Page 1:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila
Page 2:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

Alamo Area Metropolitan Planning Organization

ii

FY 2021 – 2024 Transportation Improvement Program

Opportunities for Public Comment

Public Meeting Dates

All meetings were similar in content and format and were held beginning at 6:00 p.m.

Kendall County: Wednesday, September 25, 2019 at Kronkosky Place

located at 17 Old San Antonio Road, Boerne, TX 78006

Bexar County: Thursday, September 26, 2019 at VIA Metropolitan Transit, located at 1021 San Pedro, San Antonio, TX 78212.

Guadalupe County: Wednesday, October 2, 2019 at the Seguin Public

Library located at 313 W. Nolte Street, Seguin, TX 78155

Comal County: Thursday, October 3, 2019 at the New Braunfels Civic Center, 375 S. Castell Avenue, New Braunfels, TX 78130

TIP Online public involvement ran from Monday, September 23, 2019

through Thursday, October 3, 2019

Air Quality Transportation Conformity public meeting: Thursday, February 27, 2020 at VIA Metropolitan Transit located at 1021 San Pedro, San Antonio, TX 78212; online public input ran from Friday, February 14, 2020 through Sunday, March 15, 2020

Technical Advisory Committee Meeting Dates

Presentation: Friday, March 6, 2020

Action: Friday, April 17, 2020

Transportation Policy Board Meeting Dates

Presentation: Monday, April 27, 2020

Action: Monday, May 18, 2020

Page 3:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

FY 2021 – 2024 Transportation Improvement Program

iii

Table of Contents Page

I. Introduction ......................................................................................................... 1

II. Definition of Planning Area ................................................................................... 1

III. Public Involvement Process ................................................................................. 2

IV. Performance Measurement .................................................................................. 4

V. Transportation Conformity .................................................................................... 8

VI. Americans with Disabilities Act ............................................................................. 9

VII. Project Selection Process – MPO Funding Sources ............................................. 9

VIII. Funding Categories .............................................................................................. 9

IX. Progress from Previous Year.............................................................................. 10

X. Funded Highway Projects ................................................................................... 11

Fiscal Year 2021 Projects ........................................................................ 13

Fiscal Year 2022 Projects ........................................................................ 36

Fiscal Year 2023 Projects ........................................................................ 46

Fiscal Year 2024 Projects ........................................................................ 52

XI. Funded Transit Projects ..................................................................................... 55

Fiscal Year 2021 Transit Projects ............................................................ 57

Fiscal Year 2022 Transit Projects ............................................................ 62

Fiscal Year 2023 Transit Projects ............................................................ 66

Fiscal Year 2024 Transit Projects ............................................................ 69

XII. Financial Plan ..................................................................................................... 73

Roadway Financial Summary .................................................................. 75

Transit Financial Summary ...................................................................... 76

Appendix A Certifications .................................................................................. 77

MPO Self-Certification ............................................................................. 79

Project Selection Procedures ................................................................... 89

Appendix B Alphabetical Listing of Roadway, Bicycle, Pedestrian

and Rideshare Projects ............................................................... 93

Appendix C “Grouped” or “Statewide” CSJ Project Listing .............................. 107

Appendix D Environmental Clearance Projects ............................................... 123

Appendix E. Transit Project Detail .................................................................... 133

Appendix F Policy 2: Public Participation Plan ................................................ 141

Appendix G Policy 3: Guidelines for Programming Projects in the

Metropolitan Transportation Plan and the Transportation

Improvement Program ................................................................. 167

Appendix H FAST Act Requirements .............................................................. 177

Appendix I Regionally Significant Project Table ............................................... 199

Page 4:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

Alamo Area Metropolitan Planning Organization

iv

This page intentionally left blank.

Page 5:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

FY 2021 – 2024 Transportation Improvement Program

1

I. Introduction

Transportation is an important factor in all our lives. How well we get to and from work, school, hospitals, shopping centers and recreational facilities is important to us all. The ability to travel affects our socio-economic well-being. On a larger scale, the Alamo Area Metropolitan Planning Organization’s (MPO) regional economy and environment depend heavily on the condition and efficient performance of our regional transportation system. Appropriate transportation planning, recognizing the mobility needs and identifying the available resources allow for the maintenance and improvement of our transportation system, therefore affecting our economy and quality of life.

As part of the urban transportation planning process, the Transportation Improvement Program (TIP) addresses federal regulations administered by the United States Department of Transportation. It is required, as a condition of the receipt of federal capital or operating assistance, to maintain the transportation system covered by the continuing, cooperative and comprehensive transportation planning process. Essentially, the TIP is developed to ensure that imple-mentation of the transportation plan is done in an orderly manner.

The TIP outlines a financially constrained program of federally assisted

transportation projects that will be implemented over a four-year period. Projects not included in the approved TIP are ineligible to receive federal transportation assistance. The TIP consists of projects that are to be implemented over the next four fiscal years. Also included in this document are realistic estimates of project costs and revenues for the four-year time period. Priorities and financial constraint are demonstrated by grouping projects into the one-to-four year time frame.

The construction and improvement of roadways and transportation

facilities listed in the TIP will have a positive impact on the region. Some improvements will affect conditions only within the area in which they are located, yet the impact of others will extend far beyond their immediate locations. These transportation improvement projects can be expected to decrease fatal and serious injury crashes, provide travel options, reduce congestion, enhance connectivity, improve air quality, conserve energy, enhance quality of life and maintain a transportation system beneficial to the entire region.

II. Definition of Planning Area

Figure 1 shows the MPO study area which encompasses over 2,770 square miles and includes Bexar, Comal, and Guadalupe Counties and a portion of Kendall County. San Antonio is the major population and employment center in the region, the second largest city in Texas, and the third largest metropolitan area. Like many large urban areas, rapid growth and development have contributed to ever-increasing needs in transportation.

Page 6:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

Alamo Area Metropolitan Planning Organization

2

Projects included in the TIP are consistent with the MPO’s long range

transportation plan “Mobility 2045” and other planning efforts such as the City of San Antonio’s SA Tomorrow Plan, VIA Metropolitan Transit’s Vision 2040, and TxDOT’s Unified Transportation Program.

III. Public Involvement Process

The MPO’s Public Participation Plan provides for the proactive involvement of citizens, affected public agencies, transportation agency employees, private providers of transportation, and other interested parties in the development and periodic update of the FY 2021-2024 TIP. The MPO wholly supports early and continuous public involvement, reasonable public access to technical and other information, open public meetings, open access to the transportation planning and decision-making process, and effective involvement processes that are designed to be responsive to local conditions.

All meetings of the MPO Transportation Policy Board and Technical

Advisory Committee are subject to the Texas Open Meetings Act and are open to the public. Meeting notices are sent to the Texas Secretary of State, published in

Figure 1. Alamo Area Metropolitan Planning Organization Study Area

Page 7:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

FY 2021 – 2024 Transportation Improvement Program

3

the Texas Register, and posted at the Bexar, Comal, Guadalupe and Kendall County Courthouses and at the MPO offices in accordance with the Texas Open Meetings Act. All MPO meetings are accessible to persons with disabilities.

The public was afforded the opportunity to comment on all projects

proposed for inclusion in the TIP. Public comments were accepted during the MPO’s Technical Advisory Committee meetings, which were held on March 6, 2020 and April 17, 2020, and the MPO Transportation Policy Board meetings, which were held on April 27, 2020 and May 18, 2020.

Additionally, the MPO held four public meetings. All meetings began at

6:00 p.m., were similar in content and format, and were livestreamed via Facebook. Generally, each meeting consisted of an overview presentation and an audience participation exercise to gather input on current projects and propose projects for future funding. The public meeting dates, time and locations are provided below:

Kendall County: Wednesday, September 25, 2019 at Kronkosky Place

located at 17 Old San Antonio Road, Boerne, TX 78006

Bexar County: Thursday, September 26, 2019 at VIA Metropolitan Transit, located at 1021 San Pedro, San Antonio, TX 78212.

Guadalupe County: Wednesday, October 2, 2019 at the Seguin Public

Library located at 313 W. Nolte Street, Seguin, TX 78155

Comal County: Thursday, October 3, 2019 at the New Braunfels Civic Center, 375 S. Castell Avenue, New Braunfels, TX 78130

To advertise the public meetings, newspaper ads were run in the San

Antonio Express-News, New Braunfels Herald, Seguin Gazette and Boerne Star. The public meetings were also advertised through the MPO’s bi-weekly e-newsletter, “Fast Track”, on Facebook, Twitter and Instagram. The MPO’s partner agencies assisted with outreach for the meetings.

For individuals not able to attend a public meeting in person, the MPO

provided a virtual meeting process online at www.alamoareampo.org/yourmove which duplicated the in person public meeting content and format The online public input ran from Monday, September 23 through Thursday, October 3, 2019.

Other public input methods during the TIP development process included

comment cards at public meetings, the participation exercise, and e-mails, letters and speaking opportunities at TAC and TPB meetings. The comment cards allowed for input on the transit and roadway project lists as well as the effectiveness of the public involvement process itself. All materials online and at the in-person public meetings were provided in Spanish.

Page 8:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

Alamo Area Metropolitan Planning Organization

4

IV. Performance Management Federal legislation (the Moving Ahead for Progress in the 21st Century Act

[MAP-21] and the Fixing America’s Surface Transportation Act of 2015 [FAST Act]) recognizes that “performance management will transform the Federal-aid highway program and provide a means to the most efficient investment of Federal transportation funds by refocusing on national transportation goals, increasing the accountability and transparency of the Federal-aid highway program, and improving project decision-making through performance-based planning and programming” (Title 23 of the US Code Section 150). National Federal-aid Highway Program performance goals

Seven national goals were defined by MAP-21 in 2012:

1. Safety - To achieve a significant reduction in traffic fatalities and serious

injuries on all public roads. 2. Infrastructure Condition - To maintain the highway infrastructure asset

system in a state of good repair. 3. Congestion Reduction - To achieve a significant reduction in congestion

on the National Highway System (NHS). 4. System Reliability - To improve the efficiency of the surface

transportation system. 5. Freight Movement and Economic Vitality - To improve the national

freight network, strengthen the ability of rural communities to access national and international trade markets, and support regional economic development.

6. Environmental Sustainability - To enhance the performance of the

transportation system while protecting and enhancing the natural environment.

7. Reduced Project Delivery Delays - To reduce project costs, promote

jobs and the economy, and expedite the movement of people and goods by accelerating project completion through eliminating delays in the project development and delivery process, including reducing regulatory burdens and improving agencies' work practices.

Performance Measures and Targets

Final rulemakings by the Federal Highway Administration (FHWA) and

Federal Transit Administration (FTA) have since described how State DOTs and MPOs should implement performance management (PM) for Safety (PM1),

Page 9:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

FY 2021 – 2024 Transportation Improvement Program

5

Infrastructure (PM2), System Performance (PM3) and Transit Asset Management (TAM).

Safety

The Texas Department of Transportation has officially established targets

based on five-year rolling averages for five Safety performance measures:

Performance Measure 2018 Statewide Target

(Expressed as Five-Year 2014-2018 Average)

2019 Statewide Target

(Expressed as Five-Year 2015-2019 Average)

2020 Statewide Target

(Expressed as Five-Year 2016-2020 Average)

Total number of traffic related fatalities on all public roads

3,703.8 3,791.0 3,840.0

Rate of traffic related fatalities on all public roads per 100 million VMT

1.432 1.414 1.406

Total number of traffic related serious injuries on all public roads

17,565.4 17,751.0 17,394

Rate of traffic related serious injuries on all public roads per 100 million VMT

6.740 6.550 6.286

Total number of non-motorized fatalities and serious injuries on all public roads

2,150.6 2,237.6 2,285.0

On January 22, 2018, January 28, 2019, and January 27, 2020, the Alamo Area Metropolitan Planning Organization Transportation Policy Board adopted TxDOT’s statewide Safety targets and committed to plan and program projects that contribute toward their accomplishment. Additionally, on January 27, 2020, the TPB resolved to support TxDOT’s visionary goals to end traffic fatalities on Texas roads by year 2050 and reduce fatal crashes by half by year 2035.

Numerous projects adopted in the FY 2021-2024 Transportation

Improvement Program support achieving the targets established for safety and are detailed in Appendix H FAST Act Requirements.

Transit Asset Management

VIA Metropolitan Transit has adopted targets for three Transit Asset Management Performance measures:

Page 10:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

Alamo Area Metropolitan Planning Organization

6

1. Equipment - percentage of non-revenue vehicles that have either met or exceeded their useful life benchmark (ULB):

Asset Class 2020 Performance Targets Automobiles 2.69% Trucks and Other Rubber Tire Vehicles

5.91%

2. Rolling Stock - percentage of revenue vehicles that have either met or

exceeded their useful life benchmark (ULB):

Asset Class 2020 Performance Targets Articulated Bus 0% Bus 0% Vans 0%

3. Facilities – percentage of facilities rated below condition 3 (adequate) on

the TERM scale:

Asset Class 2020 Performance Targets Administrative 0% Maintenance 0% Passenger/Parking 0%

On June 22, 2020 the Alamo Area Metropolitan Planning Organization

Transportation Policy Board adopted VIA Metropolitan Transit’s performance measurement targets.

Numerous transit projects adopted in the FY 2021-2024 Transportation

Improvement Program support achieving the targets established for Transit Asset Management and are detailed in Appendix H FAST Act Requirements. Bridge/Pavement Condition

The Texas Department of Transportation has officially established and adopted year 2022 targets for Bridge and Pavement Conditions as follows:

1. Pavement in Good Condition

a. National Highway System (Interstate): 66.4% b. National Highway System (Non-Interstate): 52.3%

2. Pavement in Poor Condition

a. National Highway System (Interstate): 0.3% b. National Highway System (Non-Interstate): 14.3%

Page 11:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

FY 2021 – 2024 Transportation Improvement Program

7

3. National Highway System Bridge Condition a. Good: 50.4% b. Poor: 0.8%

At their meeting on December 10, 2018, the MPO Transportation Policy

Board adopted TxDOT’s statewide Bridge and Pavement Condition targets and committed to plan and program projects that contribute toward their accomplishment.

Within the Transportation Improvement Program, the region has included

a number of projects that will improve the pavement and bridge conditions in the region. These projects are detailed in Appendix H FAST Act Requirements.

Roadway System Performance

The Texas Department of Transportation has established and adopted year 2022 Roadway System Performance targets, a data driven statewide-coordinated system to maintain reliability for people and for freight. On December 10, 2018, the MPO Transportation Policy Board adopted targets for the study area that contribute to the State meeting its adopted targets. These targets for Roadway System Performance are as follows:

Performance Measure 2022 Statewide Target

2022 MPO Target

Interstate reliability 56.6% 65.0%

Non-interstate National Highway System reliability

55.0% 45.0%

Truck travel time reliability 1.79 2.20

The MPO understands it is not yet required to set targets for 1) Annual

Hours of Peak Hour Excess Delay per Capita, 2) Percent Non-SOV Travel; and 3) Total Emissions Reduction based on FHWA’s initial applicability (October 1, 2017) or mid-period (October 1, 2019) applicability determinations.

Within the Transportation Improvement Program, the region has included

a number of added capacity and operational projects that will improve the Interstate, non-interstate National Highway System reliability and truck travel time reliability. These projects are detailed in Appendix H FAST Act Requirements.

The MPO commits to planning and programming projects that contribute

to accomplishing the targets established for each federal performance measure as well as monitoring the established targets and providing timely reports toward progress to the Transportation Policy Board.

Page 12:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

Alamo Area Metropolitan Planning Organization

8

V. Transportation Conformity

On July 25, 2018, under the 2015 National Ambient Air Quality Standards (NAAQS), the Environmental Protection Agency (EPA) designated Bexar County as marginal nonattainment for ozone. The effective date was September 24, 2018 and the attainment date is September 24, 2021. Additional counties fully or partially within the MPO study area (Comal, Guadalupe and Kendall), were designated unclassifiable/attainment. With the nonattainment designation for Bexar County, a federal requirement called transportation conformity is necessary to continue the implementation of certain types of projects within the nonattainment area. The MPO is responsible for conducting transportation conformity on its financially constrained plans: the short-range plan, the FY 2021-2024 Transportation Improvement Program, and its long-range transportation plan, known as Mobility 2045, for certain plan milestone years: 2025, 2035 and 2045. Projects that are exempt from the transportation conformity determination are noted as such in each plan’s project listings.

The transportation conformity determination is a two-step process. First,

the MPO Transportation Policy Board makes the initial transportation conformity determination (May 18, 2020). Next, the Federal Highway Administration and the Federal Transit Administration make the final conformity determination at the federal level (not later than September 2020).

The transportation conformity analysis does not directly measure ozone

but measures ozone’s precursors which are volatile organic compounds (VOC) and nitrogen oxides (NOx). Since the Alamo Area does not yet have an emissions budget in place for this transportation conformity determination, the area is using the “less than baseline” test, where 2017 is the baseline year. The results, as documented in the 2020 transportation conformity document, show that Bexar County meets the regional air quality conformity requirements.

The public involvement process for the TIP, MTP project list and

transportation conformity document ran from Friday, February 14, 2020 through Sunday, March 15, 2020 where public comments were accepted online. A public meeting was held on Thursday, February 27 to gather comments in person. Other public input opportunities occurred at each open meeting the MPO held during this time period which included Technical Advisory Committee, Bicycle Mobility Advisory Committee and Pedestrian Mobility Advisory Committee meetings.

The MPO’s 2020 transportation conformity document, FY 2021-2024

Transportation Improvement Program and Mobility 2045 can be found on the MPO’s website at www.alamoareampo.org.

Page 13:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

FY 2021 – 2024 Transportation Improvement Program

9

VI. Americans With Disabilities Act (ADA)

Many of the projects in the TIP include enhancements to make the various transportation amenities accessible to the disabled. All federally funded transportation projects will be developed in compliance with the ADA.

VII. Project Selection Process – MPO Funding Sources Typically, in support of the development of the TIP, the MPO would

conduct a call for projects for Surface Transportation Block Grant (STBG) and / or Transportation Alternatives (TA) funding sources. However, after scheduling out the process, with the new requirements for transportation conformity, the schedule did not allow sufficient time for a call for projects for the FY 2021-2024 TIP. Projects in this TIP are previously funded projects from a conforming Metropolitan Transportation Plan and TIP that may have been reprioritized based on expected funding levels.

The MPO plans on conducting a call for projects for STBG, TA and

Congestion Mitigation Air Quality Improvement Program (CMAQ) in sufficient time for the development of the FY 2023-2026 TIP.

Projects in certain funding categories were selected by the State (TxDOT)

or the transit operator (VIA Metropolitan Transit). The Transportation Policy Board reviewed the projects and, by adoption of this document, concurred with the selection of those projects.

VIII. Funding Categories

The categories for funding state and federal transportation improvements are as follows:

Category 1 Preventative Maintenance & Rehabilitation

Category 2 Metropolitan and Urban Corridor Projects Category 3 Non-Traditional Funding Category 4 Statewide Connectivity Corridor Category 5 Congestion Mitigation and Air Quality (CMAQ) Impr Program Category 6 Structure Rehabilitation Category 7 Surface Transportation Block Grant or STBG Category 8 Safety Category 9 Transportation Alternatives Category 10 Miscellaneous Category 11 District Discretionary Category 12 Strategic Priority

Page 14:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

Alamo Area Metropolitan Planning Organization

10

Federal Transit Administration Section 5307 (Urbanized Area Formula Grant Program)

Federal Transit Administration Section 5309 (Capital Grant Program, New Starts; Small Starts))

Federal Transit Administration Section 5310 (Elderly and Disabled Transportation Assistance Grant Program)

Federal Transit Administration Section 5339 (Bus and Bus Facilities Program)

IX. Progress From Previous Year

Roadway, transit, bicycle, pedestrian and other projects annually let to contract from FY 2004 through FY 2019 can be found on the MPO’s website at http://www.alamoareampo.org. This item will continue to be annually updated on the website. To request a copy please contact the MPO staff by telephone at 210-227-8651, by fax at 210-227-9321, by mail or in person at 825 S. St. Mary’s Street, San Antonio, Texas 78205, or by e-mail to [email protected].

Page 15:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

FY 2021 – 2024 Transportation Improvement Program

Funded Highway Projects

11

Page 16:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

Alamo Area Metropolitan Planning Organization

This page intentionally left blank.

12

Page 17:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

ALAMO AREA METROPOLITAN PLANNING ORGANIZATION

2021FY

TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.

Year of Expenditure

Cost

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

City

TIP PROJECTS FY 2021-2024

Bexar15 - San Antonio

Description:

SL 1604 E TxDOT 4049.2

Limits From: IH 10

Limits To: US 281

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $187,800,000

Construction Engineering: $8,300,000

Contingencies: $14,600,000

Indirect Costs: $4,100,000

Preliminary Engineering: $18,800,000

Other Field: $8,300,000

$241,900,000

Type of Work: Added Capacity: Non Toll

Total Project Cost:

$18,800,000

Authorized Funding by Category/Share

San Antonio

Cost of Approved Phases:

SWPE

Other

$18,800,000

$0

Other $0

Other $0

$15,040,000 $3,760,000 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$15,040,000 $3,760,000 $0 $0 $18,800,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

2452-02-128

Expand from 4 to 10 lane expressway - including 2 HOV - special use lanes & from 4 to 4 frontage roads

Status: RSR

$18,800,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

N/A

Remarks: 10/19 - add project (E); spin off of 2452-02-083 (MPO #3913); no impact to conformity

Non-Exempt

Proj Hist:

10/19 - add project (E); spin off of 2452-02-083 (MPO #3913); no impact to conformity

N/A TDM Network Years:

Bexar15 - San Antonio

Description:

FM 1518 E TxDOT 5309.3

Limits From: FM 78

Limits To: IH 10

Total Project Cost Information (TxDOT %):

ROW Purchase: $8,194,000

Construction Cost: $44,780,000

Construction Engineering: $2,687,000

Contingencies: $3,135,000

Indirect Costs: $2,239,000

Preliminary Engineering: $2,194,000

Other Field: $1,791,000

$65,020,000

Type of Work: Added Capacity: Non Toll

Total Project Cost:

$2,194,000

Authorized Funding by Category/Share

Other

Cost of Approved Phases:

SWPE

Other

$2,194,000

$0

Other $0

Other $0

$0 $2,194,000 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $2,194,000 $0 $0 $2,194,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0465-02-027

Expand from 2 to 4 lanes with raised median or center turn lane, bike lanes and sidewalks

Status: Non-RSR

$2,194,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

N/A

Remarks: None

Non-Exempt

Proj Hist:

5/20 - add E phase; 4/18 - move from FY 2021 to FY 2023 and combine with STP-MM selected project; 4/16 - funded through STP-MM project selection process

N/A TDM Network Years:

Bexar15 - San Antonio

Description:

FM 1560 E TxDOT 5391.3

Limits From: Galm/Shaenfield

Limits To: SH 16

Total Project Cost Information (TxDOT %):

ROW Purchase: $11,800,000

Construction Cost: $19,750,000

Construction Engineering: $900,000

Contingencies: $1,500,000

Indirect Costs: $400,000

Preliminary Engineering: $1,900,000

Other Field: $900,000

$37,150,000

Type of Work: Added Capacity: Non Toll

Total Project Cost:

$1,900,000

Authorized Funding by Category/Share

Other

Cost of Approved Phases:

SWPE

Other

$1,900,000

$0

Other $0

Other $0

$0 $1,900,000 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $1,900,000 $0 $0 $1,900,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

2230-01-021

Expand from 2 lanes to 4 lanes with turn lanes, bike accommodation and sidewalks

Status: Non-RSR

$1,900,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

N/A

Remarks: None

Non-Exempt

Proj Hist:

5/20 - add E phase; 4/18 - funded through the 19-22 STP-MM Call for Projects; 4/17 - add project to MTP with Prop 1/Prop 7; portion of project may have already been in the MTP

N/A TDM Network Years:

Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.

13

Page 18:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

ALAMO AREA METROPOLITAN PLANNING ORGANIZATION

2021FY

TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.

Year of Expenditure

Cost

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

City

TIP PROJECTS FY 2021-2024

Bexar15 - San Antonio

Description:

CS C CoSA 5415.0

Limits From: In San Antonio on Santa Rosa Street

Limits To: from Cesar Chavez Blvd to Martin Street

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $8,500,000

Construction Engineering: $542,000

Contingencies: $425,000

Indirect Costs: $488,000

Preliminary Engineering: $416,000

Other Field: $491,000

$10,862,000

Type of Work: TSMO: Operational

Total Project Cost:

$8,500,000

Authorized Funding by Category/Share

San Antonio

Cost of Approved Phases:

3 - LC

Other

$8,500,000

$0

Other $0

Other $0

$0 $0 $0 $8,500,000

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $8,500,000 $8,500,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0000-00-000

Reduce from 6 lanes with CTL to 4 lanes with CTL, bike accommodation and sidewalks

Status: RSR

$8,500,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

N/A

Remarks: Road diet project

Exempt

Proj Hist:

5/20 - move from FY 2020 to FY 2021; 9/19 - ADM clarify description (acc); 1/19 - add CoSA 2017 Bond project to TIP/MTP for AQ purposes

2025,2035,2045 TDM Network Years:

Bexar15 - San Antonio

Description:

CS C CoSA 5407.0

Limits From: In San Antonio on Fredericksburg Road

Limits To: From N. Flores to Woodlawn

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $5,300,000

Construction Engineering: $338,000

Contingencies: $68,000

Indirect Costs: $304,000

Preliminary Engineering: $260,000

Other Field: $306,000

$6,576,000

Type of Work: TSMO: Operational

Total Project Cost:

$5,300,000

Authorized Funding by Category/Share

San Antonio

Cost of Approved Phases:

3 - LC

Other

$5,300,000

$0

Other $0

Other $0

$0 $0 $0 $5,300,000

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $5,300,000 $5,300,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0000-00-000

Reduce from 4 to 2 lanes, upgrade drainage, add new traffic signals and provide sidewalks

Status: RSR

$5,300,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

N/A

Remarks: Road diet project

Exempt

Proj Hist:

5/20 - move from FY 2020 to FY 2021; 1/19 - add CoSA 2017 Bond project to TIP/MTP for AQ purposes

2025,2035,2045 TDM Network Years:

Bexar15 - San Antonio

Description:

CS C CoSA 5408.1

Limits From: In San Antonio on Bulverde Road

Limits To: from Briar Crest to North of Quiet Meadow Street

Total Project Cost Information (TxDOT %):

ROW Purchase: $200,000

Construction Cost: $9,700,000

Construction Engineering: $619,000

Contingencies: $125,000

Indirect Costs: $557,000

Preliminary Engineering: $1,400,000

Other Field: $561,000

$13,162,000

Type of Work: Added Capacity: Non Toll

Total Project Cost:

$9,700,000

Authorized Funding by Category/Share

San Antonio

Cost of Approved Phases:

3 - LC

Other

$9,700,000

$0

Other $0

Other $0

$0 $0 $0 $9,700,000

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $9,700,000 $9,700,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0000-00-000

Expand from 2 lanes and CTL to 4 lanes and CTL

Status: RSR

$9,700,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

N/A

Remarks: None

Non-Exempt

Proj Hist:

5/20 - move from FY 2020 to FY 2021; 1/19 - add CoSA 2017 Bond project to TIP/MTP for AQ purposes

2025,2035,2045 TDM Network Years:

Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.

14

Page 19:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

ALAMO AREA METROPOLITAN PLANNING ORGANIZATION

2021FY

TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.

Year of Expenditure

Cost

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

City

TIP PROJECTS FY 2021-2024

Bexar15 - San Antonio

Description:

CS C CoSA 5409.0

Limits From: In San Antonio on N. New Braunfels

Limits To: from Houston Street to Burleson

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $4,500,000

Construction Engineering: $287,000

Contingencies: $58,000

Indirect Costs: $258,000

Preliminary Engineering: $220,000

Other Field: $260,000

$5,583,000

Type of Work: TSMO: Operational

Total Project Cost:

$4,500,000

Authorized Funding by Category/Share

San Antonio

Cost of Approved Phases:

3 - LC

Other

$4,500,000

$0

Other $0

Other $0

$0 $0 $0 $4,500,000

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $4,500,000 $4,500,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0000-00-000

Reduce from 4 travel lanes to 2 travel lanes with a CTL and sidewalks

Status: Non-RSR

$4,500,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

N/A

Remarks: Road diet project

Exempt

Proj Hist:

5/20 - move from FY 2020 to FY 2021; 1/19 - add CoSA 2017 Bond project to TIP/MTP for AQ purposes

2025,2035,2045 TDM Network Years:

Bexar15 - San Antonio

Description:

CS C CoSA 5410.0

Limits From: In San Antonio on Rittiman Road

Limits To: from IH 35 to Castle Cross Drive

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $2,100,000

Construction Engineering: $134,000

Contingencies: $27,000

Indirect Costs: $120,000

Preliminary Engineering: $103,000

Other Field: $121,000

$2,605,000

Type of Work: TSMO: Operational

Total Project Cost:

$2,100,000

Authorized Funding by Category/Share

San Antonio

Cost of Approved Phases:

3 - LC

Other

$2,100,000

$0

Other $0

Other $0

$0 $0 $0 $2,100,000

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $2,100,000 $2,100,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0000-00-000

Extend right turn lane from Rittiman to IH 35

Status: Non-RSR

$2,100,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

N/A

Remarks: None

Exempt

Proj Hist:

5/20 - move from FY 2020 to FY 2021; 1/19 - add CoSA 2017 Bond project to TIP/MTP for AQ purposes

2025,2035,2045 TDM Network Years:

Bexar15 - San Antonio

Description:

CS C CoSA 5414.0

Limits From: In San Antonio on North Main & Soledad

Limits To: from Pecan Street to Navarro Street

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $6,000,000

Construction Engineering: $383,000

Contingencies: $300,000

Indirect Costs: $344,000

Preliminary Engineering: $294,000

Other Field: $347,000

$7,668,000

Type of Work: TSMO: Operational

Total Project Cost:

$6,000,000

Authorized Funding by Category/Share

San Antonio

Cost of Approved Phases:

3 - LC

Other

$6,000,000

$0

Other $0

Other $0

$0 $0 $0 $6,000,000

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $6,000,000 $6,000,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0000-00-000

Reduce from 7 to 4 travel lanes with CTL, bike lanes, sidewalks and traffic circle at Navarro

Status: RSR

$6,000,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

N/A

Remarks: Road diet project

Exempt

Proj Hist:

5/20 - move from FY 2020 to FY 2021; 1/19 - add CoSA 2017 Bond project to TIP/MTP for AQ purposes

2025,2035,2045 TDM Network Years:

Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.

15

Page 20:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

ALAMO AREA METROPOLITAN PLANNING ORGANIZATION

2021FY

TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.

Year of Expenditure

Cost

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

City

TIP PROJECTS FY 2021-2024

Bexar15 - San Antonio

Description:

CS C CoSA 5416.0

Limits From: In San Antonio on South Alamo Street

Limits To: from Market Street to Cesar Chavez Blvd

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $9,000,000

Construction Engineering: $574,000

Contingencies: $450,000

Indirect Costs: $517,000

Preliminary Engineering: $441,000

Other Field: $520,000

$11,502,000

Type of Work: TSMO: Operational

Total Project Cost:

$9,000,000

Authorized Funding by Category/Share

San Antonio

Cost of Approved Phases:

3 - LC

Other

$9,000,000

$0

Other $0

Other $0

$0 $0 $0 $9,000,000

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $9,000,000 $9,000,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0000-00-000

Reduce from 6 lanes with CTL to 4 lanes with CTL, bike accommodation and sidewalks

Status: RSR

$9,000,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

N/A

Remarks: Road diet project

Exempt

Proj Hist:

5/20 - move from FY 2020 to FY 2021; 1/19 - add CoSA 2017 Bond project to TIP/MTP for AQ purposes

2025,2035,2045 TDM Network Years:

Bexar15 - San Antonio

Description:

CS C CoSA 5423.0

Limits From: In San Antonio on Alamo/Commerce/Losoya Intersection

Limits To: from Commerce to Market

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $2,000,000

Construction Engineering: $128,000

Contingencies: $100,000

Indirect Costs: $115,000

Preliminary Engineering: $98,000

Other Field: $116,000

$2,557,000

Type of Work: TSMO: Operational

Total Project Cost:

$2,000,000

Authorized Funding by Category/Share

San Antonio

Cost of Approved Phases:

3 - LC

Other

$2,000,000

$0

Other $0

Other $0

$0 $0 $0 $2,000,000

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $2,000,000 $2,000,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0000-00-000

Close Alamo Street to vehicle traffic

Status: RSR

$2,000,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

N/A

Remarks: None

Exempt

Proj Hist:

1/19 - add CoSA 2017 Bond project to TIP/MTP for AQ purposes

2025,2035,2045 TDM Network Years:

Comal15 - San Antonio

Description:

IH 35 C TxDOT 5553.0

Limits From: at FM 725

Limits To: -

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $6,000,000

Construction Engineering: $383,000

Contingencies: $78,000

Indirect Costs: $344,000

Preliminary Engineering: $294,000

Other Field: $347,000

$7,446,000

Type of Work: TSMO: Operational

Total Project Cost:

$6,000,000

Authorized Funding by Category/Share

Other

Cost of Approved Phases:

4 - Connectivity

Other

$6,000,000

$0

Other $0

Other $0

$4,800,000 $1,200,000 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$4,800,000 $1,200,000 $0 $0 $6,000,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0016-05-120

Intersection operational improvements including turn lanes

Status: RSR

$6,000,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

N/A

Remarks: None

Exempt

Proj Hist:

11/19 - ADM clarify description; 10/18 - add project, created from 0016-05-114

2025,2035,2045 TDM Network Years:

Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.

16

Page 21:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

ALAMO AREA METROPOLITAN PLANNING ORGANIZATION

2021FY

TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.

Year of Expenditure

Cost

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

City

TIP PROJECTS FY 2021-2024

Guadalupe15 - San Antonio

Description:

IH 35 C,E TxDOT 4013.0

Limits From: Bexar/Guadalupe County Line

Limits To: FM 3009

Total Project Cost Information (TxDOT %):

ROW Purchase: $10,000,000

Construction Cost: $80,000,000

Construction Engineering: $35,000,000

Contingencies: $0

Indirect Costs: $4,800,000

Preliminary Engineering: $35,000,000

Other Field: $0

$164,800,000

Type of Work: Added Capacity: Non Toll

Total Project Cost:

$150,000,000

Authorized Funding by Category/Share

Other

Cost of Approved Phases:

4 - Connectivity

12 - CL

$51,000,000

$29,000,000

3 - DB $70,000,000

Other $0

$40,800,000 $10,200,000 $0 $0

$23,200,000 $5,800,000 $0 $0

$56,000,000 $14,000,000 $0 $0

$0 $0 $0 $0

$120,000,000 $30,000,000 $0 $0 $150,000,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0016-06-047

Expand from 8 ln to 14 ln expy - add 6 new express lanes, including 2 HOV-Special Use lanes; from 4 to 4 FR lanes

Status: RSR

$150,000,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

47

Remarks: None

Exempt

Proj Hist:

10/19 - move 20 to 21 and rev cost; 1/19 - rev descr to incl FR lanes; 10/18 - move 25 to 20; rev limits, descr and cost; 4/18 - move 20 to 25 (out of TIP); 10/13 - rev descr; 4/13 - add project to MTP (Env document)

2025,2035,2045 TDM Network Years:

Bexar15 - San Antonio

Description:

IH 35 North C,E TxDOT 3477.0

Limits From: IH 410 N

Limits To: Guadalupe/Bexar County Line

Total Project Cost Information (TxDOT %):

ROW Purchase: $34,923,000

Construction Cost: $715,000,000

Construction Engineering: $50,000,000

Contingencies: $0

Indirect Costs: $42,900,000

Preliminary Engineering: $50,000,000

Other Field: $0

$892,823,000

Type of Work: Added Capacity: Non Toll

Total Project Cost:

$815,000,000

Authorized Funding by Category/Share

Other

Cost of Approved Phases:

2 - Metro Corridor

4 - Connectivity

$261,400,000

$100,600,000

3-DB/11 - Distr Discr

$103,000,000

12 - CL $350,000,000

$209,120,000 $52,280,000 $0 $0

$80,480,000 $20,120,000 $0 $0

$82,400,000 $20,600,000 $0 $0

$280,000,000 $70,000,000 $0 $0

$652,000,000 $163,000,000 $0 $0 $815,000,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0016-07-113

Expand from 8 ln to 14 ln expy - add 6 new express lanes incl 2 HOV-special use lns, & from 4/6 to 4/6 FR lanes & DCs at IH 410N & LP 1604

Status: RSR

$815,000,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

42

Remarks: 1 lane DC: NB 35 to WB 1604; EB 1604 to SB 35; 2 lane DC: SB 35 to WB 1604; EB 1604 to NB 35; EB 410N to NB 35;SB 35 to WB 410N

Non-Exempt

Proj Hist:

10/19 - move 20 to 21 and rev cost; 9/19 - ADM clarify descr; 1/19 - rev descr to incl FR lanes; 10/18 - 25 to 20, rev descr and TPC; 4/18 - move 20 to 25 (out of TIP); 10/13 - rev limits and descr; 04/13 - rev limits

2025,2035,2045 TDM Network Years:

Bexar15 - San Antonio

Description:

SL 368 C CoSA 5313.0

Limits From: Burr Road

Limits To: IH 35

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $14,000,000

Construction Engineering: $694,400

Contingencies: $278,600

Indirect Costs: $803,600

Preliminary Engineering: $686,000

Other Field: $523,600

$16,986,200

Type of Work: TSMO: Operational

Total Project Cost:

$14,000,000

Authorized Funding by Category/Share

San Antonio

Cost of Approved Phases:

7 - STBG

1 - Prvnt Mnt/Rehab

$9,000,000

$5,000,000

Other $0

Other $0

$7,200,000 $1,800,000 $0 $0

$4,000,000 $1,000,000 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$11,200,000 $2,800,000 $0 $0 $14,000,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0016-08-034

Reduce from 6 to 4 travel lanes; roadway rehabilitation, bicycle and pedestrian facilities

Status: RSR

$14,000,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

N/A

Remarks: Road diet project

Exempt

Proj Hist:

5/20 - move from FY 2020 to FY 2021; 10/19 - revise project sponsor; 9/19 - ADM clarify description; 4/17 - revise funding; 4/16 - funded through STP-MM project selection process

2025,2035,2045 TDM Network Years:

Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.

17

Page 22:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

ALAMO AREA METROPOLITAN PLANNING ORGANIZATION

2021FY

TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.

Year of Expenditure

Cost

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

City

TIP PROJECTS FY 2021-2024

Bexar15 - San Antonio

Description:

SS 536 C CoSA 5536.2

Limits From: at San Antonio River

Limits To: .

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $2,000,000

Construction Engineering: $120,000

Contingencies: $140,000

Indirect Costs: $100,000

Preliminary Engineering: $98,000

Other Field: $80,000

$2,538,000

Type of Work: Bicycle/Pedestrian

Total Project Cost:

$2,000,000

Authorized Funding by Category/Share

San Antonio

Cost of Approved Phases:

7 - STBG

Other

$2,000,000

$0

Other $0

Other $0

$1,600,000 $0 $400,000 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$1,600,000 $0 $400,000 $0 $2,000,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0253-06-037

Construct bicycle and pedestrian bridge

Status: Non-RSR

$2,000,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

N/A

Remarks: None

Exempt

Proj Hist:

4/18 - funded through the 19-22 STP-MM Call for Projects

N/A TDM Network Years:

Bexar15 - San Antonio

Description:

IH 410 C TxDOT 5542.0

Limits From: FM 2536 - Pearsall Road

Limits To: Valley Hi Drive

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $19,100,000

Construction Engineering: $850,000

Contingencies: $1,500,000

Indirect Costs: $400,000

Preliminary Engineering: $1,900,000

Other Field: $850,000

$24,600,000

Type of Work: TSMO: Operational

Total Project Cost:

$19,100,000

Authorized Funding by Category/Share

San Antonio

Cost of Approved Phases:

7 - STBG

1 - Prvnt Mnt/Rehab

$8,100,000

$11,000,000

Other $0

Other $0

$6,480,000 $1,620,000 $0 $0

$8,800,000 $2,200,000 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$15,280,000 $3,820,000 $0 $0 $19,100,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 5/2020

0521-05-148

Operational improvements, including ramp revisions, intersection improvements and reconstruct frontage roads

Status: RSR

$19,100,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

N/A

Remarks: May 2020 revision to FY 2019-2022 TIP; also included in FY 2021-2023 TIP

Exempt

Proj Hist:

4/20 - move from FY 2020 to FY 2021 and revise cost; 4/19 - increase cost and revise decription; 4/18 - funded through the 19-22 STP-MM Call for Projects

2025,2035,2045 TDM Network Years:

Bexar15 - San Antonio

Description:

IH 410 C TxDOT 5371.0

Limits From: at IH 10 E

Limits To: .

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $100,000,000

Construction Engineering: $4,000,000

Contingencies: $7,000,000

Indirect Costs: $2,000,000

Preliminary Engineering: $4,800,000

Other Field: $4,000,000

$121,800,000

Type of Work: TSMO: Interchange

Total Project Cost:

$100,000,000

Authorized Funding by Category/Share

San Antonio

Cost of Approved Phases:

2 - Metro Corridor

4 - Connectivity

$50,000,000

$25,000,000

12 - CL $25,000,000

Other $0

$45,000,000 $5,000,000 $0 $0

$22,500,000 $2,500,000 $0 $0

$22,500,000 $2,500,000 $0 $0

$0 $0 $0 $0

$90,000,000 $10,000,000 $0 $0 $100,000,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0521-06-138

Construct direct connectors: Phase 1 - Priority Connectors - NB 410 to EB 10; WB 10 to SB 410

Status: RSR

$100,000,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

N/A

Remarks: None

Exempt

Proj Hist:

4/20 - rev descr and move FY 21 to FY 25; 9/19 - ADM clarify description; 3/18 - revise funding distribution; 4/17 - add project

2025,2035,2045 TDM Network Years:

Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.

18

Page 23:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

ALAMO AREA METROPOLITAN PLANNING ORGANIZATION

2021FY

TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.

Year of Expenditure

Cost

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

City

TIP PROJECTS FY 2021-2024

Bexar15 - San Antonio

Description:

FM 1535 C TxDOT 5323.0

Limits From: Lp 1604

Limits To: Huebner Road

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $9,600,000

Construction Engineering: $400,000

Contingencies: $750,000

Indirect Costs: $200,000

Preliminary Engineering: $960,000

Other Field: $425,000

$12,335,000

Type of Work: TSMO: Operational

Total Project Cost:

$9,600,000

Authorized Funding by Category/Share

San Antonio

Cost of Approved Phases:

7 - STBG

1 - Prvnt Mnt/Rehab

$6,500,000

$3,100,000

Other $0

Other $0

$5,200,000 $1,300,000 $0 $0

$2,480,000 $620,000 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$7,680,000 $1,920,000 $0 $0 $9,600,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 5/2020

0658-01-045

Construct 2 way left turn lane, bike lanes and sidewalks

Status: RSR

$9,600,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

N/A

Remarks: May 2020 revision to FY 2019-2022 TIP; also included in FY 2021-2023 TIP

Exempt

Proj Hist:

4/20 - revise cost; 4/18 - move from FY 2020 to FY 2021; 4/16 - funded through STP-MM project selection process

2025,2035,2045 TDM Network Years:

Bexar15 - San Antonio

Description:

FM 471 E, R TxDOT 5377.2

Limits From: Old FM 471

Limits To: Medina County Line

Total Project Cost Information (TxDOT %):

ROW Purchase: $2,520,000

Construction Cost: $21,000,000

Construction Engineering: $840,000

Contingencies: $1,470,000

Indirect Costs: $420,000

Preliminary Engineering: $2,100,000

Other Field: $840,000

$29,190,000

Type of Work: Added Capacity: Non Toll

Total Project Cost:

$4,620,000

Authorized Funding by Category/Share

San Antonio

Cost of Approved Phases:

SWPE

SWROW

$2,100,000

$2,520,000

Other $0

Other $0

$0 $2,100,000 $0 $0

$2,016,000 $504,000 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$2,016,000 $2,604,000 $0 $0 $4,620,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0849-01-055

Expand from 2 to 4 lane divided with bike lanes and sidewalks

Status: RSR

$4,620,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

N/A

Remarks: None

Non-Exempt

Proj Hist:

5/20 - move from FY 2019 to FY 2021; 10/18 - add phases (Engr, ROW)

N/A TDM Network Years:

Bexar15 - San Antonio

Description:

VA C TxDOT 5544.1

Limits From: Various locations within

Limits To: Bexar, Comal and Kendall counties

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $2,500,000

Construction Engineering: $0

Contingencies: $0

Indirect Costs: $0

Preliminary Engineering: $0

Other Field: $0

$2,500,000

Type of Work: TSMO: Safety Service Patrol

Total Project Cost:

$2,500,000

Authorized Funding by Category/Share

Other

Cost of Approved Phases:

7 - STBG

Other

$2,500,000

$0

Other $0

Other $0

$2,000,000 $167,500 $332,500 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$2,000,000 $167,500 $332,500 $0 $2,500,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0915-00-212

Safety Service Patrol on controlled access highways in Bexar, Comal and Kendall Counties-FY 2019

Status: Exempt

$2,500,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

N/A

Remarks: None

Exempt

Proj Hist:

5/20 - move from FY 2020 to FY 2021; 10/19 - move from FY 2019 to FY 2020; 10/18 - revise funding distribution; 4/18 - funded through the 19-22 STP-MM Call for Projects

N/A TDM Network Years:

Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.

