquifers?

No No impoundment, damming, culverting,

realignment or other changes to the

hydrology of surface watercourses is

proposed.

1.22 Stream crossings? No There are no streams running across the site.

1.23 Abstraction or transfers of

water from ground or surface

waters?

Yes During construction phase approx. 30-50

KLD of water and During operation phase

after amendment, total water requirement is

462.2 KLD out of which 295 KLD is fresh

water requirement. Water will be supplied by

GNIDA

1.24 Changes in water bodies or

the land surface affecting

drainage or run-off?

Yes Runoff may increase due to increased paved

surface. However, increased runoff is

managed by well-designed storm water

management system at site. Excess run-off is

recharged to ground through rainwater

harvesting pits.

1.25 Transport of personnel or

materials for construction,

operation or

decommissioning?

Yes During the construction phase, about 10-15

trucks are estimated per week. Adequate

parking space within the project site for

loading and unloading of materials is

provided. Adequate parking space

(1013 ECS) is provided for residents and

visitors population estimated during

operation phase

FORM 1

Amendment in Environment Clearance for Group Housing Project “Sikka

Kaamya Greens” At Plot No. GH-02B, Sector-10, Greater Noida West,

Gautam Budh Nagar, U.P.

7

M/s Ecogreen Buildtech Pvt. Ltd.

S.

No.

Information/Checklist

confirmation

Yes/

No

Details thereof (with approximate

quantities /rates, wherever possible) with

source of information data

1.26 Long-term dismantling or

decommissioning or

restoration works?

No No Long term dismantling or

decommissioning or restoration works will

be involved.

1.27 Ongoing activity during

decommissioning which could

have an impact on the

environment?

No None

1.28 Influx of people to an area in

either temporarily or

permanently?

No Local laborers from nearby area are

employed during the construction phase. In

the operation phase, most of the expected

occupants are from the surrounding areas or

can be amongst the floating population

visiting the area on daily basis. Hence, the

project may lead to a redistribution of

occupants within the city and nearby areas.

Thus, no significant influx of people is

envisaged.

1.29 Introduction of alien species? No The landscaping will be carried out with

mainly local species with a few ornamental

varieties of flora that are well suited to the

local conditions.

1.30 Loss of native species or

genetic diversity?

No There is no significant impact on the native

species or genetic diversity.

1.31 Any other actions? No Not Applicable

2. Use of Natural resources for construction or operation of the Project (such as land, water,

materials or energy, especially any resources which are non-renewable or in short

supply):

SN Information/che

cklist

confirmation

Yes/N

o

Details thereof (with approximate quantities /rates,

wherever possible) with source of information data

2.1 Land especially

undeveloped or

agricultural land

(ha)

No Land use of the project site is residential as per the

Master Plan of Greater Noida, 2021. GNIDA has given

the permission for development of the project and

accordingly the plans were sanctioned in 2014. Plans are

re-submitted to GNIDA for approval as per amendment

2.2 Water (expected

source &

competing users)

unit: KLD

Yes Construction Phase:

Water requirement for construction phase is app. 30-50

KLD and source of water is treated water from CSTP of

GNIDA

Operation Phase:

During operation phase after amendment, total water

FORM 1

Amendment in Environment Clearance for Group Housing Project “Sikka

Kaamya Greens” At Plot No. GH-02B, Sector-10, Greater Noida West,

Gautam Budh Nagar, U.P.

8

M/s Ecogreen Buildtech Pvt. Ltd.

requirement is 462.2 KLD out of which 295 KLD is

fresh water requirement. Water will be supplied by

GNIDA

2.3 Minerals (MT) Yes Minerals such as sand and aggregates are required

during the construction phase.

2.4 Construction

material – stone,

aggregates, and /

soil (expected

source – MT)

Yes Construction material requirement for project is sand,

aggregates, steel, bricks, cement, sand etc. Construction

material is being sourced from authorized vendors

2.5 Forests and

timber (source –

MT)

Yes All material forests and timber are provided by selected

suppliers only for wood work at the project site.

However steel frames etc. are used to minimize the use

of timber.

2.6 Energy including

electricity and

fuels (source,

competing users)

Unit: fuel (MT),

energy (MW)

Yes Power requirement for the project is app. 7526.96 kVA

and will be sourced from NPCL. Two nos. transformers

of 2500 kVA and 1 no. transformer of 1600 kVA are

proposed to be provided.

Details of D.G Sets

Capacity of DG sets to be provided for power back-up is

3500 kVA (2 X 1500 kVA + 1 X 500 kVA)

2.7 Any other natural

resources (use

appropriate

standard units)

No Not Applicable

3. Use, storage, transport, handling or production of substances or materials, which could be

harmful to human health or the environment or raise concerns about actual or perceived

risks to human health.

SN Information/Checklist

confirmation

Yes

/No

Details thereof (with approximate

quantities/ rates, wherever possible) with

source of information data

3.1 Use of substances or materials,

which are hazardous (as per

MSIHC rules) to human health

or the environment (flora,

fauna, and water supplies)

Yes Diesel for DG sets is stored in HDPE drums

in earmarked locations. It shall also be

handled as per The Manufacture, Storage and

Import of Hazardous Chemical Rules, 1989

and Material Safety Data Sheet.

3.2 Changes in occurrence of

disease or affect disease vectors

(e.g. insect or water borne

diseases)

No Suitable drainage and waste management

measures (with frequent spray of insecticides

etc.) are adopted such that there is no

stagnation of water or accumulation of waste.

This effectively restrict the reproduction and

growth of disease vectors.

3.3 Affect the welfare of people e.g. Yes Socio-economic standard of people will

FORM 1

Amendment in Environment Clearance for Group Housing Project “Sikka

Kaamya Greens” At Plot No. GH-02B, Sector-10, Greater Noida West,

Gautam Budh Nagar, U.P.

9

M/s Ecogreen Buildtech Pvt. Ltd.

by changing living conditions? improve due to increased employment

opportunities and better living facility

provided by this project. This will lead to

better quality of life and will also set a

standard for future developments in the area.

3.4 Vulnerable groups of people

who could be affected by the

project e.g. hospital patients,

children, the elderly etc.

No Impacts of this type are not expected.

3.5 Any other causes No Not Applicable

4. Production of solid wastes during construction or operation or decommissioning

(MT/month)

SN Information/Checklist

confirmation

Yes

/No

Details thereof (with approximate

quantities/ rates, wherever possible) with

source of information data

4.1 Spoil, overburden or mine

wastes

No No such spoil, overburden or mine wastes

will be generated.

4.2 Municipal waste (domestic and

or commercial wastes)

Yes Total municipal waste estimated to be

generated from the project site after

amendment during operation phase is 2546.5

kg/day. Out of which 1527.9 kg/day is

compostable, 763.9 kg/day will be

recyclable waste and 254.7 kg/day will be

rejected fraction. Reject waste is disposed

off through local agency in the area.

