Form–1 for Amendment in Environment Clearance 1 APPENDIX – I (See paragraph – 6) FORM 1 (I) Basic Information 1. Name of the Project : Proposed amendment in previous Environmental Clearance issued for our 120 KLPD Molasses based distillery at Village Naglamal, Tehsil Sadar, District Meerut (Uttar Pradesh). 2. S. No. in the schedule : As per EIA Notification dated 14 th Sep., 2006 as amended from time to time; the project falls in Category ‘A’, Project or Activity- 5(g). 3. Proposed capacity /area/length/tonnage to be handled/command area/lease area/number of wells to be drilled : The proposal is for amendment in existing EC of 120 KLPD Distillery Plant (Molasses Based) : Increase in no. of operational days of distillery from 270 to 365 days. EC Letter {File no. J-11011/226/2006-IA II (I)} issued by MoEFCC, New Delhi dated 31 st August, 2006. 4. New/Expansion/Modernization : Amendment in earlier EC granted by MoEFCC, dated 31 st August, 2006 5. Existing Capacity/Area etc : Existing Capacity- 120 KLPD (Ethanol /Extra Neutral Alcohol/ Rectified Spirits/ Absolute Alcohol) Existing Plant Area: 22.25 ha (55 Acres) 6. Category of Project i.e. ‘A’ or ‘B’ : Category ‘A’ 7. Does it attract the general condition? If yes, please specify : No 8. Does it attract the specific condition? If yes, please specify. : No 9. Location Village : Naglamal Tehsil : Sadar District : Meerut State : Uttar Pradesh 10 Nearest railway station/airport along Nearest Railway Station: Kharkhauda Railway

Upload: others

Post on 05-Apr-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Form–1 for Amendment in Environment Clearanceenvironmentclearance.nic.in/writereaddata/modification/PreviousTOR… · Form–1 for Amendment in Environment Clearance 2 with distance

Form–1 for Amendment in Environment Clearance

1

APPENDIX – I

(See paragraph – 6)

FORM 1

(I) Basic Information

1. Name of the Project : Proposed amendment in previous Environmental

Clearance issued for our 120 KLPD Molasses

based distillery at Village Naglamal, Tehsil Sadar,

District Meerut (Uttar Pradesh).

2. S. No. in the schedule : As per EIA Notification dated 14th Sep., 2006 as

amended from time to time; the project falls in

Category ‘A’, Project or Activity- 5(g).

3. Proposed capacity

/area/length/tonnage to be

handled/command area/lease

area/number of wells to be drilled

: The proposal is for amendment in existing EC of

120 KLPD Distillery Plant (Molasses Based) :

Increase in no. of operational days of distillery

from 270 to 365 days.

EC Letter {File no. J-11011/226/2006-IA II (I)} issued

by MoEFCC, New Delhi dated 31st August, 2006.

4. New/Expansion/Modernization : Amendment in earlier EC granted by MoEFCC,

dated 31st August, 2006

5. Existing Capacity/Area etc : Existing Capacity- 120 KLPD (Ethanol /Extra

Neutral Alcohol/ Rectified Spirits/ Absolute

Alcohol)

Existing Plant Area: 22.25 ha (55 Acres)

6. Category of Project i.e. ‘A’ or ‘B’ : Category ‘A’

7.

Does it attract the general condition?

If yes, please specify

: No

8. Does it attract the specific condition?

If yes, please specify.

: No

9. Location

Village : Naglamal

Tehsil : Sadar

District : Meerut

State : Uttar Pradesh

10 Nearest railway station/airport along • Nearest Railway Station: Kharkhauda Railway

Page 2: Form–1 for Amendment in Environment Clearanceenvironmentclearance.nic.in/writereaddata/modification/PreviousTOR… · Form–1 for Amendment in Environment Clearance 2 with distance

Form–1 for Amendment in Environment Clearance

2

with distance in KMs Station (11.0 km in WSW direction)

• Nearest Airport: New Delhi (80 km in SW

direction)

11. Nearest Town, City, District

Headquarters along with distance in

Kms.

• Town - Kharkhauda (11.0 km in WSW direction)

• District Headquarter- Meerut (17.0 km in NW

direction)

12.

Village Panchayats, Zilla Parishad,

Municipal Corporation, Local body

(complete postal addresses with

telephone nos. to be given)

Sarpanch: - Omveer Singh, +91 9675622021

Village Naglamal, Tehsil Sadar, District Meerut,

Uttar Pradesh.