19

Page 24:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

ALAMO AREA METROPOLITAN PLANNING ORGANIZATION

2021FY

TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.

Year of Expenditure

Cost

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

City

TIP PROJECTS FY 2021-2024

Bexar15 - San Antonio

Description:

VA C TxDOT 5544.2

Limits From: Various locations within

Limits To: Bexar, Comal and Kendall counties

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $5,500,000

Construction Engineering: $0

Contingencies: $0

Indirect Costs: $0

Preliminary Engineering: $0

Other Field: $0

$5,500,000

Type of Work: TSMO: Safety Service Patrol

Total Project Cost:

$5,500,000

Authorized Funding by Category/Share

Other

Cost of Approved Phases:

7 - STBG

Other

$5,500,000

$0

Other $0

Other $0

$4,400,000 $368,500 $731,500 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$4,400,000 $368,500 $731,500 $0 $5,500,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0915-00-213

Safety Service Patrol on controlled access highways in Bexar, Comal and Kendall Counties-FY 2020

Status: Exempt

$5,500,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

N/A

Remarks: None

Exempt

Proj Hist:

5/20 - move from FY 2020 to FY 2021; 6/19 - revise cost (+$1M from #5316.3); 10/18 - revise funding distribution; 4/18 - funded through the 19-22 STP-MM Call for Projects

N/A TDM Network Years:

Bexar15 - San Antonio

Description:

VA C TxDOT 5544.3

Limits From: Various locations within

Limits To: Bexar, Comal and Kendall counties

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $5,500,000

Construction Engineering: $0

Contingencies: $0

Indirect Costs: $0

Preliminary Engineering: $0

Other Field: $0

$5,500,000

Type of Work: TSMO: Safety Service Patrol

Total Project Cost:

$5,500,000

Authorized Funding by Category/Share

Other

Cost of Approved Phases:

7 - STBG

Other

$5,500,000

$0

Other $0

Other $0

$4,400,000 $368,500 $731,500 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$4,400,000 $368,500 $731,500 $0 $5,500,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0915-00-214

Safety Service Patrol on controlled access highways in Bexar, Comal and Kendall Counties-FY 2021

Status: Exempt

$5,500,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

N/A

Remarks: None

Exempt

Proj Hist:

6/19 - revise cost (+$1M from #5316.3); 10/18 - revise funding distribution; 4/18 - funded through the 19-22 STP-MM Call for Projects

N/A TDM Network Years:

Bexar15 - San Antonio

Description:

CR C BxCo 3988.0

Limits From: On Bulverde Road from Marshall Road

Limits To: Wilderness Oak

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $8,097,480

Construction Engineering: $401,635

Contingencies: $463,986

Indirect Costs: $554,677

Preliminary Engineering: $396,777

Other Field: $0

$9,914,555

Type of Work: Added Capacity: Non Toll

Total Project Cost:

$8,097,480

Authorized Funding by Category/Share

Other

Cost of Approved Phases:

7 - STBG

Other

$8,097,480

$0

Other $0

Other $0

$6,477,984 $0 $1,619,496 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$6,477,984 $0 $1,619,496 $0 $8,097,480

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0915-12-509

Reconstruct and expand from 2 to 4 lanes with shoulder, pedestrian ramps, curb, bridge construction and drainage improvements

Status: RSR

$8,097,480

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

33

Remarks: None

Non-Exempt

Proj Hist:

5/20 - move 20 to 21; 9/19 - ADM clarify descr; 4/19 - 19 to 20 and rev proj sponsor; 4/18 - 18 to 19; 1/17 - 17 to 18; 4/15 - 15 to 16 and update descr; 1/14 - 14 to 15; 4/13 - 13 to 14 and rev funding cats; 4/12 - funded

2025,2035,2045 TDM Network Years:

Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.

20

Page 25:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

ALAMO AREA METROPOLITAN PLANNING ORGANIZATION

2021FY

TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.

Year of Expenditure

Cost

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

City

TIP PROJECTS FY 2021-2024

Bexar15 - San Antonio

Description:

CS C LV 3992.0

Limits From: SH 16 - Bandera Road

Limits To: Crystal Hills Park

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $933,000

Construction Engineering: $59,525

Contingencies: $65,963

Indirect Costs: $63,911

Preliminary Engineering: $45,717

Other Field: $0

$1,168,116

Type of Work: Bicycle/Pedestrian

Total Project Cost:

$933,000

Authorized Funding by Category/Share

Leon Valley

Cost of Approved Phases:

7 - STBG

Other

$933,000

$0

Other $0

Other $0

$746,400 $0 $186,600 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$746,400 $0 $186,600 $0 $933,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0915-12-514

Construction of a hike and bike trail along Huebner Creek

Status: Exempt

$933,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

N/A

Remarks: None

Exempt

Proj Hist:

5/20 - move 20 to 21; 10/18 - move 19 to 20; 4/17 - move 17 to 19; 10/15 - move 15 to 17 and revise limits; 4/14 - rev limits and move 14 to 15; 4/12 - funded through STP-MM project selection process

N/A TDM Network Years:

Bexar15 - San Antonio

Description:

CS C BxCo 5105.0

Limits From: On Galm Road, from FM 471 (Culebra Road)

Limits To: Government Canyon State Park

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $7,323,351

Construction Engineering: $363,238

Contingencies: $145,735

Indirect Costs: $353,718

Preliminary Engineering: $1,181,757

Other Field: $273,893

$9,641,692

Type of Work: Added Capacity: Non Toll

Total Project Cost:

$7,323,351

Authorized Funding by Category/Share

Other

Cost of Approved Phases:

7 - STBG

12S - STP-MM Rec

$3,223,351

$4,100,000

Other $0

Other $0

$2,578,681 $0 $644,670 $0

$3,280,000 $0 $820,000 $0

$0 $0 $0 $0

$0 $0 $0 $0

$5,858,681 $0 $1,464,670 $0 $7,323,351

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0915-12-544

Expand from 2 to 4 lanes, including drainage improvements, bike & pedestrian amenities

Status: Non-RSR

$7,323,351

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

44

Remarks: None

Non-Exempt

Proj Hist:

5/20 - move 20 to 21; 4/19 - move 19 to FY 20; 10/18 - rev TPC; 4/18 - move 18 to FY 19; 1/16 - rev funding; 4/14 - funded through STP-MM project selection process

2025,2035,2045 TDM Network Years:

Bexar15 - San Antonio

Description:

CR C BxCo 5106.0

Limits From: On Watson Road from FM 2790-Somerset Road

Limits To: 0.62 Mi East of Somerset Road

Total Project Cost Information (TxDOT %):

ROW Purchase: $1,440,000

Construction Cost: $4,886,116

Construction Engineering: $195,445

Contingencies: $342,028

Indirect Costs: $97,722

Preliminary Engineering: $739,184

Other Field: $195,445

$7,895,940

Type of Work: Added Capacity: Non Toll

Total Project Cost:

$4,886,116

Authorized Funding by Category/Share

Other

Cost of Approved Phases:

7 - STBG

Other

$4,886,116

$0

Other $0

Other $0

$3,908,893 $0 $977,223 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$3,908,893 $0 $977,223 $0 $4,886,116

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0915-12-562

Expand from 2 to 4 lanes with traffic circle at Southwest Verano Parkway, multi-use path and drainage

Status: Non-RSR

$4,886,116

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

26

Remarks: None

Non-Exempt

Proj Hist:

5/20 - move 20 to 21; 9/19 - ADM clarify limits and description; 1/19 - move 19 to 20; 10/18 - rev TPC; 4/14 - funded through STP-MM project selection process

2025,2035,2045 TDM Network Years:

Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.

21

Page 26:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

ALAMO AREA METROPOLITAN PLANNING ORGANIZATION

2021FY

TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.

Year of Expenditure

Cost

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

City

TIP PROJECTS FY 2021-2024

Bexar15 - San Antonio

Description:

VA C CoSA 5305.0

Limits From: In City of San Antonio

Limits To: .

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $2,000,000

Construction Engineering: $99,000

Contingencies: $40,000

Indirect Costs: $115,000

Preliminary Engineering: $98,000

Other Field: $75,000

$2,427,000

Type of Work: Bicycle/Pedestrian

Total Project Cost:

$2,000,000

Authorized Funding by Category/Share

San Antonio

Cost of Approved Phases:

7 - STBG

Other

$2,000,000

$0

Other $0

Other $0

$1,600,000 $0 $400,000 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$1,600,000 $0 $400,000 $0 $2,000,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0915-12-579

Construct citywide pedestrian and bicycle improvements

Status: Exempt

$2,000,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

N/A

Remarks: None

Exempt

Proj Hist:

5/20 - move from FY 2020 to FY 2021; 1/19 - move from FY 19 to FY 20; 10/17 - reduce project cost by $1M to fund 0915-12-603; 4/16 - funded through STP-MM project selection process

N/A TDM Network Years:

Bexar15 - San Antonio

Description:

VA C CoSA 5306.0

Limits From: In City of San Antonio

Limits To: .

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $1,500,000

Construction Engineering: $90,000

Contingencies: $45,000

Indirect Costs: $75,000

Preliminary Engineering: $73,500

Other Field: $90,000

$1,873,500

Type of Work: TSMO: ITS

Total Project Cost:

$1,500,000

Authorized Funding by Category/Share

San Antonio

Cost of Approved Phases:

7 - STBG

Other

$1,500,000

$0

Other $0

Other $0

$1,200,000 $0 $300,000 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$1,200,000 $0 $300,000 $0 $1,500,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0915-12-580

Intelligent Transportation System - Enhancements to include controller hardware and software and CCTV cameras

Status: Exempt

$1,500,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

N/A

Remarks: None

Exempt

Proj Hist:

5/20 - move 20 to 21; 10/19 - move 19 to FY 20; 9/19 - ADM clarify description; 10/17 - reduce cost from $4M to $1.5M and move 20 to 19; 4/16 - funded through STP-MM project selection process

N/A TDM Network Years:

Bexar15 - San Antonio

Description:

CR C BxCo 5304.0

Limits From: In Bexar County, on Talley Road

Limits To: From Wiseman Blvd to Tamaron Pass

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $20,917,924

Construction Engineering: $1,255,000

Contingencies: $1,464,000

Indirect Costs: $1,046,000

Preliminary Engineering: $1,025,000

Other Field: $837,000

$26,544,924

Type of Work: Added Capacity: Non Toll

Total Project Cost:

$20,917,924

Authorized Funding by Category/Share

Other

Cost of Approved Phases:

7 - STBG

3 - LC

$19,417,924

$1,500,000

Other $0

Other $0

$15,534,339 $0 $3,883,585 $0

$0 $0 $0 $1,500,000

$0 $0 $0 $0

$0 $0 $0 $0

$15,534,339 $0 $3,883,585 $1,500,000 $20,917,924

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0915-12-581

Expand from 2 lane to 4 lane divided roadway with medians, curbs, bicycle facilities, pedestrian improvements, operational improvements and drainage

Status: Non-RSR

$20,917,924

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

40

Remarks: None

Non-Exempt

Proj Hist:

5/20 - move from FY 2020 to FY 2021; 4/18 and 4/16 - funded through STP-MM project selection processes

2025,2035,2045 TDM Network Years:

Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.

22

Page 27:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

ALAMO AREA METROPOLITAN PLANNING ORGANIZATION

2021FY

TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.

Year of Expenditure

Cost

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

City

TIP PROJECTS FY 2021-2024

Bexar15 - San Antonio

Description:

CS C Converse 5319.0

Limits From: On Rocket/Schaeffer, from E. Norris

Limits To: Lp 1604

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $5,430,481

Construction Engineering: $269,352

Contingencies: $108,067

Indirect Costs: $311,710

Preliminary Engineering: $266,094

Other Field: $203,100

$6,588,804

Type of Work: Added Capacity: Non Toll

Total Project Cost:

$5,430,481

Authorized Funding by Category/Share

Converse

Cost of Approved Phases:

7 - STBG

Other

$5,430,481

$0

Other $0

Other $0

$4,344,385 $0 $1,086,096 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$4,344,385 $0 $1,086,096 $0 $5,430,481

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0915-12-582

Expand from 2 to 4 lane roadway with continuous center turn lane, sidewalks and bike lane/multi-use path

Status: Non-RSR

$5,430,481

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

40

Remarks: None

Non-Exempt

Proj Hist:

4/18 - move from FY 2020 to FY 2021; 4/16 - funded through STP-MM project selection process

2025,2035,2045 TDM Network Years:

Bexar15 - San Antonio

Description:

CR C ARMA 5317.0

Limits From: In Bexar County, on Blanco Rd

Limits To: From West Oak Estates to Borgfeld

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $14,661,235

Construction Engineering: $727,197

Contingencies: $291,759

Indirect Costs: $841,555

Preliminary Engineering: $718,401

Other Field: $548,330

$17,788,477

Type of Work: Added Capacity: Non Toll

Total Project Cost:

$14,661,235

Authorized Funding by Category/Share

Other

Cost of Approved Phases:

7 - STBG

Other

$14,661,235

$0

Other $0

Other $0

$11,728,988 $0 $2,932,247 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$11,728,988 $0 $2,932,247 $0 $14,661,235

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0915-12-585

Expand from a 2 to 4 lane divided roadway with raised median, bike lanes, sidewalks, curbs and drainage

Status: RSR

$14,661,235

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

30

Remarks: None

Non-Exempt

Proj Hist:

5/20 - move 20 to 21; 10/19 - move 19 to 20; 4/17 - rev funding; 1/17 - TIP: add project; MTP: move 23 to FY 19; 4/16 - funded through STP-MM project selection process

2025,2035,2045 TDM Network Years:

Bexar15 - San Antonio

Description:

CS C CoSA 4974.0

Limits From: In San Antonio, on Zarzamora

Limits To: From Fredericksburg Rd to Loop 13

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $5,000,000

Construction Engineering: $319,000

Contingencies: $64,500

Indirect Costs: $241,500

Preliminary Engineering: $245,000

Other Field: $289,000

$6,159,000

Type of Work: Pedestrian

Total Project Cost:

$5,000,000

Authorized Funding by Category/Share

San Antonio

Cost of Approved Phases:

9 - TA

3 - LC

$4,500,000

$500,000

Other $0

Other $0

$3,600,000 $0 $900,000 $0

$0 $0 $0 $500,000

$0 $0 $0 $0

$0 $0 $0 $0

$3,600,000 $0 $900,000 $500,000 $5,000,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0915-12-596

Construct sidewalks, remove unused utility poles, and implement pedestian detection ITS

Status: RSR

$5,000,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

N/A

Remarks: None

Exempt

Proj Hist:

5/20 - move from FY 2020 to FY 2021; 6/17 - add TA project

N/A TDM Network Years:

Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.

23

Page 28:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

ALAMO AREA METROPOLITAN PLANNING ORGANIZATION

2021FY

TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.

Year of Expenditure

Cost

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

City

TIP PROJECTS FY 2021-2024

Bexar15 - San Antonio

Description:

CS C CoSA 5434.0

Limits From: in San Antonio on Presa Street

Limits To: from W. Boyer to SE Military Drive (Lp 13)

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $10,000,000

Construction Engineering: $600,000

Contingencies: $300,000

Indirect Costs: $500,000

Preliminary Engineering: $490,000

Other Field: $600,000

$12,490,000

Type of Work: Bicycle/Pedestrian

Total Project Cost:

$10,000,000

Authorized Funding by Category/Share

San Antonio

Cost of Approved Phases:

7 - STBG

3 - LC

$9,000,000

$1,000,000

Other $0

Other $0

$7,200,000 $0 $1,800,000 $0

$0 $0 $0 $1,000,000

$0 $0 $0 $0

$0 $0 $0 $0

$7,200,000 $0 $1,800,000 $1,000,000 $10,000,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2018

0915-12-604

Bike and Pedestrian Corridor enhancements to implement Complete Streets

Status: Non-RSR

$10,000,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

N/A

Remarks: 2 travel lanes throughout the corridor

Exempt

Proj Hist:

9/19 - ADM clarify description; 4/18 - move from FY 2019 to FY 2021; 10/17 - add project per CoSA, funding is from 0025-02-204; 4/16 - revise match (EDCP project); 4/14 - funded through STP-MM project

2025,2035,2045 TDM Network Years:

Bexar15 - San Antonio

Description:

CS C CoSA 5545.1

Limits From: In San Antonio

Limits To: .

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $1,000,000

Construction Engineering: $0

Contingencies: $0

Indirect Costs: $0

Preliminary Engineering: $0

Other Field: $0

$1,000,000

Type of Work: Planning

Total Project Cost:

$1,000,000

Authorized Funding by Category/Share

San Antonio

Cost of Approved Phases:

7 - STBG

Other

$1,000,000

$0

Other $0

Other $0

$800,000 $0 $200,000 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$800,000 $0 $200,000 $0 $1,000,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0915-12-609

Multimodal planning study on one arterial to accommodate travel modes including higher capacity transit

Status: Exempt

$1,000,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

N/A

Remarks: None

Exempt

Proj Hist:

5/20 - move from FY 2020 to FY 2021; 10/19 - move from FY 2019 to FY 2020; 4/18 - funded through the 19-22 STP-MM Call for Projects

N/A TDM Network Years:

Bexar15 - San Antonio

Description:

CS C CoSA 5536.1

Limits From: In San Antonio

Limits To: Along San Pedro Avenue

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $1,000,000

Construction Engineering: $60,000

Contingencies: $70,000

Indirect Costs: $50,000

Preliminary Engineering: $49,000

Other Field: $40,000

$1,269,000

Type of Work: Pedestrian

Total Project Cost:

$1,000,000

Authorized Funding by Category/Share

San Antonio

Cost of Approved Phases:

7 - STBG

Other

$1,000,000

$0

Other $0

Other $0

$800,000 $0 $200,000 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$800,000 $0 $200,000 $0 $1,000,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0915-12-610

Construct sidewalks and pedestrian infrastructure

Status: RSR

$1,000,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

N/A

Remarks: None

Exempt

Proj Hist:

5/20 - move from FY 2020 to FY 2021; 4/19 - move from FY 2019 to FY 2020; 4/18 - funded through the 19-22 STP-MM Call for Projects

N/A TDM Network Years:

Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.

24

Page 29:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

ALAMO AREA METROPOLITAN PLANNING ORGANIZATION

2021FY

TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.

Year of Expenditure

Cost

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

City

TIP PROJECTS FY 2021-2024

Bexar15 - San Antonio

Description:

VA C CoSA 5545.2

Limits From: In San Antonio

Limits To: at various locations

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $3,000,000

Construction Engineering: $0

Contingencies: $0

Indirect Costs: $0

Preliminary Engineering: $0

Other Field: $0

$3,000,000

Type of Work: Planning

Total Project Cost:

$3,000,000

Authorized Funding by Category/Share

San Antonio

Cost of Approved Phases:

7 - STBG

Other

$3,000,000

$0

Other $0

Other $0

$2,400,000 $0 $600,000 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$2,400,000 $0 $600,000 $0 $3,000,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0915-12-611

Multimodal planning study on three arterials to accommodate travel modes including higher capacity transit

Status: Exempt

$3,000,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

N/A

Remarks: None

Exempt

Proj Hist:

4/18 - funded through the 19-22 STP-MM Call for Projects

N/A TDM Network Years:

Bexar15 - San Antonio

Description:

VA C TxDOT 5570.0

Limits From: Various locations on

Limits To: IH 35 S and IH 37 S

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $5,400,000

Construction Engineering: $270,000

Contingencies: $540,000

Indirect Costs: $216,000

Preliminary Engineering: $264,000

Other Field: $162,000

$6,852,000

Type of Work: TSMO: ITS

Total Project Cost:

$5,400,000

Authorized Funding by Category/Share

Other

Cost of Approved Phases:

5 - CMAQ

Other

$5,400,000

$0

Other $0

Other $0

$4,860,000 $540,000 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$4,860,000 $540,000 $0 $0 $5,400,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0915-12-664

Install ITS equipment on IH 35 South and IH 37 South Corridors

Status: RSR

$5,400,000

NOX lbs/day

91.029

VOC lbs/day

16.777

CMP Score

N/A

Remarks: None

Exempt

Proj Hist:

6/19 - added through CMAQ project call

N/A TDM Network Years:

Bexar15 - San Antonio

Description:

VA C TxDOT 5578.0

Limits From: In Bexar County

Limits To: .

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $75,000

Construction Engineering: $0

Contingencies: $0

Indirect Costs: $0

Preliminary Engineering: $0

Other Field: $0

$75,000

Type of Work: TSMO: Training

Total Project Cost:

$75,000

Authorized Funding by Category/Share

Other

Cost of Approved Phases:

5 - CMAQ

Other

$75,000

$0

Other $0

Other $0

$60,000 $15,000 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$60,000 $15,000 $0 $0 $75,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0915-12-665

Traffic Incident Management Training Program

Status: Exempt

$75,000

NOX lbs/day

4.365

VOC lbs/day

0.507

CMP Score

N/A

Remarks: None

Exempt

Proj Hist:

5/20 - move from FY 2020 to FY 2021; 6/19 - added through CMAQ project call

N/A TDM Network Years:

Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.

25

Page 30:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

ALAMO AREA METROPOLITAN PLANNING ORGANIZATION

2021FY

TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.

Year of Expenditure

Cost

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

City

TIP PROJECTS FY 2021-2024

Bexar15 - San Antonio

Description:

VA C CoSA 5573.1

Limits From: Various locations within

Limits To: the City of San Antonio

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $1,500,000

Construction Engineering: $0

Contingencies: $0

Indirect Costs: $0

Preliminary Engineering: $0

Other Field: $0

$1,500,000

Type of Work: TSMO: Traffic Signals

Total Project Cost:

$1,500,000

Authorized Funding by Category/Share

San Antonio

Cost of Approved Phases:

5 - CMAQ

Other

$1,500,000

$0

Other $0

Other $0

$1,200,000 $0 $300,000 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$1,200,000 $0 $300,000 $0 $1,500,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0915-12-667

Traffic signal optimization on congested corridors in the City of San Antonio. Data collection and implementation of updated signal timing plans. FY 2020

Status: Exempt

$1,500,000

NOX lbs/day

31.360

VOC lbs/day

8.557

CMP Score

N/A

Remarks: None

Exempt

Proj Hist:

5/20 - move from FY 2020 to FY 2021; 6/19 - added through CMAQ project call

N/A TDM Network Years:

Bexar15 - San Antonio

Description:

VA C CoSA 5574.1

Limits From: Various locations within

Limits To: the City of San Antonio

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $1,000,000

Construction Engineering: $50,000

Contingencies: $100,000

Indirect Costs: $30,000

Preliminary Engineering: $49,000

Other Field: $30,000

$1,259,000

Type of Work: TSMO: ITS

Total Project Cost:

$1,000,000

Authorized Funding by Category/Share

San Antonio

Cost of Approved Phases:

5 - CMAQ

Other

$1,000,000

$0

Other $0

Other $0

$800,000 $0 $200,000 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$800,000 $0 $200,000 $0 $1,000,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0915-12-668

Install ITS equipment on congested corridors in the City of San Antonio - FY 2020

Status: Exempt

$1,000,000

NOX lbs/day

13.272

VOC lbs/day

15.587

CMP Score

N/A

Remarks: None

Exempt

Proj Hist:

5/20 - move from FY 2020 to FY 2021; 6/19 - added through CMAQ project call

N/A TDM Network Years:

Bexar15 - San Antonio

Description:

VA C CoSA 5575.1

Limits From: In the City of San Antonio

Limits To: .

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $250,000

Construction Engineering: $0

Contingencies: $0

Indirect Costs: $0

Preliminary Engineering: $0

Other Field: $0

$250,000

Type of Work: TSMO: TDM Program

Total Project Cost:

$250,000

Authorized Funding by Category/Share

San Antonio

Cost of Approved Phases:

5 - CMAQ

Other

$250,000

$0

Other $0

Other $0

$200,000 $0 $50,000 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$200,000 $0 $50,000 $0 $250,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0915-12-669

City of San Antonio Travel Demand Management Program. To support efforts in vanpool, carpool, telecommuting and education. FY 2020

Status: Exempt

$250,000

NOX lbs/day

10.140

VOC lbs/day

4.947

CMP Score

N/A

Remarks: None

Exempt

Proj Hist:

5/20 - move from FY 2020 to FY 2021; 6/19 - added through CMAQ project call

N/A TDM Network Years:

Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.

26

Page 31:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

ALAMO AREA METROPOLITAN PLANNING ORGANIZATION

2021FY

TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.

Year of Expenditure

Cost

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

City

TIP PROJECTS FY 2021-2024

Bexar15 - San Antonio

Description:

VA C CoSA 5576.1

Limits From: In the City of San Antonio

Limits To: .

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $150,000

Construction Engineering: $0

Contingencies: $0

Indirect Costs: $0

Preliminary Engineering: $0

Other Field: $0

$150,000

Type of Work: TSMO: TDM Program

Total Project Cost:

$150,000

Authorized Funding by Category/Share

San Antonio

Cost of Approved Phases:

5 - CMAQ

Other

$150,000

$0

Other $0

Other $0

$120,000 $0 $30,000 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$120,000 $0 $30,000 $0 $150,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0915-12-670

City of San Antonio Vehicle Emissions Reductions Program. Series of targeted outreach and education programs. Gas cap replacement program. FY 2020

Status: Exempt

$150,000

NOX lbs/day

0.152

VOC lbs/day

499.810

CMP Score

N/A

Remarks: None

Exempt

Proj Hist:

5/20 - move from FY 2020 to FY 2021; 6/19 - added through CMAQ project call

N/A TDM Network Years:

Bexar15 - San Antonio

Description:

VA C UTSA 5577.1

Limits From: University of Texas at San Antonio

Limits To: .

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $129,225

Construction Engineering: $0

Contingencies: $0

Indirect Costs: $0

Preliminary Engineering: $0

Other Field: $0

$129,225

Type of Work: TSMO: TDM Program

Total Project Cost:

$129,225

Authorized Funding by Category/Share

Other

Cost of Approved Phases:

5 - CMAQ

3 - LC (UTSA)

$113,041

$16,184

Other $0

Other $0

$90,433 $0 $22,608 $0

$0 $0 $0 $16,184

$0 $0 $0 $0

$0 $0 $0 $0

$90,433 $0 $22,608 $16,184 $129,225

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0915-12-671

Make UTSA Walkable Program. Support UTSA's efforts to establish programs to increase alternate forms of transportation. FY 2020

Status: Exempt

$129,225

NOX lbs/day

0.922

VOC lbs/day

0.628

CMP Score

N/A

Remarks: None

Exempt

Proj Hist:

5/20 - move from FY 2020 to FY 2021; 6/19 - added through CMAQ project call

N/A TDM Network Years:

Bexar15 - San Antonio

Description:

VA C CoSA 5574.2

Limits From: Various locations within

Limits To: the City of San Antonio

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $1,000,000

Construction Engineering: $50,000

Contingencies: $100,000

Indirect Costs: $30,000

Preliminary Engineering: $49,000

Other Field: $30,000

$1,259,000

Type of Work: TSMO: ITS

Total Project Cost:

$1,000,000

Authorized Funding by Category/Share

San Antonio

Cost of Approved Phases:

5 - CMAQ

Other

$1,000,000

$0

Other $0

Other $0

$800,000 $0 $200,000 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$800,000 $0 $200,000 $0 $1,000,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0915-12-674

Install ITS equipment on congested corridors in the City of San Antonio - FY 2021

Status: Exempt

$1,000,000

NOX lbs/day

13.272

VOC lbs/day

15.587

CMP Score

N/A

Remarks: None

Exempt

Proj Hist:

6/19 - added through CMAQ project call

N/A TDM Network Years:

Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.

27

Page 32:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

ALAMO AREA METROPOLITAN PLANNING ORGANIZATION

2021FY

TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.

Year of Expenditure

Cost

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

City

TIP PROJECTS FY 2021-2024

Bexar15 - San Antonio

Description:

VA C CoSA 5573.2

Limits From: Various locations within

Limits To: the City of San Antonio

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $1,500,000

Construction Engineering: $0

Contingencies: $0

Indirect Costs: $0

Preliminary Engineering: $0

Other Field: $0

$1,500,000

Type of Work: TSMO: Traffic Signals

Total Project Cost:

$1,500,000

Authorized Funding by Category/Share

San Antonio

Cost of Approved Phases:

5 - CMAQ

Other

$1,500,000

$0

Other $0

Other $0

$1,200,000 $0 $300,000 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$1,200,000 $0 $300,000 $0 $1,500,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0915-12-675

Traffic signal optimization on congested corridors in the City of San Antonio. Data collection and implementation of updated signal timing plans. FY 2021

Status: Exempt

$1,500,000

NOX lbs/day

31.360

VOC lbs/day

8.557

CMP Score

N/A

Remarks: None

Exempt

Proj Hist:

6/19 - added through CMAQ project call

N/A TDM Network Years:

Bexar15 - San Antonio

Description:

VA C CoSA 5575.2

Limits From: In the City of San Antonio

Limits To: .

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $250,000

Construction Engineering: $0

Contingencies: $0

Indirect Costs: $0

Preliminary Engineering: $0

Other Field: $0

$250,000

Type of Work: TSMO: TDM Program

Total Project Cost:

$250,000

Authorized Funding by Category/Share

San Antonio

Cost of Approved Phases:

5 - CMAQ

Other

$250,000

$0

Other $0

Other $0

$200,000 $0 $50,000 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$200,000 $0 $50,000 $0 $250,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0915-12-676

City of San Antonio Travel Demand Management Program. To support efforts in vanpool, carpool, telecommuting and education. FY 2021

Status: Exempt

$250,000

NOX lbs/day

10.140

VOC lbs/day

4.947

CMP Score

N/A

Remarks: None

Exempt

Proj Hist:

6/19 - added through CMAQ project call

N/A TDM Network Years:

Bexar15 - San Antonio

Description:

VA C CoSA 5576.2

Limits From: In the City of San Antonio

Limits To: .

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $150,000

Construction Engineering: $0

Contingencies: $0

Indirect Costs: $0

Preliminary Engineering: $0

Other Field: $0

$150,000

Type of Work: TSMO: TDM Program

Total Project Cost:

$150,000

Authorized Funding by Category/Share

San Antonio

Cost of Approved Phases:

5 - CMAQ

Other

$150,000

$0

Other $0

Other $0

$120,000 $0 $30,000 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$120,000 $0 $30,000 $0 $150,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0915-12-677

City of San Antonio Vehicle Emissions Reductions Program. Series of targeted outreach and education programs. Gas cap replacement program. FY 2021

Status: Exempt

$150,000

NOX lbs/day

0.152

VOC lbs/day

499.810

CMP Score

N/A

Remarks: None

Exempt

Proj Hist:

6/19 - added through CMAQ project call

N/A TDM Network Years:

Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.

28

Page 33:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

ALAMO AREA METROPOLITAN PLANNING ORGANIZATION

2021FY

TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.

Year of Expenditure

Cost

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

City

TIP PROJECTS FY 2021-2024

Bexar15 - San Antonio

Description:

VA C UTSA 5577.2

Limits From: University of Texas at San Antonio

Limits To: .

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $129,225

Construction Engineering: $0

Contingencies: $0

Indirect Costs: $0

Preliminary Engineering: $0

Other Field: $0

$129,225

Type of Work: TSMO: TDM Program

Total Project Cost:

$129,225

Authorized Funding by Category/Share

Other

Cost of Approved Phases:

5 - CMAQ

3 - LC (UTSA)

$113,042

$16,183

Other $0

Other $0

$90,434 $0 $22,608 $0

$0 $0 $0 $16,183

$0 $0 $0 $0

$0 $0 $0 $0

$90,434 $0 $22,608 $16,183 $129,225

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0915-12-678

Make UTSA Walkable Program. Support UTSA's efforts to establish programs to increase alternate forms of transportation. FY 2021

Status: Exempt

$129,225

NOX lbs/day

0.922

VOC lbs/day

0.628

CMP Score

N/A

Remarks: None

Exempt

Proj Hist:

6/19 - added through CMAQ project call

N/A TDM Network Years:

Bexar15 - San Antonio

Description:

VA T VIA 5580.2

Limits From: In VIA service area

Limits To: .

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $7,553,334

Construction Engineering: $0

Contingencies: $0

Indirect Costs: $0

Preliminary Engineering: $0

Other Field: $0

$7,553,334

Type of Work: Transit

Total Project Cost:

$7,553,334

Authorized Funding by Category/Share

Other

Cost of Approved Phases:

5 - CMAQ

3 - LC

$6,866,667

$686,667

Other $0

Other $0

$5,493,334 $0 $1,373,333 $0

$0 $0 $0 $686,667

$0 $0 $0 $0

$0 $0 $0 $0

$5,493,334 $0 $1,373,333 $686,667 $7,553,334

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0915-12-679

VIA Fleet Replacement Program. Purchase 14 CNG buses. FY 2021

Status: Exempt

$7,553,334

NOX lbs/day

36.092

VOC lbs/day

3.761

CMP Score

N/A

Remarks: None

Exempt

Proj Hist:

6/19 - added through CMAQ project call

N/A TDM Network Years:

Bexar15 - San Antonio

Description:

VA T VIA 5581.2

Limits From: In VIA service area

Limits To: .

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $2,181,429

Construction Engineering: $0

Contingencies: $0

Indirect Costs: $0

Preliminary Engineering: $0

Other Field: $0

$2,181,429

Type of Work: Transit

Total Project Cost:

$2,181,429

Authorized Funding by Category/Share

Other

Cost of Approved Phases:

5 - CMAQ

3 - LC

$1,489,762

$691,667

Other $0

Other $0

$1,191,810 $0 $297,952 $0

$0 $0 $0 $691,667

$0 $0 $0 $0

$0 $0 $0 $0

$1,191,810 $0 $297,952 $691,667 $2,181,429

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0915-12-680

VIA Bus Frequency Program. Increase service on #7 and #552 routes. FY 2021

Status: Exempt

$2,181,429

NOX lbs/day

4.156

VOC lbs/day

3.709

CMP Score

N/A

Remarks: None

Exempt

Proj Hist:

6/19 - added through CMAQ project call

N/A TDM Network Years:

Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.

29

Page 34:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

ALAMO AREA METROPOLITAN PLANNING ORGANIZATION

2021FY

TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.

Year of Expenditure

Cost

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

City

TIP PROJECTS FY 2021-2024

Guadalupe15 - San Antonio

Description:

CS C Seguin 5322.0

Limits From: In Seguin, on Rudeloff Rd.

Limits To: From SH 46 to Huber Rd.

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $6,316,658

Construction Engineering: $313,306

Contingencies: $125,701

Indirect Costs: $263,576

Preliminary Engineering: $309,516

Other Field: $236,243

$7,565,000

Type of Work: Added Capacity: Non Toll

Total Project Cost:

$6,316,658

Authorized Funding by Category/Share

Seguin

Cost of Approved Phases:

7 - STBG

Other

$6,316,658

$0

Other $0

Other $0

$5,053,326 $0 $1,263,332 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$5,053,326 $0 $1,263,332 $0 $6,316,658

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0915-46-045

Expand from 2 to 4 lanes with center turn lane, bicycle and pedestian facilities

Status: Non-RSR

$6,316,658

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

N/A

Remarks: None

Exempt

Proj Hist:

4/16 - funded through STP-MM project selection process

2025,2035,2045 TDM Network Years:

Guadalupe15 - San Antonio

Description:

VA C Seguin 4976.0

Limits From: in Seguin from Vaughan Bridge

Limits To: to Max Starcke Park East

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $2,801,246

Construction Engineering: $178,700

Contingencies: $36,100

Indirect Costs: $135,300

Preliminary Engineering: $137,300

Other Field: $162,000

$3,450,646

Type of Work: Bicycle/Pedestrian

Total Project Cost:

$2,801,246

Authorized Funding by Category/Share

Seguin

Cost of Approved Phases:

9 - TA

3 - LC

$2,773,234

$28,012

Other $0

Other $0

$2,218,587 $0 $554,647 $0

$0 $0 $0 $28,012

$0 $0 $0 $0

$0 $0 $0 $0

$2,218,587 $0 $554,647 $28,012 $2,801,246

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0915-46-046

Extend Walnut Springs multi use trail, including retaining walls, hand and guard rails and below grade crossing

Status: Exempt

$2,801,246

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

N/A

Remarks: None

Exempt

Proj Hist:

5/20 - move from FY 2020 to FY 2021; 1/19 - move from FY 2019 to FY 2020; 6/17 - add TA project

N/A TDM Network Years:

Guadalupe15 - San Antonio

Description:

CS C Schertz 4975.0

Limits From: in Schertz on Woodland Oaks Dr,

Limits To: Savannah Dr & Live Oak Rd

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $1,158,266

Construction Engineering: $73,900

Contingencies: $15,000

Indirect Costs: $56,000

Preliminary Engineering: $56,800

Other Field: $67,000

$1,426,966

Type of Work: Bicycle/Pedestrian

Total Project Cost:

$1,158,266

Authorized Funding by Category/Share

Schertz

Cost of Approved Phases:

9 - TA

Other

$1,158,266

$0

Other $0

Other $0

$926,613 $0 $231,653 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$926,613 $0 $231,653 $0 $1,158,266

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0915-46-050

Construct sidewalks, bike lanes and off-road trail

Status: Non-RSR

$1,158,266

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

N/A

Remarks: None

Exempt

Proj Hist:

5/20 - move 20 to 21; 4/19 - move 19 to 20; 10/18 - adm rev CSJ from 0915-17-065 to 0915-46-050; 4/18 - move 18 to FY 19; 6/17 - add TA project

N/A TDM Network Years:

Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.

30

Page 35:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

ALAMO AREA METROPOLITAN PLANNING ORGANIZATION

2021FY

TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.

Year of Expenditure

Cost

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

City

TIP PROJECTS FY 2021-2024

Comal15 - San Antonio

Description:

FM 1103 C TxDOT 4970.0

Limits From: IH 35

Limits To: Guadalupe C/L

Total Project Cost Information (TxDOT %):

ROW Purchase: $870,000

Construction Cost: $2,000,000

Construction Engineering: $89,000

Contingencies: $455,000

Indirect Costs: $44,000

Preliminary Engineering: $200,000

Other Field: $89,000

$3,747,000

Type of Work: Added Capacity: Non Toll

Total Project Cost:

$2,000,000

Authorized Funding by Category/Share

Other

Cost of Approved Phases:

1 - Prvnt Mnt/Rehab

11 - Distr Discr

$700,000

$800,000

3 - LC $500,000

Other $0

$560,000 $140,000 $0 $0

$640,000 $160,000 $0 $0

$0 $0 $0 $500,000

$0 $0 $0 $0

$1,200,000 $300,000 $0 $500,000 $2,000,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

1268-01-013

Expand from 2 to 4 lanes with medians, turn lanes, sidewalk and bike lanes

Status: Non-RSR

$2,000,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

N/A

Remarks: None

Exempt

Proj Hist:

5/20 - move 20 to 21; 10/19 - rev cost/funding; 9/19 - ADM clarify description; 4/17 - move 19 to 20; 1/17 - move 18 to 19; 10/15 - add project

2025,2035,2045 TDM Network Years:

Guadalupe15 - San Antonio

Description:

FM 1103 C TxDOT 4971.0

Limits From: Comal C/L

Limits To: Rodeo Way

Total Project Cost Information (TxDOT %):

ROW Purchase: $3,285,000

Construction Cost: $37,500,000

Construction Engineering: $1,666,000

Contingencies: $2,915,000

Indirect Costs: $833,000

Preliminary Engineering: $3,750,000

Other Field: $1,666,000

$51,615,000

Type of Work: Added Capacity: Non Toll

Total Project Cost:

$37,500,000

Authorized Funding by Category/Share

Other

Cost of Approved Phases:

1 - Prvnt Mnt/Rehab

11 - Distr Discr

$18,111,852

$11,922,500

3 - LC $7,465,648

Other $0

$14,489,482 $3,622,370 $0 $0

$9,538,000 $2,384,500 $0 $0

$0 $0 $0 $7,465,648

$0 $0 $0 $0

$24,027,482 $6,006,870 $0 $7,465,648 $37,500,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

1268-02-027

Expand from 2 to 4 lanes with medians, turn lanes, sidewalk and bike lanes

Status: Non-RSR

$37,500,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

N/A

Remarks: None

Exempt

Proj Hist:

5/20 - move 20 to 21; 10/19 - rev cost/funding; 9/19 - ADM clarify description; 4/17 - move 19 to 20 and rev funding; 1/17 - move 18 to19 and rev funding; 10/15 - add project

2025,2035,2045 TDM Network Years:

Bexar15 - San Antonio

Description:

FM 2252 E TxDOT 5329.2

Limits From: Evans Road

Limits To: Comal/Bexar County Line

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $500,000

Construction Engineering: $32,000

Contingencies: $7,000

Indirect Costs: $29,000

Preliminary Engineering: $50,000

Other Field: $29,000

$647,000

Type of Work: Added Capacity: Non Toll

Total Project Cost:

$50,000

Authorized Funding by Category/Share

San Antonio

Cost of Approved Phases:

SWPE

Other

$50,000

$0

Other $0

Other $0

$0 $50,000 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $50,000 $0 $0 $50,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

1433-01-028

Expand from 2 lanes to 4 lanes with raised median or continuous left turn lane, bike lanes and sidewalk

Status: RSR

$50,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

N/A

Remarks: None

Non-Exempt

Proj Hist:

10/18 - add phase (Engr)

N/A TDM Network Years:

Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.

31

Page 36:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

ALAMO AREA METROPOLITAN PLANNING ORGANIZATION

2021FY

TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.

Year of Expenditure

Cost

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

City

TIP PROJECTS FY 2021-2024

Bexar15 - San Antonio

Description:

FM 1516 E,R TxDOT 5379.2

Limits From: FM 78

Limits To: IH 10

Total Project Cost Information (TxDOT %):

ROW Purchase: $10,754,000

Construction Cost: $23,500,000

Construction Engineering: $940,000

Contingencies: $1,645,000

Indirect Costs: $470,000

Preliminary Engineering: $1,151,500

Other Field: $940,000

$39,400,500

Type of Work: Added Capacity: Non Toll

Total Project Cost:

$11,905,500

Authorized Funding by Category/Share

Other

Cost of Approved Phases:

SWPE

SWROW

$1,151,500

$10,754,000

Other $0

Other $0

$0 $1,151,500 $0 $0

$8,603,200 $2,150,800 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$8,603,200 $3,302,300 $0 $0 $11,905,500

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

1477-01-043

Expand from 2 to 4 lane divided with bike lanes and sidewalks

Status: RSR

$11,905,500

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

N/A

Remarks: None

Non-Exempt

Proj Hist:

5/20 - move from FY 2020 to FY 2021; 10/18 - add phases (Engr, ROW)

N/A TDM Network Years:

Bexar15 - San Antonio

Description:

FM 1560 E,R TxDOT 5311.2

Limits From: FM 471

Limits To: Galm/Shaenfield

Total Project Cost Information (TxDOT %):

ROW Purchase: $12,257,333

Construction Cost: $12,100,000

Construction Engineering: $600,160

Contingencies: $240,790

Indirect Costs: $694,540

Preliminary Engineering: $1,210,000

Other Field: $452,540

$27,555,363

Type of Work: Added Capacity: Non Toll

Total Project Cost:

$13,467,333

Authorized Funding by Category/Share

Other

Cost of Approved Phases:

SWPE

SWROW

$1,210,000

$12,257,333

Other $0

Other $0

$0 $1,210,000 $0 $0

$9,805,866 $2,451,467 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$9,805,866 $3,661,467 $0 $0 $13,467,333

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

2230-01-020

Expand from 2 to 4 lanes with raised median, or center turn lane, bike lanes and sidewalks

Status: Non-RSR

$13,467,333

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

N/A

Remarks: None

Non-Exempt

Proj Hist:

5/20 - move from FY 2020 to FY 2021; 10/18 - add phases E & R

N/A TDM Network Years:

Bexar15 - San Antonio

Description:

SL 1604 E,R TxDOT 9110.4

Limits From: Macdona-Lacoste Rd

Limits To: US 90 W

Total Project Cost Information (TxDOT %):

ROW Purchase: $4,800,000

Construction Cost: $40,000,000

Construction Engineering: $2,552,000

Contingencies: $516,000

Indirect Costs: $2,296,000

Preliminary Engineering: $4,000,000

Other Field: $2,312,000

$56,476,000

Type of Work: Added Capacity: Non Toll

Total Project Cost:

$8,800,000

Authorized Funding by Category/Share

Other

Cost of Approved Phases:

SWPE

SWROW

$4,000,000

$4,800,000

Other $0

Other $0

$0 $4,000,000 $0 $0

$3,840,000 $960,000 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$3,840,000 $4,960,000 $0 $0 $8,800,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

2452-01-066

Expand from 2 lanes to 4 lane divided

Status: RSR

$8,800,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

N/A

Remarks: None

Non-Exempt

Proj Hist:

5/20 - move from FY 2019 to FY 2021; 10/18 - add phases (Engr, ROW)

N/A TDM Network Years:

Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.

32

Page 37:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

ALAMO AREA METROPOLITAN PLANNING ORGANIZATION

2021FY

TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.