4.3 Hazardous wastes (as per

Hazardous Waste Management

Rules)

Yes The hazardous waste along with other

wastes in the project is used oil from DG

sets.

Used oil from DG sets is stored in HDPE

drums in isolated covered facility. This used

oil will be sold to authorized recyclers.

4.4 Other industrial process wastes No Not Applicable

4.5 Surplus product No Not Applicable

4.6 Sewage sludge or other sludge

from effluent treatment

Yes 46.2 kg/day of sludge may be generated

when project will be at its full capacity. This

sludge can be treated, stabilized and used as

manure for landscaping.

4.7 Construction or demolition

wastes

Yes The construction waste consist of excess

earth and construction debris along with

cement bags, steel in bits and pieces,

insulating and packaging materials etc.

Excavated soil will be used for landfilling,

leveling and road construction within the

site.

Recyclable waste construction materials are

FORM 1

Amendment in Environment Clearance for Group Housing Project “Sikka

Kaamya Greens” At Plot No. GH-02B, Sector-10, Greater Noida West,

Gautam Budh Nagar, U.P.

10

M/s Ecogreen Buildtech Pvt. Ltd.

SN Information/Checklist

confirmation

Yes

/No

Details thereof (with approximate

quantities/ rates, wherever possible) with

source of information data

sold to recyclers. Unused and excess

construction debris are disposed at

designated places in tune with the local

norms.

4.8 Redundant machinery or

equipment

No Redundant machinery will not be used.

4.9 Contaminated soils or other

materials

No Contaminated soils or other materials will

not be generated.

4.10 Agricultural wastes Yes Landscape waste of 0.5 kg/day is generated.

4.11 Other solid wastes No Not Applicable

5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)

SN Information/Checklist

confirmation

Yes

/No

Details thereof (with approximate

quantities/ rates, wherever possible) with

source of information data

5.1 Emissions from combustion of

fossil fuels from stationary or

mobile sources

Yes The project does not envisage any major air

pollution sources except operation of DG sets

and vehicular traffic. High speed diesel with

low sulphur content is used as fuel in DG sets

which ensures minimal release of SO2. Stacks

are provided with DG sets to facilitate release

of emission above the buildings

5.2 Emissions from production

processes

No No production process is involved in this

project.

5.3 Emissions from material

handling including storage or

transport

Yes Dust emissions are envisaged during

transport and handling of construction

materials. Such emissions are temporary and

can be controlled by the use of water

sprinkling and other viable techniques like

covering of loose material.

5.4 Emissions from construction

activities including plant and

equipment.

Yes Dust emissions are envisaged due to

construction activities. These are restricted to

the construction phase and the construction

site only.

5.5 Dust or odor from handling of

materials including

construction materials, sewage

and waste

Yes Dust is anticipated during loading and

unloading of construction material and

excavation of upper earth surface. These are

however be temporary in nature, which will

be controlled by providing water sprinklers.

Tarpaulin cover is provided on stored loose

FORM 1

Amendment in Environment Clearance for Group Housing Project “Sikka

Kaamya Greens” At Plot No. GH-02B, Sector-10, Greater Noida West,

Gautam Budh Nagar, U.P.

11

M/s Ecogreen Buildtech Pvt. Ltd.

SN Information/Checklist

confirmation

Yes

/No

Details thereof (with approximate

quantities/ rates, wherever possible) with

source of information data

materials to reduce the dust emission.

5.6 Emissions from incineration of

waste

No No incineration of wastes is proposed.

5.7 Emissions from burning of

waste in open air (e.g. slash

materials, construction debris)

No Open burning of biomass/other material is

prohibited on site.

5.8 Emissions from any other

sources

No Not Applicable

6. Generation of Noise and Vibration, and Emissions of Light and Heat:

SN Information/ Checklist

confirmation

Yes/

No

Details thereof (with approximate

quantities/ rates, wherever possible) with

source of information data

6.1 From operation of equipment

e.g. engines, ventilation plant,

crushers

Yes Source of noise in the operational phase are

DG sets and pumps & motors. All the

machinery is of high standard of reputed

make and complies with standard i.e. DG

sets are provided with integral acoustic

enclosure in line with the GSR 371 dated

17th

May, 2002 by MOEF&CC.

6.2 From industrial or similar

processes

No No industrial processes will be carried out in

the project.

6.3 From construction or

demolition

Yes Due to various construction activities, there

are short-term noise impacts in the

immediate vicinity of the project site. The

construction activities include the following

noise generating activities:

Concrete mixing & operation of DG

sets.

Construction equipment operation

and heavy vehicle movement.

6.4 From blasting or piling No No blasting or mechanized piling will be

done.

6.5 From construction or

operational traffic

Yes Noise may be generated from vehicular

movement in the construction and

operational phase but that can be minimized

by taking mitigation measures. Measures

during construction phase includes

Noise mufflers within the construction

FORM 1

Amendment in Environment Clearance for Group Housing Project “Sikka

Kaamya Greens” At Plot No. GH-02B, Sector-10, Greater Noida West,

Gautam Budh Nagar, U.P.

12

M/s Ecogreen Buildtech Pvt. Ltd.

machinery & equipment

Acoustic enclosure with DG sets

Prohibiting honking at the site

Barricading the site

Noisy activities to be undertaken during

day time only

Measures during operation phase includes

Noise mufflers within the pumps &

motors and housing them in room

Acoustic enclosure with DG sets

Prohibiting honking at the site

Provision of green belt

6.6 From lighting or cooling

systems

No No significant noise impact will result from

lighting or cooling systems.

6.7 From any other sources No Not Applicable

7. Risks of contamination of land or water from releases of pollutants into the Ground or

into sewers, surface waters, groundwater, coastal waters or the sea:

SN Information/Checklist

confirmation

Yes

/No

Details thereof (with approximate

quantities/ rates, wherever possible) with

source of information data

7.1 From handling, storage, use or

spillage of hazardous materials

No The used oil from DG sets is carefully stored

in HDPE drums at isolated storage, and

periodically sold to authorized recyclers. All

precautions are being taken to avoid spillage

from storage as per The Hazardous & Other

Waste Rules, 2016.

7.2 From discharge of sewage or

other effluents to water or the

land (expected mode and place

of discharge)

No Sewage will be treated in STP proposed at

project site. No disposal will be there on land.

Treated sewage is reused to maximum extent

within the project site for flushing,

horticulture and road & DG Cooling.

Remaining treated sewage is discharged into

sewer.

7.3 By deposition of pollutants

emitted to air into the land or

into water

No The DG Sets are provided with stacks of

adequate height and are air cooled. Hence

dispersion is achieved and avoid deposition

of pollutants in significant concentrations at

any single location.

