The future of the Metro Operation in the Greater Wellington Region TAKING WELLINGTON METRO OPERATIONS TO THE NEXT LEVEL Alan Bannister Managing Director

Upload: others

Post on 25-Jul-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Alan Bannister Managing Director - RTSA · Alan Bannister Managing Director . What we will cover • Introduction • Transdev and Transdev Australasia • Overview of the contract

To change the

picture, delete it then

insert the one you

want on the

dedicated location or

click on the icon at

the center

The future of the Metro Operation in the Greater Wellington Region

TAKING WELLINGTON METRO OPERATIONS TO THE NEXT LEVEL

Alan Bannister

Managing Director

Page 2: Alan Bannister Managing Director - RTSA · Alan Bannister Managing Director . What we will cover • Introduction • Transdev and Transdev Australasia • Overview of the contract

What we will cover

• Introduction

• Transdev and Transdev Australasia

• Overview of the contract and our relations with our stakeholders

• From our bid to transition and the future

• Transdev Wellington; who we are (our people)

• What we have achieved so far

• Our role as a delivery partner User requirements and our place in transport projects

• The future RS1 and the challenges on the infrastructure

Integrated Ticketing

• What more can we bring to the region (expanding our offering)

• Reflection The need for greater joined up development and transport planning

• Questions

2

Page 3: Alan Bannister Managing Director - RTSA · Alan Bannister Managing Director . What we will cover • Introduction • Transdev and Transdev Australasia • Overview of the contract

Transdev

Our Values

3

Page 4: Alan Bannister Managing Director - RTSA · Alan Bannister Managing Director . What we will cover • Introduction • Transdev and Transdev Australasia • Overview of the contract

Transdev Key Global Figures

4

20 COUNTRIES

€1.08 BILLION REVENUE

11,900 EMPLOYEES

THE NETHERLANDS

€0.43 BILLION REVENUE

5,300 EMPLOYEES

AUSTRALASIA

€6,6 bn REVENUES

€1.07 BILLION REVENUE 15,700 EMPLOYEES

NORTH AMERICA

€2.55 BILLION REVENUE

34,200 EMPLOYEES

FRANCE

€0.68 BILLION REVENUE 7,500 EMPLOYEES

EUROPE OTHERS*

€0.24 BILLION REVENUE 4,000 EMPLOYEES

OTHER COUNTRIES**

€0.58 BILLION REVENUE 4,400 EMPLOYEES

GERMANY

83,410 EMPLOYEES

* Portugal, Spain,

Ireland, Sweden,

Finland and United

Kingdom

** Chile, China,

Colombia, South Korea,

Israel, Morocco and

India

Page 5: Alan Bannister Managing Director - RTSA · Alan Bannister Managing Director . What we will cover • Introduction • Transdev and Transdev Australasia • Overview of the contract

Transdev Australasia

5 5,789 EMPLOYEES 131.8M PASSENGER JOURNEYS

Page 6: Alan Bannister Managing Director - RTSA · Alan Bannister Managing Director . What we will cover • Introduction • Transdev and Transdev Australasia • Overview of the contract

Transdev Wellington

Page 7: Alan Bannister Managing Director - RTSA · Alan Bannister Managing Director . What we will cover • Introduction • Transdev and Transdev Australasia • Overview of the contract

Overview of the contract and our relations with our

stakeholders

• PTOM, a first for rail

• Responded to RFT, bid period 30/4/15 to 30/9/15

• Preferred supplier announced 17/12/15

• 9 + 6 year franchise period

• Start of operations – 3 July 2016

• Delivery of bid promises contracted

Page 8: Alan Bannister Managing Director - RTSA · Alan Bannister Managing Director . What we will cover • Introduction • Transdev and Transdev Australasia • Overview of the contract

Overview of the contract and our relations with our

stakeholders

8

• Carry customers in a safe and secure environment, subject to the

Conditions of Carriage

• Service development and timetable design, including upgrade and

Special Events Timetables

• Rolling stock allocation and operational planning

• Maintenance and cleaning of rolling stock

• On-train security and the protection of revenue

• Alternative services e.g. rail replacement buses

• Project delivery partner.

Page 9: Alan Bannister Managing Director - RTSA · Alan Bannister Managing Director . What we will cover • Introduction • Transdev and Transdev Australasia • Overview of the contract

• Overview of the contract and our relations with our

stakeholders

9

Page 10: Alan Bannister Managing Director - RTSA · Alan Bannister Managing Director . What we will cover • Introduction • Transdev and Transdev Australasia • Overview of the contract

Our bid and Transition

Building on Strong Foundations and a sustainable

future for rail and public transport

Page 11: Alan Bannister Managing Director - RTSA · Alan Bannister Managing Director . What we will cover • Introduction • Transdev and Transdev Australasia • Overview of the contract

Our Approach – Safety

11

• A great deal of effort went in to understanding the As Is risk before taking over

• Important to keep the fresh eyes approach and not get used to ‘that’s how it is’ challenge is key

• We kept the incumbent Safety Manager

• Incorporating current local practice while bringing in established good practice from other parts of our business

• Managers at the coal face, walk the talk

• Share risk knowledge with all partners

• Openness.