Year of Expenditure

Cost

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

City

TIP PROJECTS FY 2021-2024

Bexar15 - San Antonio

Description:

SL 1604 C TxDOT 3913.0

Limits From: SH 16

Limits To: IH 10

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $185,500,000

Construction Engineering: $8,200,000

Contingencies: $14,400,000

Indirect Costs: $4,100,000

Preliminary Engineering: $18,500,000

Other Field: $8,200,000

$238,900,000

Type of Work: Added Capacity: Non Toll

Total Project Cost:

$185,500,000

Authorized Funding by Category/Share

San Antonio

Cost of Approved Phases:

2 - Metro Corridor

Other

$185,500,000

$0

Other $0

Other $0

$148,400,000 $37,100,000 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$148,400,000 $37,100,000 $0 $0 $185,500,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

2452-02-083

Expand from 4 to 10 lane expressway - including 2 HOV-special use lanes, & from 4 to 4 FR lanes

Status: RSR

$185,500,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

42

Remarks: Reference #4049 and #5556

Non-Exempt

Proj Hist:

10/19 - move 19 to 21 and rev cost, limits and descr; see #4049 and #5556; 1/19 - rev descr to incl FR lanes; 10/18 - 20 to 21, rev descr & fund, move to TxDOT; 4/17 - rev limits, descr, cost (has $398.3M in Cat 2: '17-

2025,2035,2045 TDM Network Years:

Bexar15 - San Antonio

Description:

SL 1604 C TxDOT 5332.0

Limits From: at FM 2696 - Blanco Road

Limits To: .

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $40,600,000

Construction Engineering: $1,800,000

Contingencies: $3,100,000

Indirect Costs: $900,000

Preliminary Engineering: $4,100,000

Other Field: $1,800,000

$52,300,000

Type of Work: TSMO: Operational

Total Project Cost:

$40,600,000

Authorized Funding by Category/Share

San Antonio

Cost of Approved Phases:

2 - Metro Corridor

Other

$40,600,000

$0

Other $0

Other $0

$32,480,000 $8,120,000 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$32,480,000 $8,120,000 $0 $0 $40,600,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

2452-02-117

Intersection operational improvements including construction of a diverging diamond interchange (DDI)

Status: RSR

$40,600,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

N/A

Remarks: None

Exempt

Proj Hist:

11/19 - ADM* clarify description; 10/19 - rev cost; 10/18 - move 22 to 21; 3/18 - incr cost from $30M; 10/17 - move 20 to 22; 4/17 - TIP: add project; MTP - move 27 to 20; 4/16 - funded in 17-20 TIP Call for Projects

2025,2035,2045 TDM Network Years:

Bexar15 - San Antonio

Description:

SL 1604 C TxDOT 4049.0

Limits From: IH 10

Limits To: US 281

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $187,800,000

Construction Engineering: $8,300,000

Contingencies: $14,600,000

Indirect Costs: $4,100,000

Preliminary Engineering: $18,800,000

Other Field: $8,300,000

$241,900,000

Type of Work: Added Capacity: Non Toll

Total Project Cost:

$187,800,000

Authorized Funding by Category/Share

San Antonio

Cost of Approved Phases:

2 - Metro Corridor

Other

$187,800,000

$0

Other $0

Other $0

$150,240,000 $37,560,000 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$150,240,000 $37,560,000 $0 $0 $187,800,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

2452-02-128

Expand from 4 to 10 lane expressway - including 2 HOV - special use lanes & from 4 to 4 frontage roads

Status: RSR

$187,800,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

42

Remarks: 10/19 - add project; spin off of 2452-02-083 (MPO #3913); no impact to conformity

Non-Exempt

Proj Hist:

10/19 - add project; spin off of 2452-02-083 (MPO #3913); no impact to conformity

2025,2035,2045 TDM Network Years:

Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.

33

Page 38:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

ALAMO AREA METROPOLITAN PLANNING ORGANIZATION

2021FY

TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.

Year of Expenditure

Cost

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

City

TIP PROJECTS FY 2021-2024

Medina15 - San Antonio

Description:

SH 211 C BxCo 3152.0

Limits From: Bexar C/L, 2.0 Mi S of FM 471, N

Limits To: FM 471 (Culebra Rd)

Total Project Cost Information (TxDOT %):

ROW Purchase: $1,100,000

Construction Cost: $4,400,000

Construction Engineering: $214,157

Contingencies: $309,338

Indirect Costs: $241,283

Preliminary Engineering: $233,193

Other Field: $0

$6,497,971

Type of Work: Added Capacity: Non Toll

Total Project Cost:

$4,400,000

Authorized Funding by Category/Share

Other

Cost of Approved Phases:

3 - PTF

Other

$4,400,000

$0

Other $0

Other $0

$0 $0 $0 $4,400,000

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $4,400,000 $4,400,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

3544-03-002

Construct two lane rural highway on new location

Status: Non-RSR

$4,400,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

N/A

Remarks: None

Exempt

Proj Hist:

5/20 - move 20 to 21; 10/19 - move 19 to 20; 4/18 - move 18 to 19; 10/17 - move 17 to 18; 4/15 - move 15 to 16; Pass through financing project to be reimbursed from Cat 12

2025,2035,2045 TDM Network Years:

Bexar15 - San Antonio

Description:

SH 211 C BxCo 3153.0

Limits From: FM 1957 (Potranco Rd), N 2.9 MI

Limits To: Medina County Line

Total Project Cost Information (TxDOT %):

ROW Purchase: $1,780,000

Construction Cost: $7,000,000

Construction Engineering: $340,704

Contingencies: $492,128

Indirect Costs: $383,860

Preliminary Engineering: $840,000

Other Field: $0

$10,836,692

Type of Work: Added Capacity: Non Toll

Total Project Cost:

$7,000,000

Authorized Funding by Category/Share

Other

Cost of Approved Phases:

3 - PTF

Other

$7,000,000

$0

Other $0

Other $0

$0 $0 $0 $7,000,000

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $7,000,000 $7,000,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

3544-04-002

Construct two lane rural highway on new location

Status: RSR

$7,000,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

N/A

Remarks: None

Non-Exempt

Proj Hist:

5/20 - move 20 to 21; 10/19 - move 19 to FY 20; 4/18 - move 18 to 19; 10/17 - move 17 to 18; 4/15 - move 15 to 16; Pass through financing project to be reimbursed from Cat 12

2025,2035,2045 TDM Network Years:

Bexar15 - San Antonio

Description:

SH 211 C BxCo 3154.0

Limits From: Medina Co. Line, 4.5 Mi N of FM 1957, N

Limits To: Medina Co. Line, 2.0 Mi S of FM 471

Total Project Cost Information (TxDOT %):

ROW Purchase: $700,000

Construction Cost: $2,600,000

Construction Engineering: $126,547

Contingencies: $182,790

Indirect Costs: $142,577

Preliminary Engineering: $137,796

Other Field: $0

$3,889,710

Type of Work: Added Capacity: Non Toll

Total Project Cost:

$2,600,000

Authorized Funding by Category/Share

Other

Cost of Approved Phases:

3 - PTF

Other

$2,600,000

$0

Other $0

Other $0

$0 $0 $0 $2,600,000

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $2,600,000 $2,600,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

3544-05-001

Construct two lane rural highway on new location

Status: RSR

$2,600,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

N/A

Remarks: None

Non-Exempt

Proj Hist:

5/20 - move 20 to 21; 10/19 - move 19 to 20; 10/18 - revise TPC; 4/18 - move 18 to 19;10/17 - move 17 to 18; 4/15 - move 15 to 16; Pass through financing project to be reimbursed from Cat 12

2025,2035,2045 TDM Network Years:

Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.

34

Page 39:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

ALAMO AREA METROPOLITAN PLANNING ORGANIZATION

2021FY

TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.

Year of Expenditure

Cost

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

City

TIP PROJECTS FY 2021-2024

Medina15 - San Antonio

Description:

SH 211 C BxCo 3155.0

Limits From: Bexar C/L, 2.9 MI N of FM 1957, N

Limits To: Bexar C/L, 4.5 MI N of FM 1957

Total Project Cost Information (TxDOT %):

ROW Purchase: $1,000,000

Construction Cost: $4,100,000

Construction Engineering: $199,555

Contingencies: $288,246

Indirect Costs: $224,832

Preliminary Engineering: $217,293

Other Field: $0

$6,029,926

Type of Work: Added Capacity: Non Toll

Total Project Cost:

$4,100,000

Authorized Funding by Category/Share

Other

Cost of Approved Phases:

3 - PTF

Other

$4,100,000

$0

Other $0

Other $0

$0 $0 $0 $4,100,000

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $4,100,000 $4,100,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

3544-06-001

Construct two lane rural highway on new location

Status: Non-RSR

$4,100,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

N/A

Remarks: None

Exempt

Proj Hist:

5/20 - move 20 to 21; 10/19 - move 19 to 20; 4/18 - move 18 to 19; 10/17 - move 17 to FY 18; 4/15 - move 15 to 16; Pass through financing project to be reimbursed from Cat 12

2025,2035,2045 TDM Network Years:

Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.

35

Page 40:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

ALAMO AREA METROPOLITAN PLANNING ORGANIZATION

2022FY

TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.

Year of Expenditure

Cost

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

City

TIP PROJECTS FY 2021-2024

Bexar15 - San Antonio

Description:

FM 1518 R TxDOT 5309.2

Limits From: FM 78

Limits To: IH 10

Total Project Cost Information (TxDOT %):

ROW Purchase: $8,194,000

Construction Cost: $44,780,000

Construction Engineering: $2,687,000

Contingencies: $3,135,000

Indirect Costs: $2,239,000

Preliminary Engineering: $2,194,000

Other Field: $1,791,000

$65,020,000

Type of Work: Added Capacity: Non Toll

Total Project Cost:

$8,194,000

Authorized Funding by Category/Share

Other

Cost of Approved Phases:

SWROW

Other

$8,194,000

$0

Other $0

Other $0

$6,555,200 $1,638,800 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$6,555,200 $1,638,800 $0 $0 $8,194,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0465-02-027

Expand from 2 to 4 lanes with raised median or center turn lane, bike lanes and sidewalks

Status: Non-RSR

$8,194,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

N/A

Remarks: None

Non-Exempt

Proj Hist:

5/20 - add R phase to TIP: 4/18 - move from FY 2021 to FY 2023 and combine with STP-MM selected project; 4/16 - funded through STP-MM project selection process

N/A TDM Network Years:

Bexar15 - San Antonio

Description:

US 90 E TxDOT 5380.2

Limits From: SH 211

Limits To: 0.8 Miles W of IH 410

Total Project Cost Information (TxDOT %):

ROW Purchase: $7,500,000

Construction Cost: $110,000,000

Construction Engineering: $7,018,000

Contingencies: $5,500,000

Indirect Costs: $6,314,000

Preliminary Engineering: $5,390,000

Other Field: $6,358,000

$148,080,000

Type of Work: Added Capacity: Non-Toll

Total Project Cost:

$12,408,000

Authorized Funding by Category/Share

Other

Cost of Approved Phases:

SWPE

Other

$12,408,000

$0

Other $0

Other $0

$0 $12,408,000 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $12,408,000 $0 $0 $12,408,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0024-07-059

Expand from 4 lane divided to 6 lane expressway and 4 FR lanes (LP 1604 to SH 211)

Status: RSR

$12,408,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

N/A

Remarks: None

Non-Exempt

Proj Hist:

5/20 - add E phase to TIP; 9/19 - ADM clarify description; 1/19 - rev descr to incl FR lanes and update cost; 4/18 - correct funding distribution; 4/17 - add project

N/A TDM Network Years:

Bexar15 - San Antonio

Description:

US 90 E TxDOT 5381.2

Limits From: 0.8 Miles W of IH 410

Limits To: IH 410

Total Project Cost Information (TxDOT %):

ROW Purchase: $1,000,000

Construction Cost: $10,000,000

Construction Engineering: $400,000

Contingencies: $700,000

Indirect Costs: $200,000

Preliminary Engineering: $490,000

Other Field: $400,000

$13,190,000

Type of Work: Added Capacity: Non-Toll

Total Project Cost:

$890,000

Authorized Funding by Category/Share

San Antonio

Cost of Approved Phases:

SWPE

Other

$890,000

$0

Other $0

Other $0

$0 $890,000 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $890,000 $0 $0 $890,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0024-08-138

Expand from 4 lane divided to 6 lane expressway and from 4 to 4 FR lanes

Status: RSR

$890,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

N/A

Remarks: None

Non-Exempt

Proj Hist:

5/20 - add E phase to TIP; 1/19 - rev descr to incl FR lanes; 4/18 - correct funding distribution; 4/17 - add project

N/A TDM Network Years:

Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.

36

Page 41:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

ALAMO AREA METROPOLITAN PLANNING ORGANIZATION

2022FY

TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.

Year of Expenditure

Cost

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

City

TIP PROJECTS FY 2021-2024

Bexar15 - San Antonio

Description:

FM 1560 R TxDOT 5391.2

Limits From: Galm/Shaenfield

Limits To: SH 16

Total Project Cost Information (TxDOT %):

ROW Purchase: $11,800,000

Construction Cost: $19,750,000

Construction Engineering: $900,000

Contingencies: $1,500,000

Indirect Costs: $400,000

Preliminary Engineering: $1,900,000

Other Field: $900,000

$37,150,000

Type of Work: Added Capacity: Non Toll

Total Project Cost:

$11,800,000

Authorized Funding by Category/Share

Other

Cost of Approved Phases:

SWROW

Other

$11,800,000

$0

Other $0

Other $0

$9,440,000 $2,360,000 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$9,440,000 $2,360,000 $0 $0 $11,800,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

2230-01-021

Expand from 2 lanes to 4 lanes with turn lanes, bike accommodation and sidewalks

Status: Non-RSR

$11,800,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

N/A

Remarks: None

Non-Exempt

Proj Hist:

5/20 - add R phase to TIP; 4/18 - funded through the 19-22 STP-MM Call for Projects; 4/17 - add project to MTP with Prop 1/Prop 7; portion of project may have already been in the MTP

N/A TDM Network Years:

Bexar15 - San Antonio

Description:

IH 35 North C,E TxDOT 61.2

Limits From: IH 410 S

Limits To: IH 410 N

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $538,700,000

Construction Engineering: $50,000,000

Contingencies: $0

Indirect Costs: $32,000,000

Preliminary Engineering: $50,000,000

Other Field: $0

$670,700,000

Type of Work: Added Capacity: Non Toll

Total Project Cost:

$638,700,000

Authorized Funding by Category/Share

San Antonio

Cost of Approved Phases:

12 - Strat Priority

12 - CL

$369,000,000

$133,000,000

6 - Structures $36,700,000

3 - DB $100,000,000

$295,200,000 $73,800,000 $0 $0

$106,400,000 $26,600,000 $0 $0

$33,030,000 $3,670,000 $0 $0

$80,000,000 $20,000,000 $0 $0

$514,630,000 $124,070,000 $0 $0 $638,700,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0017-10-168

Expand from 8 ln to 14 ln expy - add 6 new express lanes incl 2 HOV-special use lns, & from 4/6 to 4/6 FR lanes & DCs at IH 410 S & IH 410 N

Status: RSR

$638,700,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

58

Remarks: 1 lane DC: NB 35 to WB 410N; 2 lane DC: NB 410S to NB 35; SB 35 to SB 410S; EB 410N to SB 35

Non-Exempt

Proj Hist:

5/20 - move 21 to 22; 10/19 - move 25 to 21 & rev cost; 9/19 - ADM clarify descr; 1/19 - rev descr to incl FR lanes; 10/18 - rev descr & cost; 4/18 - move 20 to 25 (out of TIP); 10/13 - rev descr; 4/13 - rev limits and descr

2035,2045 TDM Network Years:

Guadalupe15 - San Antonio

Description:

IH 10 C TxDOT 5395.0

Limits From: Bexar/Guadalupe County Line

Limits To: FM 465

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $150,000,000

Construction Engineering: $6,700,000

Contingencies: $11,600,000

Indirect Costs: $3,300,000

Preliminary Engineering: $15,000,000

Other Field: $6,700,000

$193,300,000

Type of Work: Added Capacity: Non Toll

Total Project Cost:

$150,000,000

Authorized Funding by Category/Share

Other

Cost of Approved Phases:

12 - Strat Priority

Other

$150,000,000

$0

Other $0

Other $0

$120,000,000 $30,000,000 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$120,000,000 $30,000,000 $0 $0 $150,000,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0025-03-097

Expand from 4 lane to 6 lane expressway and from 4 to 4 FR lanes

Status: RSR

$150,000,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

N/A

Remarks: Move from MTP to TIP; no impact to conformity; see companion project #4008

Exempt

Proj Hist:

5/20 - move 21 to 22; 10/19 - move 28 to 21, rev funding & limits; 1/19 - rev descr to incl FR lanes & update cost; 10/18 - move 29 to 28; 6/18 - correct fund distrib; 4/17 - add proj to MTP with P1/P7; portion of project may

2025,2035,2045 TDM Network Years:

Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.

37

Page 42:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

ALAMO AREA METROPOLITAN PLANNING ORGANIZATION

2022FY

TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.

Year of Expenditure

Cost

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

City

TIP PROJECTS FY 2021-2024

Bexar15 - San Antonio

Description:

IH 10 C TxDOT 5556.0

Limits From: at Loop 1604 North

Limits To: -

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $279,400,000

Construction Engineering: $12,400,000

Contingencies: $21,700,000

Indirect Costs: $6,200,000

Preliminary Engineering: $27,900,000

Other Field: $12,400,000

$360,000,000

Type of Work: TSMO: Interchange

Total Project Cost:

$279,400,000

Authorized Funding by Category/Share

San Antonio

Cost of Approved Phases:

2 - Metro Corridor

4 - Connectivity

$245,400,000

$17,000,000

12 - CL $17,000,000

Other $0

$196,320,000 $49,080,000 $0 $0

$13,600,000 $3,400,000 $0 $0

$13,600,000 $3,400,000 $0 $0

$0 $0 $0 $0

$223,520,000 $55,880,000 $0 $0 $279,400,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0072-08-144

Construct Direct Connectors - 1 lane DC - NB 10 to EB 1604; EB 1604 to NB 10; SB 10 to WB 1604; WB 1604 to SB 10;

Status: RSR

$279,400,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

N/A

Remarks: 2 lane - NB 10 to WB 1604; EB 1604 to SB 10; SB 10 to EB 1604 & WB 1604 to NB 10

Exempt

Proj Hist:

10/19 - move from FY 2026 to FY 2022, revise funding, revise CSJ from 2452-02-127; 9/19 - ADM clarify description; 1/19 - update cost; 10/18 - add project

2035,2045 TDM Network Years:

Comal15 - San Antonio

Description:

SH 46 C TxDOT 9114.2

Limits From: US 281

Limits To: Bentwood Dr

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $14,000,000

Construction Engineering: $560,000

Contingencies: $980,000

Indirect Costs: $280,000

Preliminary Engineering: $686,000

Other Field: $560,000

$17,066,000

Type of Work: Added Capacity: Non Toll

Total Project Cost:

$14,000,000

Authorized Funding by Category/Share

Other

Cost of Approved Phases:

4 - Connectivity

Other

$14,000,000

$0

Other $0

Other $0

$11,200,000 $2,800,000 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$11,200,000 $2,800,000 $0 $0 $14,000,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0215-01-044

Expand from 2 lanes to 6 lanes with raised median or CLTL

Status: RSR

$14,000,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

N/A

Remarks: None

Exempt

Proj Hist:

3/18 - move from FY 2020 to FY 2022 and revise funding distribution; 4/17 - revise limits and funding; added w/ 12/8/14 adoption of the MTP

2025,2035,2045 TDM Network Years:

Comal15 - San Antonio

Description:

SH 46 C TxDOT 9114.1

Limits From: Farhills Dr

Limits To: US 281

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $26,000,000

Construction Engineering: $1,040,000

Contingencies: $1,820,000

Indirect Costs: $520,000

Preliminary Engineering: $1,274,000

Other Field: $1,040,000

$31,694,000

Type of Work: Added Capacity: Non Toll

Total Project Cost:

$26,000,000

Authorized Funding by Category/Share

Other

Cost of Approved Phases:

4 - Connectivity

Other

$26,000,000

$0

Other $0

Other $0

$20,800,000 $5,200,000 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$20,800,000 $5,200,000 $0 $0 $26,000,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0215-07-027

Expand from 2 lanes to 6 lanes with raised median or CLTL

Status: RSR

$26,000,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

N/A

Remarks: None

Exempt

Proj Hist:

3/18 - move from FY 2020 to FY 2022 and revise funding distribution; 4/17 - revise limits and funding; added w/ 12/8/14 adoption of the MTP

2025,2035,2045 TDM Network Years:

Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.

38

Page 43:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

ALAMO AREA METROPOLITAN PLANNING ORGANIZATION

2022FY

TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.

Year of Expenditure

Cost

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

City

TIP PROJECTS FY 2021-2024

Bexar15 - San Antonio

Description:

SH 16 C TxDOT 5571.0

Limits From: 0.3 Mi West of FM 1560/Leslie Rd

Limits To: LP 1604

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $8,600,000

Construction Engineering: $430,000

Contingencies: $516,000

Indirect Costs: $430,000

Preliminary Engineering: $421,000

Other Field: $258,000

$10,655,000

Type of Work: TSMO: Operational

Total Project Cost:

$8,600,000

Authorized Funding by Category/Share

Helotes

Cost of Approved Phases:

5 - CMAQ

Other

$8,600,000

$0

Other $0

Other $0

$6,880,000 $1,720,000 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$6,880,000 $1,720,000 $0 $0 $8,600,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0291-10-114

Operational improvements including implementation of median U-turns and R-cut intersections

Status: RSR

$8,600,000

NOX lbs/day

10.097

VOC lbs/day

6.945

CMP Score

N/A

Remarks: None

Exempt

Proj Hist:

11/19 - ADM clarify description; 6/19 - added through CMAQ project call

N/A TDM Network Years:

Guadalupe15 - San Antonio

Description:

IH 10 C TxDOT 5385.0

Limits From: FM 464

Limits To: SH 123

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $200,000,000

Construction Engineering: $8,000,000

Contingencies: $14,000,000

Indirect Costs: $4,000,000

Preliminary Engineering: $9,800,000

Other Field: $8,000,000

$243,800,000

Type of Work: Added Capacity: Non Toll

Total Project Cost:

$200,000,000

Authorized Funding by Category/Share

Other

Cost of Approved Phases:

2 - Metro Corridor

12 - Strat Priority

$50,000,000

$150,000,000

Other $0

Other $0

$45,000,000 $5,000,000 $0 $0

$135,000,000 $15,000,000 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$180,000,000 $20,000,000 $0 $0 $200,000,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0535-01-074

Expand from 4 lane to 6 lane expressway and from 4 to 4 FR lanes

Status: RSR

$200,000,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

N/A

Remarks: See also 0535-01-077 and 0535-01-078 as spin offs to original project

Exempt

Proj Hist:

5/20 - move from FY 2021 to FY 2022 and rev limits; 1/19 - rev descr to incl FR lanes; 10/18 - move from FY 2025 to FY 2021 and increase cost; 4/18 - correct funding distribution; 4/17 - add project

2025,2035,2045 TDM Network Years:

Bexar15 - San Antonio

Description:

FM 471 C TxDOT 5377.0

Limits From: Old FM 471

Limits To: Medina County Line

Total Project Cost Information (TxDOT %):

ROW Purchase: $2,520,000

Construction Cost: $21,000,000

Construction Engineering: $840,000

Contingencies: $1,470,000

Indirect Costs: $420,000

Preliminary Engineering: $2,100,000

Other Field: $840,000

$29,190,000

Type of Work: Added Capacity: Non Toll

Total Project Cost:

$21,000,000

Authorized Funding by Category/Share

Other

Cost of Approved Phases:

2 - Metro Corridor

3 - LC

$10,500,000

$10,500,000

Other $0

Other $0

$8,400,000 $2,100,000 $0 $0

$0 $0 $0 $10,500,000

$0 $0 $0 $0

$0 $0 $0 $0

$8,400,000 $2,100,000 $0 $10,500,000 $21,000,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0849-01-055

Expand from 2 to 4 lane divided with bike lanes and sidewalks

Status: RSR

$21,000,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

23

Remarks: None

Non-Exempt

Proj Hist:

10/18 - revise TPC

2025,2035,2045 TDM Network Years:

Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.

39

Page 44:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

ALAMO AREA METROPOLITAN PLANNING ORGANIZATION

2022FY

TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.

Year of Expenditure

Cost

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

City

TIP PROJECTS FY 2021-2024

Medina15 - San Antonio

Description:

FM 471 C TxDOT 5378.0

Limits From: Medina County Line

Limits To: SH 211

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $375,000

Construction Engineering: $15,000

Contingencies: $26,000

Indirect Costs: $8,000

Preliminary Engineering: $18,000

Other Field: $15,000

$457,000

Type of Work: Added Capacity: Non Toll

Total Project Cost:

$375,000

Authorized Funding by Category/Share

Other

Cost of Approved Phases:

2 - Metro Corridor

Other

$375,000

$0

Other $0

Other $0

$300,000 $75,000 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$300,000 $75,000 $0 $0 $375,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0849-02-045

Expand from 2 to 4 lane divided with bike lanes and sidewalks

Status: Non-RSR

$375,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

23

Remarks: None

Exempt

Proj Hist:

3/18 - revise funding distribution

2025,2035,2045 TDM Network Years:

Bexar15 - San Antonio

Description:

NR C AAMPO 5303.1

Limits From: Alamo Area MPO: Bexar, Comal

Limits To: Guadalupe & partial Kendall County

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $100,000

Construction Engineering: $0

Contingencies: $0

Indirect Costs: $0

Preliminary Engineering: $0

Other Field: $0

$100,000

Type of Work: TSMO: Rideshare

Total Project Cost:

$100,000

Authorized Funding by Category/Share

Other

Cost of Approved Phases:

7 - STBG

Other

$100,000

$0

Other $0

Other $0

$80,000 $0 $20,000 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$80,000 $0 $20,000 $0 $100,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0915-00-197

Alamo Area Commute Solutions Pgm - FY 2022

Status: Exempt

$100,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

N/A

Remarks: None

Exempt

Proj Hist:

4/18 - change agency and reduce cost; 4/16 - funded through STP-MM project selection process; project has $53,400 in TDCs which are not calculated in the funding total; fixed amount

N/A TDM Network Years:

Bexar15 - San Antonio

Description:

VA C TxDOT 5579.0

Limits From: Various locations within

Limits To: Bexar, Comal and Kendall counties

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $5,500,000

Construction Engineering: $0

Contingencies: $0

Indirect Costs: $0

Preliminary Engineering: $0

Other Field: $0

$5,500,000

Type of Work: TSMO: Safety Service Patrol

Total Project Cost:

$5,500,000

Authorized Funding by Category/Share

Other

Cost of Approved Phases:

5 - CMAQ

3 - LC

$4,950,000

$550,000

Other $0

Other $0

$3,960,000 $990,000 $0 $0

$0 $0 $0 $550,000

$0 $0 $0 $0

$0 $0 $0 $0

$3,960,000 $990,000 $0 $550,000 $5,500,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0915-00-227

Safety service patrol on controlled access highways in Bexar, Comal and Kendall Counties

Status: Exempt

$5,500,000

NOX lbs/day

4.365

VOC lbs/day

0.507

CMP Score

N/A

Remarks: None

Exempt

Proj Hist:

6/19 - added through CMAQ project call

N/A TDM Network Years:

Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.

40

Page 45:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

ALAMO AREA METROPOLITAN PLANNING ORGANIZATION

2022FY

TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.

Year of Expenditure

Cost

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

City

TIP PROJECTS FY 2021-2024

Bexar15 - San Antonio

Description:

VA C TxDOT 5316.3

Limits From: Various locations in Bexar County

Limits To: on state system

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $7,073,444

Construction Engineering: $451,000

Contingencies: $91,000

Indirect Costs: $406,000

Preliminary Engineering: $346,600

Other Field: $409,000

$8,777,044

Type of Work: Pedestrian

Total Project Cost:

$7,073,444

Authorized Funding by Category/Share

Other

Cost of Approved Phases:

7 - STBG

3 - LC

$6,273,444

$800,000

Other $0

Other $0

$5,018,755 $1,254,689 $0 $0

$0 $0 $0 $800,000

$0 $0 $0 $0

$0 $0 $0 $0

$5,018,755 $1,254,689 $0 $800,000 $7,073,444

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0915-12-576

Construct curb ramps, sidewalks and other pedestrian related infrastructure

Status: Exempt

$7,073,444

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

N/A

Remarks: None

Exempt

Proj Hist:

10/18 - move from FY 2019 to FY 2022 and reduce cost; 4/18 - move from FY 2022 to FY 2019; 4/16 - funded through STP-MM project selection process

N/A TDM Network Years:

Bexar15 - San Antonio

Description:

CS C BxCo 5318.0

Limits From: In Bexar County, on Crestway

Limits To: From Kitty Hawk Rd to FM 1976

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $7,791,571

Construction Engineering: $386,462

Contingencies: $155,052

Indirect Costs: $447,236

Preliminary Engineering: $381,787

Other Field: $291,405

$9,453,513

Type of Work: Bicycle/Pedestrian

Total Project Cost:

$7,791,571

Authorized Funding by Category/Share

Other

Cost of Approved Phases:

7 - STBG

Other

$7,791,571

$0

Other $0

Other $0

$6,233,257 $0 $1,558,314 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$6,233,257 $0 $1,558,314 $0 $7,791,571

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0915-12-584

Reconstruct to provide operational improvements including bike lanes and sidewalks

Status: Non-RSR

$7,791,571

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

N/A

Remarks: None

Exempt

Proj Hist:

4/19 - revise description; 4/16 - funded through STP-MM project selection process

N/A TDM Network Years:

Bexar15 - San Antonio

Description:

VA C CoSA 5572.0

Limits From: Various locations in San Antonio

Limits To: on Hamilton Wolfe and Ewing Halsell

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $6,000,000

Construction Engineering: $180,000

Contingencies: $300,000

Indirect Costs: $240,000

Preliminary Engineering: $294,000

Other Field: $180,000

$7,194,000

Type of Work: Bicycle

Total Project Cost:

$6,000,000

Authorized Funding by Category/Share

San Antonio

Cost of Approved Phases:

5 - CMAQ

Other

$6,000,000

$0

Other $0

Other $0

$4,800,000 $0 $1,200,000 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$4,800,000 $0 $1,200,000 $0 $6,000,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0915-12-666

Construct cycle track on Hamilton Wolff Rd from Babcock to Ewing Halsell. And on Ewing Halsell from Hamilton Wolff to Sid Katz

Status: Non-RSR

$6,000,000

NOX lbs/day

0.132

VOC lbs/day

0.090

CMP Score

N/A

Remarks: None

Exempt

Proj Hist:

6/19 - added through CMAQ project call

N/A TDM Network Years:

Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.

41

Page 46:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

ALAMO AREA METROPOLITAN PLANNING ORGANIZATION

2022FY

TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.

Year of Expenditure

Cost

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

City

TIP PROJECTS FY 2021-2024

Bexar15 - San Antonio

Description:

VA C CoSA 5573.3

Limits From: Various locations within

Limits To: the City of San Antonio

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $1,500,000

Construction Engineering: $0

Contingencies: $0

Indirect Costs: $0

Preliminary Engineering: $0

Other Field: $0

$1,500,000

Type of Work: TSMO: Traffic Signals

Total Project Cost:

$1,500,000

Authorized Funding by Category/Share

San Antonio

Cost of Approved Phases:

5 - CMAQ

Other

$1,500,000

$0

Other $0

Other $0

$1,200,000 $0 $300,000 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$1,200,000 $0 $300,000 $0 $1,500,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0915-12-681

Traffic signal optimization on congested corridors in the City of San Antonio. Data collection and implementation of updated signal timing plans. FY 2022

Status: Exempt

$1,500,000

NOX lbs/day

31.360

VOC lbs/day

8.557

CMP Score

N/A

Remarks: None

Exempt

Proj Hist:

6/19 - added through CMAQ project call

N/A TDM Network Years:

Bexar15 - San Antonio

Description:

VA C CoSA 5575.3

Limits From: In the City of San Antonio

Limits To: .

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $250,000

Construction Engineering: $0

Contingencies: $0

Indirect Costs: $0

Preliminary Engineering: $0

Other Field: $0

$250,000

Type of Work: TSMO: TDM Program

Total Project Cost:

$250,000

Authorized Funding by Category/Share

San Antonio

Cost of Approved Phases:

5 - CMAQ

Other

$250,000

$0

Other $0

Other $0

$200,000 $0 $50,000 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$200,000 $0 $50,000 $0 $250,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0915-12-682

City of San Antonio Travel Demand Management Program. To support efforts in vanpool, carpool, telecommuting and education. FY 2022

Status: Exempt

$250,000

NOX lbs/day

10.140

VOC lbs/day

4.947

CMP Score

N/A

Remarks: None

Exempt

Proj Hist:

6/19 - added through CMAQ project call

N/A TDM Network Years:

Bexar15 - San Antonio

Description:

VA C CoSA 5576.3

Limits From: In the City of San Antonio

Limits To: .

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $150,000

Construction Engineering: $0

Contingencies: $0

Indirect Costs: $0

Preliminary Engineering: $0

Other Field: $0

$150,000

Type of Work: TSMO: TDM Program

Total Project Cost:

$150,000

Authorized Funding by Category/Share

San Antonio

Cost of Approved Phases:

5 - CMAQ

Other

$150,000

$0

Other $0

Other $0

$120,000 $0 $30,000 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$120,000 $0 $30,000 $0 $150,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0915-12-683

City of San Antonio Vehicle Emissions Reductions Program. Series of targeted outreach and education programs. Gas cap replacement program. FY 2022

Status: Exempt

$150,000

NOX lbs/day

0.152

VOC lbs/day

499.810

CMP Score

N/A

Remarks: None

Exempt

Proj Hist:

6/19 - added through CMAQ project call

N/A TDM Network Years:

Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.

42

Page 47:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

ALAMO AREA METROPOLITAN PLANNING ORGANIZATION

2022FY

TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.

Year of Expenditure

Cost

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

City

TIP PROJECTS FY 2021-2024

Bexar15 - San Antonio

Description:

VA C UTSA 5577.3

Limits From: University of Texas at San Antonio

Limits To: .

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $129,225

Construction Engineering: $0

Contingencies: $0

Indirect Costs: $0

Preliminary Engineering: $0

Other Field: $0

$129,225

Type of Work: TSMO: TDM Program

Total Project Cost:

$129,225

Authorized Funding by Category/Share

Other

Cost of Approved Phases:

5 - CMAQ

3 - LC (UTSA)

$113,042

$16,183

Other $0

Other $0

$90,434 $0 $22,608 $0

$0 $0 $0 $16,183

$0 $0 $0 $0

$0 $0 $0 $0

$90,434 $0 $22,608 $16,183 $129,225

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0915-12-684

Make UTSA Walkable Program. Support UTSA's efforts to establish programs to increase alternate forms of transportation. FY 2022

Status: Exempt

$129,225

NOX lbs/day

0.922

VOC lbs/day

0.628

CMP Score

N/A

Remarks: None

Exempt

Proj Hist:

6/19 - added through CMAQ project call

N/A TDM Network Years:

Bexar15 - San Antonio

Description:

VA T VIA 5580.3

Limits From: In VIA service area

Limits To: .

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $7,553,332

Construction Engineering: $0

Contingencies: $0

Indirect Costs: $0

Preliminary Engineering: $0

Other Field: $0

$7,553,332

Type of Work: Transit

Total Project Cost:

$7,553,332

Authorized Funding by Category/Share

Other

Cost of Approved Phases:

5 - CMAQ

3 - LC

$6,866,666

$686,666

Other $0

Other $0

$5,493,333 $0 $1,373,333 $0

$0 $0 $0 $686,666

$0 $0 $0 $0

$0 $0 $0 $0

$5,493,333 $0 $1,373,333 $686,666 $7,553,332

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0915-12-685

VIA Fleet Replacement Program. Purchase 14 CNG buses. FY 2022

Status: Exempt

$7,553,332

NOX lbs/day

36.092

VOC lbs/day

3.761

CMP Score

N/A

Remarks: None

Exempt

Proj Hist:

6/19 - added through CMAQ project call

N/A TDM Network Years:

Bexar15 - San Antonio

Description:

VA T VIA 5581.3

Limits From: In VIA service area

Limits To: .

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $2,181,427

Construction Engineering: $0

Contingencies: $0

Indirect Costs: $0

Preliminary Engineering: $0

Other Field: $0

$2,181,427

Type of Work: Transit

Total Project Cost:

$2,181,427

Authorized Funding by Category/Share

Other

Cost of Approved Phases:

5 - CMAQ

3 - LC

$1,489,761

$691,666

Other $0

Other $0

$1,191,809 $0 $297,952 $0

$0 $0 $0 $691,666

$0 $0 $0 $0

$0 $0 $0 $0

$1,191,809 $0 $297,952 $691,666 $2,181,427

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0915-12-686

VIA Bus Frequency Program. Increase service on #7 and #552 routes. FY 2022

Status: Exempt

$2,181,427

NOX lbs/day

4.156

VOC lbs/day

3.709

CMP Score

N/A

Remarks: None

Exempt

Proj Hist:

6/19 - added through CMAQ project call

N/A TDM Network Years:

Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.

43

Page 48:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

ALAMO AREA METROPOLITAN PLANNING ORGANIZATION

2022FY

TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.

Year of Expenditure

Cost

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

City

TIP PROJECTS FY 2021-2024

Bexar15 - San Antonio

Description:

FM 1516 C TxDOT 5379.0

Limits From: FM 78

Limits To: IH 10

Total Project Cost Information (TxDOT %):

ROW Purchase: $10,754,000

Construction Cost: $23,500,000

Construction Engineering: $940,000

Contingencies: $1,645,000

Indirect Costs: $470,000

Preliminary Engineering: $1,151,500

Other Field: $940,000

$39,400,500

Type of Work: Added Capacity: Non Toll

Total Project Cost:

$23,500,000

Authorized Funding by Category/Share

Other

Cost of Approved Phases:

2 - Metro Corridor

3 - LC

$11,750,000

$11,750,000

Other $0

Other $0

$9,400,000 $2,350,000 $0 $0

$0 $0 $0 $11,750,000

$0 $0 $0 $0

$0 $0 $0 $0

$9,400,000 $2,350,000 $0 $11,750,000 $23,500,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

1477-01-043

Expand from 2 to 4 lane divided with bike lanes and sidewalks

Status: RSR

$23,500,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

41

Remarks: None

Non-Exempt

Proj Hist:

10/18 - revise TPC; 3/18 - revise funding distribution; 4/17 - 2017 UTP revisions

2025,2035,2045 TDM Network Years:

Bexar15 - San Antonio

Description:

FM 1560 C TxDOT 5311.0

Limits From: FM 471

Limits To: Galm/Shaenfield

Total Project Cost Information (TxDOT %):

ROW Purchase: $12,257,333

Construction Cost: $12,100,000

Construction Engineering: $600,160

Contingencies: $240,790

Indirect Costs: $694,540

Preliminary Engineering: $1,210,000

Other Field: $452,540

$27,555,363

Type of Work: Added Capacity: Non Toll

Total Project Cost:

$12,100,000

Authorized Funding by Category/Share

Other

Cost of Approved Phases:

7 - STBG

3 - LC

$10,580,000

$1,520,000

Other $0

Other $0

$8,464,000 $2,116,000 $0 $0

$0 $0 $0 $1,520,000

$0 $0 $0 $0

$0 $0 $0 $0

$8,464,000 $2,116,000 $0 $1,520,000 $12,100,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

2230-01-020

Expand from 2 to 4 lanes with raised median, or center turn lane, bike lanes and sidewalks

Status: Non-RSR

$12,100,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

31

Remarks: None

Non-Exempt

Proj Hist:

10/18 - revise TPC; 4/16 - funded through STP-MM project selection process

2025,2035,2045 TDM Network Years:

Bexar15 - San Antonio

Description:

SL 1604 C TxDOT 9110.2

Limits From: Macdona-Lacoste Rd

Limits To: US 90 W

Total Project Cost Information (TxDOT %):

ROW Purchase: $4,800,000

Construction Cost: $40,000,000

Construction Engineering: $2,552,000

Contingencies: $516,000

Indirect Costs: $2,296,000

Preliminary Engineering: $4,000,000

Other Field: $2,312,000

$56,476,000

Type of Work: Added Capacity: Non Toll

Total Project Cost:

$40,000,000

Authorized Funding by Category/Share

Other

Cost of Approved Phases:

2 - Metro Corridor

Other

$40,000,000

$0

Other $0

Other $0

$32,000,000 $8,000,000 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$32,000,000 $8,000,000 $0 $0 $40,000,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

2452-01-066

Expand from 2 lanes to 4 lanes divided

Status: RSR

$40,000,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

47

Remarks: None

Non-Exempt

Proj Hist:

10/18 - revise cost, TPC and limits; 3/18 - revise funding distribution; 4/17 - revise project; added w/ 12/8/14 adoption of the MTP

2025,2035,2045 TDM Network Years:

Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.

44

Page 49:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

ALAMO AREA METROPOLITAN PLANNING ORGANIZATION

2022FY

TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.

Year of Expenditure

Cost

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

City

TIP PROJECTS FY 2021-2024

Bexar15 - San Antonio

Description:

SL 1604 E,R TxDOT 3786.2

Limits From: US 281

Limits To: Redland Road

Total Project Cost Information (TxDOT %):

ROW Purchase: $3,600,000

Construction Cost: $58,000,000

Construction Engineering: $2,600,000

Contingencies: $4,500,000

Indirect Costs: $1,300,000

Preliminary Engineering: $5,800,000

Other Field: $2,600,000

$78,400,000

Type of Work: Added Capacity: Non Toll

Total Project Cost:

$9,400,000

Authorized Funding by Category/Share

San Antonio

Cost of Approved Phases:

SWPE

SWROW

$5,800,000

$3,600,000

Other $0

Other $0

$4,640,000 $1,160,000 $0 $0

$2,880,000 $720,000 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$7,520,000 $1,880,000 $0 $0 $9,400,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

2452-03-113

Expand from 4 to 10 lane expressway - including 2 HOV - special use lanes & from 4 to 4 FR lanes

Status: RSR

$9,400,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

N/A

Remarks: None

Non-Exempt

Proj Hist:

10/19 - move from FY 2021 to FY 2024 and revise funding; 1/19 - rev descr to incl FR lanes; 10/18 - add phases (Engr, ROW)

N/A TDM Network Years:

Bexar15 - San Antonio

Description:

SH 151 C TxDOT 5382.0

Limits From: LP 1604

Limits To: IH 410

Total Project Cost Information (TxDOT %):

ROW Purchase: $9,600,000

Construction Cost: $80,000,000

Construction Engineering: $3,200,000

Contingencies: $5,600,000

Indirect Costs: $1,600,000

Preliminary Engineering: $8,000,000

Other Field: $3,200,000

$111,200,000

Type of Work: Added Capacity: Non Toll

Total Project Cost:

$80,000,000

Authorized Funding by Category/Share

San Antonio

Cost of Approved Phases:

4 - Connectivity

Other

$80,000,000

$0

Other $0

Other $0

$72,000,000 $8,000,000 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$72,000,000 $8,000,000 $0 $0 $80,000,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

3508-01-029

Expand from 4 lane to 6 lane expressway and from 4/6 to 4/6 FR lanes including WB SH 151 to NB LP 1604 2 lane direct connector

Status: RSR

$80,000,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

49

Remarks: None

Non-Exempt

Proj Hist:

5/20 - move from FY 2021 to FY 2022; 9/19 - ADM clarify description; 1/19 - rev descr to incl FR lanes; 10/18 - move from 24 to 21, rev TPC; 4/18 - correct funding distribution; 4/17 - add project

2025,2035,2045 TDM Network Years:

Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.

45

Page 50:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

ALAMO AREA METROPOLITAN PLANNING ORGANIZATION

2023FY

TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.