7.4 From any other sources No Not Applicable

FORM 1

Amendment in Environment Clearance for Group Housing Project “Sikka

Kaamya Greens” At Plot No. GH-02B, Sector-10, Greater Noida West,

Gautam Budh Nagar, U.P.

13

M/s Ecogreen Buildtech Pvt. Ltd.

SN Information/Checklist

confirmation

Yes

/No

Details thereof (with approximate

quantities/ rates, wherever possible) with

source of information data

7.5 Is there a risk of long term

build up of pollutants in the

environment from these

sources?

No Not Applicable

8. Risk of accidents during construction or operation of the Project, which could affect

human health or the environment

SN Information/Checklist

confirmation

Yes

/No

Details thereof (with approximate

quantities/ rates, wherever possible) with

source of information data

8.1 From explosions, spillages,

fires etc from storage,

handling, use or production of

hazardous substances

Yes Firefighting facility will be provided at the

project site in line with the NBC and local

fire rules. Fire fighting measures include wet

risers, hose reel, fire alarms, fire water tanks,

fire extinguishers, yard hydrants etc. NOC is

obtained from Fire Station Officer, Greater

Noida

8.2 From any other causes No Not Applicable

8.3 Could the project be affected

by natural disasters causing

environmental damage (e.g.

floods, earthquakes, landslides,

cloudburst etc)?

Yes The project falls under seismic active zone

IV indicating high damage risk zone. The

Buildings are designed as earthquake

resistant and comply with the required IS

specifications.

9. Factors which should be considered (such as consequential development) which could

lead to environmental effects or the potential for cumulative impacts with other existing

or planned activities in the locality

SN Information/Checklist

confirmation

Yes

/No

Details thereof (with approximate

quantities/ rates, wherever possible) with

source of information data

9.1 Lead to development of

supporting utilities, ancillary

development or development

stimulated by the project

which could have impact on

the environment e.g.:

Appropriate infrastructure like roads, power

supply, waste management and sewage

treatment plant are developed within the

project site.

• Supporting infrastructure

(roads, power supply, waste or

waste water treatment, etc.)

Yes Yes within the project site.

• Housing development Yes Group Housing

FORM 1

Amendment in Environment Clearance for Group Housing Project “Sikka

Kaamya Greens” At Plot No. GH-02B, Sector-10, Greater Noida West,

Gautam Budh Nagar, U.P.

14

M/s Ecogreen Buildtech Pvt. Ltd.

SN Information/Checklist

confirmation

Yes

/No

Details thereof (with approximate

quantities/ rates, wherever possible) with

source of information data

• Extractive industries No Not Applicable

• Supply industries No Not Applicable

• Other Yes Small commercial area and community

building

9.2 Lead to after-use of the site,

which could have an impact on

the environment

No Not Anticipated

9.3 Set a precedent for later

developments

Yes The project will provide good infrastructure

and better life style and will set an example

for later developments in the areas.

9.4 Have cumulative effects due to

proximity to other existing or

planned projects with similar

effects

No Not Anticipated

(III) Environmental Sensitivity

S.

No. Areas Name/ Identity

Aerial Distance

(Within 15 km from

proposed project

location boundary)

1 Areas protected under international

conventions, national or local

legislation for their ecological,

landscape, cultural or other related

value

None None within 15 km

radius

2 Areas which are important or sensitive

for ecological reasons -Wetlands,

watercourses or other water bodies,

coastal zone, biospheres, mountains,

forests

River Hindon 5.4 km, W

3 Areas used by protected, important or

sensitive species of flora or fauna for

breeding, nesting, foraging, resting,

over wintering, migration

None None within 15 km

radius

4 Inland, coastal, marine or underground

waters

Ground water Stage of ground water

development of block

is 74.64% and is in

safe zone

5 State, National boundaries Delhi-U.P.border 15 km, W

FORM 1

Amendment in Environment Clearance for Group Housing Project “Sikka

Kaamya Greens” At Plot No. GH-02B, Sector-10, Greater Noida West,

Gautam Budh Nagar, U.P.

15

M/s Ecogreen Buildtech Pvt. Ltd.

S.

No. Areas Name/ Identity

Aerial Distance

(Within 15 km from

proposed project

location boundary)

6 Routes or facilities used by the public

for access to recreation or other tourist,

pilgrim areas

24 m wide road

Vaidpura Link

Marg

130 m highway-

Greater Noida

NH-91

abuts site along

eastern boundary

(100 m, S)

(2.6 km, W)

(4.3 km, E)

7 Defense installations None None within 15 km

radius

8 Densely populated or built-up area Village Saini

Sector-16

Village Khairpur

Gurjar

Village Patwari

Village Milak

Lachhi

(600 m, SE)

(1.0 km, NE)

(830 m, NW)

(2.5 km, NW)

(2.0 km, N)

9 Areas occupied by sensitive man-made

land uses (hospitals, schools, places of

worship, community facilities)

NM Public

School

GNIT

Gautam Buddh

Balak Inter

College

Sarvottam

Institute of

Technology

Janta Inter

College

Sunshine Public

School

Vienova

International

School

Agrasen Inter

College

(1.3 km, E)

(2.2 km, SW)

(2.4 km, WSW)

(3.65 km, NW)

(5.0 km, N)

(6.2 km, SE)

(3.2 km, SE)

(6.8 km, SE)

10 Areas containing important, high

quality or scarce resources (ground

water resources, surface resources,

forestry, agriculture, fisheries, tourism,

minerals)

None within 15 km

from project site

None within 15 km

from project site

11 Areas already subjected to pollution or

environmental damage. (Those where None There are no such

areas within 15 km

FORM 1

Amendment in Environment Clearance for Group Housing Project “Sikka

Kaamya Greens” At Plot No. GH-02B, Sector-10, Greater Noida West,

Gautam Budh Nagar, U.P.

16

M/s Ecogreen Buildtech Pvt. Ltd.

S.

No. Areas Name/ Identity

Aerial Distance

(Within 15 km from

proposed project

location boundary)

existing legal environmental standards

are exceeded)

which are subjected to

pollution or

environmental

damage.

12 Areas susceptible to natural hazard

which could cause the project to

present environmental problems

(earthquakes, subsidence, landslides,

erosion, flooding or extreme or adverse

climatic conditions)

Earthquakes A the site fall under

the Zone IV as per the

Seismic Zone map of

India and is thus the

site area is prone high

damage.

Terms of Reference (TOR): Not Applicable

FORM 1

Amendment in Environment Clearance for Group Housing Project “Sikka

Kaamya Greens” At Plot No. GH-02B, Sector-10, Greater Noida West,

Gautam Budh Nagar, U.P.

1

M/s Ecogreen Buildtech Pvt. Ltd.

