altran china ait - 3s consulting group

48
Service Catalogue 2018

Upload: others

Post on 06-Oct-2021

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Altran China AIT - 3S Consulting Group

Service Catalogue

2018

Page 2: Altran China AIT - 3S Consulting Group

2

Summary

A.Company introduction

B.Service catalog summary

C.Offer introduce and reference

D.Delivery model summary

E.Project following-up and client satisfaction monitoring

F.Escalation - Early warning, Crisis management

G.Key Contact

Page 3: Altran China AIT - 3S Consulting Group

Company introduction

Company Name The 3S Consulting Group

公司中文名上海箴思汽车工程咨询有限公司

Headquarter Shanghai office Room 2248, Floor 2, No. 488 Anchi Road, Jiading District,

Shanghai, 201805 P. R. China

中国上海市嘉定区安驰路488号 CAS汽车广场二楼2248室

Half hour trip circle to our company Half hour to Shanghai Hongqiao International Airport and High

Metro Station

距上海虹桥国际机场,虹桥高铁站30分钟以内车程

Page 4: Altran China AIT - 3S Consulting Group

3S Consulting company is consulting service provider, focusing on engineering, supply chain management,

manufacturing & logistics, and related training in automotive industry. Main service include below 4 sections.

A. In

Company introduction

Engineering

Including project management, engineering design,

engineering quality & test, simulation analysis, and

simultaneous engineering

Supply chain management

Include potential supplier evaluation, supplier

development, supplier quality management, supplier

improvement, and process audit

Manufacturing and Logistics

Include production planning, manufacturing

engineering, production quality management,

components sorting & inspection, and intra plant

logistics

Training and Promote

Include OEM quality development process, problem

solving, quality tools, quality management systems,

process audit, Lean 6 sigma and etc.

Page 5: Altran China AIT - 3S Consulting Group

5

Service catalog summary

Page 6: Altran China AIT - 3S Consulting Group

6

Engineering(1/3)

Our consultants manage and coordinate the project to ensure that all of milestones meet the plan.

To ensure that the project team communicates with clients smoothly.

Good project risk control.

Communicate with supplier, and related departments about the design/layout/package and push the design frozen

process.

Creating specification together with expert

Finish 2D drawing and 3D data together with supplier.

Meet schedule

Engineering Design

Project Management

Offer introduce

Page 7: Altran China AIT - 3S Consulting Group

7

Comprehensive application of advanced product quality planning tool, to ensure product quality.

Our consultant keep good communication with team and clients.

Including structure, BIW, NVH, Battery pack, and etc.

Use Ansys, Hypermesh and other analysis software

Track the related test, complete the simulation and test, and output the simulation report

Simulation Analysis

Engineering(2/3)

Engineering Quality & Test

Offer introduce

Page 8: Altran China AIT - 3S Consulting Group

8 8

Feasibility of process optimization/Cost optimization/Working hour reducing/Quality improvement plan

Ensure production technology and manufacturing capacity of components or assemblies meet the requirements of

the SOP.

Engineering(3/3)

8

Simultaneous Engineering

Offer introduce

Page 9: Altran China AIT - 3S Consulting Group

9

Engineering

Project Overview

o Project plan: Establish car-building plan of all phase of two projects.

o Process coordination: track vehicle online assembly as planned, monitor part delivery, regularly report for key parts.

o If any design issue or supplier quality issue, collect data about MPF, organize MPF meeting regularly, complete the meeting minutes, and follow up

the subsequent progress of issues.

Project Management

Achievement & Key data

o The milestones can be guaranteed.

o Project quality documents are complete and meet the requirements of the development

process.

o The project budget is not overweight.

o Client : DPCA

o The number of the consultant : 4

Offer reference

Page 10: Altran China AIT - 3S Consulting Group

10

Engineering

Project Overview

o Design SILL mounding rear and carpet

o Optimize the 3D model

o Finish 3D data release

o Finish FDJ data release

Engineering Design

Achievement & Key data

o Lead the design of Interior.

o Meet the project schedule.