13. Name of the applicant Naglamal Sugar Complex

(A unit of Mawana Sugars Limited)

14. Registered Address : Mawana Sugars Limited

5th Floor, Kirti Mahal, 19 Rajendra Place, New

Delhi 110125

15. Address for correspondence: : Project Proponent

Name : Rajesh Dhingra

Designation (Owner/Partner/CEO) : Retainer – Alcohol Business

Address : Mawana Sugars Limited

Plot No. 03, Institutional Area, Sector 32, Gurgaon

(Haryana)

Pin Code : 122001

E-mail : [email protected]

Telephone No. : 0124-4298000

Fax No. : 0124-4298300

16. Details of Alternative Sites examined,

if any. Location of these sites should

be shown on a topo sheet

: No alternate sites are considered as the present

proposal is only request for amendment in EC.

17. Interlinked Projects : Yes, the source of steam will be from adjusting

sugar complex.

18. Whether separate application of

interlinked project has been submitted

: Not Applicable

19. If yes, date of submission : Not Applicable

Page 3: Form–1 for Amendment in Environment Clearanceenvironmentclearance.nic.in/writereaddata/modification/PreviousTOR… · Form–1 for Amendment in Environment Clearance 2 with distance

Form–1 for Amendment in Environment Clearance

3

20. If no, reason : Not Applicable

21. Whether the proposal involves

approval/clearance under : If yes,

details of the same and the status to

be given

(a)The Forest (Conservation) Act, 1980

(b) The Wildlife (Protection) Act, 1972

(c) The C.R.Z Notification, 1991

: The proposal does not involve any approval

/clearance under any act as mentioned in the

condition.

No

No

No

22. Whether there is any Government

Order/Policy relevant/relating to the

site

: No

23. Forest land involved (hectares) : No forest land is involved in the proposed EC

amendment project.

24. Whether there is any litigation pending

against the project and / or land in

which the project is proposed to be

set up

(a) Name of the Court

(b) Case No.

(c) Orders/directions of the Court, if

any and its relevance with the

proposed project.

: No litigation is pending against the project.

(II) Activity

1. Construction, operation or decommissioning of the Project involving actions, which will

cause physical changes in the locality (topography, land use, changes in water bodies,

etc.)

S.

No.

Information/Checklist

confirmation

Yes/

No

Details there of (with approximate quantities

/rates, wherever possible) with source of

information data

1.1 Permanent or temporary change

in land use, land cover or

topography including increase in

intensity of land use (with

respect to local land use plan)

No

The total plant area is 55 acres. The proposal is for

amendment in existing environment clearance

(increase in no. of operational days). There will not

be any permanent or temporary change in land

use.

Page 4: Form–1 for Amendment in Environment Clearanceenvironmentclearance.nic.in/writereaddata/modification/PreviousTOR… · Form–1 for Amendment in Environment Clearance 2 with distance

Form–1 for Amendment in Environment Clearance

4

1.2 Clearance of existing land,

vegetation and buildings?

No The proposed increase in no. of operational days

of existing distillery does not involve any clearance

of existing land, vegetation and buildings. Covered

shed has been constructed for active bio compost

area.

1.3 Creation of new land uses? No Not applicable as the proposal is for EC

amendment only.

1.4 Pre-construction investigations

e.g. bore houses, soil testing?

No As plant has already been constructed and is in

operation, no such investigations or tests are

envisaged.

1.5 Construction works? No Covered shed for active bio compost area has

been constructed.

1.6 Demolition works? No No demolition works are envisaged as the

proposal is only for amendment in existing EC to

increase the number of operational days of

distillery.

1.7 Temporary sites used for

construction works or housing of

construction workers?

No Not Applicable

1.8 Above ground buildings,

structures or earthworks

including linear structures, cut

and fill or excavations

No Covered shed has been constructed for active bio-

compost area.

1.9 Underground works including

mining or tunneling?

No No underground works including mining or

tunneling is required.

1.10 Reclamation works? No No reclamation work is required.

1.11 Dredging? No Not Applicable

1.12 Offshore structures? No Not Applicable

1.13 Production and manufacturing

processes?

No The proposal is for increase in no. of operational

days of existing distillery. The process of

fermentation & distillation already exists and there

is no change in the installed capacity.