1

PROJECT REPORT

Project Report

Amendment in Environment Clearance for Group Housing Project “Sikka Kaamya

Greens” At Plot No-GH-02B, Sector-10, Greater Noida West, Gautam Budh Nagar, U.P.

2

M/s Ecogreen Buildtech Pvt. Ltd.

TABLE OF CONTENTS

S. No. Topic Page Nos.

1.0 Introduction 1

1.1 Environmental Legal Framework 1

1.2 Location and Land Use of Project Site 2

1.3 Surroundings and Connectivity of Project Site 4

1.4 Project Cost 8

1.5 Area Statement 8

1.6 Estimated Population 9

1.7 Water Requirement 9

1.8 Sewage Generation & Treatment 10

1.9 Rain Water Harvesting System 13

1.10 Vehicle Parking System 14

1.11 Power Requirement 15

1.12 Solid Waste Generation and Management 15

1.13 Green Area 17

1.14 Construction Material 19

Project Report

Amendment in Environment Clearance for Group Housing Project “Sikka Kaamya

Greens” At Plot No-GH-02B, Sector-10, Greater Noida West, Gautam Budh Nagar, U.P.

1

M/s Ecogreen Buildtech Pvt. Ltd.

PROJECT REPORT

1.0 Introduction

M/s Ecogreen Buildtech Pvt. Ltd. has planned a group housing project “Sikka Kaamya Greens”

at plot No. GH-02 B, Sector-10, Greater Noida, U.P. M/s Ecogreen Buildtech Pvt. Ltd. has

obtained the environmental clearance for development of group housing project from SEIAA,

U.P. vide letter no 1462/Parya/SEAC/2559/2015/DDY dated 3rd

December, 2015 and Consent to

Establish from UPPCB vide letter no. F88479 C-1/NOC-1147/2016/77 dated 5th

October, 2017.

Construction of the project has been initiated as per the EC accorded by SEIAA, U.P. Approx.

50% of construction works are completed at the site as per accorded EC. However there are

some minor changes proposed in project planning due to which minor changes in built-up area,

nos of dwelling units and ground coverage are envisaged. Minor change includes change in

design of one sub-tower and construction of this modified sub-tower is not initiated till date. Due

to this change there will increase of approx. 2985.4 sqm in the built-up area of the project.

Proposed project design incorporates all the environment management measures including

sewage management measures, utilities, waste management system and green belt and green

area.

M/s Ecogreen Buildtech Pvt. Ltd. now intends to obtain the amendment in the earlier EC letter

issued to incorporate the minor changes in the planning as per requirement of EIA Notification,

2006 as amended.

1.1 Environmental Legal Framework

Proposal is to obtain the amended environment clearance for the group housing project for which

environment clearance has already been obtained from SEIAA, U.P. in 2015 under EIA

Notification, 2006. Built-up area of the project after modification in planning will be 1,29,847.64

sq m thus the project thus the project falls under activity 8 (a) of schedule I of EIA Notification

and is categorized as Category B2. As per EIA Notification, 2006, this project should be

appraised at state level but due to absence of U.P. SEIAA presently, the project is being

submitted to MoEF&CC for consideration for grant of amendment in Environment Clearance

under EIA Notification, 2006. As per the EIA Notification, 2006, Ecogreen is regularly

submitting the six monthly compliance report of the conditions as given in EC letter awarded for

the project.

Other than EIA Notification, 2006, other Acts applicable to the project includes Air Act, 1981 &

Water Act, 1974. M/s Ecogreen Buildtech Pvt. Ltd. has obtained the Consent to establish for the

project prior initiating the construction activities. The acts & rules applicable to the project are

listed below

Environment protection Act, 1986

EIA Notification, 2006

Project Report

Amendment in Environment Clearance for Group Housing Project “Sikka Kaamya

Greens” At Plot No-GH-02B, Sector-10, Greater Noida West, Gautam Budh Nagar, U.P.

2

M/s Ecogreen Buildtech Pvt. Ltd.

MSW Rules, 2016

Construction & Demolition Waste Management Rules, 2016

Plastic waste Management Rules, 2016

Hazardous & Other waste Management Rules, 2016

E-Waste Rules, 2011 as amended in 2016

Air Act, 1981

Water Act, 1974

Noise Rules, 2000

Water Cess Act, 1977

Fly-ash Notification, 2009 as amended

Building Bye Laws of Greater Noida

1.2 Location and Land use of Project Site

Project site is spread over an area of 22565.44 sq m (5.6 acres) and entire site is in possession of

M/s Ecogreen Buildtech Pvt. Ltd. Site is located at plot No. GH-02 B, Sector-10, Greater Noida,

U.P. Location map of the project site is given in Figure 1. Geographical coordinates of the

centre of site is 28°34'8.39"N & 77°28'42.65"E. Geographical coordinates of all four corners of

the site is given in Table 1 and Figure 2. Land use of the project site is residential as per the

Greater Noida Master Plan, 2021. Master plan of Greater Noida, depicting the project location is

given in Figure 3. As per the land-use, Ecogreen has planned residential colony at the project

site.

Project Report

Amendment in Environment Clearance for Group Housing Project “Sikka Kaamya

Greens” At Plot No-GH-02B, Sector-10, Greater Noida West, Gautam Budh Nagar, U.P.

3

M/s Ecogreen Buildtech Pvt. Ltd.

Figure 1: Location Map of Project Site

Table 1: Geographical coordinates of Site

Point Latitude Longitude

A 28°34'9.24"N 77°28'38.91"E

B 28°34'11.93"N 77°28'43.24"E

C 28°34'7.92"N 77°28'46.55"E

D 28°34'5.46"N 77°28'42.30"E

Figure 2: Map of Geographical Coordinates of Site

Project Report

Amendment in Environment Clearance for Group Housing Project “Sikka Kaamya

Greens” At Plot No-GH-02B, Sector-10, Greater Noida West, Gautam Budh Nagar, U.P.

4

M/s Ecogreen Buildtech Pvt. Ltd.

Figure 3: Master Plan of Greater Noida, 2021 Depicting Site

1.3 Surroundings and Connectivity of Project Site

Project site is located at plot No. GH-02 B, Sector-10, Greater Noida, U.P. Surroundings of the

project site is urban and is surrounded by residential colonies and villages majorly. Site abuts the

park & green belt in South direction and a park of app. 12.5 is planned to be developed by

GNIDA acres at 140 m from site in North direction. Details of surrounding features of the site

are given in Table 2.

Project site is well connected by roads. A 24 m wide sector road abuts the project site in East

boundary. This road connects the project site to Vaidpura Link Marg which is at app. 100 m

from site in South direction. Vaidpura Link Marg connects site to 130 m wide Greater Noida-

Noida link road which connects project site to other sectors of Greater Noida, Noida and Delhi.