Year of Expenditure

Cost

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

City

TIP PROJECTS FY 2021-2024

Bexar15 - San Antonio

Description:

SL 1604 E TxDOT 3530.2

Limits From: Redland Road

Limits To: IH 35 North

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $230,000,000

Construction Engineering: $10,000,000

Contingencies: $17,900,000

Indirect Costs: $5,100,000

Preliminary Engineering: $23,000,000

Other Field: $10,200,000

$296,400,000

Type of Work: Added Capacity: Non Toll

Total Project Cost:

$23,000,000

Authorized Funding by Category/Share

Other

Cost of Approved Phases:

SWPE

Other

$23,000,000

$0

Other $0

Other $0

$18,400,000 $4,600,000 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$18,400,000 $4,600,000 $0 $0 $23,000,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

2452-03-087

Expand from 4 to 10 lane expressway - including 2 HOV - special use lanes & from 4 to 4 FR lanes

Status: RSR

$23,000,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

N/A

Remarks: None

Non-Exempt

Proj Hist:

5/20 - add E phase to TIP; 9/19 - ADM clarify description; 1/19 - incl FR lanes & update cost; 10/18 - move 27 to 25 & rev descr; 4/17 - move 30 to 27 and rev funding; 4/14 - move18 to 30, rev limits and descr; 8/12 -

2035,2045 TDM Network Years:

Bexar15 - San Antonio

Description:

US 90 R TxDOT 5380.3

Limits From: SH 211

Limits To: 0.8 Miles W of IH 410

Total Project Cost Information (TxDOT %):

ROW Purchase: $7,500,000

Construction Cost: $110,000,000

Construction Engineering: $7,018,000

Contingencies: $5,500,000

Indirect Costs: $6,314,000

Preliminary Engineering: $5,390,000

Other Field: $6,358,000

$148,080,000

Type of Work: Added Capacity: Non-Toll

Total Project Cost:

$7,500,000

Authorized Funding by Category/Share

Other

Cost of Approved Phases:

SWROW

Other

$7,500,000

$0

Other $0

Other $0

$6,000,000 $1,500,000 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$6,000,000 $1,500,000 $0 $0 $7,500,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0024-07-059

Expand from 4 lane divided to 6 lane expressway and 4 FR lanes (LP 1604 to SH 211)

Status: RSR

$7,500,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

N/A

Remarks: None

Non-Exempt

Proj Hist:

5/20 - add R phase to TIP; 9/19 - ADM clarify description; 1/19 - rev descr to incl FR lanes and update cost; 4/18 - correct funding distribution; 4/17 - add project

N/A TDM Network Years:

Bexar15 - San Antonio

Description:

US 90 R TxDOT 5381.3

Limits From: 0.8 Miles W of IH 410

Limits To: IH 410

Total Project Cost Information (TxDOT %):

ROW Purchase: $1,000,000

Construction Cost: $10,000,000

Construction Engineering: $400,000

Contingencies: $700,000

Indirect Costs: $200,000

Preliminary Engineering: $490,000

Other Field: $400,000

$13,190,000

Type of Work: Added Capacity: Non-Toll

Total Project Cost:

$1,000,000

Authorized Funding by Category/Share

San Antonio

Cost of Approved Phases:

SWROW

Other

$1,000,000

$0

Other $0

Other $0

$800,000 $200,000 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$800,000 $200,000 $0 $0 $1,000,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0024-08-138

Expand from 4 lane divided to 6 lane expressway and from 4 to 4 FR lanes

Status: RSR

$1,000,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

N/A

Remarks: None

Non-Exempt

Proj Hist:

5/20 - add R phase to TIP; 1/19 - rev descr to incl FR lanes; 4/18 - correct funding distribution; 4/17 - add project

N/A TDM Network Years:

Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.

46

Page 51:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

ALAMO AREA METROPOLITAN PLANNING ORGANIZATION

2023FY

TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.

Year of Expenditure

Cost

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

City

TIP PROJECTS FY 2021-2024

Bexar15 - San Antonio

Description:

IH 10 E TxDOT 5401.2

Limits From: Kendall/Bexar County Line

Limits To: FM 3351

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $129,020,000

Construction Engineering: $5,700,000

Contingencies: $10,000,000

Indirect Costs: $2,900,000

Preliminary Engineering: $12,900,000

Other Field: $5,700,000

$166,220,000

Type of Work: Added Capacity: Non Toll

Total Project Cost:

$12,900,000

Authorized Funding by Category/Share

Other

Cost of Approved Phases:

SWPE

Other

$12,900,000

$0

Other $0

Other $0

$10,320,000 $2,580,000 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$10,320,000 $2,580,000 $0 $0 $12,900,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0072-07-075

Expand from 4 to 8 lane expressway - 2 new general purpose, 2 new HOV lanes & from 4 to 4 FR lanes

Status: RSR

$12,900,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

N/A

Remarks: None

Non-Exempt

Proj Hist:

5/20 - rev cost and move 28 to 25 & add E phase to TIP ; 1/19 - rev descr to incl FR lanes; 10/18 - move 29 to 28; 6/18 - correct funding distrib; 4/17 - add project to MTP with P1/P7; portion of project may have

2035,2045 TDM Network Years:

Bexar15 - San Antonio

Description:

SL 1604 E TxDOT 5554.2

Limits From: Martinez Creek

Limits To: FM 1346 - Houston Street

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $12,000,000

Construction Engineering: $766,000

Contingencies: $155,000

Indirect Costs: $689,000

Preliminary Engineering: $588,000

Other Field: $694,000

$14,892,000

Type of Work: Added Capacity: Non Toll

Total Project Cost:

$588,000

Authorized Funding by Category/Share

Other

Cost of Approved Phases:

SWPE

Other

$588,000

$0

Other $0

Other $0

$470,400 $117,600 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$470,400 $117,600 $0 $0 $588,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

2452-04-017

Expand from 2 lanes to 4 lanes divided

Status: RSR

$588,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

N/A

Remarks: None

Non-Exempt

Proj Hist:

5/20 - move from FY 2023 to FY 2025 & add E phase to TIP; 10/18 - add project, created from 2452-04-016

2025,2035,2045 TDM Network Years:

Bexar15 - San Antonio

Description:

SL 1604 E,R TxDOT 9107.2

Limits From: FM 78

Limits To: IH 10 East

Total Project Cost Information (TxDOT %):

ROW Purchase: $4,200,000

Construction Cost: $300,000,000

Construction Engineering: $13,300,000

Contingencies: $23,300,000

Indirect Costs: $6,700,000

Preliminary Engineering: $30,000,000

Other Field: $13,300,000

$390,800,000

Type of Work: Added Capacity: Non Toll

Total Project Cost:

$47,500,000

Authorized Funding by Category/Share

Other

Cost of Approved Phases:

SBPE

SWROW

$43,300,000

$4,200,000

Other $0

Other $0

$0 $43,300,000 $0 $0

$3,360,000 $840,000 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$3,360,000 $44,140,000 $0 $0 $47,500,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

2452-03-111

Expand from 4 lane divided to 4 lane expressway and from 0 to 4 FR lanes

Status: RSR

$47,500,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

N/A

Remarks: None

Non-Exempt

Proj Hist:

5/20 - add E,R phases to TIP; 1/19 - update funding; 4/18 - correct funding distribution; 4/17 - add project; removed from 10/15 Prop 1 list due to financial constraint issues

2035,2045 TDM Network Years:

Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.

47

Page 52:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

ALAMO AREA METROPOLITAN PLANNING ORGANIZATION

2023FY

TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.

Year of Expenditure

Cost

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

City

TIP PROJECTS FY 2021-2024

Guadalupe15 - San Antonio

Description:

FM 725 C TxDOT 5308.0

Limits From: Zipp Rd

Limits To: County Line Road

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $10,600,000

Construction Engineering: $525,760

Contingencies: $210,940

Indirect Costs: $608,440

Preliminary Engineering: $519,400

Other Field: $396,440

$12,860,980

Type of Work: Added Capacity: Non Toll

Total Project Cost:

$10,600,000

Authorized Funding by Category/Share

New Braunfels

Cost of Approved Phases:

7 - STBG

Other

$10,600,000

$0

Other $0

Other $0

$8,480,000 $2,120,000 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$8,480,000 $2,120,000 $0 $0 $10,600,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0215-09-029

Expand from 2 to 4 lanes with median, sidewalks and bike lanes

Status: RSR

$10,600,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

N/A

Remarks: None

Exempt

Proj Hist:

4/20 - move from FY 2022 to FY 2023; 9/19 - ADM clarify From limit; 4/16 - funded through STP-MM project selection process

2035,2045 TDM Network Years:

Bexar15 - San Antonio

Description:

FM 1518 C TxDOT 5309.0

Limits From: FM 78

Limits To: IH 10

Total Project Cost Information (TxDOT %):

ROW Purchase: $8,194,000

Construction Cost: $44,780,000

Construction Engineering: $2,687,000

Contingencies: $3,135,000

Indirect Costs: $2,239,000

Preliminary Engineering: $2,194,000

Other Field: $1,791,000

$65,020,000

Type of Work: Added Capacity: Non Toll

Total Project Cost:

$44,780,000

Authorized Funding by Category/Share

Other

Cost of Approved Phases:

1 - Prvnt Mnt/Rehab

7 - STBG

$8,000,000

$21,780,000

3 - LC (Schertz) $10,000,000

3 - LC (BC) $5,000,000

$6,400,000 $1,600,000 $0 $0

$17,424,000 $4,356,000 $0 $0

$0 $0 $0 $10,000,000

$0 $0 $0 $5,000,000

$23,824,000 $5,956,000 $0 $15,000,000 $44,780,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0465-02-027

Expand from 2 to 4 lanes with raised median or center turn lane, bike lanes and sidewalks

Status: Non-RSR

$44,780,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

41

Remarks: None

Non-Exempt

Proj Hist:

4/18 - move from FY 2021 to FY 2023 and combine with STP-MM selected project; 4/16 - funded through STP-MM project selection process

2035,2045 TDM Network Years:

Bexar15 - San Antonio

Description:

IH 410 C TxDOT 5376.0

Limits From: at US 281/San Pedro

Limits To: .

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $70,000,000

Construction Engineering: $4,466,000

Contingencies: $903,000

Indirect Costs: $4,018,000

Preliminary Engineering: $3,430,000

Other Field: $4,046,000

$86,863,000

Type of Work: TSMO: Operational

Total Project Cost:

$70,000,000

Authorized Funding by Category/Share

San Antonio

Cost of Approved Phases:

2 - Metro Corridor

7 - STBG

$24,000,000

$10,000,000

4 - Connectivity $36,000,000

Other $0

$19,200,000 $4,800,000 $0 $0

$8,000,000 $2,000,000 $0 $0

$28,800,000 $7,200,000 $0 $0

$0 $0 $0 $0

$56,000,000 $14,000,000 $0 $0 $70,000,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0521-04-285

Operational improvements to include direct connector improvement from US 281 to IH 410 WB ; ramp revisions, frontage road and intersection improvements

Status: RSR

$70,000,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

N/A

Remarks: None

Exempt

Proj Hist:

5/20 - move 22 to 23; 11/19 - ADM clarify description; 10/18 - incr cost; 4/18 - rev proj (STP-MM project selection process); 3/18 - incr cost and rev fund distrib; 4/17 - add project

2025,2035,2045 TDM Network Years:

Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.

48

Page 53:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

ALAMO AREA METROPOLITAN PLANNING ORGANIZATION

2023FY

TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.

Year of Expenditure

Cost

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

City

TIP PROJECTS FY 2021-2024

Bexar15 - San Antonio

Description:

NR C AAMPO 5303.2

Limits From: Alamo Area MPO: in Bexar, Comal

Limits To: Guadalupe & partial Kendall County

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $100,000

Construction Engineering: $0

Contingencies: $0

Indirect Costs: $0

Preliminary Engineering: $0

Other Field: $0

$100,000

Type of Work: TSMO: Rideshare

Total Project Cost:

$100,000

Authorized Funding by Category/Share

Other

Cost of Approved Phases:

7 - STBG

Other

$100,000

$0

Other $0

Other $0

$80,000 $0 $20,000 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$80,000 $0 $20,000 $0 $100,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0915-00-216

Alamo Area Commute Solutions Pgm - FY 2023

Status: Exempt

$100,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

N/A

Remarks: None

Exempt

Proj Hist:

4/18 - add project

N/A TDM Network Years:

Bexar15 - San Antonio

Description:

VA C TxDOT 5316.1

Limits From: Various locations in Bexar County

Limits To: on state system

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $4,000,000

Construction Engineering: $240,000

Contingencies: $280,000

Indirect Costs: $226,800

Preliminary Engineering: $196,000

Other Field: $149,600

$5,092,400

Type of Work: Pedestrian

Total Project Cost:

$4,000,000

Authorized Funding by Category/Share

Other

Cost of Approved Phases:

7 - STBG

3 - LC

$3,500,000

$500,000

Other $0

Other $0

$2,800,000 $700,000 $0 $0

$0 $0 $0 $500,000

$0 $0 $0 $0

$0 $0 $0 $0

$2,800,000 $700,000 $0 $500,000 $4,000,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0915-12-574

Construct curb ramps, sidewalks and other pedestrian related infrastructure

Status: Exempt

$4,000,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

N/A

Remarks: None

Exempt

Proj Hist:

10/18 - move from FY 2021 to FY 2023 (outside of the TIP); 1/17 - revise description and reduce cost from $5M to $4M and move $1M to 0915-12-586; 3rd Qtr 16 - new project in FY 2017-2020 TIP

N/A TDM Network Years:

Bexar15 - San Antonio

Description:

VA C TxDOT 5316.2

Limits From: Various locations in Bexar County

Limits To: on state system

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $4,000,000

Construction Engineering: $198,400

Contingencies: $79,600

Indirect Costs: $229,600

Preliminary Engineering: $196,000

Other Field: $149,600

$4,853,200

Type of Work: Pedestrian

Total Project Cost:

$4,000,000

Authorized Funding by Category/Share

Other

Cost of Approved Phases:

7 - STBG

3 - LC

$3,600,000

$400,000

Other $0

Other $0

$2,880,000 $720,000 $0 $0

$0 $0 $0 $400,000

$0 $0 $0 $0

$0 $0 $0 $0

$2,880,000 $720,000 $0 $400,000 $4,000,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0915-12-575

Construct curb ramps, sidewalks and other pedestrian related infrastructure

Status: Exempt

$4,000,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

N/A

Remarks: None

Exempt

Proj Hist:

4/18 - move from FY 2021 to FY 2023; 4/16 - funded through STP-MM project selection process

N/A TDM Network Years:

Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.

49

Page 54:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

ALAMO AREA METROPOLITAN PLANNING ORGANIZATION

2023FY

TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.

Year of Expenditure

Cost

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

City

TIP PROJECTS FY 2021-2024

Bexar15 - San Antonio

Description:

VA C CoSA 5540.0

Limits From: In San Antonio

Limits To: at various locations

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $4,500,000

Construction Engineering: $270,000

Contingencies: $315,000

Indirect Costs: $225,000

Preliminary Engineering: $220,000

Other Field: $180,000

$5,710,000

Type of Work: TSMO: ITS

Total Project Cost:

$4,500,000

Authorized Funding by Category/Share

San Antonio

Cost of Approved Phases:

7 - STBG

Other

$4,500,000

$0

Other $0

Other $0

$3,600,000 $0 $900,000 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$3,600,000 $0 $900,000 $0 $4,500,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0915-12-615

Implement communication network improvements

Status: Exempt

$4,500,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

N/A

Remarks: None

Exempt

Proj Hist:

4/18 - funded through the 19-22 STP-MM Call for Projects

N/A TDM Network Years:

Bexar15 - San Antonio

Description:

FM 2252 C TxDOT 5329.0

Limits From: Evans Road

Limits To: Comal/Bexar County Line

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $500,000

Construction Engineering: $32,000

Contingencies: $7,000

Indirect Costs: $29,000

Preliminary Engineering: $50,000

Other Field: $29,000

$647,000

Type of Work: Added Capacity: Non Toll

Total Project Cost:

$500,000

Authorized Funding by Category/Share

San Antonio

Cost of Approved Phases:

11 - Distr Discr

Other

$500,000

$0

Other $0

Other $0

$400,000 $100,000 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$400,000 $100,000 $0 $0 $500,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

1433-01-028

Expand from 2 lanes to 4 lanes with raised median or continuous left turn lane, bike lanes and sidewalk

Status: RSR

$500,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

43

Remarks: None

Non-Exempt

Proj Hist:

5/20 - move from FY 2021 to FY 2023; 10/18 - revise funding distribution & TPC; 3/18 - revise funding distribution; 4/17 - move from FY 2027 to FY 2021

2035,2045 TDM Network Years:

Comal15 - San Antonio

Description:

FM 2252 C TxDOT 9115.0

Limits From: Bexar/Comal County Line

Limits To: FM 3009

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $21,700,000

Construction Engineering: $760,000

Contingencies: $1,330,000

Indirect Costs: $380,000

Preliminary Engineering: $931,000

Other Field: $760,000

$25,861,000

Type of Work: Added Capacity: Non Toll

Total Project Cost:

$21,700,000

Authorized Funding by Category/Share

Other

Cost of Approved Phases:

2 - Metro Corridor

Other

$21,700,000

$0

Other $0

Other $0

$17,360,000 $4,340,000 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$17,360,000 $4,340,000 $0 $0 $21,700,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

1433-02-044

Expand from 2 lanes to 4 lanes with raised median or continuous left turn lane, bike lanes and sidewalk

Status: RSR

$21,700,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

N/A

Remarks: None

Exempt

Proj Hist:

5/20 - move from FY 2021 to FY 2023; 10/18 - revise funding distribution; 3/18 - reverse limits and revise funding distribution; 4/17 - move from FY 2023 to FY 2021; added w/ 12/8/14 adoption of the MTP

2035,2045 TDM Network Years:

Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.

50

Page 55:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

ALAMO AREA METROPOLITAN PLANNING ORGANIZATION

2023FY

TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.

Year of Expenditure

Cost

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

City

TIP PROJECTS FY 2021-2024

Bexar15 - San Antonio

Description:

FM 1560 C TxDOT 5391.0

Limits From: Galm/Shaenfield

Limits To: SH 16

Total Project Cost Information (TxDOT %):

ROW Purchase: $11,800,000

Construction Cost: $19,750,000

Construction Engineering: $900,000

Contingencies: $1,500,000

Indirect Costs: $400,000

Preliminary Engineering: $1,900,000

Other Field: $900,000

$37,150,000

Type of Work: Added Capacity: Non Toll

Total Project Cost:

$19,750,000

Authorized Funding by Category/Share

Other

Cost of Approved Phases:

7 - STBG

3 - LC

$14,750,000

$5,000,000

Other $0

Other $0

$11,800,000 $2,950,000 $0 $0

$0 $0 $0 $5,000,000

$0 $0 $0 $0

$0 $0 $0 $0

$11,800,000 $2,950,000 $0 $5,000,000 $19,750,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

2230-01-021

Expand from 2 lanes to 4 lanes with turn lanes, bike accommodation and sidewalks

Status: Non-RSR

$19,750,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

38

Remarks: None

Non-Exempt

Proj Hist:

4/18 - funded through the 19-22 STP-MM Call for Projects; 4/17 - add project to MTP with Prop 1/Prop 7; portion of project may have already been in the MTP

2035,2045 TDM Network Years:

Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.

51

Page 56:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

ALAMO AREA METROPOLITAN PLANNING ORGANIZATION

2024FY

TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.

Year of Expenditure

Cost

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

City

TIP PROJECTS FY 2021-2024

Bexar15 - San Antonio

Description:

SL 368 C TxDOT 5535.0

Limits From: New Braunfels St.

Limits To: Burr Road

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $14,000,000

Construction Engineering: $840,000

Contingencies: $980,000

Indirect Costs: $700,000

Preliminary Engineering: $686,000

Other Field: $560,000

$17,766,000

Type of Work: Bicycle/Pedestrian

Total Project Cost:

$14,000,000

Authorized Funding by Category/Share

Alamo Heights

Cost of Approved Phases:

7 - STBG

1 - Prvnt Mnt/Rehab

$10,000,000

$4,000,000

Other $0

Other $0

$8,000,000 $2,000,000 $0 $0

$3,200,000 $800,000 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$11,200,000 $2,800,000 $0 $0 $14,000,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0016-08-041

Roadway rehabilitation and reduce travel lanes from 6 to 4 lanes, bicycle and pedestrian facilities

Status: RSR

$14,000,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

N/A

Remarks: Road diet project

Exempt

Proj Hist:

4/18 - funded through the 19-22 STP-MM Call for Projects

2035,2045 TDM Network Years:

Bexar15 - San Antonio

Description:

US 90 C TxDOT 5380.0

Limits From: SH 211

Limits To: 0.8 Miles W of IH 410

Total Project Cost Information (TxDOT %):

ROW Purchase: $7,500,000

Construction Cost: $110,000,000

Construction Engineering: $7,018,000

Contingencies: $5,500,000

Indirect Costs: $6,314,000

Preliminary Engineering: $5,390,000

Other Field: $6,358,000

$148,080,000

Type of Work: Added Capacity: Non Toll

Total Project Cost:

$110,000,000

Authorized Funding by Category/Share

Other

Cost of Approved Phases:

2 - Metro Corridor

12 - Strat Pri

$45,000,000

$65,000,000

Other $0

Other $0

$36,000,000 $9,000,000 $0 $0

$52,000,000 $13,000,000 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$88,000,000 $22,000,000 $0 $0 $110,000,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0024-07-059

Expand from 4 lane divided to 6 lane expressway and 4 FR lanes (LP 1604 to SH 211)

Status: RSR

$110,000,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

45

Remarks: None

Non-Exempt

Proj Hist:

9/19 - ADM clarify description; 1/19 - rev descr to incl FR lanes and update cost; 4/18 - correct funding distribution; 4/17 - add project

2035,2045 TDM Network Years:

Bexar15 - San Antonio

Description:

US 90 C TxDOT 5381.0

Limits From: 0.8 Miles W of IH 410

Limits To: IH 410

Total Project Cost Information (TxDOT %):

ROW Purchase: $1,000,000

Construction Cost: $10,000,000

Construction Engineering: $400,000

Contingencies: $700,000

Indirect Costs: $200,000

Preliminary Engineering: $490,000

Other Field: $400,000

$13,190,000

Type of Work: Added Capacity: Non Toll

Total Project Cost:

$10,000,000

Authorized Funding by Category/Share

San Antonio

Cost of Approved Phases:

2 - Metro Corridor

12 - Strat Pri

$5,000,000

$5,000,000

Other $0

Other $0

$4,000,000 $1,000,000 $0 $0

$4,000,000 $1,000,000 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$8,000,000 $2,000,000 $0 $0 $10,000,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0024-08-138

Expand from 4 lane divided to 6 lane expressway and from 4 to 4 FR lanes

Status: RSR

$10,000,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

45

Remarks: None

Non-Exempt

Proj Hist:

1/19 - rev descr to incl FR lanes; 4/18 - correct funding distribution; 4/17 - add project

2035,2045 TDM Network Years:

Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.

52

Page 57:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

ALAMO AREA METROPOLITAN PLANNING ORGANIZATION

2024FY

TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.

Year of Expenditure

Cost

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

City

TIP PROJECTS FY 2021-2024

Bexar15 - San Antonio

Description:

NR C AAMPO 5303.3

Limits From: Alamo Area MPO: in Bexar, Comal

Limits To: Guadalupe & partial Kendall County

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $100,000

Construction Engineering: $0

Contingencies: $0

Indirect Costs: $0

Preliminary Engineering: $0

Other Field: $0

$100,000

Type of Work: TSMO: Rideshare

Total Project Cost:

$100,000

Authorized Funding by Category/Share

Other

Cost of Approved Phases:

7 - STBG

Other

$100,000

$0

Other $0

Other $0

$80,000 $0 $20,000 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$80,000 $0 $20,000 $0 $100,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0915-00-217

Alamo Area Commute Solutions Pgm - FY 2024

Status: Exempt

$100,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

N/A

Remarks: None

Exempt

Proj Hist:

4/18 - add project

N/A TDM Network Years:

Bexar15 - San Antonio

Description:

CS C CoSA 5538.0

Limits From: In San Antonio, on Zarzamora

Limits To: From US 90 to Jennings

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $23,000,000

Construction Engineering: $1,170,000

Contingencies: $1,365,000

Indirect Costs: $975,000

Preliminary Engineering: $955,000

Other Field: $780,000

$28,245,000

Type of Work: TSMO: Operational

Total Project Cost:

$23,000,000

Authorized Funding by Category/Share

San Antonio

Cost of Approved Phases:

7 - STBG

3 - LC

$19,500,000

$3,500,000

Other $0

Other $0

$15,600,000 $0 $3,900,000 $0

$0 $0 $0 $3,500,000

$0 $0 $0 $0

$0 $0 $0 $0

$15,600,000 $0 $3,900,000 $3,500,000 $23,000,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0915-12-617

Construct 4 lane grade separation at UPRR/Frio City Rd

Status: RSR

$23,000,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

N/A

Remarks: 4 lane underlying roadway remains

Exempt

Proj Hist:

11/19 - ADM clarify description; 6/18 - revise funding to include local contribution; 4/18 - funded through the 19-22 STP-MM Call for Projects

2025,2035,2045 TDM Network Years:

Guadalupe15 - San Antonio

Description:

CS C Seguin 5533.0

Limits From: In Seguin, on Rudeloff Road

Limits To: From Huber Road to SH 123 (at FM 20)

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $12,000,000

Construction Engineering: $720,000

Contingencies: $840,000

Indirect Costs: $600,000

Preliminary Engineering: $588,000

Other Field: $480,000

$15,228,000

Type of Work: Added Capacity: Non Toll

Total Project Cost:

$12,000,000

Authorized Funding by Category/Share

Seguin

Cost of Approved Phases:

7 - STBG

Other

$12,000,000

$0

Other $0

Other $0

$9,600,000 $0 $2,400,000 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$9,600,000 $0 $2,400,000 $0 $12,000,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

0915-46-049

Construct new alignment 4 lane roadway (0 to 4 lanes) with center left turn lane, bicycle and pedestrian facilities

Status: Non-RSR

$12,000,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

N/A

Remarks: None

Exempt

Proj Hist:

5/20 - move from FY 2025 to FY 2024; 9/19 - ADM clarify description; 4/18 - funded through the 19-22 STP-MM Call for Projects

2035,2045 TDM Network Years:

Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.

53

Page 58:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

ALAMO AREA METROPOLITAN PLANNING ORGANIZATION

2024FY

TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.

Year of Expenditure

Cost

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

City

TIP PROJECTS FY 2021-2024

Bexar15 - San Antonio

Description:

SL 1604 C TxDOT 3786.0

Limits From: US 281

Limits To: Redland Road

Total Project Cost Information (TxDOT %):

ROW Purchase: $3,600,000

Construction Cost: $58,000,000

Construction Engineering: $2,600,000

Contingencies: $4,500,000

Indirect Costs: $1,300,000

Preliminary Engineering: $5,800,000

Other Field: $2,600,000

$78,400,000

Type of Work: Added Capacity: Non Toll

Total Project Cost:

$58,000,000

Authorized Funding by Category/Share

San Antonio

Cost of Approved Phases:

3 - LC

Other

$58,000,000

$0

Other $0

Other $0

$0 $0 $0 $58,000,000

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $58,000,000 $58,000,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

2452-03-113

Expand from 4 to 10 lane expressway - including 2 HOV - special use lanes & from 4 to 4 FR lanes

Status: RSR

$58,000,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

47

Remarks: None

Non-Exempt

Proj Hist:

10/19 - move from 21 to 24 and rev funding/cost; 1/19 - rev descr to incl FR lns; 10/18 - move 20 to 21, rev descr, TPC & funding, move to TxDOT; 4/17 - rev cost; 4/14 - rev limits, year ('15 to '20), descr and

2025,2035,2045 TDM Network Years:

Comal15 - San Antonio

Description:

FM 3351 C TxDOT 5541.0

Limits From: at Cibolo Creek

Limits To: .

Total Project Cost Information (TxDOT %):

ROW Purchase: $0

Construction Cost: $11,900,000

Construction Engineering: $714,000

Contingencies: $833,000

Indirect Costs: $595,000

Preliminary Engineering: $583,000

Other Field: $476,000

$15,101,000

Type of Work: Bridge

Total Project Cost:

$11,900,000

Authorized Funding by Category/Share

Fair Oaks Ranch

Cost of Approved Phases:

7 - STBG

Other

$11,900,000

$0

Other $0

Other $0

$9,520,000 $2,380,000 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$0 $0 $0 $0

$9,520,000 $2,380,000 $0 $0 $11,900,000

Total

Local ContribStateFederal Local

Funding Categories

Totals

Last Revision Date: 7/2020

3212-05-013

Reconstruct existing bridge and expand from 2 to 6 lanes

Status: RSR

$11,900,000

NOX lbs/day

N/A

VOC lbs/day

N/A

CMP Score

N/A

Remarks: Approaches remain 2 lanes

Exempt

Proj Hist:

4/18 - funded through the 19-22 STP-MM Call for Projects

2025,2035,2045 TDM Network Years:

Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.

54

Page 59:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

FY 2021 – 2024 Transportation Improvement Program

Funded Transit Projects

55

Page 60:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

Alamo Area Metropolitan Planning Organization

This page intentionally left blank.

56

Page 61:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

Transit Project Listing2021

Alamo Area MPO Transportation Improvement Program

San Antonio TxDOT District YOE=Year of Expenditure

FY

Project Sponsor: VIA Metropolitan Transit

Section 5309 ID #: N/A

Project Phase: O

TDC Awarded: $0

TDC Requested: $0

MPO Project Number: 10401

Transit: Operating Expenses

Capital Cost of Contracting, ADA, Preventive Maintenance

Federal Funding Category: FTA - 5307

Federal (FTA) Funds: $34,545,420

State Funds from TxDOT: $0

Other Funds: $8,636,355

Total Project Cost: $43,181,775

Project Description: Fiscal Year Cost: $43,181,775

General Project Information Funding Information (YOE)

Date TDC Awarded: N/A

Apportionment Year: 2021

Project Sponsor: VIA Metropolitan Transit

Section 5309 ID #: N/A

Project Phase: O

TDC Awarded: $0

TDC Requested: $0

MPO Project Number: 10403

Transit: JARC Operating Projects

Pass Through to AACOG

Transportation Services for New Braunfels, Cibolo, McQueeney, Marion, Schertz, etc

Federal Funding Category: FTA - 5307

Federal (FTA) Funds: $570,315

State Funds from TxDOT: $0

Other Funds: $570,315

Total Project Cost: $1,140,630

Project Description: Fiscal Year Cost: $1,140,630

General Project Information Funding Information (YOE)

Date TDC Awarded: N/A

Apportionment Year: 2021

Project Sponsor: VIA Metropolitan Transit

Section 5309 ID #: N/A

Project Phase: C

TDC Awarded: $0

TDC Requested: $0

MPO Project Number: 10409

Transit: Passenger Facilities

See Appendix for Project Detail

Federal Funding Category: FTA - 5307

Federal (FTA) Funds: $7,129,990

State Funds from TxDOT: $11,509,167

Other Funds: $527,439

Total Project Cost: $19,166,596

Project Description: Fiscal Year Cost: $19,166,596

General Project Information Funding Information (YOE)

Date TDC Awarded: N/A

Apportionment Year: 2021

Project Sponsor: VIA Metropolitan Transit

Section 5309 ID #: N/A

Project Phase: O

TDC Awarded: $0

TDC Requested: $0

MPO Project Number: 10405

Transit: Mobility of Seniors and Persons

with Disabilities

Other Programs Pass through to Subrecipients

Federal Funding Category: FTA - 5310

Federal (FTA) Funds: $1,592,778

State Funds from TxDOT: $0

Other Funds: $398,195

Total Project Cost: $1,990,973

Project Description: Fiscal Year Cost: $1,990,973

General Project Information Funding Information (YOE)

Date TDC Awarded: N/A

Apportionment Year: 2021

Projects are sorted by Federal Funding Category and MPO Project Number. 57

Page 62:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

Transit Project Listing2021

Alamo Area MPO Transportation Improvement Program

San Antonio TxDOT District YOE=Year of Expenditure

FY

Project Sponsor: VIA Metropolitan Transit

Section 5309 ID #: N/A

Project Phase: A

TDC Awarded: $0

TDC Requested: $0

MPO Project Number: 10406

Transit: Mobility of Seniors and Persons

with Disabilities

Program Administration

Federal Funding Category: FTA - 5310

Federal (FTA) Funds: $176,975

State Funds from TxDOT: $0

Other Funds: $0

Total Project Cost: $176,975

Project Description: Fiscal Year Cost: $176,975

General Project Information Funding Information (YOE)

Date TDC Awarded: N/A

Apportionment Year: 2021

Project Sponsor: VIA Metropolitan Transit

Section 5309 ID #: N/A

Project Phase: C

TDC Awarded: $0

TDC Requested: $0

MPO Project Number: 10407

Transit: Revenue Vehicles

See Appendix for Project Detail

Federal Funding Category: FTA - 5339

Federal (FTA) Funds: $421,396

State Funds from TxDOT: $0

Other Funds: $15,668,850

Total Project Cost: $16,090,246

Project Description: Fiscal Year Cost: $16,090,246

General Project Information Funding Information (YOE)

Date TDC Awarded: N/A

Apportionment Year: 2021

Project Sponsor: VIA Metropolitan Transit

Section 5309 ID #: N/A

Project Phase: C

TDC Awarded: $0

TDC Requested: $0

MPO Project Number: 10410

Transit: Operational Facilities

See Appendix for Project Detail

Federal Funding Category: FTA - 5339

Federal (FTA) Funds: $3,140,447

State Funds from TxDOT: $0

Other Funds: $791,494

Total Project Cost: $3,931,941

Project Description: Fiscal Year Cost: $3,931,941

General Project Information Funding Information (YOE)

Date TDC Awarded: N/A

Apportionment Year: 2021

Project Sponsor: VIA Metropolitan Transit

Section 5309 ID #: N/A

Project Phase: C

TDC Awarded: $0

TDC Requested: $0

MPO Project Number: 10412

Transit: Maintenance Tools and Equipment

See Appendix for Project Detail

Federal Funding Category: FTA - 5339

Federal (FTA) Funds: $439,122

State Funds from TxDOT: $0

Other Funds: $510,878

Total Project Cost: $950,000

Project Description: Fiscal Year Cost: $950,000

General Project Information Funding Information (YOE)

Date TDC Awarded: N/A

Apportionment Year: 2021

Projects are sorted by Federal Funding Category and MPO Project Number. 58

Page 63:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

Transit Project Listing2021

Alamo Area MPO Transportation Improvement Program

San Antonio TxDOT District YOE=Year of Expenditure

FY

Project Sponsor: VIA Metropolitan Transit

Section 5309 ID #: N/A

Project Phase: C

TDC Awarded: $0

TDC Requested: $0

MPO Project Number: 10413

Transit: Replacement Components for

Revenue Vehicles

See Appendix for Project Detail

Federal Funding Category: FTA - 5339

Federal (FTA) Funds: $324,000

State Funds from TxDOT: $0

Other Funds: $2,511,000

Total Project Cost: $2,835,000

Project Description: Fiscal Year Cost: $2,835,000

General Project Information Funding Information (YOE)

Date TDC Awarded: N/A

Apportionment Year: 2021

Project Sponsor: VIA Metropolitan Transit

Section 5309 ID #: N/A

Project Phase: C

TDC Awarded: $0

TDC Requested: $0

MPO Project Number: 10408

Transit: Service Vehicles

See Appendix for Project Detail

Federal Funding Category: FTA - None

Federal (FTA) Funds: $0

State Funds from TxDOT: $0

Other Funds: $454,781

Total Project Cost: $454,781

Project Description: Fiscal Year Cost: $454,781

General Project Information Funding Information (YOE)

Date TDC Awarded: N/A

Apportionment Year: 2021

Project Sponsor: VIA Metropolitan Transit

Section 5309 ID #: N/A

Project Phase: C

TDC Awarded: $0

TDC Requested: $0

MPO Project Number: 10411

Transit: Advanced Rapid Transit Project

See Appendix for Project Detail

Federal Funding Category: FTA - None

Federal (FTA) Funds: $0

State Funds from TxDOT: $0

Other Funds: $18,650,000

Total Project Cost: $18,650,000

Project Description: Fiscal Year Cost: $18,650,000

General Project Information Funding Information (YOE)

Date TDC Awarded: N/A

Apportionment Year: 2021

Project Sponsor: VIA Metropolitan Transit

Section 5309 ID #: N/A

Project Phase: C

TDC Awarded: $0

TDC Requested: $0

MPO Project Number: 10414

Transit: Computer Hardware/Software

See Appendix for Project Detail

Federal Funding Category: FTA - None

Federal (FTA) Funds: $0

State Funds from TxDOT: $0

Other Funds: $1,227,000

Total Project Cost: $1,227,000

Project Description: Fiscal Year Cost: $1,227,000

General Project Information Funding Information (YOE)

Date TDC Awarded: N/A

Apportionment Year: 2021

Projects are sorted by Federal Funding Category and MPO Project Number. 59

Page 64:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

Transit Project Listing2021

Alamo Area MPO Transportation Improvement Program

San Antonio TxDOT District YOE=Year of Expenditure

FY

Project Sponsor: VIA Metropolitan Transit

Section 5309 ID #: N/A

Project Phase: C

TDC Awarded: $0

TDC Requested: $0

MPO Project Number: 10415

Transit: Bus Operations and

Maintenance Facility

See Appendix for Project Detail

Federal Funding Category: FTA - None

Federal (FTA) Funds: $0

State Funds from TxDOT: $0

Other Funds: $18,850,000

Total Project Cost: $18,850,000

Project Description: Fiscal Year Cost: $18,850,000

General Project Information Funding Information (YOE)

Date TDC Awarded: N/A

Apportionment Year: 2021

Project Sponsor: VIA Metropolitan Transit

Section 5309 ID #:

Project Phase: C

TDC Awarded: $0

TDC Requested: $0

MPO Project Number: 5580.1

Transit: Revenue Vehicles

Fleet Replacement Program CSJ 0915-12-672

Purchase 14 CNG Buses

Federal Funding Category: FTA - Section 5307

Federal (FTA) Funds: $5,493,334

State Funds from TxDOT: $0

Other Funds: $2,060,000

Total Project Cost: $7,553,334

Project Description: Fiscal Year Cost: $7,553,334

General Project Information Funding Information (YOE)

Date TDC Awarded: N/A

Apportionment Year: 2020

Project Sponsor: VIA Metropolitan Transit

Section 5309 ID #: N/A

Project Phase: C

TDC Awarded: $0

TDC Requested: $0

MPO Project Number: 5580.2

Transit: Revenue Vehicles

Fleet Replacement Program CSJ 0915-12-679

Purchase 14 CNG Buses

Federal Funding Category: FTA - Section 5307

Federal (FTA) Funds: $5,493,334

State Funds from TxDOT: $0

Other Funds: $2,060,000

Total Project Cost: $7,553,334

Project Description: Fiscal Year Cost: $7,553,334

General Project Information Funding Information (YOE)

Date TDC Awarded: N/A

Apportionment Year: 2021

Project Sponsor:

Section 5309 ID #:

Project Phase:

TDC Awarded: $0

TDC Requested: $0

MPO Project Number:

Federal Funding Category: FTA - Section 5307

Federal (FTA) Funds: $5,076,382

State Funds from TxDOT: $0

Other Funds: $1,960,762

Total Project Cost: $7,037,144

Project Description: Fiscal Year Cost: $7,037,144

General Project Information Funding Information (YOE)

Date TDC Awarded: N/A

Apportionment Year:

Projects are sorted by Federal Funding Category and MPO Project Number.

Note: CMAQ flexed in 2020

Note: CMAQ flexed in 2020

on #7 and #552 routes

Purchase 9 CNG buses and increase service Bus Frequency Program CSJ 0915-12-673 Transit: Revenue Vehicles and Service

C,O

2020

5581.1

VIA Metropolitan Transit

60

Page 65:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

Transit Project Listing2021

Alamo Area MPO Transportation Improvement Program

San Antonio TxDOT District YOE=Year of Expenditure

FY

Project Sponsor: VIA Metropolitan Transit

Section 5309 ID #: N/A

Project Phase: O

TDC Awarded: $0

TDC Requested: $0

MPO Project Number: 5581.2

Transit: Service

Bus Frequency Program CSJ 0915-12-680

Increase service on #7 and #552 routes

Federal Funding Category: FTA - Section 5307

Federal (FTA) Funds: $1,191,810

State Funds from TxDOT: $0

Other Funds: $989,619

Total Project Cost: $2,181,429

Project Description: Fiscal Year Cost: $2,181,429

General Project Information Funding Information (YOE)

Date TDC Awarded: N/A

Apportionment Year: 2021

Projects are sorted by Federal Funding Category and MPO Project Number. 61

Page 66:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

Transit Project Listing2022

Alamo Area MPO Transportation Improvement Program

San Antonio TxDOT District YOE=Year of Expenditure

FY

Project Sponsor: VIA Metropolitan Transit

Section 5309 ID #: N/A

Project Phase: O

TDC Awarded: $0

TDC Requested: $0

MPO Project Number: 10501

Transit: Operating Expenses

Capital Cost of Contracting, ADA, Preventive Maintenance

Federal Funding Category: FTA - 5307

Federal (FTA) Funds: $36,301,207

State Funds from TxDOT: $0

Other Funds: $9,075,302

Total Project Cost: $45,376,509

Project Description: Fiscal Year Cost: $45,376,509

General Project Information Funding Information (YOE)

Date TDC Awarded: N/A

Apportionment Year: 2022

Project Sponsor: VIA Metropolitan Transit

Section 5309 ID #: N/A

Project Phase: O

TDC Awarded: $0

TDC Requested: $0

MPO Project Number: 10503

Transit: JARC Operating Projects

Pass Through to AACOG

Transportation Services for New Braunfels, Cibolo, McQueeney, Marion, Schertz, etc

Federal Funding Category: FTA - 5307

Federal (FTA) Funds: $570,315

State Funds from TxDOT: $0

Other Funds: $570,315

Total Project Cost: $1,140,630

Project Description: Fiscal Year Cost: $1,140,630

General Project Information Funding Information (YOE)

Date TDC Awarded: N/A

Apportionment Year: 2022

Project Sponsor: VIA Metropolitan Transit

Section 5309 ID #: N/A

Project Phase: C

TDC Awarded: $0

TDC Requested: $0

MPO Project Number: 10507

Transit: Passenger Facilities

See Appendix for Project Detail

Federal Funding Category: FTA - 5307,5339

Federal (FTA) Funds: $7,981,301

State Funds from TxDOT: $10,004,417

Other Funds: $764,253

Total Project Cost: $18,749,971

Project Description: Fiscal Year Cost: $18,749,971

General Project Information Funding Information (YOE)

Date TDC Awarded: N/A

Apportionment Year: 2022

Project Sponsor: VIA Metropolitan Transit

Section 5309 ID #: N/A

Project Phase: O

TDC Awarded: $0

TDC Requested: $0

MPO Project Number: 10504

Transit: Mobility of Seniors and Persons

with Disabilities

Other Programs Pass through to Subrecipients

Federal Funding Category: FTA - 5310

Federal (FTA) Funds: $1,672,417

State Funds from TxDOT: $0

Other Funds: $418,104

Total Project Cost: $2,090,521

Project Description: Fiscal Year Cost: $2,090,521

General Project Information Funding Information (YOE)

Date TDC Awarded: N/A

Apportionment Year: 2022

Projects are sorted by Federal Funding Category and MPO Project Number. 62

Page 67:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

Transit Project Listing2022

Alamo Area MPO Transportation Improvement Program

San Antonio TxDOT District YOE=Year of Expenditure

FY

Project Sponsor: VIA Metropolitan Transit

Section 5309 ID #: N/A

Project Phase: A

TDC Awarded: $0

TDC Requested: $0

MPO Project Number: 10505

Transit: Mobility of Seniors and Persons

with Disabilities

Program Administration

Federal Funding Category: FTA - 5310

Federal (FTA) Funds: $185,824

State Funds from TxDOT: $0

Other Funds: $0

Total Project Cost: $185,824

Project Description: Fiscal Year Cost: $185,824

General Project Information Funding Information (YOE)

Date TDC Awarded: N/A

Apportionment Year: 2022

Project Sponsor: VIA Metropolitan Transit

Section 5309 ID #: N/A

Project Phase: C

TDC Awarded: $0

TDC Requested: $0

MPO Project Number: 10506

Transit: Revenue Vehicles

See Appendix for Project Detail

Federal Funding Category: FTA - 5339

Federal (FTA) Funds: $8,362,878

State Funds from TxDOT: $0

Other Funds: $14,765,185

Total Project Cost: $23,128,063

Project Description: Fiscal Year Cost: $23,128,063

General Project Information Funding Information (YOE)

Date TDC Awarded: N/A

Apportionment Year: 2022

Project Sponsor: VIA Metropolitan Transit

Section 5309 ID #: N/A

Project Phase: C

TDC Awarded: $0

TDC Requested: $0

MPO Project Number: 10510

Transit: Maintenance Tools and Equipment

See Appendix for Project Detail

Federal Funding Category: FTA - 5339

Federal (FTA) Funds: $40,000

State Funds from TxDOT: $0

Other Funds: $1,060,000

Total Project Cost: $1,100,000

Project Description: Fiscal Year Cost: $1,100,000

General Project Information Funding Information (YOE)

Date TDC Awarded: N/A

Apportionment Year: 2022

Project Sponsor: VIA Metropolitan Transit

Section 5309 ID #: N/A

Project Phase: C

TDC Awarded: $0

TDC Requested: $0

MPO Project Number: 10508

Transit: Operational Facilities

See Appendix for Project Detail

Federal Funding Category: FTA - None

Federal (FTA) Funds: $0

State Funds from TxDOT: $0

Other Funds: $280,000

Total Project Cost: $280,000

Project Description: Fiscal Year Cost: $280,000

General Project Information Funding Information (YOE)

Date TDC Awarded: N/A

Apportionment Year: 2022

Projects are sorted by Federal Funding Category and MPO Project Number. 63

Page 68:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

Transit Project Listing2022

Alamo Area MPO Transportation Improvement Program

San Antonio TxDOT District YOE=Year of Expenditure

FY

Project Sponsor: VIA Metropolitan Transit

Section 5309 ID #: N/A

Project Phase: C

TDC Awarded: $0

TDC Requested: $0

MPO Project Number: 10509

Transit: Advanced Rapid Transit Project

See Appendix for Project Detail

Federal Funding Category: FTA - None

Federal (FTA) Funds: $0

State Funds from TxDOT: $0

Other Funds: $31,509,000

Total Project Cost: $31,509,000

Project Description: Fiscal Year Cost: $31,509,000

General Project Information Funding Information (YOE)