o Help the clients trained 3 engineers

o Client : VCC

o The number of consultants : 1

Offer reference

Page 11: Altran China AIT - 3S Consulting Group

11

Engineering

Project Overview

o Shenzhen DENZA new technology co., LTD. was established jointly by BYD and Daimler , it is a joint venture enterprise, it was formally established in

2010, headquartered in Shenzhen .

o D FMEA on-site assessment

o D FMEA drafting (OV DFMEA)

o DFMEA review + rewrite (Systems + Sub systems+ Parts DFMEA)

Engineering Design - D FMEA

Achievement & Key data

o On time finished the D FMEA

o Gave the client team training

o Better product reliability

o Decrease the failures rate

o Client : DENZA

o The number of consultants : 2

Offer reference

Page 12: Altran China AIT - 3S Consulting Group

12

Engineering

Project Overview

o For a certain model of FCA, the navigation system failure rate is high, the market failure rate of the first 3 months is up to 3.63%

o Our consultants collected after defect data, and using Plato accurately find out the Top issues.

o Get the defective parts log in the vehicle verification and validation test , and use appropriate quality analysis tools to find out the root cause ,

work out corrective and preventive action.

o The implementation of long-term validation test to verify the effectiveness of corrective and preventive actions.

o Based on the data of after-sales return items set up quality chart to monitor the downtrend of defect rate.

Engineering Quality

Achievement & Key data

o Our consultants help clients set up a team to improve the quality level of navigation system,

the team members including OEM and parts suppliers.

o Compare with 2014 model ,the navigation system defect rate of 2015 model just is 0.92%,

reduced 74.5%.

o Client : FCA

o The number of the consultants : 1

Offer reference

Page 13: Altran China AIT - 3S Consulting Group

13

Engineering

Project Overview

o Responsible for modeling simulation of core, module and battery pack, and proposed optimization plan for structural design through simulation

analysis

o Based on the national standard, conduct the analysis of battery pack the static, modal, random vibration, extrusion, mechanical impact and relevant

simulation and experimental verification

o Track the related structural test of battery pack, complete the simulation and test, and output the simulation report;

o Based on the simulation and test accumulation, a simulation and test related technical standard of battery pack structure design was established.

Simulation Analysis

Achievement & Key data

o Dig out the design issues

o Optimized the structure

o Saved the development cost

o Reduce the development time more than 2 weeks

o Client : SVW

o The number of consultants: 1

Offer reference

Page 14: Altran China AIT - 3S Consulting Group

14

Engineering

Project Overview

o PSA Shanghai R&D center was established in 2008. It is a only R&D center that was set up outside French . It provides product development and

technical support to global market.

o Project Scope:

Confirm the new designed parts to be able to meet the relevant PSA assembly specifications and manufacturing standards.

During the product development , analyze the assembly feasibility of assembly parts, and provide the most reliable assembly proposal.

Provide the technical specifications of the relevant equipment and tools.

Through digital simulation and physical assembly to verify assembly feasibility of the parts and man-machine engineering.

Technical support for assembly-line vehicle assembling test , verify the assemblability of part and summarize Lessons Learned.

Simultaneous Engineering

Achievement & Key data

o Successfully completed the simultaneous engineering of two global project (C84 P23C).

Offer assembly quotation of all assembly parts.

Define all process specifications in projects.

Set up technical requirements of facilities and tools.

o Help the client to improve the efficiency of the design work:

Manage operators' safety risk.

Control assembly time.

Reduce debugging time

Save development costs by reducing the number of tools

o Client : PSA

o The number of consultants : 2

Offer reference

Page 15: Altran China AIT - 3S Consulting Group

15

Supply Chain Management(1/3)

Evaluate and grade the supplier

Work out roadmap

Push the improvement of potential supplier

Multi-skill team will help suppliers totally improve the ability of technology, management, quality, etc.

Ensure communicate smoothly between supplier and client

Supplier Development

Potential Supplier Evaluation

Offer introduce

Page 16: Altran China AIT - 3S Consulting Group

16

Professional SQE have related product/technology background.

SQE deal with the relationship with suppliers.

Good supply chain risk control.

Based on the process audit results, involve in the problem solving process.

Track the implementation of the corrective and preventive actions, verify the effectiveness of the corrective and

preventive actions.