Nearest highway to the site is NH-91 located at 4.3 km in East direction. A metro rail corridor of

30 km from Noida to Greater Noida is proposed and the nearest metro station to the site will be

Sector-71 Noida which is accessible to site vide 130 m Greater Noida-Noida link road. Nearest

railway station to the site is Dadri Railway station at app. 6.7 km from site in SE direction.

Ghaziabad Railway station is app. 10 km from the site in North direction. Nearest airport to the

site is Indira Gandhi International Airport which is at app. 36 km in west direction. Details of

connectivity to the site are given in Table 2. Connectivity map of the site is given in Figure 4.

Figure 3: Connectivity Map of Project Site

Table 2: Surroundings and Connectivity of the Project Site

Project Report

Amendment in Environment Clearance for Group Housing Project “Sikka Kaamya

Greens” At Plot No-GH-02B, Sector-10, Greater Noida West, Gautam Budh Nagar, U.P.

5

M/s Ecogreen Buildtech Pvt. Ltd.

S. No. Category Description

1. Nearby Residential Areas Residential Colony “Ammatra Homes” abuts the site in

NW direction

Village Saini (600 m, SE)

Sector-16 (1.0 km, NE)

Village Khairpur Gurjar (830 m, NW)

Village Patwari (2.5 km, NW)

Village Milak Lachhi (2.0 km, N)

2. Nearest City Site is located within Greater Noida

Ghaziabad (8.5 km, N)

3. Nearest Industrial Area Surajpur Industrial Area (5-6 km, S & SSE)

Ecotech-III, Greater Noida (3 km, S)

4. Nearest School & College NM Public School (1.3 km, E)

GNIT (2.2 km, SW)

Gautam Buddh Balak Inter College (2.4 km, WSW)

Sarvottam Institute of Technology (3.65 km, NW)

Janta Inter College (5.0 km, N)

Sunshine Public School (6.2 km, SE)

Vienova International School (3.2 km, SE)

Agrasen Inter College (6.8 km, SE)

5. Nearest Hospital Government Ayurvedic Dispensary, Surajpur (6.5 km, S)

Bharti Eye Hospital (6.4 km, SE)

Mohan Swaroop Hospital (6 km, E)

6. Nearest River River Hindon (5.4 km, W)

7. Nearest Reserve Forest Khodankhurd RF (7.4 km, S)

Gulistapur RF (7.6 km, S)

8. Nearest Roads & Highway 24 m wide road abuts site along eastern boundary

Vaidpura Link Marg (100 m, S)

130 m highway-Greater Noida (2.6 km, W)

NH-91 (4.3 km, E)

9. Nearest Railway Station Dadri railway Station (6.7 km, SE)

Ghaziabad Railway Station (10.0 km, N)

Sec-71 proposed metro station (11.0 km, NW)

10. Nearest Airport Indira Gandhi International airport (35 km, W)

Project Report

Amendment in Environment Clearance for Group Housing Project “Sikka Kaamya

Greens” At Plot No-GH-02B, Sector-10, Greater Noida West, Gautam Budh Nagar, U.P.

6

M/s Ecogreen Buildtech Pvt. Ltd.

Figure 3: Connectivity Map of Project Site

Project Report

Amendment in Environment Clearance for Group Housing Project “Sikka Kaamya

Greens” At Plot No-GH-02B, Sector-10, Greater Noida West, Gautam Budh Nagar, U.P.

7

M/s Ecogreen Buildtech Pvt. Ltd.

1.4 Project Cost

Estimated cost of the project is approx 220 Crores including land and development cost.

1.5 Area Statement

Project site is spread over area of 22565.44 sq m. Project involves development of 2 residential

towers, i.e tower 1 & 2 (Sub-Tower 1 A, 1 B, 1 C & 1 D and Tower 2 A, 2 B, 2 C & 2 D) along

with the community building and other support facilities. There is minor modification in design

of one sub-tower, i.e. tower 1 C. Design of the tower 1 C is modified and now is being built as

Tower 3 and tower 1 D is renamed as tower 1C. Details of the areas as per EC accorded and as

modified planning are given in Table 3. Built-up area has increased by 2985.37 sq m due to this

modification.

Table 3: Details of Area (As per EC Accorded and Now Amended)

S. No Particulars Area (sq m)-EC

Approved

Area (sq m)-

Amendment

Modification

Status

1 Plot Area 22565.44 22565.44 No Change

2 Permissible Ground

Coverage (35%)

7897.904 7897.904 No Change

3 Proposed Ground

Coverage Percentage

24.34% 25.38% Increased by

1.04%

4 Proposed Ground

Coverage

5492.1 5727.33 increased by

235.23 sq m

a GC for towers 4609.78 4845.01 increased by

235.23 sq m

b GC for commercial 302.63 302.63 No Change

c GC for Community

Centre

470.97 470.97 No Change

d GC for guard room 26.02 26.02 No Change

e GC for ESS 26.69 26.69 No Change

f GC for toilets 56 56 No Change

5 Permissible FAR

(@3.5 of plot area)

78979.04 78979.04 No Change

6 Proposed FAR 78920.49 80611.95 increase by

1691.46 sq m

a Towers 78131.66 79823.12 increase by

1691.46 sq m

b Commercial 788.83 788.83 No Change

7 Permissible

Additional FAR

(@15% of

permissible FAR)

11846.856 11846.856 No Change

Project Report

Amendment in Environment Clearance for Group Housing Project “Sikka Kaamya

Greens” At Plot No-GH-02B, Sector-10, Greater Noida West, Gautam Budh Nagar, U.P.

8

M/s Ecogreen Buildtech Pvt. Ltd.

8 Proposed additional

FAR

10966.91 11455.31 increase by 488.4

sq m

9 Basement 19257.962 19257.962 No Change

10 Stilt 4299.79 4498.32 increased by

198.53 sq m

11 Podium 5203.118 5203.118 No Change

12 Balcony 8214 8820.98 increased by

606.98 sq m

13 Built-up Area 126862.27 129847.64 increased by

2985.37 sq m

14 Green Area 8602.41 8479.55 Decrease by

122.86 sq m

15 Maximum Height 72.6 72.6 No Change

16 Dwelling Unit 984 1053 increased by 69

nos.

1.6 Estimated Population

Population details as per EC accorded and as modification are given below in Table 4.

Population as per amendment will be 5450.

Table 4: Estimated Population (As per EC Accorded and Now Amended)

S.

No.