Date TDC Awarded: N/A

Apportionment Year: 2022

Project Sponsor: VIA Metropolitan Transit

Section 5309 ID #: N/A

Project Phase: C

TDC Awarded: $0

TDC Requested: $0

MPO Project Number: 10511

Transit: Replacement Components for

Revenue Vehicles

See Appendix for Project Detail

Federal Funding Category: FTA - None

Federal (FTA) Funds: $0

State Funds from TxDOT: $0

Other Funds: $1,235,000

Total Project Cost: $1,235,000

Project Description: Fiscal Year Cost: $1,235,000

General Project Information Funding Information (YOE)

Date TDC Awarded: N/A

Apportionment Year: 2022

Project Sponsor: VIA Metropolitan Transit

Section 5309 ID #: N/A

Project Phase: C

TDC Awarded: $0

TDC Requested: $0

MPO Project Number: 10512

Transit: Computer Hardware/Software

See Appendix for Project Detail

Federal Funding Category: FTA - None

Federal (FTA) Funds: $0

State Funds from TxDOT: $0

Other Funds: $2,050,000

Total Project Cost: $2,050,000

Project Description: Fiscal Year Cost: $2,050,000

General Project Information Funding Information (YOE)

Date TDC Awarded: N/A

Apportionment Year: 2022

Project Sponsor: VIA Metropolitan Transit

Section 5309 ID #: N/A

Project Phase: C

TDC Awarded: $0

TDC Requested: $0

MPO Project Number: 10513

Transit: Service Vehicles

See Appendix for Project Detail

Federal Funding Category: FTA - None

Federal (FTA) Funds: $0

State Funds from TxDOT: $0

Other Funds: $256,282

Total Project Cost: $256,282

Project Description: Fiscal Year Cost: $256,282

General Project Information Funding Information (YOE)

Date TDC Awarded: N/A

Apportionment Year: 2022

Projects are sorted by Federal Funding Category and MPO Project Number. 64

Page 69:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

Transit Project Listing2022

Alamo Area MPO Transportation Improvement Program

San Antonio TxDOT District YOE=Year of Expenditure

FY

Project Sponsor: VIA Metropolitan Transit

Section 5309 ID #: N/A

Project Phase: C

TDC Awarded: $0

TDC Requested: $0

MPO Project Number: 10514

Transit: Bus Operations and

Maintenance Facility

See Appendix for Project Detail

Federal Funding Category: FTA - None

Federal (FTA) Funds: $0

State Funds from TxDOT: $0

Other Funds: $5,150,000

Total Project Cost: $5,150,000

Project Description: Fiscal Year Cost: $5,150,000

General Project Information Funding Information (YOE)

Date TDC Awarded: N/A

Apportionment Year: 2022

Project Sponsor: VIA Metropolitan Transit

Section 5309 ID #: N/A

Project Phase: C

TDC Awarded: $0

TDC Requested: $0

MPO Project Number: 5580.3

Transit: Revenue Vehicles

Fleet Replacement Program CSJ 0915-12-685

Purchase 14 CNG Buses

Federal Funding Category: FTA - Section 5307

Federal (FTA) Funds: $5,493,333

State Funds from TxDOT: $0

Other Funds: $2,059,999

Total Project Cost: $7,553,332

Project Description: Fiscal Year Cost: $7,553,332

General Project Information Funding Information (YOE)

Date TDC Awarded: N/A

Apportionment Year: 2022

Project Sponsor: VIA Metropolitan Transit

Section 5309 ID #: N/A

Project Phase: O

TDC Awarded: $0

TDC Requested: $0

MPO Project Number: 5581.3

Transit: Service

Bus Frequency Program CSJ 0915-12-686

Increase service on #7 and #552 routes

Federal Funding Category: FTA - Section 5307

Federal (FTA) Funds: $1,191,809

State Funds from TxDOT: $0

Other Funds: $989,618

Total Project Cost: $2,181,427

Project Description: Fiscal Year Cost: $2,181,427

General Project Information Funding Information (YOE)

Date TDC Awarded: N/A

Apportionment Year: 2022

Projects are sorted by Federal Funding Category and MPO Project Number. 65

Page 70:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

Transit Project Listing2023

Alamo Area MPO Transportation Improvement Program

San Antonio TxDOT District YOE=Year of Expenditure

FY

Project Sponsor: VIA Metropolitan Transit

Section 5309 ID #: N/A

Project Phase: O

TDC Awarded: $0

TDC Requested: $0

MPO Project Number: 10601

Transit: Operating Expenses

Capital Cost of Contracting, ADA, Preventive Maintenance

Federal Funding Category: FTA - 5307

Federal (FTA) Funds: $38,144,783

State Funds from TxDOT: $0

Other Funds: $9,536,196

Total Project Cost: $47,680,979

Project Description: Fiscal Year Cost: $47,680,979

General Project Information Funding Information (YOE)

Date TDC Awarded: N/A

Apportionment Year: 2023

Project Sponsor: VIA Metropolitan Transit

Section 5309 ID #: N/A

Project Phase: O

TDC Awarded: $0

TDC Requested: $0

MPO Project Number: 10603

Transit: JARC Operating Projects

Pass Through to AACOG

Transportation Services for New Braunfels, Cibolo, McQueeney, Marion, Schertz, etc

Federal Funding Category: FTA - 5307

Federal (FTA) Funds: $570,315

State Funds from TxDOT: $0

Other Funds: $570,315

Total Project Cost: $1,140,630

Project Description: Fiscal Year Cost: $1,140,630

General Project Information Funding Information (YOE)

Date TDC Awarded: N/A

Apportionment Year: 2023

Project Sponsor: VIA Metropolitan Transit

Section 5309 ID #: N/A

Project Phase: O

TDC Awarded: $0

TDC Requested: $0

MPO Project Number: 10604

Transit: Mobility of Seniors and Persons

with Disabilities

Other Programs Pass through to Subrecipients

Federal Funding Category: FTA - 5310

Federal (FTA) Funds: $1,756,038

State Funds from TxDOT: $0

Other Funds: $439,010

Total Project Cost: $2,195,048

Project Description: Fiscal Year Cost: $2,195,048

General Project Information Funding Information (YOE)

Date TDC Awarded: N/A

Apportionment Year: 2023

Project Sponsor: VIA Metropolitan Transit

Section 5309 ID #: N/A

Project Phase: A

TDC Awarded: $0

TDC Requested: $0

MPO Project Number: 10605

Transit: Mobility of Seniors and Persons

with Disabilities

Program Administration

Federal Funding Category: FTA - 5310

Federal (FTA) Funds: $195,115

State Funds from TxDOT: $0

Other Funds: $0

Total Project Cost: $195,115

Project Description: Fiscal Year Cost: $195,115

General Project Information Funding Information (YOE)

Date TDC Awarded: N/A

Apportionment Year: 2023

Projects are sorted by Federal Funding Category and MPO Project Number. 66

Page 71:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

Transit Project Listing2023

Alamo Area MPO Transportation Improvement Program

San Antonio TxDOT District YOE=Year of Expenditure

FY

Project Sponsor: VIA Metropolitan Transit

Section 5309 ID #: N/A

Project Phase: C

TDC Awarded: $0

TDC Requested: $0

MPO Project Number: 10607

Transit: Passenger Facilities

See Appendix for Project Detail

Federal Funding Category: FTA - 5339

Federal (FTA) Funds: $896,274

State Funds from TxDOT: $345,711

Other Funds: $1,501,250

Total Project Cost: $2,743,235

Project Description: Fiscal Year Cost: $2,743,235

General Project Information Funding Information (YOE)

Date TDC Awarded: N/A

Apportionment Year: 2023

Project Sponsor: VIA Metropolitan Transit

Section 5309 ID #: N/A

Project Phase: C

TDC Awarded: $0

TDC Requested: $0

MPO Project Number: 10608

Transit: Operational Facilities

See Appendix for Project Detail

Federal Funding Category: FTA - 5339

Federal (FTA) Funds: $2,084,000

State Funds from TxDOT: $0

Other Funds: $521,000

Total Project Cost: $2,605,000

Project Description: Fiscal Year Cost: $2,605,000

General Project Information Funding Information (YOE)

Date TDC Awarded: N/A

Apportionment Year: 2023

Project Sponsor: VIA Metropolitan Transit

Section 5309 ID #: N/A

Project Phase: C

TDC Awarded: $0

TDC Requested: $0

MPO Project Number: 10611

Transit: Replacement Components for

Revenue Vehicles

See Appendix for Project Detail

Federal Funding Category: FTA - 5339

Federal (FTA) Funds: $1,788,000

State Funds from TxDOT: $0

Other Funds: $447,000

Total Project Cost: $2,235,000

Project Description: Fiscal Year Cost: $2,235,000

General Project Information Funding Information (YOE)

Date TDC Awarded: N/A

Apportionment Year: 2023

Project Sponsor: VIA Metropolitan Transit

Section 5309 ID #: N/A

Project Phase: C

TDC Awarded: $0

TDC Requested: $0

MPO Project Number: 10606

Transit: Service Vehicles

See Appendix for Project Detail

Federal Funding Category: FTA - None

Federal (FTA) Funds: $0

State Funds from TxDOT: $0

Other Funds: $483,167

Total Project Cost: $483,167

Project Description: Fiscal Year Cost: $483,167

General Project Information Funding Information (YOE)

Date TDC Awarded: N/A

Apportionment Year: 2023

Projects are sorted by Federal Funding Category and MPO Project Number. 67

Page 72:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

Transit Project Listing2023

Alamo Area MPO Transportation Improvement Program

San Antonio TxDOT District YOE=Year of Expenditure

FY

Project Sponsor: VIA Metropolitan Transit

Section 5309 ID #: N/A

Project Phase: C

TDC Awarded: $0

TDC Requested: $0

MPO Project Number: 10609

Transit: Advanced Rapid Transit Project

See Appendix for Project Detail

Federal Funding Category: FTA - None

Federal (FTA) Funds: $0

State Funds from TxDOT: $0

Other Funds: $53,093,000

Total Project Cost: $53,093,000

Project Description: Fiscal Year Cost: $53,093,000

General Project Information Funding Information (YOE)

Date TDC Awarded: N/A

Apportionment Year: 2023

Project Sponsor: VIA Metropolitan Transit

Section 5309 ID #: N/A

Project Phase: C

TDC Awarded: $0

TDC Requested: $0

MPO Project Number: 10610

Transit: Maintenance Tools and Equipment

See Appendix for Project Detail

Federal Funding Category: FTA - None

Federal (FTA) Funds: $0

State Funds from TxDOT: $0

Other Funds: $150,000

Total Project Cost: $150,000

Project Description: Fiscal Year Cost: $150,000

General Project Information Funding Information (YOE)

Date TDC Awarded: N/A

Apportionment Year: 2023

Project Sponsor: VIA Metropolitan Transit

Section 5309 ID #: N/A

Project Phase: C

TDC Awarded: $0

TDC Requested: $0

MPO Project Number: 10612

Transit: Computer Hardware/Software

See Appendix for Project Detail

Federal Funding Category: FTA - None

Federal (FTA) Funds: $0

State Funds from TxDOT: $0

Other Funds: $1,005,000

Total Project Cost: $1,005,000

Project Description: Fiscal Year Cost: $1,005,000

General Project Information Funding Information (YOE)

Date TDC Awarded: N/A

Apportionment Year: 2023

Project Sponsor: VIA Metropolitan Transit

Section 5309 ID #: N/A

Project Phase: C

TDC Awarded: $0

TDC Requested: $0

MPO Project Number: 10613

Transit: Bus Operations and

Maintenance Facility

See Appendix for Project Detail

Federal Funding Category: FTA - None

Federal (FTA) Funds: $0

State Funds from TxDOT: $0

Other Funds: $4,805,000

Total Project Cost: $4,805,000

Project Description: Fiscal Year Cost: $4,805,000

General Project Information Funding Information (YOE)

Date TDC Awarded: N/A

Apportionment Year: 2023

Projects are sorted by Federal Funding Category and MPO Project Number. 68

Page 73:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

Transit Project Listing2024

Alamo Area MPO Transportation Improvement Program

San Antonio TxDOT District YOE=Year of Expenditure

FY

Project Sponsor: VIA Metropolitan Transit

Section 5309 ID #: N/A

Project Phase: O

TDC Awarded: $0

TDC Requested: $0

MPO Project Number: 10701

Transit: Operating Expenses

Capital Cost of Contracting, ADA, Preventive Maintenance

Federal Funding Category: FTA - 5307

Federal (FTA) Funds: $40,080,538

State Funds from TxDOT: $0

Other Funds: $10,020,134

Total Project Cost: $50,100,672

Project Description: Fiscal Year Cost: $50,100,672

General Project Information Funding Information (YOE)

Date TDC Awarded: N/A

Apportionment Year: 2024

Project Sponsor: VIA Metropolitan Transit

Section 5309 ID #: N/A

Project Phase: O

TDC Awarded: $0

TDC Requested: $0

MPO Project Number: 10703

Transit: JARC Operating Projects

Pass Through to AACOG

Transportation Services for New Braunfels, Cibolo, McQueeney, Marion, Schertz, etc

Federal Funding Category: FTA - 5307

Federal (FTA) Funds: $570,315

State Funds from TxDOT: $0

Other Funds: $570,315

Total Project Cost: $1,140,630

Project Description: Fiscal Year Cost: $1,140,630

General Project Information Funding Information (YOE)

Date TDC Awarded: N/A

Apportionment Year: 2024

Project Sponsor: VIA Metropolitan Transit

Section 5309 ID #: N/A

Project Phase: O

TDC Awarded: $0

TDC Requested: $0

MPO Project Number: 10704

Transit: Mobility of Seniors and Persons

with Disabilities

Other Programs Pass through to Subrecipients

Federal Funding Category: FTA - 5310

Federal (FTA) Funds: $1,843,640

State Funds from TxDOT: $0

Other Funds: $460,960

Total Project Cost: $2,304,800

Project Description: Fiscal Year Cost: $2,304,800

General Project Information Funding Information (YOE)

Date TDC Awarded: N/A

Apportionment Year: 2024

Project Sponsor: VIA Metropolitan Transit

Section 5309 ID #: N/A

Project Phase: A

TDC Awarded: $0

TDC Requested: $0

MPO Project Number: 10705

Transit: Mobility of Seniors and Persons

with Disabilities

Program Administration

Federal Funding Category: FTA - 5310

Federal (FTA) Funds: $204,871

State Funds from TxDOT: $0

Other Funds: $0

Total Project Cost: $204,871

Project Description: Fiscal Year Cost: $204,871

General Project Information Funding Information (YOE)

Date TDC Awarded: N/A

Apportionment Year: 2024

Projects are sorted by Federal Funding Category and MPO Project Number. 69

Page 74:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

Transit Project Listing2024

Alamo Area MPO Transportation Improvement Program

San Antonio TxDOT District YOE=Year of Expenditure

FY

Project Sponsor: VIA Metropolitan Transit

Section 5309 ID #: N/A

Project Phase: C

TDC Awarded: $0

TDC Requested: $0

MPO Project Number: 10707

Transit: Passenger Facilities

See Appendix for Project Detail

Federal Funding Category: FTA - 5339

Federal (FTA) Funds: $26,989

State Funds from TxDOT: $0

Other Funds: $460,346

Total Project Cost: $487,335

Project Description: Fiscal Year Cost: $487,335

General Project Information Funding Information (YOE)

Date TDC Awarded: N/A

Apportionment Year: 2024

Project Sponsor: VIA Metropolitan Transit

Section 5309 ID #: N/A

Project Phase: C

TDC Awarded: $0

TDC Requested: $0

MPO Project Number: 10708

Transit: Operational Facilities

See Appendix for Project Detail

Federal Funding Category: FTA - 5339

Federal (FTA) Funds: $80,000

State Funds from TxDOT: $0

Other Funds: $20,000

Total Project Cost: $100,000

Project Description: Fiscal Year Cost: $100,000

General Project Information Funding Information (YOE)

Date TDC Awarded: N/A

Apportionment Year: 2024

Project Sponsor: VIA Metropolitan Transit

Section 5309 ID #: N/A

Project Phase: C

TDC Awarded: $0

TDC Requested: $0

MPO Project Number: 10711

Transit: Replacement Components for

Revenue Vehicles

See Appendix for Project Detail

Federal Funding Category: FTA - 5339

Federal (FTA) Funds: $48,000

State Funds from TxDOT: $0

Other Funds: $12,000

Total Project Cost: $60,000

Project Description: Fiscal Year Cost: $60,000

General Project Information Funding Information (YOE)

Date TDC Awarded: N/A

Apportionment Year: 2024

Project Sponsor: VIA Metropolitan Transit

Section 5309 ID #: N/A

Project Phase: C

TDC Awarded: $0

TDC Requested: $0

MPO Project Number: 10712

Transit: Computer Hardware/Software

See Appendix for Project Detail

Federal Funding Category: FTA - 5339

Federal (FTA) Funds: $3,200,000

State Funds from TxDOT: $0

Other Funds: $1,745,000

Total Project Cost: $4,945,000

Project Description: Fiscal Year Cost: $4,945,000

General Project Information Funding Information (YOE)

Date TDC Awarded: N/A

Apportionment Year: 2024

Projects are sorted by Federal Funding Category and MPO Project Number. 70

Page 75:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

Transit Project Listing2024

Alamo Area MPO Transportation Improvement Program

San Antonio TxDOT District YOE=Year of Expenditure

FY

Project Sponsor: VIA Metropolitan Transit

Section 5309 ID #: N/A

Project Phase: C

TDC Awarded: $0

TDC Requested: $0

MPO Project Number: 10706

Transit: Service Vehicles

See Appendix for Project Detail

Federal Funding Category: FTA - None

Federal (FTA) Funds: $0

State Funds from TxDOT: $0

Other Funds: $711,041

Total Project Cost: $711,041

Project Description: Fiscal Year Cost: $711,041

General Project Information Funding Information (YOE)

Date TDC Awarded: N/A

Apportionment Year: 2024

Project Sponsor: VIA Metropolitan Transit

Section 5309 ID #: N/A

Project Phase: C

TDC Awarded: $0

TDC Requested: $0

MPO Project Number: 10709

Transit: Advanced Rapid Transit Project

See Appendix for Project Detail

Federal Funding Category: FTA - None

Federal (FTA) Funds: $0

State Funds from TxDOT: $0

Other Funds: $56,457,000

Total Project Cost: $56,457,000

Project Description: Fiscal Year Cost: $56,457,000

General Project Information Funding Information (YOE)

Date TDC Awarded: N/A

Apportionment Year: 2024

Project Sponsor: VIA Metropolitan Transit

Section 5309 ID #: N/A

Project Phase: C

TDC Awarded: $0

TDC Requested: $0

MPO Project Number: 10710

Transit: Maintenance Tools and Equipment

See Appendix for Project Detail

Federal Funding Category: FTA - None

Federal (FTA) Funds: $0

State Funds from TxDOT: $0

Other Funds: $182,000

Total Project Cost: $182,000

Project Description: Fiscal Year Cost: $182,000

General Project Information Funding Information (YOE)

Date TDC Awarded: N/A

Apportionment Year: 2024

Project Sponsor: VIA Metropolitan Transit

Section 5309 ID #: N/A

Project Phase: C

TDC Awarded: $0

TDC Requested: $0

MPO Project Number: 10713

Transit: Bus Operations and

Maintenance Facility

See Appendix for Project Detail

Federal Funding Category: FTA - None

Federal (FTA) Funds: $0

State Funds from TxDOT: $0

Other Funds: $34,270,000

Total Project Cost: $34,270,000

Project Description: Fiscal Year Cost: $34,270,000

General Project Information Funding Information (YOE)

Date TDC Awarded: N/A

Apportionment Year: 2024

Projects are sorted by Federal Funding Category and MPO Project Number. 71

Page 76:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

Alamo Area Metropolitan Planning Organization

This page intentionally left blank.

72

Page 77:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

FY 2021 – 2024 Transportation Improvement Program

Financial Plan

73

Page 78:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

Alamo Area Metropolitan Planning Organization

This page intentionally left blank.

74

Page 79:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

Highway Financial Summary - Year of Expenditure Cost

Funding by Category Effective May 18, 2020

Category Description Programmed Authorized Programmed Authorized Programmed Authorized Programmed Authorized Programmed Authorized

1 1Preventive Maintenance

and Rehabilitation $37,911,852 $37,911,852 $0 $0 $8,000,000 $8,000,000 $4,000,000 $4,000,000 $49,911,852 $49,911,852

2M Urban Area Corridor Projects $725,300,000 $725,300,000 $358,025,000 $358,025,000 $45,700,000 $45,700,000 $50,000,000 $50,000,000 $1,179,025,000 $1,179,025,000

3Non-Traditionally Funded

Transportation Projects $77,604,361 $77,604,361 $26,514,515 $26,514,515 $20,900,000 $20,900,000 $61,500,000 $61,500,000 $186,518,876 $186,518,876

3 - DB Design/Build $170,000,000 $170,000,000 $100,000,000 $100,000,000 $0 $0 $0 $0 $270,000,000 $270,000,000

4Urban and Regional

Connectivity $182,600,000 $182,600,000 $137,000,000 $137,000,000 $36,000,000 $36,000,000 $0 $0 $355,600,000 $355,600,000

5 CMAQ $19,857,512 $21,050,000 $29,919,469 $21,330,000 $0 $21,610,000 $0 $21,890,000 $49,776,981 $85,880,000

5 Unspent Prev Yrs CMAQ $0 $7,598,000 $0 $8,790,488 $0 $201,019 $0 $21,811,019 $0 $43,701,019

5 Total CMAQ Available $19,857,512 $28,648,000 $29,919,469 $30,120,488 $0 $21,811,019 $0 $43,701,019 $49,776,981 $129,581,019

6 1 Structures - Bridge $0 $0 $36,700,000 $36,700,000 $0 $0 $0 $0 $36,700,000 $36,700,000

7 STBG $119,566,245 $46,750,000 $24,745,015 $47,370,000 $68,830,000 $48,000,000 $53,500,000 $48,630,000 $266,641,260 $269,451,334

7Unspent Prev Yrs STBG

$0 $78,701,334 $0 $5,885,089 $0 $28,510,074 $0 $7,680,074 $0 $2,810,074

7 Total STBG Available $119,566,245 $125,451,334 $24,745,015 $53,255,089 $68,830,000 $76,510,074 $53,500,000 $56,310,074 $266,641,260 $272,261,408

8 1 Safety $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

9 Transportation Alternatives $8,431,500 $3,180,000 $0 $3,180,000 $0 $3,180,000 $0 $3,180,000 $8,431,500 $12,720,000

9 Unspent Prev Yr TA $0 $6,685,000 $0 $2,767,283 $0 $5,947,283 $0 $9,127,283 $0 $12,307,283

9 Total TA Available $8,431,500 $9,865,000 $0 $5,947,283 $0 $9,127,283 $0 $12,307,283 $8,431,500 $25,027,283

10 Supplemental Transportation $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

11 1 District Discretionary $15,722,500 $15,722,500 $0 $0 $500,000 $500,000 $0 $0 $16,222,500 $16,222,500

12 Strategic Priority $0 $0 $669,000,000 $669,000,000 $0 $0 $70,000,000 $70,000,000 $739,000,000 $739,000,000

12C Texas Clear Lanes (CL) $404,000,000 $404,000,000 $150,000,000 $150,000,000 $0 $0 $0 $0 $554,000,000 $554,000,000

12S Strategic Priority RECON $4,100,000 $4,100,000 $0 $0 $0 $0 $0 $0 $4,100,000 $4,100,000

SWPE Statewide Budget PE $31,405,500 $31,405,500 $19,098,000 $19,098,000 $79,788,000 $79,788,000 $0 $0 $130,291,500 $130,291,500

SWROW Statewide Budget ROW $30,331,333 $30,331,333 $23,594,000 $23,594,000 $12,700,000 $12,700,000 $0 $0 $66,625,333 $66,625,333

Total $1,826,830,803 $1,842,939,880 $1,574,595,999 $1,609,254,375 $272,418,000 $311,036,376 $239,000,000 $297,818,376 $3,912,844,802 $3,956,046,395

FY 2021 FY 2022 FY 2023 FY 2024 Total

$1,360,531,689 $1,235,981,588 $127,224,000 $142,000,000 $2,865,737,277

$303,486,370 $264,555,689 $30,886,000 $29,180,000 $628,108,059

$23,471,550 $4,852,207 $920,000 $6,320,000 $35,563,757

$59,504,361 $26,514,515 $20,900,000 $61,500,000 $168,418,876

$18,100,000 $0 $0 $0 $18,100,000

$31,405,500 $19,098,000 $79,788,000 $0 $130,291,500

$30,331,333 $23,594,000 $12,700,000 $0 $66,625,333

$1,826,830,803 $1,574,595,999 $272,418,000 $239,000,000 $3,912,844,802

This table uses TxDOT's FY 2020 UTP for Category 5 CMAQ, Category 7 STBG and Category 9 TA funding levels. Funding

levels will be updated as the UTP is revised.

Funding Participation Source

Total FY 2019 - 2022

Total

Cat 3 - Pass Thru Toll Revenue (SH 211)

Statewide Budget PE

Statewide Budget ROW

Source

Local Match

Federal

State

Cat 3 - Local Contributions

Notes:

1 at TxDOT's direction, grouped project CSJs, primarily funded under these categories, are not to be included in this

financial table.

Alamo Area Metropolitan Planning Organization - District 15

Initial FY 2021 - 2024 Transportation Improvement Program

FY 2021 FY 2022 FY 2023 FY 2024

75

Page 80:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

All Figures in Year of Expenditure (YOE) Dollars

FY 2021 FY 2022 FY 2023

Federal State/Other Total Federal State/Other Total Federal State/Other Total

1 Sec. 5307 - Urbanized Formula >200K $59,500,585 $16,804,490 $76,305,075 $51,537,965 $13,459,487 $64,997,452 $38,715,098 $10,106,511 $48,821,609

2 Sec. 5307 - Urbanized Formula <200K $0 $0 $0

3 Sec. 5309 - Discretionary $0 $0 $0

4 Sec. 5310 - Elderly &Individuals w/Disabilities $1,769,753 $398,195 $2,167,948 $1,858,241 $418,104 $2,276,345 $1,951,153 $439,010 $2,390,163

5 Sec. 5311 - Nonurbanized Formula $0 $0 $0

6 Sec. 5316 - JARC >200K $0 $0 $0

7 Sec. 5316 - JARC <200K $0 $0 $0

8 Sec. 5316 - JARC Nonurbanized $0 $0 $0

9 Sec. 5317 - New Freedom >200K $0 $0 $0

10 Sec. 5317 - New Freedom <200K $0 $0 $0

11 Sec. 5317 - New Freedom Nonurbanized $0 $0 $0

12 Other FTA $4,324,965 $19,482,222 $23,807,187 $8,402,878 $16,105,185 $24,508,063 $4,768,274 $2,469,250 $7,237,524

13 Regionally Significant or Other $50,690,948 $50,690,948 $50,204,699 $50,204,699 $59,881,878 $59,881,878

Total Funds $65,595,303 $87,375,855 $152,971,158 $61,799,084 $80,187,475 $141,986,559 $45,434,525 $72,896,649 $118,331,174

Requested $0 $0 $0 Awarded $0 $0 $0

$20,437,531 8,020,080

FY 2024 Total

Federal State/Other Total Federal State/Other Total

1 Sec. 5307 - Urbanized Formula >200K $40,650,853 $10,590,449 $51,241,302 $190,404,501 $50,960,937 $241,365,438

2 Sec. 5307 - Urbanized Formula <200K $0 $0 $13,459,487 $0

3 Sec. 5309 - Discretionary $0 $0 $0 $0

4 Sec. 5310 - Elderly &Individuals w/Disabilities $2,048,511 $460,960 $2,509,471 $7,627,658 $1,716,269 $9,343,927

5 Sec. 5311 - Nonurbanized Formula $0 $0 $0 $0

6 Sec. 5316 - JARC >200K $0 $0 $0 $0

7 Sec. 5316 - JARC <200K $0 $0 $0 $0

8 Sec. 5316 - JARC Nonurbanized $0 $0 $0 $0

9 Sec. 5317 - New Freedom >200K $0 $0 $0 $0

10 Sec. 5317 - New Freedom <200K $0 $0 $0 $0

11 Sec. 5317 - New Freedom Nonurbanized $0 $0 $0 $0

12 Other FTA $3,354,989 $2,237,346 $5,592,335 $20,851,106 $40,294,003 $61,145,109

13 Regionally Significant or Other $91,620,041 $91,620,041 $0 $252,397,566 $252,397,566

Total Funds $46,054,353 $104,908,796 $150,963,149 $218,883,265 $345,368,775 $564,252,040

Requested $0 $0 Awarded $0 $0

Transportation Development Credits

Transportation Development Credits

Transit Program

All Figures in Year of Expenditure (YOE) Dollars

Transit Financial Summary

FY 2021 - 2024 Transportation Improvement Program

Transit Program

Current as of 5/18/2020

Alamo Area Metropolitan Planning Organization

76

Page 81:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

FY 2021 – 2024 Transportation Improvement Program

APPENDIX A

Certifications

77

Page 82:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

Alamo Area Metropolitan Planning Organization

This page intentionally left blank.

78

Page 83:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

FY 2021 – 2024 Transportation Improvement Program

Self - Certification

79

Page 84:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

Alamo Area Metropolitan Planning Organization

This page intentionally left blank.

80

Page 85:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

DocuSign Envelope lD: 76B13E98-8C7E-460F-8783-51420993DE28

A PO

luano K. Jorh l.€.

MPO Self - Certification

ln accordance with 23 CFR Part 450.334 and 450.220 of the Fixing Amertca's Surface Transportation Act(FAST Act), the Texas Departmeni of Transportation, and the Alamo Area Metropolitan PlanningOrganrzation for the San Antonio urbanized area, hereby certify that the transportation planning processis addressing the major issues in the metropolitan planning area and is being conducted in accordancewith all applicable requirements of:

(1) 23 U. S. C.134,49 U.S.C. 5303, and this subpart;

(2) Title Vl of the Civil Rights Act of 1964, as amended (42 U.S.C. 2000d-1), and 49 CFR part 21;

(3) 49 U,S.C. 5332, prohibiting discrimination on the basis of race, color, creed, national origin, sex,or age in employment or business opportunity;

Section 1101(b) of the FAST Act (Pub. L. 114-357) and 49 CFR part 26 regarding theinvolvement of disadvantaged business enterprises in DOT funded projects;

23 CFR part 230, regarding the implementation of an equal employment opportunity program onFederal and Federal-aid highway construction contracts;

The provisions of the Americans with Disabilities Act of 1990 (42 U.S.C. 12101 et seq.) and 49CFR parts 27,37, and 38;

The Older Americans Act, as amended (42 U.S.C. 6101), prohibiting discrimination on the basisof age in programs or activities receiving Federal financial assistance;

Section 324 of title 23, U.S.C., regarding the prohibition of discrimination based on gender; and

Section 504 of the Rehabilitation Act of 1973 (29 U.S.C. 794) and 49 CFR part27 regardingdiscrimination against individuals with disabilities.

\Mtness these signatures this 27$ day of April 2020.

(4)

(5)

(6)

(7)

(8)

(e)

Texas Department of TransportationSan Antonio District

DocuSigned by:

Alamo AreaMPO Transportation Policy Board

Kevin WoltfChair

E.

District Engineer

\.{Af -baninby:

Wtness

81

Page 86:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

Alamo Area Metropolitan Planning Organization

This page intentionally left blank.

82

Page 87:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

Certification of Planning Process Title 23 of the Code of Federal Regulations, §450.334 mandates that the State and the Metropolitan Planning Organization (MPO) certify that the planning process is consistent with the requirements of 23 USC §134; and 49 USC §5303, and 23 CFR 450 subpart C – Metropolitan Transportation Planning and Programming. The requirements of this certification and the actions(s) taken by the Alamo Area MPO to comply with those requirements are discussed in the following sections. Federal Regulations 23 CFR 450, 23 USC 134, and 49 USC 5303 Federal regulations require the urban transportation planning process to include activities to support the development and implementation of a long-range transportation plan, Metropolitan Transportation Plan (MTP) and a short range transportation plan, the Transportation Improvement Program (TIP) and subsequent project development activities. While all of the activities programmed in the MPO’s Budget Document, the Unified Planning Work Program (UPWP), contribute to those requirements, the following lists some of the more recent efforts:

Program Support Public Involvement Activities including social media, meeting hosting and

facilitation, and development of outreach materials Environmental Justice Analysis and Outreach Geographic Information Systems Activities including transportation-related data

collection and continued refinement of the MPO’s online mapping application, iMap

Bicycle and Pedestrian Planning Studies and Activities including Bike to Work Day; support to Bicycle and Pedestrian Mobility Advisory Committees, Walk & Roll events, Street Skills classes, and Walkable Community Program and Safe Routes to Schools workshops and activities

Traffic Safety Planning and Crash Data Analysis Air Quality Planning including the development of the transportation conformity

document Congestion Management System/Process to include the Regional Thoroughfare

Plan Study Support for the Transportation Improvement Program including public outreach

and document development Support for the Metropolitan Transportation Plan including development of

demographics, travel demand modeling, public outreach and document development

23 CFR 450.306: Scope of the metropolitan planning process The MPO’s metropolitan transportation planning process is continuous, cooperative and comprehensive and provides for the consideration and implementation of projects, strategies and services that address the adopted ten planning factors listed below:

83

Page 88:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

Support the economic vitality of the metropolitan area, especially by enabling global competitiveness, productivity, and efficiency;

Increase the safety of the transportation system for motorized and non-motorized users;

Increase the security of the transportation system for motorized and non-motorized users;

Increase accessibility and mobility of people and for freight; Protect and enhance the environment, promote energy conservation, improve the

quality of life, and promote consistency between transportation improvements and State and local planned growth and economic development patterns;

Enhance the integration and connectivity of the transportation system, across and between modes, for people and freight;

Promote efficient system management and operation; Emphasize the preservation of the existing transportation system. Improve the resiliency and reliability of the transportation system; and reduce or

mitigate the stormwater impacts of surface transportation; and Enhance travel and tourism.

23 CFR 450.308: Funding for transportation planning and unified planning work programs The Unified Planning Work Program (UPWP) is developed cooperatively with the State, the MPO, recipients of FTA Section 5307 funds (VIA Metropolitan Transit) and participating local governments. Currently, the UPWP is developed and maintained on a two-year cycle. 23 CFR 450.310: Metropolitan planning organization and redesignation The MPO, a Transportation Management Area, continues to be designated by the Governor with the concurrence of the State and local elected officials. The Transportation Policy Board (i.e., the MPO) consists of elected officials and staff of general purpose governments. The MPO was redesignated in April 2014 as a result of a boundary expansion and the assumption of transportation planning and programming activities in a portion of the San Marcos urbanized area located within Guadalupe County. 23 CFR 450.312: Metropolitan planning area boundaries The MPO boundary is in effect through an agreement between the MPO and the Governor. 23 CFR 450.314: Metropolitan planning agreements Responsibilities for transportation planning are cooperatively determined by the State, the MPO, VIA Metropolitan Transit and participating local governments. 23 CFR 450.316: Interested parties, participation and consultation

The MPO utilizes a proactive public involvement process that provides complete information, timely public notice, full public access to key decisions, and supports early and continuing involvement of the public in developing plans and TIPs. The MPO’s public involvement process

84

Page 89:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

meets the necessary requirements and criteria. The MPO Public Participation Plan was updated in December 2017 to align with new federal requirements.

23 CFR 450.320: Congestion management process in transportation management areas The MPO’s transportation planning process incorporates a functioning congestion management process. 23 CFR 450.322: Development and content of the metropolitan transportation plan The updated Metropolitan Transportation Plan (MTP), Mobility 2045, was approved on May 18, 2020. The recommendations within the MTP were formulated in accordance with the planning requirements of 23 U.S.C Section 135 and 49 U.S.C. Section 5323. The 2045 MTP covers all of Bexar, Comal and Guadalupe counties and a portion of Kendall County. 23 CFR 450.324: Development and content of the transportation improvement program At least every two years, or as required by the State of Texas, the MPO has prepared and adopted a Transportation Improvement Program (TIP) which:

covers a period of not less than four years;

includes realistic estimates of costs and revenues consistent with estimated funding available;

is submitted to the Governor for approval, and to the Federal Transit

Administration and the Federal Highway Administrator through the State;

provides required information for all projects, including total project

cost and year of expenditure project construction cost. Section 134 of Title 23, U.S.C. and Section 5303 OF Title 49, U.S.C. These requirements are "...development of transportation systems embracing various modes of transportation in a manner which will efficiently maximize mobility of people and goods within and through urbanized areas and minimize transportation-related fuel consumption and air pollution. To accomplish this objective, metropolitan planning organizations, in cooperation with the State, shall develop transportation plans and programs for urbanized areas of the State. Such plans and programs shall provide for the development of transportation facilities (including pedestrian walkways and bicycle transportation facilities) which will function as an intermodal transportation system for the state, the metropolitan areas, and the nation. The process for developing such plans and programs shall provide for consideration of all modes of transportation and shall be continuing, cooperative, and comprehensive to the degree appropriate, based on the complexity of the transportation problems". Long range land use plans and overall development objectives are a functional

responsibility of local governments. As long range needs are evaluated, consideration is given to their relationship and impact on overall development

85

Page 90:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

objectives of local governments. (Geographic Information Systems Activities; Support for the Metropolitan Transportation Plan; Public Involvement Activities; Environmental Justice Analysis and Outreach)

Social, economic, and environmental affects of transportation improvements are

considered in environmental studies for individual projects. These factors were considered in the overall comparison of alternatives and the selection of projects in the MTP. (Air quality planning; Geographic Information Systems Activities; Support for the Metropolitan Transportation Plan; Congestion Management System/Process; Public involvement activities; and Environmental Justice analysis and outreach)

System performance is considered both in the evaluation of alternatives in the

development of the long-range plan and in technical studies analyzing existing needs for highway, street, and/or transit improvements. (Support for the Metropolitan Transportation Plan; bicycle and pedestrian planning studies and activities; Congestion Management System/Process; New Braunfels Transit Study; traffic safety planning Studies; development and reporting of federally required performance measures, and other transportation data collection and management system activities, [iMap])

Alternative transportation systems management strategies are considered as an

integral part of short-range planning efforts to address existing problems in both highway/street and transit. (Support for the Metropolitan Transportation Plan; Congestion Management System/Process; New Braunfels Transit Study, bicycle and pedestrian planning studies and activities; and traffic safety planning studies)

Alternative investment strategies are considered in the economic/financial

analysis of transportation improvements. (Support for the Metropolitan Transportation Plan; and Transportation Improvement Program Development)

Plans are developed for modes utilizing travel forecasts based on the same

demographic projections and the impact of modal recommendations on different modes is analyzed prior to a final recommendation being formulated. (Support for the Metropolitan Transportation Plan; VIA and City of San Antonio corridor planning; New Braunfels Transit Study; and air quality planning)

Transportation planning and the development of transportation plans and

programs have been done on a continuous basis since the mid-1960s. (Program Support; Support for the Metropolitan Transportation Plan; Tansportation Improvement Program Development; VIA and City of San Antonio corridor planning; public involvement activities; and Environmental Justice analysis and outreach)

The process maintains a cooperative relationship between the agencies in

planning through agency interaction and review at the technical committee levels and direct staff contacts. (Program Support; Support for the Metropolitan Transportation Plan; and study oversight committees)

The planning process is comprehensive through the use of local-government

developed demographic forecasts and the consideration of their overall

86

Page 91:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

development objectives. (Support for the Metropolitan Transportation Plan; VIA and City of San Antonio Corridor Planning; and Air quality planning)

42 U.S. Code 7504, 7506(c) and (d); The Clean Air Act, Section 174 and 176(c) and (d) On July 25, 2018, under the 2015 National Ambient Air Quality Standards (NAAQS), the Environmental Protection Agency (EPA) designated Bexar County as marginal nonattainment for ozone. The effective date is September 24, 2018 and the attainment date is September 24, 2021. Additional counties fully or partially within the MPO study area (Comal, Guadalupe and Kendall), were designated unclassifiable/attainment. With the nonattainment designation for Bexar County, transportation conformity is necessary to continue the implementation of certain types of projects within the nonattainment area. The MPO is responsible for conducting transportation conformity on its financially constrained plans: the short range plan, the FY 2021-2024 Transportation Improvement Program, and its long range transportation plan, known as Mobility 2045, for certain plan milestone years: 2025, 2035 and 2045. Projects that are exempt from the transportation conformity determination are noted as such in each plan’s project listings. The transportation conformity determination is a two step process. First, the MPO Transportation Policy Board makes the initial transportation conformity determination (May 2020). Next, the Federal Highway Administration and the Federal Transit Administration make the final conformity determination at the federal level (not later than September 2020). Title VI of the Civil Rights Act of 1964 Title VI requires that programs supported by Federal assistance do not discriminate and Federal grant recipients must prepare and follow a program which effects such assurances. A Title VI program has been developed and is updated as required. Title VI Assurances Filed By State These assurances apply to highway project funding in the same manner as the above section applies to transit projects. The Alamo Area MPO complies with the requirements of Title VI through the Title VI Program and the requirement that all subrecipients contractually comply with the requirement of Title VI. Assurances are filed by the State. Section 1101(b) of MAP-21 (Pub. L. 114-357) This section deals with the requirement that, except to the extent the Secretary of Transportation determines otherwise, not less than 10 percent of the funds authorized to be appropriated under other Titles of MAP-21 shall be expended with small business concerns owned and controlled by socially and economically disadvantaged individuals. To comply with this requirement, the MPO includes in all agreements with the agencies that receive funds from the MPO a clause requiring that Minority Business Enterprises have the maximum opportunity to participate in the performance of contracts and subcontracts financed in whole or in part with Federal funds. The MPO has established an overall disadvantaged business enterprise participation goal of 25% in all of its third-party contracting opportunities. The MPO regularly exceeds this 25% goal. In addition, VIA (a recipient of funds from the MPO) has an adopted Minority Owned/Women Owned Business participation goal for all Federal funds received by

87

Page 92:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

them which they normally achieve and/or exceed. While the MPO has an adopted target, the MPO, in accordance with the contract between the MPO and TxDOT, is following TxDOT’s process. 49 CFR Parts 27, 37 and 38 (Americans with Disabilities Act) Part 27 requires compliance with all applicable requirements of the Americans with Disabilities Act of 1990 (ADA) including the regulations of the Department of Justice implementing Titles II and III of the ADA (28 CFR Parts 35 and 36) and the regulations of the Equal Employment Opportunity Commission implementing Title I of the ADA (29 CFR Part 1630). The Metropolitan Planning Organization meetings are held in accessible facilities and meeting notices contain the following:

Meetings are accessible to persons with disabilities. To arrange for special assistance or an interpreter, please call (210)-227-8651 OR TDD 1-800-735-2989 (Relay Texas) at least five working days in advance.

Parts 37 and 38 require compliance with the accessible transportation and related provisions of Title II and III of the ADA. VIA Metropolitan Transit indicated full compliance with the ADA Paratransit Service Criteria in January 1995 (ADA Paratransit Plan - Third Annual Update). All of VIA's newly procured transit vehicles are accessible. 23 USC Section 324, Section 504 of the Rehabilitation Act of 1973 (29 USC 794 and 49 CFR part 27), 42 USC 6101, and 49 USC 5332

The Metropolitan Planning Organization is an Equal Employment Opportunity Employer and does not discriminate on the basis of race, color, national origin, religion, age, sex, or disability. Conclusions and Recommendations The transportation planning process for the Alamo Area metropolitan area is consistent with all applicable Federal requirements. It is therefore recommended the Transportation Policy Board approve the attached MPO Self-Certification for submittal to the State of Texas, the Federal Highway Administration and the Federal Transit Administration.

88

Page 93:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

FY 2021 – 2024 Transportation Improvement Program

Project Selection Procedures

89

Page 94:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

Alamo Area Metropolitan Planning Organization

This page intentionally left blank.

90

Page 95:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

DocuSign Envelope lD: 7€Bl3E98-8C78-460F-8783-51420993DE28

POAlamo Area

Metropol itan Plan ning OrganizationProject Selection Procedures -FY 2021

tn accordance with Section 134(hX2) of Title 23 U.S.C. as amended and Section 8(hX2)

of 4g U.S.C. '1601 as amended, the Alamo Area Metropolitan Planning Organization(MPO) Transportation Policy Board hereby approves the following Project SelectionProcedures:

1) The approved Transportation lmprovement Program shall be utilized forprogramming projects within the metropolitan planning area.

2l Any project listed in the first year of the approved Transportation lmprovementProgram shall be considered in the first priority and may be implemented as soonas plans are completed and funds are appropriated.

3) Should any projects not be implementable from the first priority, then projects

should be selected from the second, third or fourth years which shall be

considered the second priority, and those projects may be implemented as plans

are completed and funds are appropriated'

4l Any projects listed in the second, third or fourth year of the Transportationlmprovement Program may be accelerated to the first year of the Transportationlmprovement Program as soon as plans are complete, including right-of-way and

utility adjustments, and funding is available.