Distillery process steps:

1. Molasses Handling

2. Yeast Propagation

Page 5: Form–1 for Amendment in Environment Clearanceenvironmentclearance.nic.in/writereaddata/modification/PreviousTOR… · Form–1 for Amendment in Environment Clearance 2 with distance

Form–1 for Amendment in Environment Clearance

5

3. Fermentation

4. Multi Pressure Distillation

5. Multi Effect Evaporation

6. Bio composting

7. Alcohol daily receivers & bulk storage

1.14 Facilities for storage of goods or

materials?

No No additional storage of goods or materials is

envisaged.

1.15 Facilities for treatment or

disposal of solid waste or liquid

effluents?

No Liquid effluent

• Concentrated spent wash from MEE will be

mixed with Press Mud generated from Sugar

Unit for manufacturing Organic Manure (Bio

composting).

• Process condensate from MEE will be recycled

back in the process.

Solid Waste

• Fly ash is being/will be used in bio-composting.

Now we have constructed covered shed for active

bio compost area to avoid contamination in run off

during rainy season. In view of the above, we

request Honorable Ministry to permit us to

operate distillery for 365 days.

1.16 Facilities for long term housing

of operational workers?

No Most of the staff reside in nearby areas. So, there

is no need of long term housing facility.

1.17 New road, rail or sea traffic

during construction or

operation?

No No new road, rail or sea traffic will come into

existence during construction or operation of the

proposed amendment project.

1.18 New road, rail, air waterborne or

other transport infrastructure

including new or altered routes

and stations, ports, airports etc?

No Existing transport infrastructure will only be used

for the proposed amendment project.

1.19 Closure or diversion of existing

transport routes or

infrastructure leading to changes

in traffic movements?

No There will be no closure or diversion of existing

transport routes or infrastructure leading to

changes in traffic movements.

1.20 New or diverted transmission No No new or diverted transmission lines or pipelines

Page 6: Form–1 for Amendment in Environment Clearanceenvironmentclearance.nic.in/writereaddata/modification/PreviousTOR… · Form–1 for Amendment in Environment Clearance 2 with distance

Form–1 for Amendment in Environment Clearance

6

lines or pipelines? are there.

1.21 Impoundment, damming,

culverting, realignment or other

changes to the hydrology of

watercourses or aquifers?

No There will be no impoundment, damming,

culverting, realignment or other changes to the

hydrology of watercourses or aquifers.

1.22 Stream crossings? No Not applicable as no stream crossings exists in the

plant site.

1.23 Abstraction or transfers of water

from ground or surface waters?

No No additional water is required for the proposed

amendment project. Existing ground water

requirement is 2840 KLPD.

1.24 Changes in water bodies or the

land surface affecting drainage

or run-off?

No There will be no change in water bodies or the

land surface affecting drainage or run- off due to

the proposed amendments.

1.25 Transport of personnel or

materials for construction,

operation or decommissioning?

No There will not be any increase in traffic during

operation as no capacity enhancement is

proposed.

1.26 Long-term dismantling or

decommissioning or restoration

works?

No No long-term dismantling or decommissioning or

restoration works is required.

1.27 Ongoing activity during

decommissioning which could

have an impact on the

environment?

No Not Applicable

1.28 Influx of people to an area in

either temporarily or

permanently?

No No influx of people to an area either temporarily

or permanently is anticipated.

1.29 Introduction of alien species? No Not Applicable

1.30 Loss of native species or genetic

diversity?

No Not Applicable

1.31 Any other actions? No Not Applicable

2. Use of Natural resources for construction or operation of the Project (such as land,

water, materials or energy, especially any resources which are non-renewable or in

short supply):

Page 7: Form–1 for Amendment in Environment Clearanceenvironmentclearance.nic.in/writereaddata/modification/PreviousTOR… · Form–1 for Amendment in Environment Clearance 2 with distance

Form–1 for Amendment in Environment Clearance

7

S.

No.

Information/checklist

confirmation

Yes/

No

Details thereof (with approximate quantities/

rates, wherever possible) with source of

information data

2.1 Land especially undeveloped or

agricultural land (ha)

No No additional land is required for the proposed

amendment project as the same will be done

within existing plant premises.

2.2 Water (expected source &

competing users) unit: KLPD

No No additional water is required for the

proposed amendment project. Existing ground

water requirement is 2840 KLPD.