Category PPU Nos. of

DUs-EC

Accorded

Total

Population-

EC

Accorded

Nos. of

DUs-

Amendment

Total

Population-

Amendment

Increase in

Population

by

1 Resident 4.5 984 4428 1053 4739 311

2 Staff 5% of residents 221 5% of

residents

237 16

3 Visitors 10% of residents 443 10% of

residents

474 31

Total Population 5092 5450 358

1.7 Water Requirement

Water requirement for construction phase is app. 30-50 KLD and source of water is treated water

from CSTP of GNIDA. Water during operation phase will be supplied by GNIDA. Water

requirement has changed slightly due to the amendment. Calculations for water requirement are

given in Table 5.

Table 5: Water Requirement Calculation (As per EC Accorded and Now Amended)

Project Report

Amendment in Environment Clearance for Group Housing Project “Sikka Kaamya

Greens” At Plot No-GH-02B, Sector-10, Greater Noida West, Gautam Budh Nagar, U.P.

9

M/s Ecogreen Buildtech Pvt. Ltd.

S.

No

.

Descriptio

n

Rate of

Water

Deman

d

(LPCD

)

Total

Occupancy/Are

a-EC Accorded

Water

Requiremen

t-EC

Accorded

(KLD)

Total

Occupancy/Are

a-Amendment

Water

Requiremen

t-

Amendment

(KLD)

Increase in

Water

Requireme

nt by

(KLD)

A Domestic

Water

1 Resident 86 4428 380.8 4739 407.6 26.7

2 Staff 30 222 6.7 237 7.1 0.5

3 Visitor 15 443 6.6 474 7.1 0.5

Total Domestic Water

Requirement

-- 394.1 -- 421.8 27.7

B Landscapin

g

2.5 l/sq

m

8602.41 21.5 8479.55 21.2 -0.3

C DG

Cooling

0.9

l/kVA

3500 kVA 18.9 3500 kVA 18.9 0

Total Water Requirement -- 434.5 -- 462.2 27.4

Category Quantities as Amended

(KLD)

Fresh Water Requirement 295

Flushing Water Requirement 126.8

Sewage 362.8

STP Capacity 405

Recovered Water

Flushing

Landscaping

DG Cooling

Excess Water (GNIDA green belt/Construction in nearby areas/sewer)

290.2

126.8

21.5

18.9

123.0

1.8 Sewage Generation & Treatment

It is estimated that sewage generation from the project after amendment will be 362.8 KLD

which will be treated in STP of 405 KLD. Approx. 290.2 KLD of water will be recovered from

STP after treatment, out of which 126.8 KLD may be used for flushing, 21.5 KLD for

landscaping and 18.9 KLD for DG cooling.Approx.123 KLD can be used for watering green belt

of GNIDA, construction in nearby areas or can be discharged to sewer. Details of sewage

generation and usage of treated water is given in Table 5 above. STP with FAB technology will

be installed within the project site. Further to reduce the water demand, various water

conservation measures will be taken and are given in Table 6.

Project Report

Amendment in Environment Clearance for Group Housing Project “Sikka Kaamya

Greens” At Plot No-GH-02B, Sector-10, Greater Noida West, Gautam Budh Nagar, U.P.

10

M/s Ecogreen Buildtech Pvt. Ltd.

Figure 4: Water balance Diagram-Dry Season (Amended)

Fresh Water Requirement 295 KLD

Total Fresh Water Requirement

295 KLD

Horticulture Water Requirement

21.5 KLD

DG Cooling 18.9 KLD

Sewage Generated 362.8 KLD

STP Capacity 405 KLD

Construction to nearby area/GNIDA Green Belt

/Sewer 123.0 KLD

Flushing Water Requirement

126.8 KLD

100%

80%

126.8 KLD

21.5 KLD

18.9 KLD

123.0 KLD

290.2 KLD

Project Report

Amendment in Environment Clearance for Group Housing Project “Sikka Kaamya

Greens” At Plot No-GH-02B, Sector-10, Greater Noida West, Gautam Budh Nagar, U.P.

11

M/s Ecogreen Buildtech Pvt. Ltd.

Figure 5: Water balance Diagram-Monsoon Season (Amended)

Table 6: Water Conservation Plan

Measures Type

Water Conservation Fixtures Dual plumbing cisterns, Dual flushing system,

low flow taps, low flow urinals, sensor based

taps in commercial areas and facility areas, low

faucet taps, low flow showers, tap aerators,

auto control valves and pressure reducing

devices

Monetary Measures Metering (flow water) and pricing of water

Leakage Prevention Timely detection of leakages in pipeline &

tanks

Wastage Prevention Alarms for filling of tank

Storm water harvesting Storm water collection and recharging system.

57 nos of pits for recharge pits to be provided

for recharging collected rain water to ground.

1.9 Rain Water Harvesting System

Project site falls in Bisrakh tehsil and in Greater Noida west Area of Gautam Budh Nagar. As per

CGWB, the tehsil is classified in safe category and stage of ground water development in the

area is 74.64%. Water level of phreatic aquifer during pre-monsoon season varies from 3.35-

14.40 mbgl and during post-monsoon varies from 2.0-13.95 mbgl. On average water level of 9 m

bgl is observed in the non-command area. It is thus suggested that the storm water from the site

Fresh Water Requirement 295 KLD

Total Fresh Water Requirement

295 KLD

DG Cooling 18.9 KLD

Sewage Generated 362.8 KLD

STP Capacity 405 KLD

Construction to nearby area/GNIDA Green Belt

/Sewer 144.5 KLD

Flushing Water Requirement

126.8 KLD

100%

80%

126.8 KLD

18.9 KLD

144.5 KLD

290.2 KLD

Project Report

Amendment in Environment Clearance for Group Housing Project “Sikka Kaamya

Greens” At Plot No-GH-02B, Sector-10, Greater Noida West, Gautam Budh Nagar, U.P.

12

M/s Ecogreen Buildtech Pvt. Ltd.

should be treated as resource and should be recharged to the ground so as to augment the ground

water aquifers. This also prevents issue of local flooding during rains.

Storm water drainage system will be provided at project site for channelizing storm water and

prevent local flooding. Covered storm water drains will be provided at the site. Rain water

harvesting system will be provided at the site to collect rain water and recharge the same in

ground through RWH pits. Run-off generation from the site will insignificantly change due to

slight increase in ground coverage but requirement of pits will remain same as the run-off

increase is insignificant. Calculation for run-off availability and design of RWH pit is given in

Table 7 & 8.

Table 7: Run-off Available At Site (As per EC Accorded and Now Amended)

S. No. Catchment

Area of

Catchment (sq

m)

Run-off

Coff.

Average

Annual

Rainfall

(m)

Run-off

collected (cu

m)

1 Roof-Top 5727.33 0.9 0.7 3608.2

2 Paved area 8358.56 0.7 0.7 4095.7

3 Green Area 8479.55 0.1 0.7 593.6

Total Available Run-off 8297.5

Table 8: Calculations for Rain Harvesting Pits (As per EC Accorded and Now Amended)

S. No. Catchment

Area of

Catchment (sq

m)

Run-off

Coff.