Regularly report the actual situation.

Supplier Improvement

Supplier Quality Management

Offer introduce

Supply Chain Management(2/3)

Page 17: Altran China AIT - 3S Consulting Group

17

According to quality standards that the client specified (such as ISO/TS, VDA, etc.)

Certificated auditors perform audit, and send the audit report.

Perform special project capacity audit, ensure that the supplier has the ability to meet the demand.

Process Audit & Capacity Audit

Offer introduce

Supply Chain Management(3/3)

Page 18: Altran China AIT - 3S Consulting Group

18

Supply Chain Management

Project Overview

o BMW Motorcycle manufactures two kinds of motorcycle , needs to develop a batch of local suppliers.

o Evaluate potential supplier according to BMW SPS check list:

Management / Design and development / Innovation / Sub-supplier management / Production/technology / Quality / Logistics

Potential supplier evaluation

Achievement & Key data

o Evaluate 115 BMW potential suppliers in total.

o Track/Coach 35 of all potential suppliers

o In the end,29 potential suppliers enter ed the qualified supplier list of BMW Motorcycle.

o Client: BMW Motorcycle

o The number of consultants: 4

Offer reference

Page 19: Altran China AIT - 3S Consulting Group

19

Supply Chain Management

Project Overview

o DGRC (Daimler China) need to develop new supplier, but the ability level of new supplier is too low for Daimler.

o Coach the potential suppliers of DGRC comprehensively, heavily promote these suppliers in three to six months.

Supplier site evaluation

Improve roadmap planning

The execution of improvement plans

Pre-audit

DGRC project acceptance check

Supplier Development

Achievement & Key data

o Through comprehensive coach ,we changed results of three potential supplier

audit ,promoted red light to green light, successfully entered the DGRC qualified supplier

list.

o Through comprehensive coach ,we changed results of two potential supplier

audit ,promoted yellow light to green light, successfully entered the DGRC qualified

supplier list.

o Client : DGRC(Daimler China)

o The number of consultants: 3

Offer reference

Page 20: Altran China AIT - 3S Consulting Group

20

Supply Chain Management

Project Overview

o BMW China, there are a lot of new ongoing projects, lack of (have related technology background) senior SQE.

o Our company signed related service framework agreement with BMW China in 2014 Q1,according to the agreement , our company sent 15 senior

SQE to BMW China.

o Comprehensively use 5 TS quality tools to proceed advanced supplier quality management。

› Manage and train supplier according to clients’ special requirements and related quality tools.

Supplier Quality Management (Development phase)

Achievement & Key data

o Every SQE manage two to four suppliers at the same time , work on three to five new

projects.

o Every project delivery must meet project quality goal.

o The actual milestone is 4.6 days ahead of project milestone requirement on average.

o Client : BMW China

o The number of consultants : 5

Offer reference

Page 21: Altran China AIT - 3S Consulting Group

21

Supply Chain Management

Project Overview

o Nissan Spain commercial vehicle purchased parts in China.

o Our consultants help Nissan Spain to manage the supplier of China.

o Our consultants help Nissan Spain to solve the supplier quality problem in China, at the same time, through training and coaching to help suppliers

improve the problem solving process.

o Count supplier monthly return quantity, the number of customer complaints, supplier quality issue list, calculate SPPM data , and find out key

suppliers monthly, push the quality improvement of key supplier .

Supplier Quality Management(Production phase)

Achievement & Key data

o Help Nissan Spain to manage five China supplier.

o Set up a supplier performance management system for the five suppliers.

o Improve supplier problem solving process, improving the efficiency of supplier problem

solving

o Client : Nissan Spain

o The number of consultants : 1

Offer reference

Page 22: Altran China AIT - 3S Consulting Group

22

Supply Chain Management

Project Overview

o As T1 supplier of Chang’an Ford(CAF) , Faurecia has some quality problem repeating in mass production stage.

o For supplier quality problems , our consultants use Plato to find out the main problems.

o Our consultants use 8D method to lead the team to find the root cause of quality problem, work out corrective and preventive actions, prevent the

quality problem no longer reoccur.