2.3 Minerals (MT) No No mineral is required for the said proposal.

2.4 Construction material – stone,

aggregates, sand / soil (expected

source – MT)

No Not Applicable

2.5 Forests and timber (source – MT) No No forests and timber is required.

2.6 Energy including electricity and

fuels (source, competing users)

Unit: fuel (MT), energy (MW)

No No additional energy including electricity or

fuel is required. The power requirement is 1.33

MW which will be met from co-generation

power plant installed in adjacent own sugar

mill.

2.7 Any other natural resources

(Use appropriate standard units)

No Not Applicable

Page 8: Form–1 for Amendment in Environment Clearanceenvironmentclearance.nic.in/writereaddata/modification/PreviousTOR… · Form–1 for Amendment in Environment Clearance 2 with distance

Form–1 for Amendment in Environment Clearance

8

3. Use, storage, transport, handling or production of substances or materials, which could

be harmful to human health or the environment or raise concerns about actual or

perceived risks to human health.

S.

No.

Information/Checklist

confirmation

Yes/

No

Details thereof (with approximate

quantities/rates, wherever possible) with

source of information data

3.1 Use of substances or materials,

which are hazardous (as per

MSIHC rules) to human health or

the environment (flora, fauna, and

water supplies)

No No substances or materials will be used, which

are hazardous to human health or the

environment.

Used oil is being / will be carefully stored in

HDPE drums in isolated covered facility. The

used oil is being / will be sold to vendors

authorized by CPCB for the treatment of the

same. Suitable care is being / will be taken to

avoid the spills/leaks of used oil.

3.2 Changes in occurrence of disease

or affect disease vectors (e.g.

insect or water borne diseases)

No No such changes are envisaged.

3.3 Affect the welfare of people e.g.

by changing living conditions?

No The existing unit enabled local villagers to get

employment and improved the business

opportunities to the locals.

3.4 Vulnerable groups of people who

could be affected by the project

e.g. hospital patients, children, the

elderly etc.,

No Not Applicable

3.5 Any other causes Nil Not Applicable

4. Production of solid wastes during construction or operation or decommissioning

(MT/month)

S.

No.

Information/Checklist

confirmation

Yes/

No

Details thereof (with approximate

quantities/rates, wherever possible) with

source of information data

4.1 Spoil, overburden or mine wastes No There will be no spoil, overburden or mine

Page 9: Form–1 for Amendment in Environment Clearanceenvironmentclearance.nic.in/writereaddata/modification/PreviousTOR… · Form–1 for Amendment in Environment Clearance 2 with distance

Form–1 for Amendment in Environment Clearance

9

wastes.

4.2 Municipal waste (domestic and or

commercial wastes)

No There will be no municipal waste generation by

the proposed amendment project.

4.3 Hazardous wastes (as per

Hazardous Waste Management

Rules)

No There will no hazardous waste (as per

Hazardous Waste Management Rules)

generation.

Used oil is being / will be carefully stored in

HDPE drums in isolated covered facility. The

used oil is being / will be sold to vendors

authorized by Central Pollution Control Board

for the treatment of the same. Suitable care is

being / will be taken to avoid the spills/leaks of

used oil.

4.4 Other industrial process wastes No No other industrial process waste will be

generated.

4.5 Surplus product No No surplus product will be generated.

4.6 Sewage sludge or other sludge

from effluent treatment

No Lagoon Sludge is being / will be used for

making compost/ manure.

4.7 Construction or demolition

wastes

No Since the amendment project will be done

within existing plant, there will be no

construction or demolition wastes.

4.8 Redundant machinery or

equipment

No There will no redundant machinery or

equipment.

4.9 Contaminated soils or other

materials

No There will not be any contaminated soils or

other materials.

4.10 Agricultural wastes No There will not be any agricultural wastes.

4.11 Other solid wastes No Concentrated spent wash from MEE & yeast

sludge will be mixed with press mud generated

from Sugar unit for manufacturing organic

manure (Bio composting).

Fly ash is being/will be used in bio-composting.