Peak

Hourly

Rainfall

(m/hr)

Run-off

collected (cu

m)

1 Roof-Top 5727.33 0.9 0.05 257.7

2 Paved area 8358.56 0.7 0.05 292.5

3 Green Area 8479.55 0.1 0.05 42.4

Total hourly Run-off 592.6

Taking Retention of 15 min, run-off load is 148.2

Size of RWH Pit (diameter- 5 m , depth 5 m) 98

No. of Pits Required 1.5

No of Pits Provided 2

Project Report

Amendment in Environment Clearance for Group Housing Project “Sikka Kaamya

Greens” At Plot No-GH-02B, Sector-10, Greater Noida West, Gautam Budh Nagar, U.P.

13

M/s Ecogreen Buildtech Pvt. Ltd.

Figure 7: Schematic Diagram of RWH Pit

1.10 Vehicle Parking System

Parking provision are made as per Greater Noida Bye Laws in the project. Parking requirement

and parking proposed to be provided is slightly modified due to change in planning and parking

requirement as amended is given below in Table 9.

Table 9: Parking Required and Proposed (As per EC Accorded and Now Amended)

Parking Required

S.

No.

Category Standard as

per Greater

Noida Bye

Laws

FAR (sq m) Parking

Required

(ECS)

Parking

Required

as per

EC

Accorded

(ECS)

Change

by

(ECS)

1. Residential &

Commercial

1 ECS/80 sq

m of FAR

80611.95 1008 987 21

Parking Proposed

S.

No.

Category Area (sq m) Parking

Space/ECS

Parking

Provided

Parking

Provided

as per

Change

by

(ECS)

Project Report

Amendment in Environment Clearance for Group Housing Project “Sikka Kaamya

Greens” At Plot No-GH-02B, Sector-10, Greater Noida West, Gautam Budh Nagar, U.P.

14

M/s Ecogreen Buildtech Pvt. Ltd.

EC

Accorded

(ECS)

1. Lower Basement 18306.29 30 610 610 0

2. Podium Basement 4910.56 30 163 163 0

3. Stilt 4498.32 30 149 143 6

4. Open 1834.31 20 91 73 18

Total parking Proposed 1013 989 21

1.11 Power Requirement

Power requirement for the project is app. 7526.96 kVA and will be sourced from NPCL. Two

nos. transformers of 2500 kVA and 1 no. transformer of 1600 kVA are proposed to be provided.

Capacity of DG sets to be provided for power back-up is 3500 kVA (2 X 1500 kVA + 1 X 500

kVA)

1.12 Solid Waste Generation and Management

Solid waste is generated both during construction as well as during operation phase. Solid waste

during construction phase comprise of excavated materials, used bags, bricks, concrete, MS rods,

tiles, wood etc. Table 10 details the solid waste management plan during construction phase

Table 10: Solid Waste Management during Construction Phase

S. No. Solid waste Solid waste Management

1. Waste materials like MS

Rods, bricks, concrete,

broken tiles, wood pieces,

cement bags etc.

Material is segregated into recyclable and rejects.

Recyclable material is sold to authorize dealers.

Remaining is sent for disposal through government

authorized vendors on regular basis.

2. Excavated Soil

Top soil is stripped off and kept in covered area and

will be used for landscaping in later stage. Remaining

soil will be used for filling and road construction.

Remaining soil will be disposed off at designated

locations by GNIDA.

3. Domestic waste Domestic waste is composted in pit within the site and

the compost may be used for landscaping later

Waste to be generated during operation phase will be majorly municipal waste. Apart from

municipal waste some amount of e-waste is also expected to be generated. A waste storage room

is proposed to be provided at the site for storage of e-waste during operation phase which can be

sold to authorized vendors periodically. Further, if DG sets are operated then there will be

generation of used oil which is hazardous waste. This used oil is generally taken back by the

service agencies or will be sold to authorized vendors. Solid waste to be generated during

operation phase will slightly change from the amount estimated as per EC accorded due to slight

increase in nos. of dwelling units. Detail of the waste generation is given below in Table 11.

Project Report

Amendment in Environment Clearance for Group Housing Project “Sikka Kaamya

Greens” At Plot No-GH-02B, Sector-10, Greater Noida West, Gautam Budh Nagar, U.P.

15

M/s Ecogreen Buildtech Pvt. Ltd.

Waste generation may increase totally by 165 kg/day. Compostable waste generation after

amendment will be 1527.9 kg/day, 763.9 kg/day will be recyclable waste and 254.7 kg/day will

be rejected fraction.

Table 11: Calculation of Municipal Solid Waste Generation (As per EC Accorded and

Now Amended)

S.

No.

Category Per Capita

Waste

Generation

(kg/day)

Population/Area

(sq m)-EC

Accorded

Waste

Generation

(Kg/day)-

EC

Accorded

Population/Area

(sq m)-

Amendment

Waste

Generation

(Kg/day)-

Amendment

Increased

By

1 Resident 0.5 4428 2214 4739 2369.5 155.5

2 Staff 0.25 222 55.5 237 59.25 3.75

3 Visitor 0.15 443 66.45 474 71.1 4.65

4 Landscape

Area

0.2 kg/acres 2.12 0.424 2.1 0.42 -0.004

5 Sludge -- -- 45.08 -- 46.2 1.12

6 Total -- -- 2381.454

Say 2381.5

-- 2546.47

Say 2546.5

165

(Source: For Waste Collection, Chapter 3, Table 3.6, Page no. 49, of Central Public Health & Environment

Engineering Organization, Ministry of Urban Development, (Government of India, May 2000))

Management Plan for Municipal Solid Waste

Collection and Segregation of waste

1. Three color dustbins will be provided in the common areas and in each dwelling unit

for collection and segregation of compostable, recyclable and inert waste

2. Door to door waste collection system will be established by hiring vendors for waste

collection

3. Waste storage area is proposed to be provided within the site for temporary collection

of the waste. Waste storage space of 2 days will be maintained

4. Room for storage of recyclable and E-waste will also be provided at the site

5. RWA will be formed at the site to manage the functionality of various systems during

the operation phase and will also take care of waste management

Treatment of Waste

1. Compostable waste will be treated in organic waste convertor and converted into

manure

2. STP sludge will also be used as manure after stabilization

Project Report

Amendment in Environment Clearance for Group Housing Project “Sikka Kaamya

Greens” At Plot No-GH-02B, Sector-10, Greater Noida West, Gautam Budh Nagar, U.P.

16

M/s Ecogreen Buildtech Pvt. Ltd.