Supplier Improvement

Achievement & Key data

o A total of 21 supplier quality problems were solved.

o Push the establishment of the supplier quality wall, make sure the supplier PVNC system

effective operation.

o Identify and solve the problem of the differences between the control plan and the actual

operation.

o Collaborate with logistics and product development department , solve the problem of

product damage during transport.

o Client : CAF (Chang’an Ford)

o The number of consultants: 1

Offer reference

Page 23: Altran China AIT - 3S Consulting Group

23

Supply Chain Management

Project Overview

o DENZA is the joint venture (BYD and Daimler),

o DENZA have less capability and capacity about VDA6.3 process audit.

o 3S help DENZA to do annual process audit, using Daimler and VDA6.3 standard.

o Also during audit, coaching DENZA SQE to get more actual audit experience.

o Process audit coverer by below parts and components.

Power-train

Chassis

Exterior & Interior

Battery & Electronic

Process audit

Achievement & Key data

o 15 pcs VDA6.3 audit are conducted.

o 6 DENZA SQE are trained.

o Some supplier quality are improvement by process audit.

o Supplier are more familiar with Daimler requirement and VDA6.3 standard.

o Client:DENZA

o The number of consultants: 3

Offer reference

Page 24: Altran China AIT - 3S Consulting Group

24

Supply Chain Management

Project Overview

o According to CMA standard of Volvo to capacity audit , and send the complete capacity audit report to client.

o work out audit plan, including the following:

Layout

The customer data management

The capacity management

The production control

The inventory management

o Perform capacity audit, duration is 1 working day

o Prepare production audit report

Capacity Audit

Achievement & Key data

o Within one working day after the audit is end, submit audit reports to the client.

o Define the appropriate action plan with supplier.

o A total of 82 suppliers have been audited, clients are fully satisfied.

o Client : Volvo Group

o The number of consultants: 3

Offer reference

Page 25: Altran China AIT - 3S Consulting Group

25

Manufacturing and logistics(1/3)

Develop related projects on the basis of fully understanding the definition, application of the product and process.

Establish an advanced production line that meets related design concept.

Production line equipment / process development

Production line equipment / process problem solving

Production line equipment / process improvement

Manufacturing Engineering

Production Planning

Offer introduce

Page 26: Altran China AIT - 3S Consulting Group

26

Investigate on site and output the list of problem

Analyse the list of problem and determine priority of problems

Seek the root cause of problem

Make out corrective action plan according to the root cause

Push the implementation of corrective actions

Production or the supplier’s production cannot match the quality requirements

Setup a team to sort or inspect the part with a reactivity of 24h

The project manager will confirm inspection criteria and inspection WI with the clients before inspection kick-off

Components Sorting & Inspection

Manufacturing and logistics(2/3)

Production Quality Management

Offer introduce

Page 27: Altran China AIT - 3S Consulting Group

27 27

Some experienced experts will come to research the current situation of your plant

The experts will provide and discuss the related constructive planning with you

The experts will work with your team, perform and perfect the improvement plan

Manufacturing and logistics(3/3)

27

Intra Plant Logistics

Offer introduce

Page 28: Altran China AIT - 3S Consulting Group

28

Manufacturing and logistics

Project Overview

o Shanghai Volkswagen Nanjing plant was the first OEM which was established by Shanghai Volkswagen outside Shanghai, annual production

capacity designed is 400000, including hot car models such as New Passtat , New Lavida etc.

o This project is to add Surperb NF(Skoda) in assembly line, platform span is huge, and it is based on the fully new platform to build, project duration is

tight, pressure of project implementation is very big.

Production Planning

Achievement & Key data

Framer station integration solutions:

o For key assembly station, Framer1, increase robots from 6 to 12 units, at the same time,

add 2 sets of electric hoist system and model-switching mechanism.

o This project adopts advanced offline integration technology, pre-assembling for

subsequent assembly, move the pre-assembled modules into the station.