5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)

S. Information/Checklist Yes/ Details thereof (with approximate

Page 10: Form–1 for Amendment in Environment Clearanceenvironmentclearance.nic.in/writereaddata/modification/PreviousTOR… · Form–1 for Amendment in Environment Clearance 2 with distance

Form–1 for Amendment in Environment Clearance

10

No. confirmation No quantities/rates, wherever possible) with

source of information data

5.1 Emissions from combustion of

fossil fuels from stationary or

mobile sources

No Not applicable

5.2 Emissions from production

processes

No CO2 being generated during fermentation

process is being scrubbed in CO2 scrubbers

before disposing off.

5.3 Emissions from materials handling

including storage or transport

No As materials transfer is being / will be done in

closed

packaging / pipe lines, therefore no emission

are envisaged.

5.4 Emissions from construction

activities including plant and

equipment

No There will be no construction activity involved

in the proposed amendment project.

5.5 Dust or odours from handling of

materials including construction

materials, sewage and waste

Yes No 0dour from bio-composting area as only

pressmud is used as raw material. And now the

work related to covered bio-composting and

greenbelt is complete.

5.6 Emissions from incineration of

waste

No Not Applicable

5.7 Emissions from burning of waste

in open air (e.g. slash materials,

construction debris)

No Not applicable as there will be no burning of

waste in open air.

5.8 Emissions from any other sources No There will be no emissions from any other

sources.

6. Generation of Noise and Vibration, and Emissions of Light and Heat:

S.

No.

Information/Checklist

confirmation

Yes/

No

Details thereof (with approximate

quantities/rates, wherever possible) with

source of information data with source of

information data

6.1 From operation of equipment e.g.

engines, ventilation plant,

crushers

No There is no change from the previous EC

obtained.

6.2 From industrial or similar No Not Applicable

Page 11: Form–1 for Amendment in Environment Clearanceenvironmentclearance.nic.in/writereaddata/modification/PreviousTOR… · Form–1 for Amendment in Environment Clearance 2 with distance

Form–1 for Amendment in Environment Clearance

11

processes

6.3 From construction or demolition No Since no construction will be carried out in the

plant

premises, there will be no noise generation

6.4 From blasting or piling No Not Applicable

6.5 From construction or operational

traffic

No No change in existing traffic pattern.

6.6 From lighting or cooling systems No Not Applicable

6.7 From any other sources No Not Applicable

7. Risks of contamination of land or water from releases of pollutants into the ground or

into sewers, surface waters, groundwater, coastal waters or the sea:

S.

No.

Information/Checklist

confirmation

Yes/

No

Details thereof (with approximate

quantities/rates, wherever possible) with

source of information data

7.1 From handling, storage, use or

spillage of hazardous materials.

No There will be no handling, storage, use or

spillage of hazardous material from the

amendment project.

7.2 From discharge of sewage or

other effluents to water or the

land (expected mode and place of

discharge)

No The plant is/will be based on “Zero Effluent

Discharge”. Industrial effluent will be treated in

ETP and recycled/reused in plant.

7.3 By deposition of pollutants

emitted to air into the land or into

water

No Not Applicable

7.4 From any other sources No Not Applicable

7.5 Is there a risk of long term build

up of pollutants in the

environment from these sources?

No There will be no long term build up of

pollutants in the environment; however

periodic monitoring is being/will be done for

the air, water, noise & soil, in the plant premises

and the surrounding environment, so that

timely mitigation measures can be undertaken.

Page 12: Form–1 for Amendment in Environment Clearanceenvironmentclearance.nic.in/writereaddata/modification/PreviousTOR… · Form–1 for Amendment in Environment Clearance 2 with distance

Form–1 for Amendment in Environment Clearance

12

8. Risk of accidents during construction or operation of the Project, which could affect

human health or the environment

S.

No.

Information/Checklist

confirmation

Yes/

No

Details thereof (with approximate

quantities/rates, wherever possible) with

source of information data

8.1 From explosions, spillages, fires

etc from storage, handling, use or

production of hazardous

substances

No Possibility of accident on account of explosion,

spillages, fire or hazardous substances etc is

very less. Proper maintenance, operation and

leakage proof condition of machinery

eliminates possibilities of fire.

Fire extinguishers are being / will be made

available near all machines and all persons

would be properly trained to quench the fire at

source itself. No other major risks will be

involved.

8.2 From any other causes No Not Applicable

8.3 Could the project be affected by

natural disasters causing

environmental damage (e.g.

floods, earthquakes, landslides,

cloudburst etc)?

No No such case has been reported in the area and

chances are minimal.