5) Projects with "statewide" or "grouped" CSJs will be implemented as outlined in

the MPO's Policy 6: Guidelines for Programming Projects in the Transportationlmprovement Program,

This procedure was developed cooperatively between the Texas Department ofTransportation, VIA Metropolitan Transit and the MPO, signed this the 27th day of

Kevin WolffChairMPO Transportation PolicY Board

ArndtPresidenUOEOVIA Metropolitan Transit

tttnno K. P.€.E

San Antonio District EngineerTexas Department of Transportation

91

Page 96:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

Alamo Area Metropolitan Planning Organization

This page intentionally left blank.

92

Page 97:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

FY 2021 – 2024 Transportation Improvement Program

Appendix B

Alphabetical Listing of Roadway, Bicycle,

Pedestrian and Rideshare Projects

93

Page 98:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

Alamo Area Metropolitan Planning Organization

This page intentionally left blank.

94

Page 99:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

MPO Project Number

Project NameLimits From:

Project Description

FY 2021-2024 Transportation Improvement Program

Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

To: Construction Cost

Fiscal YearTxDOT Project Number Responsible Agency

5303.1

Alamo Area Commute Solutions Program

Alamo Area MPO: Bexar, Comal Guadalupe & partial Kendall County $100,000

FYAlamo Area Commute Solutions Pgm - FY 2022

0915-00-197 AAMPO

2022

7/2020 C None

5303.2

Alamo Area Commute Solutions Program

Alamo Area MPO: Bexar, Comal Guadalupe & partial Kendall County $100,000

FYAlamo Area Commute Solutions Pgm - FY 2023

0915-00-216 AAMPO

2023

7/2020 C None

5303.3

Alamo Area Commute Solutions Program

Alamo Area MPO: Bexar, Comal Guadalupe & partial Kendall County $100,000

FYAlamo Area Commute Solutions Pgm - FY 2024

0915-00-217 AAMPO

2024

7/2020 C None

5423.0

Alamo/Commerce/Losoya Intersection

Commerce Market $2,000,000

FYClose Alamo Street to vehicle traffic

0000-00-000 CoSA

2021

7/2020 C None

5317.0

Blanco Road West Oak Estates Borgfeld Rd $14,661,235

FYExpand from a 2 to 4 lane divided roadway with raised median, bike lanes, sidewalks, curbs and drainage0915-12-585 ARMA

2021

7/2020 C None

5313.0

Broadway Burr Road IH 35 $14,000,000

FYReduce from 6 to 4 travel lanes; roadway rehabilitation, bicycle and pedestrian facilities

0016-08-034 CoSA

2021

7/2020 C Road diet project

5535.0

Broadway New Braunfels St. Burr Road $14,000,000

FYRoadway rehabilitation and reduce travel lanes from 6 to 4 lanes, bicycle and pedestrian facilities

0016-08-041 TxDOT

2024

7/2020 C Road diet project

5408.1

Bulverde Road Briar Crest North of Quiet Meadow Street $9,700,000

FYExpand from 2 lanes and CTL to 4 lanes and CTL

0000-00-000 CoSA

2021

7/2020 C None

3988.0

Bulverde Road Marshall Road Wilderness Oak $8,097,480

FYReconstruct and expand from 2 to 4 lanes with shoulder, pedestrian ramps, curb, bridge construction and drainage improvements0915-12-509 BxCo

2021

7/2020 C None

5318.0

Crestway Road Kitty Hawk Rd FM 1976 $7,791,571

FYReconstruct to provide operational improvements including bike lanes and sidewalks

0915-12-584 BxCo

2022

7/2020 C None

4971.0

FM 1103 Comal C/L Rodeo Way $37,500,000

FYExpand from 2 to 4 lanes with medians, turn lanes, sidewalk and bike lanes

1268-02-027 TxDOT

2021

7/2020 C None

95

Page 100:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

MPO Project Number

Project NameLimits From:

Project Description

FY 2021-2024 Transportation Improvement Program

Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

To: Construction Cost

Fiscal YearTxDOT Project Number Responsible Agency

4970.0

FM 1103 IH 35 Guadalupe County Line $2,000,000

FYExpand from 2 to 4 lanes with medians, turn lanes, sidewalk and bike lanes

1268-01-013 TxDOT

2021

7/2020 C None

5379.0

FM 1516 FM 78 IH 10 $23,500,000

FYExpand from 2 to 4 lane divided with bike lanes and sidewalks

1477-01-043 TxDOT

2022

7/2020 C None

5379.2

FM 1516 FM 78 IH 10 $11,905,500

FYExpand from 2 to 4 lane divided with bike lanes and sidewalks

1477-01-043 TxDOT

2021

7/2020 E,R None

5309.0

FM 1518 FM 78 IH 10 E $44,780,000

FYExpand from 2 to 4 lanes with raised median or center turn lane, bike lanes and sidewalks

0465-02-027 TxDOT

2023

7/2020 C None

5309.2

FM 1518 FM 78 IH 10 E $8,194,000

FYExpand from 2 to 4 lanes with raised median or center turn lane, bike lanes and sidewalks

0465-02-027 TxDOT

2022

7/2020 R None

5309.3

FM 1518 FM 78 IH 10 E $2,194,000

FYExpand from 2 to 4 lanes with raised median or center turn lane, bike lanes and sidewalks

0465-02-027 TxDOT

2021

7/2020 E None

5311.0

FM 1560 FM 471 Galm/Shaenfield $12,100,000

FYExpand from 2 to 4 lanes with raised median, or center turn lane, bike lanes and sidewalks

2230-01-020 TxDOT

2022

7/2020 C None

5311.2

FM 1560 FM 471 Galm/Shaenfield $13,467,333

FYExpand from 2 to 4 lanes with raised median, or center turn lane, bike lanes and sidewalks

2230-01-020 TxDOT

2021

7/2020 E,R None

5391.0

FM 1560 Galm/Shaenfield SH 16 $19,750,000

FYExpand from 2 lanes to 4 lanes with turn lanes, bike accommodation and sidewalks

2230-01-021 TxDOT

2023

7/2020 C None

5391.2

FM 1560 Galm/Shaenfield SH 16 $11,800,000

FYExpand from 2 lanes to 4 lanes with turn lanes, bike accommodation and sidewalks

2230-01-021 TxDOT

2022

7/2020 R None

5391.3

FM 1560 Galm/Shaenfield SH 16 $1,900,000

FYExpand from 2 lanes to 4 lanes with turn lanes, bike accommodation and sidewalks

2230-01-021 TxDOT

2021

7/2020 E None

96

Page 101:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

MPO Project Number

Project NameLimits From:

Project Description

FY 2021-2024 Transportation Improvement Program

Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

To: Construction Cost

Fiscal YearTxDOT Project Number Responsible Agency

9115.0

FM 2252 Bexar/Comal County Line FM 3009 $21,700,000

FYExpand from 2 lanes to 4 lanes with raised median or continuous left turn lane, bike lanes and sidewalk

1433-02-044 TxDOT

2023

7/2020 C None

5329.0

FM 2252 Evans Road Comal/Bexar County Line $500,000

FYExpand from 2 lanes to 4 lanes with raised median or continuous left turn lane, bike lanes and sidewalk

1433-01-028 TxDOT

2023

7/2020 C None

5329.2

FM 2252 Evans Road Comal/Bexar County Line $50,000

FYExpand from 2 lanes to 4 lanes with raised median or continuous left turn lane, bike lanes and sidewalk

1433-01-028 TxDOT

2021

7/2020 E None

5541.0

FM 3351 at Cibolo Creek . $11,900,000

FYReconstruct existing bridge and expand from 2 to 6 lanes

3212-05-013 TxDOT

2024

7/2020 C Approaches remain 2 lanes

5378.0

FM 471 Medina County Line SH 211 $375,000

FYExpand from 2 to 4 lane divided with bike lanes and sidewalks

0849-02-045 TxDOT

2022

7/2020 C None

5377.0

FM 471 Old FM 471 Medina County Line $21,000,000

FYExpand from 2 to 4 lane divided with bike lanes and sidewalks

0849-01-055 TxDOT

2022

7/2020 C None

5377.2

FM 471 Old FM 471 Medina County Line $4,620,000

FYExpand from 2 to 4 lane divided with bike lanes and sidewalks

0849-01-055 TxDOT

2021

7/2020 E, R None

5308.0

FM 725 Zipp Rd County Line Road $10,600,000

FYExpand from 2 to 4 lanes with median, sidewalks and bike lanes

0215-09-029 TxDOT

2023

7/2020 C None

5407.0

Fredericksburg Road N. Flores Woodlawn $5,300,000

FYReduce from 4 to 2 lanes, upgrade drainage, add new traffic signals and provide sidewalks

0000-00-000 CoSA

2021

7/2020 C Road diet project

5105.0

Galm Road Ph III Culebra Road Government Canyon State Park $7,323,351

FYExpand from 2 to 4 lanes, including drainage improvements, bike & pedestrian amenities

0915-12-544 BxCo

2021

7/2020 C None

3992.0

Huebner Creek Hike/Bike Trail SH 16 (Bandera Road) bridge Crystal Hills Park $933,000

FYConstruction of a hike and bike trail along Huebner Creek

0915-12-514 LV

2021

7/2020 C None

97

Page 102:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

MPO Project Number

Project NameLimits From:

Project Description

FY 2021-2024 Transportation Improvement Program

Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

To: Construction Cost

Fiscal YearTxDOT Project Number Responsible Agency

5556.0

IH 10 al Loop 1604 - $279,400,000

FYConstruct Direct Connectors - 1 lane DC - NB 10 to EB 1604; EB 1604 to NB 10; SB 10 to WB 1604; WB 1604 to SB 10;0072-08-144 TxDOT

2022

7/2020 C 2 lane - NB 10 to WB 1604; EB 1604 to SB 10; SB 10 to EB 1604 & WB 1604 to NB 10

5395.0

IH 10 Bexar/Guadalupe County Line FM 465 $150,000,000

FYExpand from 4 lane to 6 lane expressway and from 4 to 4 FR lanes

0025-03-097 TxDOT

2022

7/2020 C Move from MTP to TIP; no impact to conformity; see companion project #4008

5385.0

IH 10 FM 464 SH 123 $200,000,000

FYExpand from 4 lane to 6 lane expressway and from 4 to 4 FR lanes

0535-01-074 TxDOT

2022

7/2020 C See also 0535-01-077 and 0535-01-078 as spin offs to original project

5401.2

IH 10 Kendall/Bexar County Line FM 3351 $12,900,000

FYExpand from 4 to 8 lane expressway - 2 new general purpose, 2 new HOV lanes & from 4 to 4 FR lanes

0072-07-075 TxDOT

2023

7/2020 E None

5553.0

IH 35 at FM 725 - $6,000,000

FYIntersection operational improvements including turn lanes

0016-05-120 TxDOT

2021

7/2020 C None

4013.0

IH 35 Bexar/Guadalupe County Line FM 3009 $150,000,000

FYExpand from 8 ln to 14 ln expy - add 6 new express lanes, including 2 HOV-Special Use lanes; from 4 to 4 FR lanes0016-06-047 TxDOT

2021

7/2020 C,E None

3477.0

IH 35 IH 410 N Guadalupe/Bexar County Line $815,000,000

FYExpand from 8 ln to 14 ln expy - add 6 new express lanes incl 2 HOV-special use lns, & from 4/6 to 4/6 FR lanes & DCs at IH 410N & LP 16040016-07-113 TxDOT

2021

7/2020 C,E 1 lane DC: NB 35 to WB 1604; EB 1604 to SB 35; 2 lane DC: SB 35 to WB 1604; EB 1604 to NB 35; EB 410N to NB 35;SB 35 to WB 410N

61.2

IH 35 North IH 410 S IH 410 N $638,700,000

FYExpand from 8 ln to 14 ln expy - add 6 new express lanes incl 2 HOV-special use lns, & from 4/6 to 4/6 FR lanes & DCs at IH 410 S & IH 410 N0017-10-168 TxDOT

2022

7/2020 C,E 1 lane DC: NB 35 to WB 410N; 2 lane DC: NB 410S to NB 35; SB 35 to SB 410S; EB 410N to SB 35

5542.0

IH 410 Old Pearsall Road Valley Hi Drive $19,100,000

FYOperational improvements, including ramp revisions, intersection improvements and reconstruct frontage roads0521-05-148 TxDOT

2021

5/2020 C May 2020 revision to FY 2019-2022 TIP; also included in FY 2021-2023 TIP

5574.1

ITS (CoSA) . . $1,000,000

FYInstall ITS equipment on congested corridors in the City of San Antonio - FY 2020

0915-12-668 CoSA

2021

7/2020 C None

5574.2

ITS (CoSA) . . $1,000,000

FYInstall ITS equipment on congested corridors in the City of San Antonio - FY 2021

0915-12-674 CoSA

2021

7/2020 C None

98

Page 103:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

MPO Project Number

Project NameLimits From:

Project Description

FY 2021-2024 Transportation Improvement Program

Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

To: Construction Cost

Fiscal YearTxDOT Project Number Responsible Agency

5570.0

ITS (TxDOT) Various locations on IH 35 S and IH 37 S $5,400,000

FYInstall ITS equipment on IH 35 South and IH 37 South Corridors

0915-12-664 TxDOT

2021

7/2020 C None

5540.0

ITS Enhancements Citywide . $4,500,000

FYImplement communication network improvements

0915-12-615 CoSA

2023

7/2020 C None

5332.0

Loop 1604 at FM 2696 - Blanco Road . $40,600,000

FYIntersection operational improvements including construction of a diverging diamond interchange (DDI)

2452-02-117 TxDOT

2021

7/2020 C None

9110.2

Loop 1604 Macdona-Lacoste Rd US 90 W $40,000,000

FYExpand from 2 lanes to 4 lanes divided

2452-01-066 TxDOT

2022

7/2020 C None

9110.4

Loop 1604 Macdona-Lacoste Rd US 90 W $8,800,000

FYExpand from 2 lanes to 4 lane divided

2452-01-066 TxDOT

2021

7/2020 E,R None

3530.2

Loop 1604 Redland Road IH 35 North $23,000,000

FYExpand from 4 to 10 lane expressway - including 2 HOV - special use lanes & from 4 to 4 FR lanes

2452-03-087 TxDOT

2023

7/2020 E None

3913.0

Loop 1604 SH 16 IH 10 $185,500,000

FYExpand from 4 to 10 lane expressway - including 2 HOV-special use lanes, & from 4 to 4 FR lanes

2452-02-083 TxDOT

2021

7/2020 C Reference #4049 and #5556

3786.0

Loop 1604 US 281 Redland Road $58,000,000

FYExpand from 4 to 10 lane expressway - including 2 HOV - special use lanes & from 4 to 4 FR lanes

2452-03-113 TxDOT

2024

7/2020 C None

3786.2

Loop 1604 US 281 Redland Road $9,400,000

FYExpand from 4 to 10 lane expressway - including 2 HOV - special use lanes & from 4 to 4 FR lanes

2452-03-113 TxDOT

2022

7/2020 E,R None

5371.0

Loop 410 at IH 10 E . $100,000,000

FYConstruct direct connectors: Phase 1 - Priority Connectors - NB 410 to EB 10; WB 10 to SB 410

0521-06-138 TxDOT

2021

7/2020 C None

5376.0

Loop 410 at US 281/San Pedro . $70,000,000

FYOperational improvements to include direct connector improvement from US 281 to IH 410 WB ; ramp revisions, frontage road and intersection improvements0521-04-285 TxDOT

2023

7/2020 C None

99

Page 104:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

MPO Project Number

Project NameLimits From:

Project Description

FY 2021-2024 Transportation Improvement Program

Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

To: Construction Cost

Fiscal YearTxDOT Project Number Responsible Agency

5577.1

Make UTSA Walkable Program . . $129,225

FYMake UTSA Walkable Program. Support UTSA's efforts to establish programs to increase alternate forms of transportation. FY 20200915-12-671 UTSA

2021

7/2020 C None

5577.2

Make UTSA Walkable Program . . $129,225

FYMake UTSA Walkable Program. Support UTSA's efforts to establish programs to increase alternate forms of transportation. FY 20210915-12-678 UTSA

2021

7/2020 C None

5577.3

Make UTSA Walkable Program . . $129,225

FYMake UTSA Walkable Program. Support UTSA's efforts to establish programs to increase alternate forms of transportation. FY 20220915-12-684 UTSA

2022

7/2020 C None

5572.0

Medical Center Green Street On Hamilton Wolfe and Ewing Halsell $6,000,000

FYConstruct cycle track on Hamilton Wolff Rd from Babcock to Ewing Halsell. And on Ewing Halsell from Hamilton Wolff to Sid Katz0915-12-666 CoSA

2022

7/2020 C None

5545.1

Mobility Corridor Planning Various . $1,000,000

FYMultimodal planning study on one arterial to accommodate travel modes including higher capacity transit

0915-12-609 CoSA

2021

7/2020 C None

5545.2

Mobility Corridor Planning Various . $3,000,000

FYMultimodal planning study on three arterials to accommodate travel modes including higher capacity transit0915-12-611 CoSA

2021

7/2020 C None

5414.0

North Main Avenue & Soledad Street

Pecan Street Navarro Street $6,000,000

FYReduce from 7 to 4 travel lanes with CTL, bike lanes, sidewalks and traffic circle at Navarro

0000-00-000 CoSA

2021

7/2020 C Road diet project

5409.0

North New Braunfels Avenue E. Houston Street Burleson $4,500,000

FYReduce from 4 travel lanes to 2 travel lanes with a CTL and sidewalks

0000-00-000 CoSA

2021

7/2020 C Road diet project

5323.0

NW Military Highway Lp 1604 Huebner Road $9,600,000

FYConstruct 2 way left turn lane, bike lanes and sidewalks

0658-01-045 TxDOT

2021

5/2020 C May 2020 revision to FY 2019-2022 TIP; also included in FY 2021-2023 TIP

5434.0

Presa Street West Boyer Street SE Military Drive (Loop 13) $10,000,000

FYBike and Pedestrian Corridor enhancements to implement Complete Streets

0915-12-604 CoSA

2021

7/2018 C 2 travel lanes throughout the corridor

5410.0

Rittiman Road IH 35 Castle Cross Drive $2,100,000

FYExtend right turn lane from Rittiman to IH 35

0000-00-000 CoSA

2021

7/2020 C None

100

Page 105:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

MPO Project Number

Project NameLimits From:

Project Description

FY 2021-2024 Transportation Improvement Program

Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

To: Construction Cost

Fiscal YearTxDOT Project Number Responsible Agency

5319.0

Rocket Lane E. Norris Drive Loop 1604 $5,430,481

FYExpand from 2 to 4 lane roadway with continuous center turn lane, sidewalks and bike lane/multi-use path0915-12-582 Converse

2021

7/2020 C None

5536.2

Roosevelt Avenue Bike & Ped Improvements

. . $2,000,000

FYConstruct bicycle and pedestrian bridge

0253-06-037 CoSA

2021

7/2020 C None

5322.0

Rudeloff Road SH 46 Huber Road $6,316,658

FYExpand from 2 to 4 lanes with center turn lane, bicycle and pedestian facilities

0915-46-045 Seguin

2021

7/2020 C None

5533.0

Rudeloff Road Huber Road SH 123 (at FM 20) $12,000,000

FYConstruct new alignment 4 lane roadway (0 to 4 lanes) with center left turn lane, bicycle and pedestrian facilities0915-46-049 Seguin

2024

7/2020 C None

5544.1

San Antonio Region Safety Service Patrol

Various locations within Bexar, Comal and Kendall Counties $2,500,000

FYSafety Service Patrol on controlled access highways in Bexar, Comal and Kendall Counties-FY 2019

0915-00-212 TxDOT

2021

7/2020 C None

5544.2

San Antonio Region Safety Service Patrol

Various locations within Bexar, Comal and Kendall Counties $5,500,000

FYSafety Service Patrol on controlled access highways in Bexar, Comal and Kendall Counties-FY 2020

0915-00-213 TxDOT

2021

7/2020 C None

5544.3

San Antonio Region Safety Service Patrol

Various locations within Bexar, Comal and Kendall Counties $5,500,000

FYSafety Service Patrol on controlled access highways in Bexar, Comal and Kendall Counties-FY 2021

0915-00-214 TxDOT

2021

7/2020 C None

5579.0

San Antonio Region Safety Service Patrol

Various locations within Bexar, Comal and Kendall Counties $5,500,000

FYSafety service patrol on controlled access highways in Bexar, Comal and Kendall Counties

0915-00-227 TxDOT

2022

7/2020 C None

5536.1

San Pedro Various locations along San Pedro . $1,000,000

FYConstruct sidewalks and pedestrian infrastructure

0915-12-610 CoSA

2021

7/2020 C None

5415.0

Santa Rosa Street Cesar Chavez Blvd Martin Street $8,500,000

FYReduce from 6 lanes with CTL to 4 lanes with CTL, bike accommodation and sidewalks

0000-00-000 CoSA

2021

7/2020 C Road diet project

4975.0

Schertz Pedestrian and Bike Improvements

Woodland Oaks Drive, Savannah Drive, a Live Oak Road and off road trail $1,158,266

FYConstruct sidewalks, bike lanes and off-road trail

0915-46-050 Schertz

2021

7/2020 C None

101

Page 106:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

MPO Project Number

Project NameLimits From:

Project Description

FY 2021-2024 Transportation Improvement Program

Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

To: Construction Cost

Fiscal YearTxDOT Project Number Responsible Agency

5382.0

SH 151 LP 1604 IH 410 $80,000,000

FYExpand from 4 lane to 6 lane expressway and from 4/6 to 4/6 FR lanes including WB SH 151 to NB LP 1604 2 lane direct connector3508-01-029 TxDOT

2022

7/2020 C None

5571.0

SH 16 0.3 Mi West of FM 1560/Leslie Rd LP 1604 $8,600,000

FYOperational improvements including implementation of median U-turns and R-cut intersections

0291-10-114 TxDOT

2022

7/2020 C None

3152.0

SH 211 (TX Research Pkwy) Bexar CL, 2.0 MI S of FM 471, N FM 471 (Culebra Rd) $4,400,000

FYConstruct two lane rural highway on new location

3544-03-002 BxCo

2021

7/2020 C None

3155.0

SH 211 (TX Research Pkwy) Bexar C/L, 2.9 MI N of FM 1957, N Bexar C/L, 4.5 MI N of FM 1957 $4,100,000

FYConstruct two lane rural highway on new location

3544-06-001 BxCo

2021

7/2020 C None

3153.0

SH 211 (TX Research Pkwy) FM 1957 (Potranco Rd), N 2.9 Mi Medina County Line $7,000,000

FYConstruct two lane rural highway on new location

3544-04-002 BxCo

2021

7/2020 C None

3154.0

SH 211 (TX Research Pkwy) Medina Co. Line, 4.5 Mi N of FM 1957, N Medina Co. Line, 2.0 Mi S of FM 471 $2,600,000

FYConstruct two lane rural highway on new location

3544-05-001 BxCo

2021

7/2020 C None

9114.1

SH 46 Farhills Dr US 281 $26,000,000

FYExpand from 2 lanes to 6 lanes with raised median or CLTL

0215-07-027 TxDOT

2022

7/2020 C None

9114.2

SH 46 US 281 Bentwood Dr $14,000,000

FYExpand from 2 lanes to 6 lanes with raised median or CLTL

0215-01-044 TxDOT

2022

7/2020 C None

9107.2

SL 1604 FM 78 IH 10 East $47,500,000

FYExpand from 4 lane divided to 4 lane expressway and from 0 to 4 FR lanes

2452-03-111 TxDOT

2023

7/2020 E,R None

4049.0

SL 1604 IH 10 US 281 $187,800,000

FYExpand from 4 to 10 lane expressway - including 2 HOV - special use lanes & from 4 to 4 frontage roads

2452-02-128 TxDOT

2021

7/2020 C 10/19 - add project; spin off of 2452-02-083 (MPO #3913); no impact to conformity

4049.2

SL 1604 IH 10 US 281 $18,800,000

FYExpand from 4 to 10 lane expressway - including 2 HOV - special use lanes & from 4 to 4 frontage roads

2452-02-128 TxDOT

2021

7/2020 E 10/19 - add project (E); spin off of 2452-02-083 (MPO #3913); no impact to conformity

102

Page 107:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

MPO Project Number

Project NameLimits From:

Project Description

FY 2021-2024 Transportation Improvement Program

Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

To: Construction Cost

Fiscal YearTxDOT Project Number Responsible Agency

5554.2

SL 1604 Martinez Creek FM 1346 - Houston Street $588,000

FYExpand from 2 lanes to 4 lanes divided

2452-04-017 TxDOT

2023

7/2020 E None

5416.0

South Alamo Street Market Street Cesar Chavez Blvd $9,000,000

FYReduce from 6 lanes with CTL to 4 lanes with CTL, bike accommodation and sidewalks

0000-00-000 CoSA

2021

7/2020 C Road diet project

5304.0

Talley Road Wiseman Blvd. Tamaron Pass $20,917,924

FYExpand from 2 lane to 4 lane divided roadway with medians, curbs, bicycle facilities, pedestrian improvements, operational improvements and drainage0915-12-581 BxCo

2021

7/2020 C None

5575.1

TDM Program . . $250,000

FYCity of San Antonio Travel Demand Management Program. To support efforts in vanpool, carpool, telecommuting and education. FY 20200915-12-669 CoSA

2021

7/2020 C None

5575.2

TDM Program . . $250,000

FYCity of San Antonio Travel Demand Management Program. To support efforts in vanpool, carpool, telecommuting and education. FY 20210915-12-676 CoSA

2021

7/2020 C None

5575.3

TDM Program . . $250,000

FYCity of San Antonio Travel Demand Management Program. To support efforts in vanpool, carpool, telecommuting and education. FY 20220915-12-682 CoSA

2022

7/2020 C None

5578.0

Traffic Incident Management Program

in Bexar County . $75,000

FYTraffic Incident Management Training Program

0915-12-665 TxDOT

2021

7/2020 C None

5573.1

Traffic Signal Optimization . . $1,500,000

FYTraffic signal optimization on congested corridors in the City of San Antonio. Data collection and implementation of updated signal timing plans. FY 20200915-12-667 CoSA

2021

7/2020 C None

5573.2

Traffic Signal Optimization . . $1,500,000

FYTraffic signal optimization on congested corridors in the City of San Antonio. Data collection and implementation of updated signal timing plans. FY 20210915-12-675 CoSA

2021

7/2020 C None

5573.3

Traffic Signal Optimization . . $1,500,000

FYTraffic signal optimization on congested corridors in the City of San Antonio. Data collection and implementation of updated signal timing plans. FY 20220915-12-681 CoSA

2022

7/2020 C None

5381.0

US 90 0.8 Miles W of IH 410 IH 410 $10,000,000

FYExpand from 4 lane divided to 6 lane expressway and from 4 to 4 FR lanes

0024-08-138 TxDOT

2024

7/2020 C None

103

Page 108:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

MPO Project Number

Project NameLimits From:

Project Description

FY 2021-2024 Transportation Improvement Program

Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

To: Construction Cost

Fiscal YearTxDOT Project Number Responsible Agency

5381.2

US 90 0.8 Miles W of IH 410 IH 410 $890,000

FYExpand from 4 lane divided to 6 lane expressway and from 4 to 4 FR lanes

0024-08-138 TxDOT

2022

7/2020 E None

5381.3

US 90 0.8 Miles W of IH 410 IH 410 $1,000,000

FYExpand from 4 lane divided to 6 lane expressway and from 4 to 4 FR lanes

0024-08-138 TxDOT

2023

7/2020 R None

5380.0

US 90 SH 211 0.8 Miles W of IH 410 $110,000,000

FYExpand from 4 lane divided to 6 lane expressway and 4 FR lanes (LP 1604 to SH 211)

0024-07-059 TxDOT

2024

7/2020 C None

5380.2

US 90 SH 211 0.8 Miles W of IH 410 $12,408,000

FYExpand from 4 lane divided to 6 lane expressway and 4 FR lanes (LP 1604 to SH 211)

0024-07-059 TxDOT

2022

7/2020 E None

5380.3

US 90 SH 211 0.8 Miles W of IH 410 $7,500,000

FYExpand from 4 lane divided to 6 lane expressway and 4 FR lanes (LP 1604 to SH 211)

0024-07-059 TxDOT

2023

7/2020 R None

5305.0

VA In City of San Antonio . $2,000,000

FYConstruct citywide pedestrian and bicycle improvements

0915-12-579 CoSA

2021

7/2020 C None

5306.0

VA In City of San Antonio . $1,500,000

FYIntelligent Transportation System - Enhancements to include controller hardware and software and CCTV cameras0915-12-580 CoSA

2021

7/2020 C None

5316.1

VA Various locations on the state roadway s . $4,000,000

FYConstruct curb ramps, sidewalks and other pedestrian related infrastructure

0915-12-574 TxDOT

2023

7/2020 C None

5316.2

VA Various locations on the state roadway s . $4,000,000

FYConstruct curb ramps, sidewalks and other pedestrian related infrastructure

0915-12-575 TxDOT

2023

7/2020 C None

5316.3

VA Various locations on the state roadway s . $7,073,444

FYConstruct curb ramps, sidewalks and other pedestrian related infrastructure

0915-12-576 TxDOT

2022

7/2020 C None

5576.1

Vehicle Emissions Reductions Programs

. . $150,000

FYCity of San Antonio Vehicle Emissions Reductions Program. Series of targeted outreach and education programs. Gas cap replacement program. FY 20200915-12-670 CoSA

2021

7/2020 C None

104

Page 109:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

MPO Project Number

Project NameLimits From:

Project Description

FY 2021-2024 Transportation Improvement Program

Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

To: Construction Cost

Fiscal YearTxDOT Project Number Responsible Agency

5576.2

Vehicle Emissions Reductions Programs

. . $150,000

FYCity of San Antonio Vehicle Emissions Reductions Program. Series of targeted outreach and education programs. Gas cap replacement program. FY 20210915-12-677 CoSA

2021

7/2020 C None

5576.3

Vehicle Emissions Reductions Programs

. . $150,000

FYCity of San Antonio Vehicle Emissions Reductions Program. Series of targeted outreach and education programs. Gas cap replacement program. FY 20220915-12-683 CoSA

2022

7/2020 C None

5581.2

VIA Bus Frequency Program . . $2,181,429

FYVIA Bus Frequency Program. Increase service on #7 and #552 routes. FY 2021

0915-12-680 VIA

2021

7/2020 T None

5581.3

VIA Bus Frequency Program . . $2,181,427

FYVIA Bus Frequency Program. Increase service on #7 and #552 routes. FY 2022

0915-12-686 VIA

2022

7/2020 T None

5580.2

VIA Fleet Replacement . . $7,553,334

FYVIA Fleet Replacement Program. Purchase 14 CNG buses. FY 2021

0915-12-679 VIA

2021

7/2020 T None

5580.3

VIA Fleet Replacement . . $7,553,332

FYVIA Fleet Replacement Program. Purchase 14 CNG buses. FY 2022

0915-12-685 VIA

2022

7/2020 T None

4976.0

Walnut Springs Trail Extension Project

Vaughan Bridge Max Starcke Park East $2,801,246

FYExtend Walnut Springs multi use trail, including retaining walls, hand and guard rails and below grade crossing0915-46-046 Seguin

2021

7/2020 C None

5106.0

Watson Road Somerset Road (FM 2790) 0.62 Mi E of Somerset Road $4,886,116

FYExpand from 2 to 4 lanes with traffic circle at Southwest Verano Parkway, multi-use path and drainage

0915-12-562 BxCo

2021

7/2020 C None

4974.0

Zarzamora Street Fredericksburg Road Loop 13 $5,000,000

FYConstruct sidewalks, remove unused utility poles, and implement pedestian detection ITS

0915-12-596 CoSA

2021

7/2020 C None

5538.0

Zarzamora/Frio City Road RR Overpass

US 90 Jennings $23,000,000

FYConstruct 4 lane grade separation at UPRR/Frio City Rd

0915-12-617 CoSA

2024

7/2020 C 4 lane underlying roadway remains

105

Page 110:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

MPO Project Number

Project NameLimits From:

Project Description

FY 2021-2024 Transportation Improvement Program

Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

To: Construction Cost

Fiscal YearTxDOT Project Number Responsible Agency

106

Page 111:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

FY 2021 – 2024 Transportation Improvement Program

APPENDIX C

“Grouped” or “Statewide” CSJ Project Listing

In cooperation with the Federal Highway Administration, the Texas Department of Transportation

developed statewide programs identified by statewide CSJs to maximize the provisions for grouping

projects that are not determined to be regionally significant in one line item, as allowed for in Title 23 USC

Section 135 Statewide Planning. A table of the eligible funding categories and corresponding CSJs can

be found in this section.

The use of statewide CSJs for these categories provides a more efficient method of programming and

letting projects and decreases the necessity for TIP/STIP revisions. By adopted policy, the Alamo Area

MPO will not have any Category 2 Metro Corridor or Category 7 Surface Transportation Block Grant

(formerly Surface Transportation Program – Metropolitan Mobility, STP-MM) projects listed in this section

of the TIP. Category 5 Congestion Mitigation and Air Quality Improvement Projects (CMAQ) will also not

be listed in this section. An illustrative listing of the grouped CSJ projects eligible to be let during the FY

2021-2024 timeframe can be found in this section. Grouped CSJ projects are financially constrained at

the state level.

107

Page 112:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

Alamo Area Metropolitan Planning Organization

This page intentionally left blank.

108

Page 113:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

109

Page 114:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

110

Page 115:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

MPO Proj. No

Project NameProject Limits From: and To:

Project Description

FY 2021-2024 Transportation Improvement Program

Grouped CSJ Projects Sorted by County and CSJ

Construction Cost

Fiscal YearCSJ

County

5690

$6,099,600

FYReplace bridge and approaches0016-08-039 2022

Bexar

SL 368 at Salado Creek and Ira Lee Rd .

N/ATravel Demand Model Network Years:ExemptStatus:BridgeType of Work:

5676

$641,213

FYInstall raised median, safety lighting, install pedestrian crosswalk0016-08-043 2022

Bexar

SL 368 Walzem Rd Corinne Rd

N/ATravel Demand Model Network Years:ExemptStatus:TSMO: SafetyType of Work:

5695

$210,480

FYSeal coat and pavement markings0017-01-026 2022

Bexar

SL 353 LP 13 IH 35

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5748

$13,116

FYSeal coat and pavement markings on SBFR0017-02-079 2023

Bexar

IH 35 IH 410 New Laredo Highway

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5752

$5,781,648

FYBase repair, mill, inlay and pavement markings0017-02-278 2024

Bexar

IH 35 Oussett Rd 0.3 Mi N of IH 410

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5753

$6,617,548

FYBase repair, mill, inlay and pavement markings0017-03-068 2024

Bexar

IH 35 0.42 Mi S of Kinney Rd Oussett Rd

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5754

$10,820,272

FYBase repair, mill, inlay and pavement markings0017-09-106 2024

Bexar

IH 35 0.3 Mi N of IH 410 W. Mayfield Dr

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5746

$88,732

FYSeal coat and pavement markings on NBFR0017-09-107 2023

Bexar

IH 35 IH 410 Somerset Rd

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5749

$71,245

FYSeal coat and pavement markings on SBFR0017-09-108 2023

Bexar

IH 35 New Laredo Highway Somerset Rd

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5678

$4,600,000

FYNB and SB bridge deck replacement0017-09-109 2022

Bexar

IH 35 at Division Ave .

N/ATravel Demand Model Network Years:ExemptStatus:BridgeType of Work:

5621

$5,544,380

FYPedestrian corridor enhancements with operational improvements at intersections (CoSA)0017-11-040 2021

Bexar

SS 536 Alamo St Steves Ave

N/ATravel Demand Model Network Years:ExemptStatus:TSMO: OperationalType of Work:

5677

$2,500,000

FYIntersection operational improvements including turn lanes and WB to EB turnaround0024-07-063 2022

Bexar

US 90 at Montgomery Rd .

N/ATravel Demand Model Network Years:ExemptStatus:TSMO: OperationalType of Work:

5654

$17,364,967

FYBase repair, mill, inlay and pavement markings0024-08-141 2022

Bexar

US 90 IH 410 SL 353

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5661

$1,000,000

FYBridge deck replacement and replace rocker bearings on EB and WB bridges0024-08-142 2022

Bexar

US 90 at Loop 13 (Military Dr) .

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

Note: This is an illustrative list only. These projects are not mapped and are not included in the financial summary.

111

Page 116:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

MPO Proj. No

Project NameProject Limits From: and To:

Project Description

FY 2021-2024 Transportation Improvement Program

Grouped CSJ Projects Sorted by County and CSJ

Construction Cost

Fiscal YearCSJ

County

5615

$41,290

FYInstall LED flashing chevrons (curve)0024-09-025 2021

Bexar

SS 371 0.318 Mi E of Cupples Rd 0.118 Mi E of Cupples Rd

N/ATravel Demand Model Network Years:ExemptStatus:SafetyType of Work:

5619

$292,716

FYInstall raised median0025-09-078 2021

Bexar

FM 78 2.611 Mi E of IH 410 3.368 Mi E of IH 410

N/ATravel Demand Model Network Years:ExemptStatus:TSMO: SafetyType of Work:

5725

$13,089,785

FYBase repair, mill, inlay and pavement markings0025-09-081 2023

Bexar

FM 78 IH 410 SL 1604

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5655

$8,084,213

FYBase repair, mill, inlay and pavement markings0072-08-143 2022

Bexar

SL 345 IH 10 Balcones Rd

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5630

$902,096

FYSafety lighting0073-02-074 2021

Bexar

US 281 IH 410 FM 1937

N/ATravel Demand Model Network Years:ExemptStatus:SafetyType of Work:

5605

$1,800,000

FYBike and pedestrian enhancements with operational improvements at intersections (CoSA)0073-02-076 2021

Bexar

SS 536 E. Ashley Rd IH 410

N/ATravel Demand Model Network Years:ExemptStatus:TSMO: OperationalType of Work:

5730

$124,139

FYSeal coat and pavement markings0073-02-077 2023

Bexar

US 281 LP 410 FM 1937

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5731

$5,921

FYSeal coat and pavement markings0073-02-078 2023

Bexar

SS 536 E. Ashley Rd LP 410

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5683

$400,000

FYRehabilitate and paint steel beams and deck replacement on SB bridge0073-02-079 2022

Bexar

US 281 at Medina River .

N/ATravel Demand Model Network Years:ExemptStatus:BridgeType of Work:

5717

$42,585

FYSeal coat and pavement markings on NBFR0073-09-035 2022

Bexar

IH 37 S Flores Rd San Antonio River

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5718

$108,486

FYSeal coat and pavement markings on NBFR0073-09-036 2022

Bexar

IH 37 San Antonio River Southton Rd

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5720

$62,825

FYSeal coat and pavement markings on SBFR0073-09-037 2022

Bexar

IH 37 0.82 MI S of Lp 1604 San Antonio River

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5721

$33,032

FYSeal coat and pavement markings on SBFR0073-09-038 2022

Bexar

IH 37 San Antonio River Donup Rd

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5722

$47,281

FYSeal coat and pavement markings on SBFR0073-09-039 2022

Bexar

IH 37 Donup Rd Southton Rd

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

Note: This is an illustrative list only. These projects are not mapped and are not included in the financial summary.

112

Page 117:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

MPO Proj. No

Project NameProject Limits From: and To:

Project Description

FY 2021-2024 Transportation Improvement Program

Grouped CSJ Projects Sorted by County and CSJ

Construction Cost

Fiscal YearCSJ

County

5601

$324,005

FYBase repair, mill, inlay and pavement markings0073-12-015 2021

Bexar

US 181 IH 37 SS 122

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5671

$1,003,030

FYImprove traffic signals, channelization0100-02-066 2022

Bexar

US 181 at Elmendorf-LaVernia Rd .

N/ATravel Demand Model Network Years:ExemptStatus:TSMO: SafetyType of Work:

5602

$6,569,716

FYBase repair, mill, inlay and pavement markings0100-02-067 2021

Bexar

US 181 Spur 122 Bexar/Wilson County Line

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5613

$342,756

FYImprove traffic signals and safety lighting at intersection0143-01-059 2021

Bexar

US 87 at Pecan Valley .

N/ATravel Demand Model Network Years:ExemptStatus:TSMO: SafetyType of Work:

5603

$2,765,766

FYBase repair, mill, inlay and pavement markings0143-01-060 2021

Bexar

US 87 Amanda St IH 410

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5631

$82,919

FYSeal coat and pavement markings0143-11-005 2021

Bexar

SL 106 US 87 E US 87 W

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5632

$16,662

FYSeal coat and pavement markings0143-12-005 2021

Bexar

SL 107 US 87 FM 3465

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5604

$8,300,000

FYBike and pedestrian enhancements with operational improvements at intersections (CoSA)0253-06-039 2021

Bexar

SS 536 Steves Ave E. Ashley Rd

N/ATravel Demand Model Network Years:ExemptStatus:TSMO: OperationalType of Work:

5733

$180,449

FYSeal coat and pavement markings0253-06-040 2023

Bexar

SS 536 LP 13 E Ashley Rd

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5607

$205,493

FYImprove traffic signals0291-10-113 2021

Bexar

SS 421 at Hillcrest .

N/ATravel Demand Model Network Years:ExemptStatus:TSMO: SafetyType of Work:

5635

$211,082

FYSeal coat and pavement markings0465-02-030 2021

Bexar

FM 1518 IH 10 FM 1346

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5672

$425,266

FYImprove traffic signals, safety lighting at intersection0521-01-055 2022

Bexar

SL 13 at FM 1346 .

N/ATravel Demand Model Network Years:ExemptStatus:TSMO: SafetyType of Work:

5679

$101,114

FYPedestrian hybrid beacon0521-02-041 2022

Bexar

SL 13 SL 353 Kelsey Ave

N/ATravel Demand Model Network Years:ExemptStatus:SafetyType of Work:

5657

$2,986,211

FYBase repair, mill, inlay and pavement markings0521-02-042 2022

Bexar

SL 13 SL 353 IH 35

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

Note: This is an illustrative list only. These projects are not mapped and are not included in the financial summary.

113

Page 118:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

MPO Proj. No

Project NameProject Limits From: and To:

Project Description

FY 2021-2024 Transportation Improvement Program

Grouped CSJ Projects Sorted by County and CSJ

Construction Cost

Fiscal YearCSJ

County

5658

$2,767,112

FYBase repair, mill, inlay and pavement markings0521-03-061 2022

Bexar

SL 13 Leon Creek SL 353

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5660

$3,626,536

FYBase repair, mill, inlay and pavement markings0521-05-151 2022

Bexar

IH 410 SH 16 FM 2790

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5724

$269,192

FYSeal coat and pavement markings on WBFR0521-05-153 2022

Bexar

IH 410 0.2 Mi S of US 281 SH 16

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5716

$269,192

FYSeal coat and pavement markings on EBFR0521-05-154 2022

Bexar

IH 410 0.2 Mi S of US 281 SH 16

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5727

$5,171,916

FYBase repair, mill, inlay and pavement markings0521-06-146 2023

Bexar

IH 410 FM 78 FM 1346 (Houston St)

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5723

$88,303

FYSeal coat and pavement markings on SBFR0613-01-066 2022

Bexar

SH 16 IH 410 Leon Creek

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5719

$92,583

FYSeal coat and pavement markings on NBFR0613-01-067 2022

Bexar

SH 16 IH 410 Leon Creek

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5662

$3,996,435

FYConstruct 2 lane grade separation over FM 4710849-01-053 2022

Bexar

FM 471 at SH 211 .

N/ATravel Demand Model Network Years:ExemptStatus:TSMO: SafetyType of Work:

5685

$586,704

FYReplace bridge and approach railing or add safety end treatment or replace guardfence0915-00-183 2022

Bexar

VA Various bridges on IH 35 in Bexar and Atascosa Counties

N/ATravel Demand Model Network Years:ExemptStatus:BridgeType of Work:

5686

$757,656

FYReplace bridge and approach railing or add safety end treatment or replace guardfence0915-00-184 2022

Bexar

VA Various bridges on IH 10 in Bexar and Kendall Counties

N/ATravel Demand Model Network Years:ExemptStatus:BridgeType of Work:

5620

$1,500,000

FYIntersection operational improvements0915-00-224 2021

Bexar

VA Various locations in Bexar County .

N/ATravel Demand Model Network Years:ExemptStatus:TSMO: OperationalType of Work:

5624

$5,837,642

FYRehab bridge and approaches0915-12-532 2021

Bexar

CS N. Walters St @ UPRR & Larry Street .

N/ATravel Demand Model Network Years:ExemptStatus:BridgeType of Work:

5687

$1,717,816

FYReplace bridge and approach railing or add safety end treatment or replace guardfence0915-12-552 2022

Bexar

VA Variuus bridges in IH 410 in Bexar County

N/ATravel Demand Model Network Years:ExemptStatus:BridgeType of Work:

5688

$261,256

FYReplace bridge and approach railing or add safety end treatment or replace guardfence0915-12-553 2022

Bexar

VA Varouns bridges on IH 35 and US 281 in Bexar County

N/ATravel Demand Model Network Years:ExemptStatus:BridgeType of Work:

Note: This is an illustrative list only. These projects are not mapped and are not included in the financial summary.