Wheel roller hemming solutions:

o A station need to integrate two kinds of wheel roller hemming.

o For the technical difficulties, the project adopts the advanced roller hemming technology

of ABB, robot switching grab membranes, so as to adapt the different modelling and

match a variety of different models.

o Client : SVW (Nanjing plant)

o The number of consultants : 1

Offer reference

Page 29: Altran China AIT - 3S Consulting Group

29

Manufacturing and logistics

Project Overview

o Confirm the quantity of issues completed situation of SNT with maintainer and user

o Prepare these new EC for equipment and collect the related information

o Join APAC F/T Mechanical Net work meeting to share experience with APAC team

Manufacturing Engineering

Achievement & Key data

o Finished 18 PCS SNT issue

o Submit 10 PCS EC

o Client : VCC

o The number of consultants: 1

o Date : 2017H2

Offer reference

Page 30: Altran China AIT - 3S Consulting Group

30

Manufacturing and logistics

Project Overview

o BDNT (Shenzhen BYD Daimler new technology co., LTD.) was established jointly by BYD and Daimler , it is a joint venture enterprise, it was formally

established in 2010, headquartered in Shenzhen . BDNT developed a new energy automobile brand DENZA, focus on new energy vehicle technology

research and development.

o Our consultants help clients to build and maintain quality assurance system of the assembly plant.

o Monitor assembly process performance, assure the quality of assembly process.

Production Quality Management

Achievement & Key data

o Established a set of perfect process quality control system.

o Set up ABC - 3 levels file system:

A level - the quality manual

B level - Procedure files, total 20

C level - Work instructions, total 21

o Established process quality performance evaluation system.

o Client :BDNT

o The number of consultants : 1

Offer reference

Page 31: Altran China AIT - 3S Consulting Group

31

Manufacturing and logistics

Project Overview

o Clients’ production cannot match the requirements

o 3S align the quality standards with both OEM and Faurecia team.

o 3S project team to check the parts based the aligned quality standards

Components sorting & inspection

Achievement & Key data

o Setup a team to sort or inspect the part with a reactivity of 24h.

o Provided detail result with analysis of the defect to help the clients for the improvement

o Secure the deliveries or OEM incoming components

o Client : Faurecia

o Team size : 10

Offer reference

Page 32: Altran China AIT - 3S Consulting Group

32

Manufacturing and logistics

Project Overview

o Based on the client needs, confirm with clients again and again, at the same time, ask the client to provide the necessary basic data as input, such as

customer designed capacity, tact time, BOM , the plant delivery cycle, packaging standardization level, the number of door-to-door suppliers , etc.

o Strict audit the basis data that was provided by clients , prevent basic data errors to affect the effect of the whole planning and bring client complaints.

o Based on identified clients' needs and basic data, provide the optimization of plant logistics solutions for the clients, and let the clients review and

approval the solutions.

o Work with clients’ logistics team, implement the plant logistics solutions that was approved by the clients, and review the progress of the project at

milestones , monitor project progress and identify the project risk in time.

Intra Plant logistics

Achievement & Key data

o Parts incoming delivery cycle is 2 to 3 hours.

o Production square: Logistics square 3:1

o Material JST rate is 60.5%.

o Door-to-door: home-delivery 58:166

o Client : Chery

o The number of consultants: 2

Offer reference

Page 33: Altran China AIT - 3S Consulting Group

33

Training & Promote(1/3)

Coach and promote suppliers in specific development tools of OEM, quality management system, etc.(from RFQ to

SOP stage),.

Provide a set of training and coaching with the development tools and methods of OEM, the training will be

conducted by the consultant who has a lot of experience of OEM.

Coach the employees of clients use tools such as 8D, fishing bone, etc.

Coach problem solving project of clients

Monitor the implementation of corrective and preventive actions

Problem Solving

OEM Development Process

Offer introduce

Page 34: Altran China AIT - 3S Consulting Group

34

Training & Promote(2/3)

5 quality tools: APQP, PPAP, FMEA, SPC, MSA

Train and coach trainees on quality tool skill

IATF16949, VDA6.1 quality system training

VDA6.3 process audit training

Plan and draft the quality system documents

Train quality system documents and coach implementation of the quality system documents

Quality management systems

Quality tools

Offer introduce

Page 35: Altran China AIT - 3S Consulting Group

35

Training & Promote(3/3)

VDA6.3 process audit Training

Class training and on-site actual audit training

System audit training, IATF16949, VDA6.1 training

Product audit, Requalification training

Provide a full set of 6Sigma method (DMAIC) and lean tools (5S, beat time, etc.) for training and coaching