Disposal of Waste

1. Recyclable waste will be sold off to the authorized vendors

2. Inert waste will be disposed off to the dumping site by local agency in the area

responsible for waste management

1.13 Green Area

It is proposed that area of 8479.99 sq m will be put under green as per modified planning.

Approx. 1801.77 sq m of area will be under green belt area and remaining 6678.22 sq m of area

will be developed as organized green. Evergreen, native species will preferably be planted at the

project site. Native species are adapted to natural conditions and also requires less aftercare and

maintenance. Trees with large & round canopy will be planted. Plantation will act as noise buffer

and will provide surface for dust settlement. Green belt development plan for the area is given

below.

Green Belt development Plan

All the developments are associated with the pollution of one or more environmental component.

Plants are the natural sink of that pollution. Plants help in abatement of the pollution and restore

the degraded environment. Green belt lowers down the air pollution by providing a surface to

settle down or by absorbing the pollutants, attenuate noise level and uses the waste water. Green

cover will comprise of:

A peripheral green belt

Avenue plantation

Lawns/parks

Grass cretes in parking areas

Planters

Selection of Plant Species for Green Belt Development

Selection of plant species for the development depends on various factors such as climate,

elevation and soil. The plants having following desirable characteristics would be selected for

plantation

1. Species should be fast growing and providing optimum penetrability with minimal

maintenance. Perennial, evergreen & fast growing trees

2. Species should be wind-firm and deep rooted

3. Indigenous and locally available species

Project Report

Amendment in Environment Clearance for Group Housing Project “Sikka Kaamya

Greens” At Plot No-GH-02B, Sector-10, Greater Noida West, Gautam Budh Nagar, U.P.

17

M/s Ecogreen Buildtech Pvt. Ltd.

4. Plants with high foliage density, leaves with larger leaf area and hairy on both the

surfaces. Round, thick & spreading canopy is preferred for peripheral green belt and

oblong canopy for road side plantation

5. Ability to withstand conditions like inundation and drought

6. Soil improving plants (Nitrogen fixing rapidly decomposable leaf litter)

7. Bird and insect attracting species

8. Tolerant to climatic conditions of the area and with less water requirement. Species

tolerance to air pollutants like SO2 and NO2 should be preferred

9. Plants with ornamental foliage & shrubs with fragrant flowers and fruit bearing

10. Plantation should maintain ecological & hydrological balance of the region.

List of the trees which can be planted at the site as per the Green Belt development Guidelines,

2000 by CPCB is given below in Table 12.

Table 12: List of Trees Which can be Planted at Site S. No. Botanical Name Common Name

Trees

1 Albizzia lebbek Shirish

2 Melia azadirach Bakain

3 Toona cilata Roxb Indian Cedar

4 Litsea glutinosa Soft bollygum

5 Mallotus philippinensis Kamala

6 Diospyros melanoxylon Tendu

7 Ehretia laevis Chamror

8 Mangifera indica Aam

9 Lannea coromandelica Mohini

10 Pistacia khinjuk Kakra

11 Cassia fistula Amaltas

12 Litsaea glutinosa Asan

13 Albizzia lebbek Sirish

14 Flcus glomerata Guler

15 Butea monosperma Palash

16 Ziziphus mauritiana Ber

17 Azadirachta indiaca Neem

18 Aegel maemelos Bel

19 Ailanthes excels Mahanimb

20 Bombax cebia Shalmali

21 Moras alba Shehtut

22 Phoenix sylvestris Sugar date palm

Shrubs

1 Adathoda vasica Adosa

2 Carissa opaca Jungli Karonda

3 Launea asplenifolia Jangi gobi

Project Report

Amendment in Environment Clearance for Group Housing Project “Sikka Kaamya

Greens” At Plot No-GH-02B, Sector-10, Greater Noida West, Gautam Budh Nagar, U.P.

18

M/s Ecogreen Buildtech Pvt. Ltd.

4 Flacourita sapida Kanel

5 Colebrookia oppositifolia Bhamber

6 Woodfordia fruticosa Dhaaya

7 Jasminum multiflorum Jasmine

8 Nyctanthes arbor-tristis Linn. Parijat

9 Randia tetrasperma India willow

10 Murraya koenigii Kari ped

11 Dodonaea viscosa Sanatta

12 Grewia oppositifolia Beul

Grass/herbs

1 Dioscorea alata Purple yam

2 Corchorus acutangulus Nalta jute

3 Solanum minima Choti kateri

4 Adiantum edgeworthii Hansraj

5 Dyropteris cochleata Wood ferm

Creepers

1 Cardiospermum halicacabum Kanphata

2 Abrus precatorius Ratti

3 Tinospora cordifolia Geloy

4 Cissampelos pareira Bhatvel

5 Ipomea cairica Morning glory

6 Momordica charantia Karela

(Source: Guidelines for developing Green Belts by CPCB, 2000)

After Care and Monitoring

Plants grown will be monitored for first three years. Nutrients will be supplemented and the

juveniles provided protection. Following measures will be taken:

1. Adequate nutrient supply will be maintained by providing manure timely

2. Absence of water stress

3. Construction of the protection wall all around to protect from animals and outsiders from

damage

Regular inspection of the site will be kept. Record keeping of number of saplings planted and

surviving will be kept. Regular pruning of road side trees will be done as per requirement.

Weeding will be carried out along with regular manuring & watering. Treated water from STP

will be used for watering plant which is rich in nutrients.

1.14 Construction Material

Detail of different type of construction material with their U values is given in Table 13. List of

machinery which may be used for construction is given in section below.

Project Report

Amendment in Environment Clearance for Group Housing Project “Sikka Kaamya

Greens” At Plot No-GH-02B, Sector-10, Greater Noida West, Gautam Budh Nagar, U.P.

19

M/s Ecogreen Buildtech Pvt. Ltd.

Table 13: List of Construction Materials Type of Construction U values (in W/m

2deg C)

Walls:

Brick:

Plastered both sides 3.24

Solid Un plastered 2.67

Plastered both sides 2.24

Concrete, Ordinary, Dense:

-152mm 3.58

-203mm 3.18

Concrete block:

CLC Fly ash block 1.19

Hollow Concrete block, 220mm, single skin, outside rendered, inside plastered:

CLC Fly ash block 1.70

Roofs Flat

Reinforced concrete slab, 100mm, scered 63-12 mm, 3

layers bituminous felt

3.35

Floors:

Concrete on ground or hardcore fill 1.13

+ Grano, Terrazze or tile finish 1.13

+ Wood block finish 0.85

Exposure South Sheltered:

Single glazing 3.97

Double glazing 6 mm space 2.67

List of Machinery Used During Construction

Dumper

Concrete mixer with hopper

Excavator

Concrete Batching Plant

Cranes

Road roller

Bulldozer

Tower Cranes

Hoist

Labor Lifts

Concrete pressure pumps

Mobile transit mixer