114

Page 119:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

MPO Proj. No

Project NameProject Limits From: and To:

Project Description

FY 2021-2024 Transportation Improvement Program

Grouped CSJ Projects Sorted by County and CSJ

Construction Cost

Fiscal YearCSJ

County

5689

$260,304

FYReplace bridge and approach railing or add safety end treatment or replace guardfence0915-12-554 2022

Bexar

VA Various bridges on IH 37 and IH 410 in Bexar County

N/ATravel Demand Model Network Years:ExemptStatus:BridgeType of Work:

5653

$102,140

FYSeal coat various roads, parking lots, and campsite pullouts within the park0915-12-563 2021

Bexar

VA Government Canyon State Natural Area

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5663

$280,191

FYImprove traffic signal0915-12-616 2022

Bexar

CS on Commercial at Harding Blvd .

N/ATravel Demand Model Network Years:ExemptStatus:TSMO: SafetyType of Work:

5617

$37,392

FYInstall pedestrian crosswalk0915-12-619 2021

Bexar

CS on Babcock from 0.1 Mi W of Snowden 0.1 MI E of Snowden Rd

N/ATravel Demand Model Network Years:ExemptStatus:TSMO: SafetyType of Work:

5627

$93,397

FYSafety lighting0915-12-621 2021

Bexar

CS on Broadway from Ridgecrest Dr Lawndale Dr

N/ATravel Demand Model Network Years:ExemptStatus:SafetyType of Work:

5664

$280,191

FYImprove traffic signals0915-12-624 2022

Bexar

CS on Castroville Rd at Cupples Rd .

N/ATravel Demand Model Network Years:ExemptStatus:TSMO: SafetyType of Work:

5608

$230,648

FYImprove traffic signals0915-12-625 2021

Bexar

CS on Commerce St at Hamilton Ave .

N/ATravel Demand Model Network Years:ExemptStatus:TSMO: SafetyType of Work:

5628

$159,500

FYSafety lighting0915-12-629 2021

Bexar

CS on Culebra Rd from Mira Vista Benrus Blvd

N/ATravel Demand Model Network Years:ExemptStatus:SafetyType of Work:

5694

$581,341

FYSafety treat fixed objects, construct a roundabout0915-12-630 2022

Bexar

CS on Fair Oaks Pkwy at Dietz Elkhorn .

N/ATravel Demand Model Network Years:ExemptStatus:TSMO: SafetyType of Work:

5609

$280,191

FYImprove traffic signals0915-12-631 2021

Bexar

CS on Flores St at Southcross Blvd .

N/ATravel Demand Model Network Years:ExemptStatus:TSMO: SafetyType of Work:

5616

$206,645

FYInstall LED flashing chevrons on curve, profile edgeline markings, profile centerline markings0915-12-636 2021

Bexar

CS on Green Mountain Rd from 0.21 Mi N of Loop 1604 to 0.56 Mi W of Evers Rd

N/ATravel Demand Model Network Years:ExemptStatus:SafetyType of Work:

5665

$280,191

FYImprove traffic signals0915-12-637 2022

Bexar

CS on Ingram Rd at Oakhill Rd .

N/ATravel Demand Model Network Years:ExemptStatus:TSMO: SafetyType of Work:

5666

$280,191

FYImprove traffic signals0915-12-638 2022

Bexar

CS on McCullough Ave at Brooklyn Ave .

N/ATravel Demand Model Network Years:ExemptStatus:TSMO: SafetyType of Work:

5667

$280,191

FYImprove traffic signals0915-12-639 2022

Bexar

CS on Military Dr at Westfield .

N/ATravel Demand Model Network Years:ExemptStatus:TSMO: SafetyType of Work:

Note: This is an illustrative list only. These projects are not mapped and are not included in the financial summary.

115

Page 120:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

MPO Proj. No

Project NameProject Limits From: and To:

Project Description

FY 2021-2024 Transportation Improvement Program

Grouped CSJ Projects Sorted by County and CSJ

Construction Cost

Fiscal YearCSJ

County

5668

$280,191

FYImprove traffic signals0915-12-641 2022

Bexar

CS on Nacogdoches Rd at Astronaut Dr .

N/ATravel Demand Model Network Years:ExemptStatus:TSMO: SafetyType of Work:

5669

$280,191

FYImprove traffic signals0915-12-642 2022

Bexar

CS on New Braunfels Ave at Claywell Dr/Eisenhauer Rd

N/ATravel Demand Model Network Years:ExemptStatus:TSMO: SafetyType of Work:

5614

$28,434

FYInstall advance warning signals and signs (curve), install chevron (curve)0915-12-647 2021

Bexar

CS on Prue Road from Shady Elms Westfirld Place

N/ATravel Demand Model Network Years:ExemptStatus:SafetyType of Work:

5610

$304,891

FYImprove traffic signals0915-12-648 2021

Bexar

CS on San Pedro Ave at Jackson Keller .

N/ATravel Demand Model Network Years:ExemptStatus:TSMO: SafetyType of Work:

5692

$485,003

FYSafety lighting0915-12-649 2022

Bexar

CS on San Pedro Ave from Rampart Dr Linda Dr

N/ATravel Demand Model Network Years:ExemptStatus:SafetyType of Work:

5611

$304,891

FYImprove traffic signals0915-12-650 2021

Bexar

CS on Santa Rosa at at Martin St .

N/ATravel Demand Model Network Years:ExemptStatus:TSMO: SafetyType of Work:

5675

$64,491

FYInstall intersection flashing beacon0915-12-651 2022

Bexar

CS on S Gevers St at Drexel .

N/ATravel Demand Model Network Years:ExemptStatus:SafetyType of Work:

5618

$49,885

FYInstall pedestrian signal, install pedestrian crosswalk0915-12-652 2021

Bexar

CS on New Braunfels Ave at Porter .

N/ATravel Demand Model Network Years:ExemptStatus:TSMO: SafetyType of Work:

5612

$280,191

FYImprove traffic signals0915-12-653 2021

Bexar

CS on Vance Jackson at Gardina St .

N/ATravel Demand Model Network Years:ExemptStatus:TSMO: SafetyType of Work:

5693

$620,766

FYSafety lighting0915-12-654 2022

Bexar

CS on W Commerce St from NW 36th St Gen McMullen Dr

N/ATravel Demand Model Network Years:ExemptStatus:SafetyType of Work:

5670

$280,191

FYImprove traffic signals0915-12-655 2022

Bexar

CS on Zarzamora St at Culberson Ave .

N/ATravel Demand Model Network Years:ExemptStatus:TSMO: SafetyType of Work:

5629

$196,679

FYSafety lighting0915-12-656 2021

Bexar

CS on Zarzamora from Whitman Ave SAS Dr

N/ATravel Demand Model Network Years:ExemptStatus:SafetyType of Work:

5606

$55,648

FYImprove pedestrian signals0915-12-659 2021

Bexar

CS on Fredericksburg Rd at Zarzamora .

N/ATravel Demand Model Network Years:ExemptStatus:SafetyType of Work:

5623

$68,948

FYPedestrian hybrid beacon0915-12-660 2021

Bexar

CS on Fredericksburg Rd from Vance Jackson Rd to Babcock Rd

N/ATravel Demand Model Network Years:ExemptStatus:SafetyType of Work:

Note: This is an illustrative list only. These projects are not mapped and are not included in the financial summary.

116

Page 121:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

MPO Proj. No

Project NameProject Limits From: and To:

Project Description

FY 2021-2024 Transportation Improvement Program

Grouped CSJ Projects Sorted by County and CSJ

Construction Cost

Fiscal YearCSJ

County

5622

$586,680

FYPedestrian corridor enhancements with operational improvements at intersections (CoSA)0915-12-662 2021

Bexar

CS Steves Ave IH 10/US 90 WB Frontage Road

N/ATravel Demand Model Network Years:ExemptStatus:TSMO: OperationalType of Work:

5680

$74,724

FYPedestrian hybrid beacon1433-01-031 2022

Bexar

FM 2252 O'Connor Rd El Charro St

N/ATravel Demand Model Network Years:ExemptStatus:SafetyType of Work:

5681

$82,034

FYPedestrian hybrid beacon1433-01-032 2022

Bexar

FM 2252 El Sendero St Schertz Rd

N/ATravel Demand Model Network Years:ExemptStatus:SafetyType of Work:

5707

$524,839

FYSeal coat and pavement markings1437-01-039 2022

Bexar

FM 1346 Foster Rd LP 1604

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5736

$18,418

FYSeal coat and pavement markings1479-02-005 2023

Bexar

FM 3499 FM 1937 Lp 1604

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5638

$100,930

FYSeal coat and pavement markings1540-01-010 2021

Bexar

FM 1628 LP 106 FM 3432

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5708

$69,949

FYSeal coat and pavement markings1548-02-006 2022

Bexar

FM 1303 LP 1604 Bexar/Wilson County Line

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5625

$3,624,726

FYRehabilitate and widen to add shoulders1741-02-036 2021

Bexar

FM 2790 Fischer Rd IH 410

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5639

$467,247

FYSeal coat and pavement markings1741-02-037 2021

Bexar

FM 2790 IH 410 0.25 Mi E of FM 476 (Somerset Lity Limits)

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5642

$666,494

FYSeal coat and pavement markings2020-02-034 2021

Bexar

SL 1604 SH 16 0.71 Mi N of FM 2536

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5643

$241,234

FYSeal coat and pavement markings2021-02-019 2021

Bexar

FM 1044 Comal/Guadalupe County Line FM 78

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5684

$5,051,097

FYRehabilitate existing roadway2104-02-038 2022

Bexar

FM 1957 Medina/Bexar County Line SH 211

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5739

$217,135

FYSeal coat and pavement markings2255-01-086 2023

Bexar

FM 1937 US 281 LP 1604

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5644

$550,528

FYSeal coat and pavement markings2255-02-029 2021

Bexar

SL 1604 FM 3432 San Antonio River

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

Note: This is an illustrative list only. These projects are not mapped and are not included in the financial summary.

117

Page 122:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

MPO Proj. No

Project NameProject Limits From: and To:

Project Description

FY 2021-2024 Transportation Improvement Program

Grouped CSJ Projects Sorted by County and CSJ

Construction Cost

Fiscal YearCSJ

County

5711

$68,989

FYSeal coat and pavement markings2255-03-007 2022

Bexar

FM 327 LP 1604 E LP 1604 W

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5740

$128,662

FYSeal coat and pavement markings2440-01-026 2023

Bexar

FM 2536 LP 1604 IH 410

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5741

$48,770

FYSeal coat and pavement markings2441-01-013 2023

Bexar

FM 2537 Pleasanton Road US 281

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5712

$237,871

FYSeal coat and pavement markings2442-01-009 2022

Bexar

FM 2538 IH 10 Bexar/Guadalupe County Line

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5647

$55,548

FYSeal coat and pavement markings2452-05-004 2021

Bexar

FM 3465 Loop 1604 N Loop 1604 South

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5646

$337,410

FYSeal coat and pavement markings2453-01-071 2021

Bexar

SL 1604 0.71 Mi N of FM 2536 US 90

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5649

$404,240

FYSeal coat and pavement markings3544-02-007 2021

Bexar

SH 211 SH 16 Bexar/Medina County Line

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5650

$286,005

FYSeal coat and pavement markings3544-04-010 2021

Bexar

SH 211 FM 1957 US 90

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5659

$4,311,911

FYBase repair, mill, inlay and pavement markings7774-01-003 2022

Bexar

PA 1502 FM 1535 (NW Military) US 281

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5745

$102,333

FYSeal coat and pavement markings on NBFR0016-05-122 2023

Comal

IH 35 Solms Rd Walnut St

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5747

$102,981

FYSeal coat and pavement markings on SBFR0016-05-123 2023

Comal

IH 35 Solms Rd Walnut St

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5728

$242,524

FYSeal coat and pavement markings0016-19-025 2023

Comal

FM 482 IH 35 FM 2252

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5697

$561,431

FYSeal coat and pavement markings0215-07-051 2022

Comal

SH 46 Kendall/Comal County Line Farhills Drive

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5698

$82,525

FYSeal coat and pavement markings0477-01-006 2022

Comal

PR 31 Park Entrance SH 46

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

Note: This is an illustrative list only. These projects are not mapped and are not included in the financial summary.

118

Page 123:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

MPO Proj. No

Project NameProject Limits From: and To:

Project Description

FY 2021-2024 Transportation Improvement Program

Grouped CSJ Projects Sorted by County and CSJ

Construction Cost

Fiscal YearCSJ

County

5636

$446,673

FYSeal coat and pavement markings0511-02-025 2021

Comal

RM 32 Blanco/Comal County Line Comal/Hays County Line

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5626

$469,200

FYReplace bridge and approaches0511-02-026 2021

Comal

RM 32 at Carper Creek .

N/ATravel Demand Model Network Years:ExemptStatus:BridgeType of Work:

5734

$151,217

FYSeal coat and pavement markings0857-01-038 2023

Comal

FM 306 FM 3424 0.85 Mi S of N Park Rd

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5691

$632,060

FYReplace bridge and approaches0915-17-070 2022

Comal

CS Landa Park Drive at Comal River

N/ATravel Demand Model Network Years:ExemptStatus:BridgeType of Work:

5703

$179,448

FYSeal coat and pavement markings1272-01-020 2022

Comal

FM 1101 FM 306 Comal/Guadalupe County Line

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5637

$154,957

FYSeal coat and pavement markings1273-01-038 2021

Comal

FM 1102 IH 35 Watson Ln

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5735

$94,885

FYSeal coat and pavement markings1433-02-048 2023

Comal

FM 2252 FM 482 FM 3009

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5761

$12,444,160

FYRehabilitate and widen existing narrow lanes and shoulders1541-01-016 2024

Comal

FM 311 US 281 FM 3159

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5709

$58,550

FYSeal coat and pavement markings1728-01-008 2022

Comal

FM 3424 RM 32 FM 306

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5737

$277,725

FYSeal coat and pavement markings1728-02-064 2023

Comal

FM 306 0.85 Mi S of N Park Road Greune Haven

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5645

$21,471

FYSeal coat and pavement markings2293-02-008 2021

Comal

FM 2439 Comal/Hays County Line FM 1102

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5755

$3,580,926

FYBase repair, mill, inlay and pavement markings2650-01-026 2024

Comal

FM 2673 Pegg Ranch (End of State Maintenance) FM 2722

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5714

$503,247

FYSeal coat and pavement markings2666-01-014 2022

Comal

RM 2722 FM 2673 SH 46

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5743

$520,735

FYSeal coat and pavement markings3107-01-044 2023

Comal

FM 3009 SH 46 FM 2252

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

Note: This is an illustrative list only. These projects are not mapped and are not included in the financial summary.

119

Page 124:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

MPO Proj. No

Project NameProject Limits From: and To:

Project Description

FY 2021-2024 Transportation Improvement Program

Grouped CSJ Projects Sorted by County and CSJ

Construction Cost

Fiscal YearCSJ

County

5648

$393,830

FYSeal coat and pavement markings3213-01-010 2021

Comal

FM 3159 FM 2673 SH 46

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5756

$2,179,740

FYBase repair, mill, inlay and pavement markings0025-03-100 2024

Guadalupe

UA 90 SH 46 SH 123B

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5757

$2,434,909

FYBase repair, mill, inlay and pavement markings0025-04-050 2024

Guadalupe

UA 90 SH 123B SH 123

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5758

$2,435,814

FYBase repair, mill, inlay and pavement markings0029-01-029 2024

Guadalupe

US 90 SH 46 SH 123B

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5759

$2,216,179

FYBase repair, mill, inlay and pavement markings0029-02-054 2024

Guadalupe

US 90 SH 123B SH 123

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5729

$1,611,444

FYSeal coat and pavement markings0029-02-056 2023

Guadalupe

US 90 SH 123 Guadalupe/Gonzalez County Line

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5634

$592,627

FYSeal coat and pavement markings0215-09-034 2021

Guadalupe

FM 725 Zipp Rd FM 78

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5732

$125,909

FYSeal coat and pavement markings0216-03-035 2023

Guadalupe

FM 466 US 90 FM 477

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5760

$3,863,990

FYConstruct Super 2 lanes0287-02-017 2024

Guadalupe

SH 80 IH 10 Gonzalez County Line

N/ATravel Demand Model Network Years:ExemptStatus:TSMO: OperationalType of Work:

5656

$5,715,631

FYBase repair, mill, inlay and pavement markings0366-02-094 2022

Guadalupe

SH 123 FM 20 FM 758

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5699

$567,065

FYSeal coat and pavement markings0851-01-024 2022

Guadalupe

FM 467 FM 775 FM 725

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5700

$348,336

FYSeal coat and pavement markings0987-01-036 2022

Guadalupe

FM 621 Guadalupe/Hays County Line FM 20

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5701

$232,353

FYSeal coat and pavement markings0987-02-015 2022

Guadalupe

FM 758 SH 46 SH 123

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5682

$2,388,602

FYRehab and widen narrow roadway1268-02-031 2022

Guadalupe

FM 1103 Rodeo Way Main Street

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

Note: This is an illustrative list only. These projects are not mapped and are not included in the financial summary.

120

Page 125:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

MPO Proj. No

Project NameProject Limits From: and To:

Project Description

FY 2021-2024 Transportation Improvement Program

Grouped CSJ Projects Sorted by County and CSJ

Construction Cost

Fiscal YearCSJ

County

5704

$123,394

FYSeal coat and pavement markings1272-02-011 2022

Guadalupe

FM 1101 Comal/Guadalupe County Line SH 123

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5705

$224,799

FYSeal coat and pavement markings1272-03-011 2022

Guadalupe

FM 3353 FM 1979 FM 20

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5706

$171,284

FYSeal coat and pavement markings1272-04-014 2022

Guadalupe

FM 1104 US 90 FM 1150

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5710

$131,665

FYSeal coat and pavement markings1897-02-010 2022

Guadalupe

FM 1978 SH 123 FM 621

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5640

$94,944

FYSeal coat and pavement markings1898-02-010 2021

Guadalupe

FM 1979 FM 621 Guadalupe/Caldwell County Line

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5641

$161,726

FYSeal coat and pavement markings1898-03-013 2021

Guadalupe

FM 1979 SH 123 FM 621

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5738

$119,853

FYSeal coat and pavement markings2233-02-007 2023

Guadalupe

FM 539 FM 467 Guadalupe/Wilson County Line

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5713

$62,946

FYSeal coat and pavement markings2442-02-009 2022

Guadalupe

FM 2538 Bexar/Guadalupe County Line FM 775

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5742

$197,348

FYSeal coat and pavement markings2651-01-011 2023

Guadalupe

FM 2438 US 90 US 90A

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5726

$12,321,678

FYBase repair, mill, inlay and pavement markings0072-05-089 2023

Kendall

IH 10 FM 473 Cibolo Creek

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5715

$11,011

FYSeal coat and pavement markings on EBFR0072-05-093 2022

Kendall

IH 10 S of Guadalupe River US 87 (Comfort)

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5651

$209,838

FYSeal coat and pavement markings on EBFR0072-05-095 2021

Kendall

IH 10 1.2 Mi S of Little Joshua Creek Cibolo Creek

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5744

$55,053

FYSeal coat and pavement markings on EBFR0072-06-085 2023

Kendall

IH 10 Austin Dr South Frederick Creek

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5750

$2,267

FYSeal coat and pavement markings on WBFR0072-06-086 2023

Kendall

IH 10 IH 10 WB Exit Ramp John's Rd

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

Note: This is an illustrative list only. These projects are not mapped and are not included in the financial summary.

121

Page 126:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

MPO Proj. No

Project NameProject Limits From: and To:

Project Description

FY 2021-2024 Transportation Improvement Program

Grouped CSJ Projects Sorted by County and CSJ

Construction Cost

Fiscal YearCSJ

County

5751

$23,087

FYSeal coat and pavement markings on WBFR0072-06-087 2023

Kendall

IH 10 Boerne City Park Entrance John's Rd

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5652

$17,670

FYSeal coat and pavement markings on FR Rds0072-06-088 2021

Kendall

IH 10 Cibolo Creek IH 10 Entrance

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5696

$332,066

FYSeal coat and pavement markings0072-10-007 2022

Kendall

FM 289 IH 10 WB FR IH 10 EBFR

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5633

$640,556

FYSeal coat and pavement markings0215-06-044 2021

Kendall

SH 46 1 Miles east of Esser Kendall/Comal County Line

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

5673

$341,524

FYInst adv wrng sgns & chvrons (curve),imp horiz algnmt, incr supelev, milled edgeline rmb strps0915-11-035 2022

Kendall

CS on Ammann Rd from 3.6 Mi E of SH 46 3.85 Mi East of SH 46

N/ATravel Demand Model Network Years:ExemptStatus:SafetyType of Work:

5702

$433,622

FYSeal coat and pavement markings1042-02-023 2022

Kendall

SH 46 Bandera/Kendall County Line 0.5 Mi W of IH 10

N/ATravel Demand Model Network Years:ExemptStatus:Maint/RehabType of Work:

Note: This is an illustrative list only. These projects are not mapped and are not included in the financial summary.

122

Page 127:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

FY 2021 – 2024 Transportation Improvement Program

APPENDIX D

Environmental Clearance Projects

123

Page 128:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

Alamo Area Metropolitan Planning Organization

This page intentionally left blank.

124

Page 129:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

Appendix D: Environmental Clearance Project Listing

CSJHwy Project SponsorMPO Proj ID No.

FY 2021-2024 Transportation Improvement Program

Description:

CR BC5532.0

Limits From: In Bexar County, on Blanco Road

Limits To: Borgfeld to Bexar/Comal County Line

0915-12-618

Expand from 2 to 4 lane divided roadway with a raised median, bike lanes, sidewalk, curbs and drainage

Note: Project included in Appendix D in April 2018

2025

Remarks: None Project Status: Non-RSR Non-Exempt

CMP: 18

County: Bexar

Network Years: 2035,2045

Let Year:

Description:

CS CoSA5534.0

Limits From: In San Antonio on South New Braunfels

Limits To: From Lyster Road to IH 410

0915-12-593

Construct new alignment 4 lane roadway (0 to 4 lanes) with multiuse path and sidewalks

Note: Project included in Appendix D in April 2018

2025

Remarks: None Project Status: Non-RSR Non-Exempt

CMP: 53

County: Bexar

Network Years: 2035,2045

Let Year:

Description:

CS Seguin5533.0

Limits From: In Seguin, on Rudeloff Road

Limits To: From Huber Road to SH 123 (at FM 20)

0915-46-049

Construct new alignment 4 lane roadway (0 to 4 lanes) with center left turn lane, bicycle and pedestrian facilities

Note: Project included in Appendix D in April 2018

2024

Remarks: None Project Status: Non-RSR Exempt

CMP: N/A

County: Guadalupe

Network Years: 2035,2045

Let Year:

Description:

FM 1103 TxDOT5560.0

Limits From: Rodeo Way

Limits To: FM 78

1268-02-030

Expand from 2 to 4 lanes with median, turn lanes, sidewalk and bike lanes

Note: Project included in Appendix D in May 2020

2025

Remarks: None Project Status: Non-RSR Exempt

CMP: N/A

County: Guadalupe

Network Years: 2035,2045

Let Year:

Description:

FM 306 TxDOT9122.0

Limits From: River Chase Way

Limits To: FM 2673

0000-00-000

Expand from 2 to 4 lanes with turn lanes at intersections

Note: Project included in Appendix D in May 2020

2035

Remarks: None Project Status: RSR Exempt

CMP: N/A

County: Comal

Network Years: 2045

Let Year:

Description:

FM 306 Extens TBD9123.0

Limits From: FM 1101

Limits To: FM 758

0000-00-000

Expand from 2 to 4 lanes with turn lanes at intersections

Note: Project included in Appendix D in May 2020

2025

Remarks: None Project Status: Non-RSR Exempt

CMP: N/A

County: Guadalupe

Network Years: 2035,2045

Let Year:

Description:

FM 3351 TxDOT5558.0

Limits From: SH 46

Limits To: Kendall/Comal County Line

3212-04-008

Expand from 2 to 6 lanes with center turn lane, bike lanes and sidewalks

Note: Project included in Appendix D in May 2020

2030

Remarks: None Project Status: RSR Exempt

CMP: N/A

County: Comal

Network Years: 2035,2045

Let Year:

125

Page 130:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

Appendix D: Environmental Clearance Project Listing

CSJHwy Project SponsorMPO Proj ID No.

FY 2021-2024 Transportation Improvement Program

Description:

FM 3351 TxDOT5330.1

Limits From: Kenneland

Limits To: Bexar/Comal County Line

3212-05-011

Expand from 2 to 4 lanes with turn lanes, bike lanes & sidewalks

Note: Project included in Appendix D in April 2018

2027

Remarks: None Project Status: RSR Exempt

CMP: N/A

County: Comal

Network Years: 2035,2045

Let Year:

Description:

FM 3351 TxDOT5559.0

Limits From: Kendall/Comal County Line

Limits To: Keeneland Dr

3212-05-014

Expand from 2 to 6 lanes with center turn lane, bike lanes and sidewalks

Note: Project included in Appendix D in May 2020

2030

Remarks: None Project Status: RSR Exempt

CMP: N/A

County: Comal

Network Years: 2035,2045

Let Year:

Description:

FM 3351 TxDOT5330.2

Limits From: Comal/Bexar County Line

Limits To: IH 10

3212-06-017

Expand from 2 to 4 lanes with turn lanes, bike lanes & sidewalks

Note: Project included in Appendix D in April 2018

2027

Remarks: None Project Status: RSR Non-Exempt

CMP: 21

County: Bexar

Network Years: 2035,2045

Let Year:

Description:

FM 725 TxDOT5390.0

Limits From: Zipp Rd

Limits To: FM 78

0215-09-033

Expand from 2 lanes to 4 lane divided and intersection improvements

Note: Project included in Appendix D in May 2020

2037

Remarks: None Project Status: RSR Exempt

CMP: N/A

County: Guadalupe

Network Years: 2045

Let Year:

Description:

IH 10 TxDOT4008.0

Limits From: Santa Clara Road

Limits To: US 90A

0025-03-101

Expand from 4 lane to 6 lane expressway and from 4 to 4 frontage road lanes

Note: Project included in Appendix D in May 2020

2025

Remarks: None Project Status: RSR Exempt

CMP: N/A

County: Guadalupe

Network Years: 2035,2045

Let Year:

Description:

IH 10 TxDOT5590.0

Limits From: FM 775

Limits To: US 90A

0025-03-102

Expand from 4 to 6 lane expressway and from 4 to 4 frontage road lanes

Note: Project included in Appendix D in May 2020

2025

Remarks: Overlap with 0025-03-101 Project Status: RSR Exempt

CMP: N/A

County: Guadalupe

Network Years: 2035,2045

Let Year:

Description:

IH 10 TxDOT5400.0

Limits From: SH 46

Limits To: 0.25 Mi W of Bexar/Kendall County Line

0072-06-082

Expand from 4 to 8 lanes expressway - 2 new general purpose, 2 new HOV lanes & from 4 to 4 FR lanes

Note: Project included in Appendix D in May 2020

2025

Remarks: None Project Status: RSR Exempt

CMP: N/A

County: Kendall

Network Years: 2035,2045

Let Year:

126

Page 131:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

Appendix D: Environmental Clearance Project Listing

CSJHwy Project SponsorMPO Proj ID No.

FY 2021-2024 Transportation Improvement Program

Description:

IH 10 TxDOT5591.0

Limits From: 0.25 M W of Bexar/Kendall County Line

Limits To: Kendall/Bexar County Line

0072-06-089

Expand from 4 to 8 lane expressway - 2 new general purpose & 2 new HOV lanes; from 4 to 4 frontage road lanes

Note: Project included in Appendix D in May 2020

2025

Remarks: Spin off of 0072-06-082 Project Status: RSR Exempt

CMP: N/A

County: Kendall

Network Years: 2035,2045

Let Year:

Description:

IH 10 TxDOT5401.0

Limits From: Kendall/Bexar County Line

Limits To: FM 3351

0072-07-075

Expand from 4 to 8 lane expressway - 2 new general purpose, 2 new HOV lanes & from 4 to 4 FR lanes

Note: Project included in Appendix D in May 2020

2025

Remarks: None Project Status: RSR Non-Exempt

CMP: N/A

County: Bexar

Network Years: 2035,2045

Let Year:

Description:

IH 10 TxDOT5592.0

Limits From: US 90A

Limits To: FM 464

0535-01-077

Expand from 4 to 6 lane expressway and from 4 to 4 frontage road lanes

Note: Project included in Appendix D in May 2020

2025

Remarks: Spin off of 0535-01-074 Project Status: RSR Exempt

CMP: N/A

County: Guadalupe

Network Years: 2035,2045

Let Year:

Description:

IH 10 TxDOT5593.0

Limits From: SH 123

Limits To: SH 130

0535-01-078

Expand from 4 to 6 lane expressway and from 4 to 4 frontage road lanes

Note: Project included in Appendix D in May 2020

2025

Remarks: Spin off of 0535-01-074 Project Status: RSR Exempt

CMP: N/A

County: Guadalupe

Network Years: 2035,2045

Let Year:

Description:

IH 10 TxDOT5397.0

Limits From: SH 130

Limits To: SH 80

0535-02-047

Expand from 4 lane to 6 lane expressway

Note: Project included in Appendix D in May 2020

2028

Remarks: None Project Status: RSR Exempt

CMP: N/A

County: Guadalupe

Network Years: 2035,2045

Let Year:

Description:

IH 35 TxDOT5375.0

Limits From: Guadalupe River

Limits To: Hays/Comal County Line

0016-04-112

Operational improvements including ramp revisions and intersection improvements - convert frontage roads to one way

Note: Project included in Appendix D in May 2020

2035

Remarks: None Project Status: RSR Exempt

CMP: N/A

County: Comal

Network Years: 2045

Let Year:

Description:

IH 35 TxDOT4014.0

Limits From: Guadalupe/Comal County Line

Limits To: FM 1103

0016-05-111

Expand from 6 ln to 10 ln expy - add 4 new express lanes including 2 HOV-special use lanes & from 4 to 4 FR lanes

Note: Project included in Appendix D in April 2018

2025

Remarks: Design Build project Project Status: RSR Exempt

CMP: N/A

County: Comal

Network Years: 2035,2045

Let Year:

127

Page 132:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

Appendix D: Environmental Clearance Project Listing

CSJHwy Project SponsorMPO Proj ID No.

FY 2021-2024 Transportation Improvement Program

Description:

IH 35 TxDOT5383.0

Limits From: Guadalupe River

Limits To: FM 1103

0016-05-114

Operational improvements including ramp revisions & intersection improvements

Note: Project included in Appendix D in April 2018

2035

Remarks: None Project Status: RSR Exempt

CMP: N/A

County: Comal

Network Years: 2045

Let Year:

Description:

IH 35 TxDOT5555.0

Limits From: FM 3009

Limits To: Guadalupe Comal County Line

0016-06-115

Expand from 6 ln to 10 lane expy - add 4 new express lanes including 2 HOV-Special Use Lanes & from 4 to 4 FR lanes

Note: Project included in Appendix D in May 2020

2025

Remarks: Design Build project Project Status: RSR Exempt

CMP: 47

County: Guadalupe

Network Years: 2035,2045

Let Year:

Description:

IH 35 North TxDOT3514.0

Limits From: US 281/IH 37, East

Limits To: IH 410 S

0017-10-180

Expand from 6 lane to 10 lane expy - including 2 HOV - special use lanes & from 6 to 6 FR lanes

Note: Project included in Appendix D in May 2020

2040

Remarks: None Project Status: RSR Non-Exempt

CMP: 58

County: Bexar

Network Years: 2045

Let Year:

Description:

IH 37 TxDOT4969.0

Limits From: LP 13

Limits To: IH 410

0073-08-183

Construction of a SB 2 lane frontage road from Lp 13 to relocated entrance ramp to SB IH 37 and intersection improvements

Note: Project included in Appendix D in May 2020

2025

Remarks: None Project Status: RSR Exempt

CMP: N/A

County: Bexar

Network Years: N/A

Let Year:

Description:

IH 410 TxDOT5402.0

Limits From: US 90

Limits To: IH 35 S

0521-05-144

Exp fr 6 to 8 lns btwn US 90 & Valley Hi; frm 4 to 6 lns btwn Valley Hi & IH 35 S; frm 4/6 to 4/6 FR ln; construct all DCs at IH 35 S;

Note: Project included in Appendix D in May 2020

2028

Remarks: all DCs are 1 lane; cloverleaf remains for FR connectivity Project Status: RSR Non-Exempt

CMP: 41

County: Bexar

Network Years: 2035,2045

Let Year:

Description:

IH 410 TxDOT5384.0

Limits From: at IH 10 E

Limits To: .

0521-06-142

Phase 2 interchange improvements - 1-lane DC: SB 410 to WB 10; SB 410 to EB 10; NB 410 to WB 10; WB 10 to NB 410; EB 10 to NB 410; EB 10 to SB 410;

Note: Project included in Appendix D in May 2020

2025

Remarks: 2 lane DC: WB 10 to SB 410 & NB 410 to EB 10 Project Status: RSR Exempt

CMP: N/A

County: Bexar

Network Years: 2035,2045

Let Year:

Description:

Loop 1604 TxDOT2020.0

Limits From: US 90

Limits To: West Military Drive

2452-01-029

Expand from 4 to 6 lane expressway & from 4 to 4 FR lanes

Note: Project included in Appendix D in May 2020

2030

Remarks: None Project Status: RSR Non-Exempt

CMP: 50

County: Bexar

Network Years: 2035,2045

Let Year:

128

Page 133:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

Appendix D: Environmental Clearance Project Listing

CSJHwy Project SponsorMPO Proj ID No.

FY 2021-2024 Transportation Improvement Program

Description:

Loop 1604 TxDOT3911.0

Limits From: West Military Dr.

Limits To: Braun Road

2452-01-052

Expand from 4 to 6 lane expressway & from 4/6 to 4/6 FR lanes, including 1 lane direct connectors at SH 151 - NB 1604 to EB 151; WB 151 to SB 1604

Note: Project included in Appendix D in May 2020

2030

Remarks: None Project Status: RSR Non-Exempt

CMP: 50

County: Bexar

Network Years: 2035,2045

Let Year:

Description:

Loop 1604 TxDOT3912.0

Limits From: Braun Road

Limits To: SH 16

2452-01-053

Expand from 4 to 8 lane expressway and from 6 to 6 FR lanes

Note: EIS underway

2030

Remarks: None Project Status: RSR Non-Exempt

CMP: 50

County: Bexar

Network Years: 2035,2045

Let Year:

Description:

SH 123 TxDOT5398.0

Limits From: Guadalupe/Hays County Line

Limits To: Cordova Ln

0366-02-088

Widen roadway to provide operational improvements including shoulders

Note: Project included in Appendix D in May 2020

2029

Remarks: None Project Status: RSR Exempt

CMP: N/A

County: Guadalupe

Network Years: 2035,2045

Let Year:

Description:

SH 123 TxDOT5337.0

Limits From: Cordova Ln

Limits To: IH 10

0366-02-089

Expand from 2 to 4 lanes with center left turn lane

Note: Project included in Appendix D in April 2018

2026

Remarks: None Project Status: RSR Exempt

CMP: N/A

County: Guadalupe

Network Years: 2035,2045

Let Year:

Description:

SH 123 TxDOT5399.0

Limits From: SH 123B in Seguin

Limits To: Wilson/Guadalupe County Line

0366-03-066

Expand from 2 to 4 lane divided roadway

Note: Project included in Appendix D in May 2020

2029

Remarks: None Project Status: RSR Exempt

CMP: N/A

County: Guadalupe

Network Years: 2035,2045

Let Year:

Description:

SH 16 TxDOT9112.2

Limits From: Guilbeau Rd

Limits To: Loop 1604

0291-10-099

Operational improvements

Note: Project included in Appendix D in May 2020

2044

Remarks: Feasibility study is underway; partnership between TxDOT, CoSA and Leon Valle Project Status: RSR Exempt

CMP: N/A

County: Bexar

Network Years: past 2045

Let Year:

Description:

SH 16 TxDOT9112.1

Limits From: IH 410

Limits To: Guilbeau Road

0291-10-100

Operational improvements

Note: Project included in Appendix D in May 2020

2044

Remarks: Feasibility study is underway; partnership between TxDOT, CoSA and Leon Valle Project Status: RSR Exempt

CMP: N/A

County: Bexar

Network Years: past 2045

Let Year:

129

Page 134:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

Appendix D: Environmental Clearance Project Listing

CSJHwy Project SponsorMPO Proj ID No.

FY 2021-2024 Transportation Improvement Program

Description:

SH 46 TxDOT5392.0

Limits From: Bentwood Dr

Limits To: FM 3159

0215-01-051

Expand from 2 lanes to 6 lanes with raised median or CLTL

Note: Project included in Appendix D in May 2020

2028

Remarks: None Project Status: RSR Exempt

CMP: N/A

County: Comal

Network Years: 2035,2045

Let Year:

Description:

SH 46 TxDOT5393.0

Limits From: Bulverde Rd

Limits To: Farhills Dr

0215-07-049

Expand from 2 lanes to 6 lanes with raised median or CLTL

Note: Project included in Appendix D in May 2020

2028

Remarks: None Project Status: RSR Exempt

CMP: N/A

County: Comal

Network Years: 2035,2045

Let Year:

Description:

SL 1604 TxDOT9110.1

Limits From: IH 35 S

Limits To: 0.7 Mi North of FM 2536

2020-02-031

Expand from 2 lanes to 4 lanes divided

Note: Project included in Appendix D in May 2020

2031

Remarks: None Project Status: RSR Non-Exempt

CMP: 47

County: Bexar

Network Years: 2035,2045

Let Year:

Description:

SL 1604 TxDOT5386.0

Limits From: 0.38 Mi North of FM 1303

Limits To: FM 1303

2255-01-084

Expand from 2 lanes to 4 lanes divided

Note: Project included in Appendix D in April 2018

2026

Remarks: None Project Status: RSR Non-Exempt

CMP: 50

County: Bexar

Network Years: 2035,2045

Let Year:

Description:

SL 1604 TxDOT5387.0

Limits From: US 87

Limits To: US 181

2255-02-027

Expand from 2 lanes to 4 lanes divided

Note: Project included in Appendix D in April 2018

2026

Remarks: None Project Status: RSR Non-Exempt

CMP: 50

County: Bexar

Network Years: 2035,2045

Let Year:

Description:

SL 1604 TxDOT5388.0

Limits From: US 181

Limits To: 0.38 Mi North of FM 1303

2255-02-028

Expand from 2 lanes to 4 lanes divided

Note: Project included in Appendix D in April 2018

2026

Remarks: None Project Status: RSR Non-Exempt

CMP: 50

County: Bexar

Network Years: 2035,2045

Let Year:

Description:

SL 1604 TxDOT5557.0

Limits From: 0.7 Mi North of FM 2536

Limits To: Macdona-Lacoste Rd

2452-01-070

Expand from 2 lanes to 4 lanes divided

Note: Project included in Appendix D in May 2020

2031

Remarks: None Project Status: RSR Non-Exempt

CMP: 47

County: Bexar

Network Years: 2035,2045

Let Year:

130

Page 135:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

Appendix D: Environmental Clearance Project Listing

CSJHwy Project SponsorMPO Proj ID No.

FY 2021-2024 Transportation Improvement Program

Description:

SL 1604 TxDOT3530.0

Limits From: Redland Road

Limits To: IH 35 North

2452-03-087

Expand from 4 to 10 lane expressway - including 2 HOV - special use lanes & from 4 to 4 FR lanes

Note: Project included in Appendix D in May 2020

2025

Remarks: None Project Status: RSR Non-Exempt

CMP: 47

County: Bexar

Network Years: 2035,2045

Let Year:

Description:

SL 1604 TxDOT9107.0

Limits From: FM 78

Limits To: IH 10 East

2452-03-111

Expand from 4 lane divided to 4 lane expressway and from 0 to 4 FR lanes

Note: Project included in Appendix D in April 2018

2025

Remarks: None Project Status: RSR Non-Exempt

CMP: 35

County: Bexar

Network Years: 2035,2045

Let Year:

Description:

SL 1604 TxDOT5389.0

Limits From: FM 1346 - Houston Street

Limits To: US 87

2452-04-015

Expand from 2 lanes to 4 lanes divided

Note: Project included in Appendix D in April 2018

2026

Remarks: None Project Status: RSR Non-Exempt

CMP: 50

County: Bexar

Network Years: 2035,2045

Let Year:

Description:

SL 1604 TxDOT5554.0

Limits From: Martinez Creek

Limits To: FM 1346 - Houston Street

2452-04-017

Expand from 2 lanes to 4 lanes divided

Note: Project included in Appendix D in May 2020

2025

Remarks: None Project Status: RSR Non-Exempt

CMP: 50

County: Bexar

Network Years: 2025,2035,2045

Let Year:

Description:

US 90 TxDOT5561.0

Limits From: at Lp 1604 W

Limits To: -

0024-07-064

Construct direct connectors: 1 lane DC - SB 1604 to WB 90; NB 1604 to EB 90; NB 1604 to WB 90; EB 90 to NB 1604 & EB 90 to SB 1604; 2 lane DC: WB 90 to NB 1604 & WB 90 to SB 1604

Note: Project included in Appendix D in May 2020

2031

Remarks: None Project Status: RSR Exempt

CMP: N/A

County: Bexar

Network Years: 2035,2045

Let Year:

Description:

US 90 TxDOT5562.0

Limits From: IH 410

Limits To: Lp 13

0024-08-143

Ramp revisions and rehabilitate mainlanes

Note: Project included in Appendix D in May 2020

2031

Remarks: None Project Status: RSR Exempt

CMP: N/A

County: Bexar

Network Years: N/A

Let Year:

Description:

US 90 TxDOT5381.0

Limits From: 0.8 Miles W of IH 410

Limits To: IH 410

0024-08-138

Expand from 4 lane divided to 6 lane expressway and from 4 to 4 FR lanes

Note: Project included in Appendix D in April 2018

2024

Remarks: None Project Status: RSR Non-Exempt

CMP: 45

County: Bexar

Network Years: 2035,2045

Let Year:

131

Page 136:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

Appendix D: Environmental Clearance Project Listing

CSJHwy Project SponsorMPO Proj ID No.

FY 2021-2024 Transportation Improvement Program

Description:

US 90 TxDOT5338.0

Limits From: at Zarzamora

Limits To: .

0024-08-139

Construct westbound entrance ramp

Note: Project included in Appendix D in May 2020

2035

Remarks: None Project Status: RSR Exempt

CMP: N/A

County: Bexar

Network Years: 2045

Let Year:

132

Page 137:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

FY 2021 – 2024 Transportation Improvement Program

APPENDIX E

Transit Project Detail

133

Page 138:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

Alamo Area Metropolitan Planning Organization

This page intentionally left blank.