During project ongoing, coach the team

After the success of project , issue certificates of qualification to trainees

Lean 6Sigma

Audit

Offer introduce

Page 36: Altran China AIT - 3S Consulting Group

36

Training & Promote

Project Overview

o CAPSA (Chang'an Peugeot) is a joint venture company that was established by Changan group and PSA in 2011.

o CAPSA completely outsourced the training and examination.

o In different locations (Shanghai, Beijing, Shenzhen and Wuhan) trained CAPSA Q3P development process, training duration is 3 days.

o Training by the professional consultants who are familiar with CAPSA Q3P development process.

o Send training progress reports/test results to R&D quality department every week.

OEM Development Process

Achievement & Key data

o Provide a full set of CAPSA Q3P development process training to CAPSA suppliers.

o More than 100 CAPSA parts suppliers attended the training.

o The total number of training people is more than 400.

o Client: CAPSA

o The number of consultants : 4

Offer reference

Page 37: Altran China AIT - 3S Consulting Group

37

Training & Promote

Project Overview

o SFH diesel engine is widely used in commercial vehicles, engineering machinery, ships and generator.

o The client faced all kinds of problems during quality problem solving: lack of method, no systematic effectiveness verification of corrective and

preventive actions, lack of professional skills.

o Our consultant help SFH to solve problems ,at the same time, our consultant provide training and coaching, let trainees improve quality problem

solving skill in actual problems, problem solving tools include:

8D, 5WHY, Fishbone diagram, MSA

Problem solving

Achievement & Key data

o The timely closing rate of quality problem is from 29% to 44%.

o Train 12 core members of problem solving team.

o Client: SFH

o The number of consultants: 1

Offer reference

Page 38: Altran China AIT - 3S Consulting Group

38

Training & Promote

Project Overview

o In March 2015, Loncin signed with Germany BMW motorcycle, cooperated to build pedal motorcycle. BMW request Loncin to execute the quality

standard of automobile industry , Loncin whole-motorcycle SQE team members are mostly not from the automotive industry, not familiar with

automotive industry quality standards, and most of the members are quite young, lack of experience.

o The expectations of Loncin is that trainees can master the following skills through this training:

Independently manage new part supplier development

Implement supplier process audit independently

Help and promote supplier quality problem solving independently

Quality Tools

Achievement & Key data

o Through training, the trainees to be familiar with TS five manual, train a total of 100 +

trainees, 20 core trainees.

o Quality Tools including:

APQP/PPAP/MSA/SPC/FMEA

Problem solving 8D

Project Management

Process audit

o Client: Loncin

o The number of consultants: 2

Offer reference

MoTu We Th Fr Sa Su Mo Tu We Th Fr Sa Su Mo Tu We Th Fr Sa Su Mo Tu We Th Fr Sa Su Mo Tu We Th Fr Sa Su Mo Tu We Th Fr Sa Su Mo Tu We Th Fr Sa Su Mo Tu We Th Fr Sa Su Mo Tu We Th Fr Sa Su Mo Tu We Th Fr Sa Su Mo Tu We Th Fr Sa Su Mo Tu We Th Fr Sa Su Mo Tu We Th Fr Sa Su Mo Tu We Th Fr Sa Su Mo Tu We Th Fr Sa Su Mo Tu We Th Fr Sa Su Mo Tu We Th Fr Sa Su Mo Tu We Th Fr Sa Su Mo Tu We Th Fr Sa Su Mo Tu We Th Fr Sa Su Mo Tu We Th Fr Sa Su Mo Tu We Th Fr Sa Su Mo Tu We Th Fr Sa Su Mo Tu We Th Fr Sa Su Mo Tu We Th Fr Sa Su

# 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

8:30-11:30 AM ● ● ● ● ● ● ● ● ● ● ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○

1:30-4:30 PM ● ● ● ● ● ● ● ● ● ● ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○