9. Factors which should be considered (such as consequential development) which could

lead to environmental effects or the potential for cumulative impacts with other

existing or planned activities in the locality

S.

No.

Information/Checklist

confirmation

Yes/

No

Details thereof (with approximate

quantities/rates, wherever possible) with

source of information data

9.1 Lead to development of

supporting utilities, ancillary

development or development

stimulated by the project which

could have impact on the

environment e.g.:

No There will be no such activity due to the

proposed amendment project.

Page 13: Form–1 for Amendment in Environment Clearanceenvironmentclearance.nic.in/writereaddata/modification/PreviousTOR… · Form–1 for Amendment in Environment Clearance 2 with distance

Form–1 for Amendment in Environment Clearance

13

• Supporting infrastructure

(roads, power supply, waste

or waste water treatment,

etc.)

• housing development

• extractive industries

• supply industries

• other

9.2 Lead to after-use of the site,

which could have an impact on

the environment

No Not Applicable

9.3 Set a precedent for later

developments

No Not Applicable

9.4 Have cumulative effects due to

proximity to other existing or

planned projects with similar

effects.

No There will be no environmental effects or the

potential for cumulative impacts with other

existing or planned activities in the locality.

(II) Environmental Sensitivity

S.

No.

Areas Name/

Identity

Aerial distance (within 15 km.) Proposed project

location boundary

1 Areas protected under international

conventions, national or local

legislation for their ecological,

landscape, cultural or other related

value.

None There are no areas protected under

international conventions, national or local

legislation for their ecological, landscape,

cultural or other related value within 15 km

radius of the plant site.

2 Areas which are important or

sensitive for ecological reasons-

Wetlands, watercourses or other

water bodies, coastal zone,

biospheres, mountains, forests

Yes • Chhoiya Nadi (500 m in West direction)

• Kali Nadi (5.0 km in SW direction)

• Upper Parichhatgarh distributary (7.0 km in

NE direction)

• Anupshahr Branch - Upper Ganga Canal

(10.0 km in East direction)

3 Areas used by protected, important None There are no areas used by protected,

Page 14: Form–1 for Amendment in Environment Clearanceenvironmentclearance.nic.in/writereaddata/modification/PreviousTOR… · Form–1 for Amendment in Environment Clearance 2 with distance

Form–1 for Amendment in Environment Clearance

14

or sensitive species of flora or fauna

for breeding, nesting, foraging,

resting, over wintering, migration

important or sensitive species of flora or fauna

for breeding, nesting, foraging, resting, over

wintering, migration within 15 km radius of the

plant site.

4 Inland, coastal, marine or

underground waters

None There is no coastal or marine water body within

15 Km radius from the plant Site.

5 State, National boundaries None There is no state or national boundary within 15

km radius of the plant site.

6 Routes or facilities used by the public

for access to recreation or other

tourist, pilgrim areas

Yes • NH-235 (~10 km in WSW direction)

• SH-14 (2 km in North direction)

7 Defense installations None There is no defense installation within 15 km

radius of the plant site.

8 Densely populated or built-up area Yes Mundali village (1.8 km in SW direction)

Town - Kharkhauda (11.0 km in WSW direction)

9 Areas occupied by sensitive man-

made land uses (hospitals, schools,

places of worship, community

facilities)

Yes Primary schools, dispensaries, hospitals, places

of worship, community facilities is available in

nearby area.

10 Areas containing important, high

quality or scarce resources (ground

water resources, surface resources,

forestry, agriculture, fisheries,

tourism, minerals)

Not

Applicabl

e

None in close proximity of site to have any

effect.

11 Areas already subjected to pollution

or environmental damage. (those

where existing legal environmental

standards are exceeded)

- There is no area already subjected to pollution

or environmental damage within 15 km radius of

the plant site.

12 Areas susceptible to natural hazard

which could cause the project to

present environmental problems

(earthquakes, subsidence, landslides,

erosion, flooding or extreme or

adverse climatic conditions)

- No area susceptible to natural hazard which

could cause the project to present

environmental problems exists within 15 km

radius of the plant site.

Page 15: Form–1 for Amendment in Environment Clearanceenvironmentclearance.nic.in/writereaddata/modification/PreviousTOR… · Form–1 for Amendment in Environment Clearance 2 with distance

Form–1 for Amendment in Environment Clearance

15