Page 12: Alan Bannister Managing Director - RTSA · Alan Bannister Managing Director . What we will cover • Introduction • Transdev and Transdev Australasia • Overview of the contract

Transdev Wellington Organisation Chart: Senior Managers

Managing Director

Transdev Wellington Ltd

Alan Bannister

Manager Quality, Safety & Environment

Selwyn Jaquiery

Chief Operations Officer

Mike Fenton

Manager Finance & Commercial

Amish Vallabh

Manager Customer and Communications

Emily Liddell

Manager People & Culture

David Gould

Page 13: Alan Bannister Managing Director - RTSA · Alan Bannister Managing Director . What we will cover • Introduction • Transdev and Transdev Australasia • Overview of the contract

What we have already brought or will bring to

Wellington

Safety • International experience

• A great team (full license granted 24th February)

• Quality processes

• Safety training focus for all staff

Customer Experience ● Longer trains (1000 more seats in the peak)

● Increase inter peak services from September

● Focus on performance and timetable (timetable app)

● Microphones on platforms

● Managers in the field and Meet the Manager

● Uniform roll out

● More focus on customer communications (quality and quantity)

Service control ● New SCC (CCTV, Emergency Control, Public Address System)

● Staff Smart Devices for service updates and reporting (Wisper)

● Smart on-time running tools

Page 14: Alan Bannister Managing Director - RTSA · Alan Bannister Managing Director . What we will cover • Introduction • Transdev and Transdev Australasia • Overview of the contract

What we have already brought or will bring to

Wellington

14

Training

● Simulators (Ordered)

● New training facility (level 6)

● Training program for existing staff

Security ● Rail Monitoring Centre in SCC

● SCC staff visibility of CCTV

● Body Worn CCTV

Planning ● September timetable increase off peak services (well underway)

● RS1 with less changes to infrastructure

● Timetables, fleet, network and infrastructure simulations suite

● Crew/roster optimisation software (started)

Page 15: Alan Bannister Managing Director - RTSA · Alan Bannister Managing Director . What we will cover • Introduction • Transdev and Transdev Australasia • Overview of the contract

SCC, come and have a look

15

Page 16: Alan Bannister Managing Director - RTSA · Alan Bannister Managing Director . What we will cover • Introduction • Transdev and Transdev Australasia • Overview of the contract

The Results so far

16

I am proud of what we are achieving

• Performance on target

• Growth is strong

• Customer feedback positive (well most of it)

• Staff are engaged (well most of them)

• SPAD record is good

• Good relationship with our stakeholders.

Page 17: Alan Bannister Managing Director - RTSA · Alan Bannister Managing Director . What we will cover • Introduction • Transdev and Transdev Australasia • Overview of the contract

Performance

17

While our own performance is in

the mid to high 90s the customer

experience is more like 85%

Page 18: Alan Bannister Managing Director - RTSA · Alan Bannister Managing Director . What we will cover • Introduction • Transdev and Transdev Australasia • Overview of the contract

On time performance (operator only)

18

Page 19: Alan Bannister Managing Director - RTSA · Alan Bannister Managing Director . What we will cover • Introduction • Transdev and Transdev Australasia • Overview of the contract

Patronage Growth!

19

Page 20: Alan Bannister Managing Director - RTSA · Alan Bannister Managing Director . What we will cover • Introduction • Transdev and Transdev Australasia • Overview of the contract

SPAD Results

20

Page 21: Alan Bannister Managing Director - RTSA · Alan Bannister Managing Director . What we will cover • Introduction • Transdev and Transdev Australasia • Overview of the contract

Our role as a Delivery Partner

21

• Long term partner with stake in the future of

New Zealand

• Commitment to share our knowledge and

experience for the greater good of the

industry/region

• A delivery partner not just an operator.

Page 22: Alan Bannister Managing Director - RTSA · Alan Bannister Managing Director . What we will cover • Introduction • Transdev and Transdev Australasia • Overview of the contract

Our place on the V

22

Identify Need

Transdev main focus

Page 23: Alan Bannister Managing Director - RTSA · Alan Bannister Managing Director . What we will cover • Introduction • Transdev and Transdev Australasia • Overview of the contract

RS1

23

Page 24: Alan Bannister Managing Director - RTSA · Alan Bannister Managing Director . What we will cover • Introduction • Transdev and Transdev Australasia • Overview of the contract

RS1 (GWRC Original)

The future may be closer than we think!

24

Page 25: Alan Bannister Managing Director - RTSA · Alan Bannister Managing Director . What we will cover • Introduction • Transdev and Transdev Australasia • Overview of the contract

Our proposal from bid

25

Page 26: Alan Bannister Managing Director - RTSA · Alan Bannister Managing Director . What we will cover • Introduction • Transdev and Transdev Australasia • Overview of the contract

IFT

• Keep it simple!

• Make small steps first, what can be done now to move towards IFT?

• Timing with RS1 to balance resourcing change, this is very important to me!

26

Page 27: Alan Bannister Managing Director - RTSA · Alan Bannister Managing Director . What we will cover • Introduction • Transdev and Transdev Australasia • Overview of the contract

Growing our service offering in partnership

27

• More services inter-peak (September

changes to 20 minute services

• Better integration

• Focus on customer service, communication

and connectivity

• Wider opportunities (that lead to rail

growth):

• Tourism

• Rental bike scheme

• Other modes

• To grow rail patronage we need to think

bigger than railways!

Page 28: Alan Bannister Managing Director - RTSA · Alan Bannister Managing Director . What we will cover • Introduction • Transdev and Transdev Australasia • Overview of the contract

The Challenges

• Ticketing system

• Rail infrastructure

• Station infrastructure

• Rail/other mode interfaces (car parks and mode interface)

• Growth limiters.

28

Page 29: Alan Bannister Managing Director - RTSA · Alan Bannister Managing Director . What we will cover • Introduction • Transdev and Transdev Australasia • Overview of the contract

Questions