8:30-11:30 AM ● ●

1:30-4:30 PM ● ●

8:30-11:30 AM ●

1:30-4:30 PM ●

8:30-11:30 AM ● ● ● ● ● ● ● ○ ○ ○

1:30-4:30 PM ● ● ● ● ● ● ● ○ ○ ○

8:30-11:30 AM ● ● ● ● ○ ○ ○ ○

1:30-4:30 PM ● ● ● ● ○ ○ ○

8:30-11:30 AM ● ● ○ ○ ○ ○

1:30-4:30 PM ● ● ○ ○ ○ ○

8:30-11:30 AM ● ● ○ ○ ○

1:30-4:30 PM ● ● ● ● ○ ○ ○

8:30-11:30 AM ○ ○ ○

1:30-4:30 PM ○ ○ ○ ○

8:30-11:30 AM ○ ○

1:30-4:30 PM ○ ○ ○

8:30-11:30 AM ○ ○ ○

1:30-4:30 PM ○ ○ ○

1 VDA audit

8 Control Plan

7 PPAP

Sep-15 Oct-15

CW43 CW44 CW45CW36 CW37 CW38 CW39 CW40 CW41 CW42

Remark: ○: Planning ●: Finished ●: Delay

Time

4 APQP

3 SPS

6 Problem Solving Process & 8D

5 P-FMEA

9 MSA

10 Capabilities studies & SPC

2 Project management

CW35NO

.Training Course

CW33 CW34

August--15

CW48 CW49 CW50

Nov-15

CW46 CW47 CW04 CW05

Dec-15 Jan-16

CW51 CW52 CW01 CW02 CW03

Training finish CW51

Page 39: Altran China AIT - 3S Consulting Group

39

Training & Promote

Project Overview

o Gangyang has passed TS16949 system certification, but the effectiveness of TS16949 system is still a problem, the actual execution and system

documents have large gap, specific problems are as below:

Frequency of internal system audit is not enough, can not find the problem in time.

Process audit is not implemented effectively.

Mistake proofing of production line is without verification.

The team didn’t get sufficient training, control plan was non-conforming.

o Clients' expectations is to solve the gap between implementing and documents of quality management system.

Quality management systems

Achievement & Key data

o Our consultants integrated the system documents , COP process files 6 PCS ,MP

process files 9 PCS, SP process files 9 PCS.

o Main delivery:

System documents audit report

Integrated procedure files

Procedure files audit report

LOP

Roadmap

o Client:Gangyang

o The number of consultants: 2

Offer reference

Page 40: Altran China AIT - 3S Consulting Group

40

Project Overview

o Beijing Beinei is the Daimler local supplier, and his quality system is the typical china government style. And the customer require Beinei to set up the

VDA quality system.

o We help Beinei to set up new VDA quality system. Main elements are as below.

Project management system ; Manufacture process quality control process; Internal audit system;Capability verification system; Non-conform

management system; Measurement system; Maturity level, Q-gate control system.

o VDA standard training to Beinei.

o Quality tools training to Beinei.

o Annual audit conduct.

Achievement & Key data

o Beinei successful setting up VDA system.

o Beinei have a potential ability to get award for other Germany OEM project. Eg. BMW

camshaft project, VW con-rod project.

o Successful pass the Daimler SOP VDA6.3 process audit.

o Some qualify Beinei staff are trained. And they are transfer to other BAIC company to

extend the quality system.

o Client:Beinei

o The number of consultants: 2

Offer reference

Quality management systems

Training & Promote

Page 41: Altran China AIT - 3S Consulting Group

41

Training & Promote

Project Overview

o Loncin is the OEM, motor vehicle manufacture to BMW brand motor.

o But Loncin quality system have big gap with BMW customer requirement.

o As NOK rate is very high, quality and capacity can’t satisfy BMW requirement.

o Also as Loncin low performance result BMW project SOP postpone for several months.

o Improve and optimize the quality system by BMW and VDA requirement.

Quality systems improved

Offer reference

Achievement & Key data

o Loncin pass BMW process audit, yellow release.

o NOK rate is down. Much quality cost saving.

o Help Loncin to optimize the quality system.

o Good reputation from Loncin to BMW.

o Client: Loncin

o The number of consultants: 2

Page 42: Altran China AIT - 3S Consulting Group

42

Training & Promote

Project Overview

o BYD want input VDA6.3 standard, and use it to manage BYD suppliers.

o BYD SQE team have no any VDA6.3 background.

o 3S help BYD to set up VDA6.3 ability. Action as below.

VDA6.3 class training to BYD.

Quality tools training to BYD, APQP, ISIR(PPAP), SPC, MSA, FMEA, 8D, Maturity level, Q-gates.

On-site VDA6.3 reality audit to BYD supplier, coaching BYD SQE on site. (3S leader auditor)

Qualify and verification BYD SQE. (BYD SQE conduct BDA6.3 audit and 3S check on-site).

VDA6.3 training and coaching qualify VDA6.3 auditors.

Achievement & Key data

o BYD successful setting up a VDA6.3 SQE team.

o VDA6.3 standard was input to BYD supply chain.

o BYD supplier quality improvement according to audit.

o 2 rounds VDA6.3 training were conducted.

o 26 pcs VDA6.3 process audit were conducted.

o 3 BYD SQE are qualified to have ability of VDA6.3 lead auditor.

o Also some other SQE get VDA6.3 knowhow and will grow up to Lead auditor in next

2years.

o Client:BYD

o The number of consultants: 2

Offer reference

Page 43: Altran China AIT - 3S Consulting Group

43

Training & Promote

Project Overview

o Our consultants provided a fully set of training of 6Sigma method(DAMIC) and lean tools(5S,Takt Time etc.) to clients.

o Through training, optimize clients’ manufacturing process, improve work efficiency, increase tact time, achieve the goal of production cost down.

o 6Sigma method is a set of very practical tools, we coach trainees’ specific project , during project ongoing, give necessary pressure to the trainees to

push trainees upright learning attitude, guarantee the training effect.

o Test and certificate the trainees.

Lean 6Sigma

Achievement & Key data

o Duration is 10 days, five training modules were completed.

o A total of 22 people completed the training and coaching.

o Client: SXQC

o The number of consultants: 2

Offer reference

Page 44: Altran China AIT - 3S Consulting Group

Delivery Model Summary

Working Environment

Provided

Risk-sharing

Quality Management System

Work Specifications/Detailed

Tech.Requierement

Schedule Management

Resource Management

Staff Management

Performance Evaluation

Billing Process

Customer Needs

Technical support service

Delivery Model A

Structured team service

Delivery Model B

Work Package

Delivery Model C

Super Work Package

Delivery Model D

Client Satisfaction Service Level

Agreement Formal acceptance

delivery Completion Work Activities

/Work Units

Time Time Achievements &

Deliverables

Scope of work and

requirements are not

clear

May become work package,

but now it is managed by

client.

Share planning goals, but

we manage milestones. Long term partnership

COMPETENCES & SKILLS COMMITMENTS FIXED PRICE COMMITMENTS

Achievements &

Deliverables

Page 45: Altran China AIT - 3S Consulting Group

Have kick-off meeting to confirm project goals and

activities.

Implement project following-up and monitoring customer

satisfaction at least by every quarter: measure our

performance ,and establish action plans if it’s necessary.

At the end of the project ,organize a

meeting to work out the final actions and

summarize lessons learned.

Project following-up and client satisfaction monitoring

Page 46: Altran China AIT - 3S Consulting Group

Level 3

Level 2

Level 1 Open issue

Risk

Open issue

Decision

Team leader

Project manager

Purchasing manager

GM

Technical director

Purchasing director

CEO

Technical Director

Sales Director

Technical manager

Sales manager

Project manager

The e

scala

tion p

rocess

46

Client 3S Consulting

Escalation – Early warning & Crisis management

Page 47: Altran China AIT - 3S Consulting Group

47

Key contact

刘飞斌 Sucre

(+86)1391 7233 700

(+86)21 8015 8325 ext. 808

[email protected]

上海箴思汽车工程咨询有限公司

Address: Room 2248, Floor 2, No. 488 Anchi Road, Jiading District, Shanghai, P.R.China

地址:上海市嘉定区安驰路488号 CAS汽车广场二楼2248室

Website: www.3SConsulting-group.com

Page 48: Altran China AIT - 3S Consulting Group

48

Official account