134

Page 139:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

VIA Metropolitan Transit

2021 Capital Spending Plan

MPO ID# Category Project No Totals

Revenue Vehicles

Fullsize (40') CNG Buses (*includes CMAQ) 191101 15,422,400

Paratransit Vehicles 211101 8,221,180

Total Revenue Vehicles 23,643,580

Service Vehicles

Non-Revenue Support Vehicles 181201 414,781

Non-Revenue Support Equipment 181202 40,000

Total Service Vehicles 454,781

Passenger Facilities

Robert Thompson Transit Center 161301 6,372,000

IH10 Park & Pool 161304 1,410,000

Alamo Ranch Park & Ride 161305 4,813,000

Naco Pass 161308 2,021,000

Bus Stop Improvements (BSI) 161310 661,167

Bus Stop Improvements (I-35 Corridor) 161311 132,234

Bus Stop Improvements (Suburban Cities) 161312 87,195

Randolph Park & Ride 161400 2,326,000

Passenger Facility Upgrade/Renovation 161403 150,000

Eastside Mobility Hub 191301 1,194,000

Total Passenger Facilities 19,166,596

Operational Facilities

Existing Paint Facility Upgrade 171602 1,525,000

Paint Maintenance Bldg Ceiling 161605 1,000,000

General Concrete and/or Asphalt Work 161610 100,000

Madla Training Center Upgrades 171609 180,000

VMC Carpet Replacement 181604 146,941

Insp Steamroom Renovations 191603 150,000

Storeroom Cabinets & Material Handling Trucks 181607 30,000

Replace All VMC HVAC Air Handlers 201601 800,000

Total Operational Facilities 3,931,941

Maintenance Tools & Equipment

Shop Tools and Equipment 161800 100,000

Mobile Bus Lifts 161802 50,000

Inground Brake Testor 171806 300,000

Inground Chassis Dyno 171807 500,000

Total Maintenance Tools & Equip. 950,000

Replace Components for Rev. Vehicles

Engines and Transmissions 161900 1,000,000

Hybrid Bus Major Components 171900 175,000

Diesel Particulate Filters 161901 10,000

Misc Components for Revenue Vehicles 211900 50,000

Operator Safety Compartment 181903 1,600,000

Total Replace Components for Rev. Veh. 2,835,000

135

Page 140:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

VIA Metropolitan Transit

2021 Capital Spending Plan

MPO ID# Category Project No Totals

Computer Hardware/Software

10GB End Switch Network Upgrade 172100 40,000

Computing Devices 162102 50,000

Network Storage/Servers/Data Ctr 162105 255,000

AVL Hardware 162110 50,000

Security (Cameras, Doors, Network, Storage) 162118 65,000

VMC AV Replacement 162121 5,000

VDI Licenses & HW (Citrix) 172104 40,000

Cloud Migration & Build Out Svcs 172105 90,000

Wireless Network 162131 5,000

Software Development Tools 172107 12,000

Other Transit Software / Hardware 192103 125,000

Digital Signage/Kiosks 182100 40,000

Other Vehicle Hardware 212100 450,000

Total Computer Hardware/Software 1,227,000

Advanced Rapid Transit Project

Advanced Rapid Transit (ART) Phase 1a 171300 18,650,000

Total Rapid Transit Project 18,650,000

New Bus Operations & Maintenance Facility

New Bus Operations & Maintenance Facility 204100 18,850,000

Total New Bus Operations & Maintenance Facility 18,850,000

GRAND TOTAL 89,708,898

136

Page 141:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

VIA Metropolitan Transit

2022 Capital Spending Plan

MPO ID# Category Project No Totals

Revenue Vehicles

Fullsize (40') CNG Buses (*includes CMAQ) 191100 7,865,424

Fullsize (40') CNG Buses 211102 20,787,192

Paratransit Vehicles 211101 2,028,780

Total Revenue Vehicles 30,681,396

Service Vehicles

Non-Revenue Support Vehicles 181201 256,282

Total Service Vehicles 256,282

Passenger Facilities

Robert Thompson Transit Center 161301 5,688,000

IH10 Park & Pool 161304 2,370,000

Alamo Ranch Park & Ride 161305 1,541,500

Naco Pass 161308 325,000

Bus Stop Improvements (BSI) 161310 439,104

Bus Stop Improvements (I-35 Corridor) 161311 87,820

Bus Stop Improvements (Suburban Cities) 161312 58,547

Randolph Park & Ride 161400 6,489,000

Passenger Facility Upgrade/Renovation 161403 150,000

Eastside Mobility Hub 191301 1,601,000

Total Passenger Facilities 18,749,971

Operational Facilities

General Concrete and/or Asphalt Work 161610 100,000

Storeroom Cabinets & Material Handling Trucks 181607 30,000

Battery Room Upgrade 211601 150,000

Total Operational Facilities 280,000

Maintenance Tools & Equipment

Shop Tools and Equipment 161800 100,000

Mobile Bus Lifts 161802 50,000

Replace Parts Washers, Pressure/Steam Cleaners 171805 250,000

Bus Washer Purchases and Upgrades 181802 700,000

Total Maintenance Tools & Equip. 1,100,000

Replace Components for Rev. Vehicles

Engines and Transmissions 161900 1,000,000

Hybrid Bus Major Components 171900 175,000

Diesel Particulate Filters 161901 10,000

Misc Components for Revenue Vehicles 211900 50,000

Total Replace Components for Rev. Veh. 1,235,000

137

Page 142:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

VIA Metropolitan Transit

2022 Capital Spending Plan

MPO ID# Category Project No Totals

Computer Hardware/Software

10GB End Switch Network Upgrade 172100 40,000

Computing Devices 162102 150,000

Network Storage/Servers/Data Ctr 162105 250,000

P25 Radio System Upgrade / Replacement 162109 250,000

AVL Hardware 162110 50,000

Telephone System Upgrade / Replacement 162111 300,000

Security (Cameras, Doors, Network, Storage) 162118 65,000

M7300 Mobile Radio Replacement 172103 25,000

VDI Licenses & HW (Citrix) 172104 40,000

Wireless Network 162131 90,000

Operating System Licenses 172110 175,000

Other Transit Software / Hardware 192103 125,000

Digital Signage/Kiosks 182100 40,000

Other Vehicle Hardware 212100 450,000

Total Computer Hardware/Software 2,050,000

Advanced Rapid Transit Project

Advanced Rapid Transit (ART) Phase 1a 171300 26,150,000

Advanced Rapid Transit (ART) Phase 1b 214100 5,359,000

Total Rapid Transit Project 31,509,000

New Bus Operations & Maintenance Facility

New Bus Operations & Maintenance Facility 204100 5,150,000

Total New Bus Operations & Maintenance Facility 5,150,000

GRAND TOTAL 91,011,649

138

Page 143:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

VIA Metropolitan Transit

2023 Capital Spending Plan

MPO ID# Category Project No Totals

Service Vehicles

Non-Revenue Support Vehicles 181201 483,167

Total Service Vehicles 483,167

Passenger Facilities

Alamo Ranch Park & Ride 161305 925,500

Bus Stop Improvements (BSI) 161310 431,375

Bus Stop Improvements (I-35 Corridor) 161311 87,821

Bus Stop Improvements (Suburban Cities) 161312 57,516

Randolph Park & Ride 161400 1,091,023

Passenger Facility Upgrade/Renovation 161403 150,000

Total Passenger Facilities 2,743,235

Operational Facilities

General Concrete and/or Asphalt Work 161610 100,000

Other Tire & Shop Pit Repair 161620 1,000,000

Replace VMC Roof 191600 475,000

Storeroom Cabinets & Material Handling Trucks 181607 30,000

Renovation of Main Service Station 221601 1,000,000

Total Operational Facilities 2,605,000

Maintenance Tools & Equipment

Shop Tools and Equipment 161800 100,000

Mobile Bus Lifts 161802 50,000

Total Maintenance Tools & Equip. 150,000

Replace Components for Rev. Vehicles

Engines and Transmissions 161900 2,000,000

Hybrid Bus Major Components 171900 175,000

Diesel Particulate Filters 161901 10,000

Misc Components for Revenue Vehicles 211900 50,000

Total Replace Components for Rev. Veh. 2,235,000

Computer Hardware/Software

10GB End Switch Network Upgrade 172100 250,000

Computing Devices 162102 150,000

Network Storage/Servers/Data Ctr 162105 250,000

Security (Cameras, Doors, Network, Storage) 162118 65,000

VDI Licenses & HW (Citrix) 172104 125,000

Other Transit Software / Hardware 192103 125,000

Digital Signage/Kiosks 182100 40,000

Total Computer Hardware/Software 1,005,000

Advanced Rapid Transit Project

Advanced Rapid Transit (ART) Phase 1a 171300 34,500,000

Advanced Rapid Transit (ART) Phase 1b 214100 18,593,000

Total Rapid Transit Project 53,093,000

New Bus Operations & Maintenance Facility

New Bus Operations & Maintenance Facility 204100 4,805,000

Total New Bus Operations & Maintenance Facility 4,805,000

GRAND TOTAL 67,119,402

139

Page 144:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

VIA Metropolitan Transit

2024 Capital Spending Plan

MPO ID# Category Project No Totals

Service Vehicles

Non-Revenue Support Vehicles 181201 711,041

Total Service Vehicles 711,041

Passenger Facilities

Bus Stop Improvements (BSI) 161310 253,002

Bus Stop Improvements (I-35 Corridor) 161311 50,600

Bus Stop Improvements (Suburban Cities) 161312 33,733

Passenger Facility Upgrade/Renovation 161403 150,000

Total Passenger Facilities 487,335

Operational Facilities

General Concrete and/or Asphalt Work 161610 100,000

Total Operational Facilities 100,000

Maintenance Tools & Equipment

Shop Tools and Equipment 161800 100,000

Mobile Bus Lifts 161802 50,000

AC Recovery Machines 171809 32,000

Total Maintenance Tools & Equip. 182,000

Replace Components for Rev. Vehicles

Diesel Particulate Filters 161901 10,000

Misc Components for Revenue Vehicles 211900 50,000

Total Replace Components for Rev. Veh. 60,000

Computer Hardware/Software

10GB End Switch Network Upgrade 172100 50,000

Computing Devices 162102 150,000

Network Storage/Servers/Data Ctr 162105 450,000

AVL Hardware 162110 4,000,000

Security (Cameras, Doors, Network, Storage) 162118 65,000

M7300 Mobile Radio Replacement 172103 25,000

VDI Licenses & HW (Citrix) 172104 40,000

Other Transit Software / Hardware 192103 125,000

Digital Signage/Kiosks 182100 40,000

Total Computer Hardware/Software 4,945,000

Advanced Rapid Transit Project

Advanced Rapid Transit (ART) Phase 1a 171300 30,900,000

Advanced Rapid Transit (ART) Phase 1b 214100 25,557,000

Total Rapid Transit Project 56,457,000

New Bus Operations & Maintenance Facility

New Bus Operations & Maintenance Facility 204100 34,270,000

Total New Bus Operations & Maintenance Facility 34,270,000

GRAND TOTAL 97,212,376

140

Page 145:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

FY 2021 – 2024 Transportation Improvement Program

APPENDIX F

Policy 2: Public Participation Plan

141

Page 146:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

Alamo Area Metropolitan Planning Organization

This page intentionally left blank.

142

Page 147:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

Alamo Area Metropolitan Planning Organization |Policy 2: Public Participation Plan 1

Policy 2: Public Participation Plan

This text is the Alamo Area Metropolitan Planning Organization’s (MPO) plan to involve the

public. It is called a Public Participation Plan (PPP) and is required by law. People were able to

comment on the plan for 45 days. This comment period took place prior to adoption of the plan.

Purpose of the Public Participation Plan

This plan provides a guide for how MPO staff can involve the public. It includes goals, procedures,

and tools the MPO will use. It also includes metrics used to measure and evaluate plan

performance.

MPO’s Commitment to Public Participation

People should have a say in transportation decisions that affect their lives. To help make this

possible, the MPO commits to:

1. Welcome all people into the planning process.

2. Identify people affected and involve them in the process.

3. Get people involved early and keep them involved throughout in the process.

4. Provide people with a variety of ways to participate.

5. Hold meetings at convenient dates, times, and locations.

6. Hold meetings at accessible places (see attachment 1).

7. Make meetings accessible for people with disabilities.

8. Provide interpreters (spoken or sign) if requested at least five (5) working days in

advance of a meeting.

9. Use information and graphics that are easy to understand.

10. Talk to people and record their comments.

11. Consider comments in the planning process.

143

Page 148:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

Alamo Area Metropolitan Planning Organization |Policy 2: Public Participation Plan 2

Public Participation Goals

• The MPO will engage people in the transportation planning process. The MPO will do this according to the goals in this plan and applicable laws.

Goal 1

• The MPO will keep people informed of transportation news.Goal 2

• The MPO will encourage everyone in the study area to get involved. This includes those traditionally underserved.

Goal 3

• The MPO will strive to improve public participation.Goal 4

• The MPO will work closely with other transportation agencies.

Goal 5

144

Page 149:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

Alamo Area Metropolitan Planning Organization |Policy 2: Public Participation Plan 3

Federal and State Requirements

This plan reflects the MPO’s commitment to the public. It also outlines their role in the regional planning process. It follows the federal and local laws listed below.

Federal Highway Administration (FHWA) and Federal Transit Administration (FTA) Federal rules for metropolitan transportation planning (23 CFR 450.316) and FHWA guidelines say that Metropolitan Planning Organizations (MPOs) shall develop and use a documented participation plan. The plan defines a process for providing citizens, affected public agencies, representatives of public transportation employees, freight shippers, providers of freight transportation services, private providers of transportation, representatives of users of public transportation, representatives of users of pedestrian walkways and bicycle transportation facilities, representatives of the disabled, and other interested parties with reasonable opportunities to be involved in the metropolitan transportation planning process. The MPO complies with the ten MPO requirements listed in 23 CFR 450.316.

Fixing America’s Surface Transportation Act (FAST Act) The current transportation bill is the Fixing America’s Surface Transportation (FAST) Act. It was passed by Congress and signed by President Obama on December 4, 2015. The FAST Act authorizes $305 billion nationwide over fiscal years 2016 through 2020 for transportation spending. It is the first law enacted in over ten years that provides long-term funding certainty for surface transportation.

Americans with Disabilities Act of 1990 The Americans with Disabilities Act of 1990 (ADA) stipulates involving the community, particularly those with disabilities in the development and improvement of services.

The Age Discrimination Act of 1975 The Age Discrimination Act of 1975 prohibits discrimination based on age in programs or activities receiving Federal financial assistance. The Act prohibits recipients of Federal financial assistance from taking actions that result in denying or limiting services or otherwise discriminating based on age.

Title VI of the Civil Rights Act of 1964. Title VI states that “No person in the United States shall, on the grounds of race, color, or national origin, be excluded from participation in, be denied the benefit of, or be subjected to discrimination under any program or activity receiving federal financial assistance.” Title VI serves as the legal foundation for what is today referred to as environmental justice. The MPO adheres to Title VI and environmental justice principles.

Executive Order 13166 – Limited English Proficiency Executive Order 13166 was created to "... improve access to federally conducted and federally assisted programs and activities for persons who, as a result of national origin, are limited in their English proficiency ..." Federal agencies were directed to provide guidance and technical

145

Page 150:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

Alamo Area Metropolitan Planning Organization |Policy 2: Public Participation Plan 4

assistance to recipients of federal funds as to how they can provide meaningful access to limited English proficient users of federal programs. Consistent with Executive Order 13166 and U.S. Department of Transportation (DOT) guidance, the MPO has developed a Limited English Proficiency Plan) in order to ensure meaningful input opportunities for persons with limited English proficiency. The MPO LEP plan is available on the MPO website (www.alamoareampo.org) and calls for translations of vital documents, such as public notices, into Spanish. The MPO may, at its discretion, translate documents into additional languages if the nature of the document and the character of the document’s target audience justify additional translation. The LEP plan provides further guidance for serving limited English-speaking populations.

Executive Order 12898 on Environmental Justice This order was signed by President Clinton in 1994. It reinforced the requirements of Title VI of the Civil Rights Act of 1964 that focused federal attention on the environmental and human health condition in minority and low-income communities:

Each federal agency shall make achieving environmental justice part of its mission by identifying and addressing, as appropriate, disproportionately high and adverse human health or environmental effects of its programs, policies and activities on minority populations and low-income populations.

Executive Order 13175 – Consultation and Coordination with Tribal Governments Executive Order 13175 states that “in formulating or implementing policies that have tribal implications, agencies shall establish regular and meaningful consultation and collaboration with tribal officials to reduce the imposition of unfunded mandates upon Indian tribes.”

At least one American Indian tribe has expressed an interest in being notified of activities throughout the state of Texas. Though there are no tribal governments located in the Alamo Area MPO study area, the MPO will actively seek to keep tribal governments informed of major decisions affecting the region. The MPO will continue to communicate with Native American Indian tribal leaders on an ongoing basis to identify issues of common concern.

Disclaimers In order to share appropriate requirements with the public related to various laws and regulations, the MPO regularly uses the following disclaimers. Their purpose and use is described below.

American’s with Disabilities Act Statement The following disclaimer will be included on public meeting notices as appropriate:

MPO meetings will be conducted in accordance with the Americans with Disabilities Act and are accessible to persons with disabilities. Arrangements for special assistance can be made by calling the MPO at (210) 227-8651, or Relay Texas at 1-800-735-2989 at least five (5) business days in advance. The meeting facilities will also be within a reasonable distance of a bus route in counties where bus service is readily available.

146

Page 151:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

Alamo Area Metropolitan Planning Organization |Policy 2: Public Participation Plan 5

Title VI and Environmental Justice Statement The following MPO Title VI and Environmental Justice Nondiscrimination Statement will be included in informational items and collateral materials as appropriate:

The Alamo Area Metropolitan Planning Organization (MPO), as a recipient of Federal funding and under Title VI of the Civil Rights Act and related statutes, ensures that no person shall on the grounds of race, religion, color, national origin, sex, age or disability be excluded from participation in, denied benefits of, or otherwise discriminated against by any MPO program or activity.

Report Language The following language shall be included in all reports published by the MPO:

Prepared in cooperation with the Texas Department of Transportation and the U.S. Department of Transportation, Federal Highway Administration, and Federal Transit Administration.

This language shall be displayed on the interior front cover page in a place of prominence in accordance with the contract between TxDOT and the Alamo Area MPO.

Federal Transit Administration Section 5307 Language For newspaper ads in support of the development of the Transportation Improvement Program, by agreement with the transit provider, the language shown below must be included in the ad text itself:

The TIP development process is being used to satisfy the public hearing requirements of FTA’s Section 5307 program and this notice and associated review period will satisfy FTA’s Program of Projects requirements.

147

Page 152:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

Alamo Area Metropolitan Planning Organization |Policy 2: Public Participation Plan 6

Target Audiences

The MPO takes great pride in working with people and other agencies. The MPO strongly believes that people should have a say in decisions that impact their lives. MPO staff keeps a contact list updated on a continuous basis. People and groups that the MPO targets are listed below. This list is not exhaustive but is meant to give an understanding of key stakeholder groups.

Target Audiences

Airport operators

Board and committee members

Business and trade organizations

City and academic libraries

Civic and public interest groups

Colleges and universities

Community-based associations

Commuters

Disabled populations

Elected local, state and federal officials

Emergency response agencies

Employers

Environmental groups

Faith-based organizations

Freight shippers

Homeowner, neighborhood and resident associations

Local media outlets

Military Bases

Motorcyclists and motorcycle groups

Natural disaster risk reduction agencies

Private transportation organizations and employees

Providers of freight transportation services

Public agencies and staff

Public at large

Public health organizations

Public ports

Public transportation providers

School districts

Social service organizations

Tourism industry

Traditionally underserved populations (described in greater detail in the following section)

Transportation advocates

Tribal governments

Users of micromobility (bicycles, scooters etc.)

Users of pedestrian walkways

148

Page 153:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

Alamo Area Metropolitan Planning Organization |Policy 2: Public Participation Plan 7

Target Audiences

Users of ridesharing services such as Uber and Lyft

Workforce development organizations and programs

Diversity and Inclusiveness

The MPO commits to engage traditionally underserved groups. These groups include low-income and minority populations. Federal laws protect additional groups. Protected groups are listed here.

Protected Categories Both Title VI of the Civil Rights Act of 1964 (Title VI) and Executive Order 12898 (EO 12898) on Environmental Justice (EO 12898) are specific in the description of the populations they protect. Title VI prohibits discrimination based on race, color and national origin. EO 12898 protects

minority and low‐income populations. Discrimination against persons based on gender, age, and disability are addressed by other nondiscrimination statutes. Collectively, these populations are often referred to as “traditionally underserved” in the transportation planning process.

Minority Persons considered minorities are identified by the U.S. Census as people of African, Hispanic, Asian, American Indian, or Alaskan Native origin. Executive Order 12898 and the DOT and FHWA Orders on Environmental Justice consider minority persons as persons belonging to any of the following groups:

• Black – a person having origins in any of the black racial groups of Africa

• Hispanic – a person of Mexican, Puerto Rican, Cuban, Central or South American, or other Spanish culture or origin, regardless of race

• Asian – a person having origins in the Far East, Southeast Asia, or the Indian subcontinent

• American Indian and Alaskan Native – a person having origins in North America and who maintains cultural identification through tribal affiliation or community recognition

Low Income A person whose household income (or in the case of a community or group, whose median household income) is at or below the U.S. Department of Health and Human Services poverty guidelines. The national poverty guidelines are issued annually by the Department of Health and Human Services and are available at http://aspe.hhs.gov/poverty/poverty.shtml.

Elderly Any persons over the age of 65

149

Page 154:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

Alamo Area Metropolitan Planning Organization |Policy 2: Public Participation Plan 8

People with Disabilities Under the Americans with Disabilities Act of 1990, a qualified individual with a disability is a person that 1) has a physical or mental impairment that substantially limits one or more major life activities; 2) has a record of such an impairment; or 3) is regarded as having such an impairment.

Limited English Proficiency People who do not speak English as their primary language and have a limited ability to read, speak, write, or understand English may be considered limited English proficient

Additional Categories Additionally, MPO includes low-literacy populations and households without personal transportation as traditionally underserved populations, although they are not protected by either a federal act or an executive order.

Low Literacy People who have difficulty using certain reading, writing, and computational skills considered necessary for functioning in everyday life may be considered to have low literacy. Persons with

low literacy are generally defined as having less than fifth‐grade reading and comprehension

skills.

Zero Car Households Households without cars or access to one.

150

Page 155:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

Alamo Area Metropolitan Planning Organization |Policy 2: Public Participation Plan 9

Board and Committees

The MPO board and committees provide one of the most regular and consistent ways for public involvement. Following is a list of committees supported by MPO staff. The table below identifies the day of the month, time, and location of their meetings.

Committee Date/Time* Location*

Technical Advisory Committee (TAC)

First Friday of the month at 1:30 p.m.

TxDOT District Office Building 2 Hearing Room 4615 NW Loop 410 San Antonio, TX 78229

Bicycle Mobility Advisory Committee (BMAC)

Second Wednesday of the month at 9:00 a.m.

MPO Conference Room B 825 South Saint Mary’s Street San Antonio, TX 78205

Pedestrian Mobility Advisory Committee (PMAC)

Third Wednesday of the month at 3:30 p.m.

MPO Conference Room B at 825 South Saint Mary’s Street, San Antonio, TX 78205

Transportation Policy Board (TPB)

Fourth Monday of the month at 1:30 p.m.

VIA Metro Center Community Room 1021 San Pedro San Antonio, TX 78212

* Meeting dates and locations are subject to change. The BMAC and PMAC committees hold joint evening meetings several times a year. Some committees choose to cancel meetings in July and December. For the most current information, please visit www.alamoareampo.org/calendar.

MPO meetings are open to all. For special needs or a translator, call 210-227-8651. You can also call TDD 1-800-735-2989 (Relay Texas). Please call at least five working days before the meeting. Meeting dates, times, and locations may change. You can call 210-227-8651 to confirm the meeting. The table below lists by when the MPO commits to posting information on the website.

Materials What is available on the web? When is it posted on the web?

Meeting agendas and packages

Transportation Policy Board www.alamoareampo.org/Committees/TPB/ Technical Advisory Committee www.alamoareampo.org/Committees/TAC/

One week prior to the meeting

Bicycle Mobility Advisory Committee www.alamoareampo.org/Committees/BMAC/

One week prior to the meeting

Pedestrian Mobility Advisory Committee www.alamoareampo.org/Committees/PMAC/

One week prior to the meeting

151

Page 156:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

Alamo Area Metropolitan Planning Organization |Policy 2: Public Participation Plan 10

Materials What is available on the web? When is it posted on the web?

Meeting Information

Board and committee meeting dates and times www.alamoareampo.org/Calendar/

Online calendar is posted and updated throughout the year, along with board/committee web pages. Meeting information pages updated monthly.

Livestreaming Transportation Policy Board meetings only www.alamoareampo.org/mpolive

Listen or watch the Transportation Policy Board meetings live or in a searchable archive available 24 hours after the event.

News releases News and media items, published or broadcast www.alamoareampo.org/news/

Timing of the news release varies depending on the news item or event.

Meeting Notices The Texas Open Meetings Act requires written notice of all meetings. Section 551.041 provides:

A governmental body shall give written notice of the date, hour, place, and subject of each meeting held by the governmental body.

The MPO regularly posts MPO Transportation Policy Board (TPB), Executive Committee, Technical Advisory Committee (TAC), Bicycle Mobility Advisory Committee (BMAC) and Pedestrian Mobility Advisory Committee (PMAC) meetings in the Texas Register, at the Bexar County Courthouse Bulletin Board, and with Comal and Guadalupe Counties.

Public Comments The MPO accepts public comments at every regular meeting of the board and committees. Comments can be spoken or in writing. Com

152

Page 157:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

Alamo Area Metropolitan Planning Organization |Policy 2: Public Participation Plan 11

Public Participation Toolbox

The MPO communicates with the public in a variety of ways. Information shared covers the MPO’s programs, projects and studies. MPO information materials display the MPO logo and include contacts. This section describes some of the communication tools the MPO uses.

Philosophy of External Communications Guiding principles for external communications include:

▪ Informative: The MPO will provide information. The MPO does not advocate on issues.

▪ Concise: The MPO will provide clear and concise information.

▪ Clear: The MPO will use easy to understand text and graphics.

▪ Engaging: The MPO will hold meetings that are fun, interactive, and meaningful.

The MPO uses the “Spectrum of Public Participation.” It was developed by the International Association of Public Participation. The spectrum helps identify when to use tools in the process.

153

Page 158:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

Alamo Area Metropolitan Planning Organization |Policy 2: Public Participation Plan 12

The table shows different communication tools. The last column shows the level of participation. It corresponds to the Spectrum of Participation. Some strategies, such as outreach tools, are solely informational. Others can include multiple points on the spectrum.

Meetings /Speaking Engagements

Type Description Level of Participation

Public Meetings An organized large-group meeting usually used to make a presentation and give the public an opportunity to ask questions and give comments. Public meetings are open to the public at large. They are set up to be welcoming and as receptive as possible to ideas and opinions. This format allows for greater interaction between technical staff and the public.

Inform

Consult

Involve

Collaborate

Project Workshops/Open-Houses

This type of public meeting is open and more informal. Team members interact with the public on a one-on-one basis. Short presentations may be given at these meetings. They will be followed by small group exercises or exhibits that people can visit on their own.

Inform

Consult

Involve

Collaborate

Public Hearings Formal meetings with scheduled presentations offered. Typically, members of the public individually state opinions/positions that are recorded without an immediate response. Instead, comments are collected and responded to after the hearing through a formal comment response process.

Inform

Consult

Speakers Bureau MPO staff actively looks for opportunities to present to the community on a variety of topics including MPO 101, air quality, active transportation, walkability, bicycle safety, and travel demand management. Staff is trained to deliver presentations and answer associated questions prior to going out into the community.

Inform

Consult

Involve

Pop-Up Outreach Pop-up staff will conduct pop-up outreach in busy locations to inform, consult, and involve the community. This outreach method has been used effectively for Bike to Work Day and the MPO’s annual Fiesta Medal Outreach Campaign.

Inform

Consult

Involve

MPO Exhibit Tables MPO staff attend other agency events and staff tables or booths. These include activities, maps, charts and

Inform

154

Page 159:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

Alamo Area Metropolitan Planning Organization |Policy 2: Public Participation Plan 13

Meetings /Speaking Engagements

Type Description Level of Participation

informational brochures. Exhibit tables may also be used at malls or other public venues.

Consult

Small Group Meetings

During projects such as planning studies, meetings are held with small groups that have an interest in the project. Meetings could be with homeowners or neighborhood associations, civic groups, special interest groups, or other groups of affected or interested parties.

Inform

Consult

Involve

Partner Agency Meetings

MPO staff attends and participates in as many transportation partner public participation activities as is feasible to enhance public consideration of transportation issues, plans, and programs and to reduce redundancies and costs.

Inform

Consult

Involve

Collaborate

Online/Electronic Tools

Type Description Level of Participation

MPO Website The website was established in 1998 with basic information about the MPO process, members, meeting times and contact information. The site has been expanded to include information about specific projects undertaken by the MPO. Bicycle, pedestrian and trails information and event schedules are also included. Work products such as the UPWP, TIP and MTP are available from the website. The site provides many links to other transportation related sites from the local to national level. The site is continually maintained and updated by MPO staff and is used to promote regular and special meetings, planning studies, bicycle and pedestrian events, publications and work products.

Inform

FastTrack E-Newsletter

The MPO publishes an electronic newsletter on a bi-weekly basis and distributes it according to the database e-mail list. Citizens are added to the distribution list at their own request. Opportunities to be added to the list occur during public meetings hosted by

Inform

Consult

155

Page 160:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

Alamo Area Metropolitan Planning Organization |Policy 2: Public Participation Plan 14

Online/Electronic Tools

Type Description Level of Participation

the MPO, during public events attended by the MPO, on the MPO website, and when citizens contact MPO staff. Each issue of the newsletter includes staff contact information, upcoming meeting schedules, the MPO website address, project highlights, and current planning project status reports. Information regarding significant transportation issues, MPO awards, and other one-time activities are also included.

Social Media The MPO will utilize appropriate social media avenues to post pertinent information and notices on a frequent basis. This also provides another opportunity for the public to provide public input to the MPO’s on-going planning process.

Inform

Consult

Involve

Project-specific Web Sites

For individual projects, project-specific websites may be used. These sites are used when project information is too extensive to be included on the MPO site. Project websites can contain study area maps, meeting announcements, descriptions of alternatives, comment forms, user surveys and project team contact information. Links to project sites are provided from the MPO site.

Inform

Consult

Involve

Crowdsourcing The MPO will utilize different online tools to solicit input, ideas, and suggestions from the public. This could be in the form of comments on a map or submitted via an online form.

Inform

Consult

Virtual public meetings

The MPO will provide online participation opportunities as appropriate. Virtual public meetings will include the same information provided at in-person public meetings and will be advertised at the same time as in-person opportunities. Further, virtual public meetings will typically be up for a period of at least two weeks and the beginning and end dates for the virtual public meeting will be included in the meeting notice.

Inform

Consult

Involve

Live webinars Meetings that occur online. The MPO uses Webex for its webinar meetings. These meetings combine telephone and video technology to allow people to see each

Inform

Consult

156

Page 161:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

Alamo Area Metropolitan Planning Organization |Policy 2: Public Participation Plan 15

Online/Electronic Tools

Type Description Level of Participation

other and view information online using web-based technology.

Involve

Online surveys Qualitative surveys conducted online and disseminated via email and social media. Respondents self-select whether or not to respond.

Inform

Consult

Involve

Public Notice Delivery Tools

Type Description Level of Participation

US Postal Service Traditional mail service is used for formal public hearing notices, as well as to publicize public meetings/workshops.

Inform

Email Email blasts are used in addition to traditional mailing to stakeholders and community members. Recipients have previously opted in to communications by providing their email addresses.

Inform

Phone The MPO regularly contacts members of the public and potential meeting participants via telephone to notify them of upcoming meetings and events.

Inform

Flyer/Notice Distribution

Meeting notices are posted in high-traffic gathering places, including but not limited to: schools, parks, libraries, community centers, and other such gathering places. This method of communication is especially helpful in environmental justice areas.

Inform

Transit Meeting flyers and related collateral material may also be available on buses, notifying riders of upcoming meetings.

Inform

157

Page 162:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

Alamo Area Metropolitan Planning Organization |Policy 2: Public Participation Plan 16

Print and Broadcast Media Tools

Type Description Level of Participation

Display Ads These ads are used to promote meetings or activities that are not regularly scheduled such as corridor or subarea workshops, project specific meetings, open houses, public meetings, or public hearings. They are published in local/regional newspapers and/or through social and digital media sites that provide the best coverage at an economical price.

Inform

Social Media Ads Social media advertising is a way to target audiences on specific networks through demographic information. The MPO uses social media ads to targeted stakeholders with messages that appear in their feeds.

Inform

Press Releases Formal press releases are sent to local media (newspaper, TV and radio) to announce upcoming meetings and activities and to provide information on specific issues being considered by MPO committees.

Inform

TV and Radio Public Affairs Shows

MPO staff will solicit radio and talk show appearances to provide information or to promote events and topics as appropriate.

Inform

Video and Audio Public Service Announcements

MPO staff will produce audio and video public service announcements for selected events and distribute them to the appropriate metro area radio, TV and cable stations.

Inform

Multimedia Tools

Type Description Level of Participation

Project Newsletters For individual projects, such as corridor or subarea studies, that are typically performed using consulting services, newsletters are often used to address specific project issues. These newsletters are mailed to targeted residents, businesses and property owners in the area affected by a particular study. Information regarding upcoming project meetings, alternatives being proposed

Inform

158

Page 163:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

Alamo Area Metropolitan Planning Organization |Policy 2: Public Participation Plan 17

Multimedia Tools

Type Description Level of Participation

in the area, and other project news is reported in these newsletters.

Other Newsletters When project-specific newsletters are not used, articles may be prepared for publication in other newsletters produced by municipalities, homeowner associations, church groups, civic groups, or others that may have an interest in the project. These articles are subject to the publication dates and space restrictions of publishers.

Inform

Videos

The MPO produces brief videos focused on topics of interest several times per month. These are shared on social media, through the MPO’s e-Newsletter and/or on the MPO website.

Inform

Flyers, Posters, Fact Sheets and Rack Cards

To provide summary information regarding MPO policy, programs and projects, flyers, posters, fact sheets and rack cards may be distributed at public meetings, posted on the MPO web site, and displayed in public places such as libraries and community centers. Individuals and special interest groups can also request these items directly from the MPO staff office.

Inform

Shareable content The MPO creates shareable information for social media to support MPO meetings, programs, and initiatives. The type of content can vary from shareable graphics sized for different social media platforms, infographics, videos, and sample posts. This content is shared to other public information officers at their monthly meeting, as part of media kits, and with partner organizations.

Inform

Bus Placards The MPO will use advertising space in VIA buses whenever possible as provided by VIA Metropolitan Transit for various MPO events.

Inform

Banners The MPO will consider using banner advertising such as physical street banners and internet page banners as appropriate for MPO events and activities.

Inform

159

Page 164:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

Alamo Area Metropolitan Planning Organization |Policy 2: Public Participation Plan 18

Public Participation Procedures

The MPO generates major planning documents that require public input and community consensus. As a result, they are made available for public comment using various outreach strategies. Members of the public can view all of the required documents, and any amendments, on the MPO website at www.alamoareampo.org or call 210-230-6929 to receive a copy. Following is a list of the major planning documents produced by the MPO.

• Metropolitan Transportation Plan, or long-range plan

• Transportation Improvement Program, or short-range plan

• Unified Planning Work Program

• Public Participation Plan

• Performance Measures Report

• Transportation Conformity Document

The Transportation Policy Board has set different approval processes depending on the item agendized for action. The two-step approval process is for new TIP, MTP and Transportation Conformity documents, as well as amendments to the TIP and MTP. The two-step process means that items will be presented to the Transportation Policy Board one month with action scheduled for the following month, allowing for a minimum public comment period of 30 days.

The MPO also has a process for an expedited, or one-step process, for TIP and MTP amendments that allows the board to hear the item presented and take action within one meeting.

Other items such as amendments to the Unified Planning Work Program, consultant contract awards and resolutions of support, as examples, are acted upon by the Transportation Policy Board in a one-step approval process.

Below, please find a description of the two-step and expedited one-step processes. For more information on these processes, please reference Policy 3. The following page identifies the planning steps required for each planning document produced by the MPO along with the minimum outreach strategies recommended for each. Whenever possible, the MPO will strive to go beyond the minimum outreach strategies.

Two-Step Approval Process 1. Present, for informational purposes, the Proposed Action to the Technical Advisory

Committee/Transportation Policy Board in month one 2. Present, for Action, to the Technical Advisory Committee/Transportation Policy Board in

month two

Expedited One-Step Approval Process (for TIP and MTP Amendments only)

• Transportation Policy Board hears a presentation and takes action at one meeting as opposed to two board meetings

160

Page 165:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

Alamo Area Metropolitan Planning Organization |Policy 2: Public Participation Plan 19

• Reserved for items requiring quick action due to impending federal or state requirements or deadlines (or for other reasons deemed in the community's best interest)

• Requires a 75% vote by the Transportation Policy Board to enter into a time certain public hearing and the Board will solicit input into the amendment(s) prior to taking action

Approval Process

Two-S

tep

Ap

pro

val

Pro

cess

One

-Ste

p A

pp

rova

l

Pro

cess

Exp

ed

ited

One

Ste

p P

roce

ss

w/ 7

5%

Boa

rd V

ote

for

pub

lic

hea

ring

30

Da

y C

om

ment

Peri

od

45

Da

y C

om

ment

Peri

od

Pa

rtne

r A

genc

y

Coord

ina

tion

New

s re

lease

New

spap

er

Ad

s

Soci

al m

ed

ia

E-ne

wsl

etter

Pub

lic M

eeting

Neig

hborh

ood

pre

sent

ations

TIP/MTP Development Process & Adoption of the TIP/MTP

Routine amendments to the TIP/MTP occurring between annual updates

Expedited process, urgent amendments to the TIP/MTP

Transportation Conformity

Adoption of the Unified Planning Work Program

Amendments to the Unified Planning Work Program

Public Participation Plan

Consultant Contract Award

Performance Measures and Targets

161

Page 166:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

Alamo Area Metropolitan Planning Organization |Policy 2: Public Participation Plan 20

Monitoring and Evaluation

This PPP will be reviewed and adopted, with revisions if necessary, at least every three (3) years. The following performance measures will be recorded by staff on a continuous basis to monitor and evaluate the effectiveness of participation strategies. Where appropriate, the Deputy Director and the Planning/Public Involvement Program Manager will set yearly targets. Adjustments to strategies will be made as needed to meet the public involvement plan goals.

Goals Addressed Public Involvement Tool Evaluation Method

Goals 1, 2, 3, 4, and 5 Public Participation Plan To be reviewed every three years

Goal 2 MPO Website Number of New Users Number of Returning users Page Views Sessions

Goal 2 FastTrack E-Newsletter Number of Subscribers Number of Emails Accepted Unique/Total Views

Goals 1, 2, and 3 Open Houses, Meetings, Workshops, and Public Hearings

Comment Cards and Meeting Evaluations Received

Goals 1, 2, and 3 Online Public Meetings Number of Participants

Goals 1, 2, and 3 Newspaper Advertisements Sign-in sheets – “How did you hear about this meeting?”

Goals 1, 2, and 3 Direct Mailings Distribution

Goals 1, 2, and 3 Press Releases Press Mentions

Goals 1, 2, and 3 Surveys Number of Responses

Goals 1, 2, and 3 Facebook Likes Engaged Users Total Daily Reach Total Daily Impressions Total Daily 30+ sec views

Goals 1, 2, and 3 Twitter Followers Impressions Retweets Likes Profile Visits Mentions

Goal 2 Instagram Followers Comments Likes

162

Page 167:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

Alamo Area Metropolitan Planning Organization |Policy 2: Public Participation Plan 21

Goals Addressed Public Involvement Tool Evaluation Method

Goal 2 YouTube Subscribers Watch Time

Goals 1, 2, and 3 Webstreaming Number of people watching

Goal 5 Attend Partner Agency Events Number of Events

In addition to the measures listed above, the MPO will provide meeting evaluation forms at public meetings, workshops, and hearings to collect qualitative feedback from participants that can be used to improve meeting processes for future events.

Revisions and Amendments This Public Participation Plan reflects the current policies of the Alamo Area MPO. At a minimum, these policies will be reviewed, revised if necessary and adopted every three (3) years.

Administrative amendments to the PPP include changes to the public involvement tools and strategies, revision of references to applicable regulations, misspellings, omissions or typographical errors. Staff performs these updates, with no notification required.

Amendments to the Participation Plan include any other changes that do not fit the administrative definition above. A two-step process and 45 days of public comment are required before adoption. If the document changes significantly due to public comments, an additional 45-day comment period is required.

Development of a new Public Participation Plan follows a two-step process and requires a 45-day comment period.

Policies Regarding Electronic Communications

Social Media The MPO recognizes the value in reaching out to the public on social media platforms such as Facebook, Twitter, Instagram, YouTube, and Nextdoor. The MPO uses these tools to communicate information to the public. They are also a convenient option for the public to communicate comments and questions directly to MPO staff. Following is the MPO’s official social media policy:

Comments on the MPO’s social media sites do not necessarily reflect the opinions and position of the MPO, its individual board members, administrators, officers, or employees. Further, the MPO reserves the right to remove or hide a comment that is in violation of the MPO’s policy without prior notification. The MPO does not endorse any content, viewpoint, product, or service linked from its social media sites and shall not be held liable for any losses caused by reliance on the accuracy, reliability, or timeliness of shared information. In addition to information provided by the MPO, the MPO’s social media sites may contain comments and opinions from unrelated third parties which are being provided as a convenience to the public and for informational purposes only. These comments or opinions do not constitute an endorsement or an approval by the MPO of any of the views or comments posted on the MPO’s social media platforms. More importantly, comments

163

Page 168:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

Alamo Area Metropolitan Planning Organization |Policy 2: Public Participation Plan 22

received and exchange via the MPO’s social media platforms do not count as official comments during a published comment period. MPO staff will make every effort to communicate the appropriate channels to submit comments, which typically include in-person, mail, fax, email, or through the organization’s online virtual public meetings.

The MPO’s social media sites serve as a limited public forum and all content published is subject to monitoring. In the same manner as a public forum, user-generated posts should be suitable in terms of time, manner and place. The MPO reserves the right to publish any posting, or to later remove it based on the following guidelines. Third party comments will be rejected or removed (if possible) when the content:

o Is off-subject or out of context o Contains obscenity or material that appeals to the prurient interest o Contains personal identifying information or sensitive personal information o Contains offensive terms that target protected classes o Is threatening, harassing, defamatory or discriminatory o Contains any copyrighted material owned by a third party o Circumvents Public Records and Open Meetings Laws o Incites or promotes violence or illegal activities o Contains information that reasonably could compromise individual or public safety o Advertises or promotes a commercial product or service, or any entity or individual

MPO social media sites are subject to applicable public records laws. Any content maintained in a social media format related to MPO business, including communication posted by the Agency and communication received from citizens, is a public record.

Section 508 Compliant Website The MPO is committed to ensuring that information posted on an MPO-sponsored website is accessible for all people regardless of ability or access method. Additionally, the MPO will conduct two compliance scans yearly, one in July and one in January, to detect Section 508 violations. Given that the MPO’s website was developed and updated in-house, violations will be corrected to the best of our ability. Upon request, all information contained on any MPO-sponsored website can be made available in an alternative format by contacting [Name and Title pending], at (210) 227-8651. The MPO’s websites make use of industry-standard techniques and preferred practices to provide the highest possible level of ADA website accessibility for our users. These include, but are not limited to, the characteristics of usability for screen reader users, keyboard-only users, users with low/impaired vision, users who are deaf and users who are color blind.

Known Accessibility Challenges

• The MPO is committed to assessing, prioritizing, and updating MPO websites found to be non-ADA compliant. At any point in time, we are in varying stages of progress toward our accessibility goal.

164

Page 169:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

Alamo Area Metropolitan Planning Organization |Policy 2: Public Participation Plan 23

• Some of our content is in PDF format only. We are working on a process to ensure all PDFs are accessible.

• Due to current technology constraints, there are some instances where we are unable to provide information in an accessible format (e.g. mapping information).

Relevant Documents Sample Outreach Checklist Sample Checklist for Planning an Accessible Meeting Environmental Justice Plan Limited English Proficiency Plan Social Media Plan

Revised: August 26, 2019

165

Page 170:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

Alamo Area Metropolitan Planning Organization

This page intentionally left blank.

166

Page 171:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

FY 2021 – 2024 Transportation Improvement Program

APPENDIX G

Policy 3:

Guidelines for Programming Projects in the Metropolitan Transportation Plan and the

Transportation Improvement Program

167

Page 172:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

Alamo Area Metropolitan Planning Organization

This page intentionally left blank.

168

Page 173:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

Policy 3: Guidelines for Programming Projects

in the Metropolitan Transportation Plan and the Transportation Improvement Program

This document constitutes the Alamo Area Metropolitan Planning Organization’s process for

programming projects in the Metropolitan Transportation Plan and the Transportation Improvement

Program. When considered for amendment, this document shall be subject to a public comment period

of approximately 30 days prior to adoption by the Metropolitan Planning Organization Transportation

Policy Board.

A. Purpose

The Alamo Area Metropolitan Planning Organization (MPO) develops a Transportation Improvement

Program (TIP) that programs projects for a minimum of the following four (4) fiscal years. The TIP

is forwarded to the Texas Department of Transportation (TxDOT) for inclusion into the Statewide

Transportation Improvement Program. The TIP project selection process begins with the long-range

Metropolitan Transportation Plan process. The public is invited to fully participate in the Metropolitan

Transportation Plan development process thus assisting in the selection and prioritization of

transportation improvement projects. Implementing agencies which include the Alamo Area Council

of Governments, Alamo Regional Mobility Authority, cities and counties within the MPO study area,

the Texas Department of Transportation (TxDOT), and VIA Metropolitan Transit, participate in the

Metropolitan Transportation Plan development process with one of the final products of the process

being a prioritized list of transportation projects to be eventually considered for inclusion in the TIP.

Projects in the TIP are either selected by the Transportation Policy Board in consultation with the

State (TxDOT) and transit operator (VIA) or selected by the State (TxDOT) in cooperation with the

MPO. Projects selected by the Transportation Policy Board are those that are to be funded with

Surface Transportation Program - Metro Mobility (STP-MM), Transportation Alternatives (TA) ,

Congestion Mitigation & Air Quality (CMAQ), and any other future U.S. Department of Transportation

(USDOT) or TxDOT funds suballocated to the local level.

B. Project Funding Categories Project funding categories in the TIP and MTP include but are not limited to:

Category 1 Preventative Maintenance & Rehabilitation

Category 2 Metropolitan and Urban Corridor Projects

Category 3 Non-Traditional Funding

Category 4 Statewide Connectivity Corridor Category 5 Congestion Mitigation and Air Quality (CMAQ) 1 Category 6 Structure Rehabilitation

Category 7 Surface Transportation Program – Metro Mobility or STP-MM

1 The Alamo Area MPO does not currently receive this type of funding.

169

Page 174:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

Category 8 Safety

Category 9 Transportation Alternatives

Category 10 Miscellaneous

Category 11 District Discretionary

Category 12 Strategic Priority

Federal Transit Administration Section 5307 (Urbanized Area Formula Grant Program)

Federal Transit Administration Section 5309 (Capital Grant Program)

Federal Transit Administration Section 5310 (Elderly and Disabled Transportation

Assistance Grant Program)

Federal Transit Administration Section 5339 (Bus and Bus Facilities Infrastructure

Investment Program)

C. Use of ‘Grouped’ Control Section Job (CSJ) Numbers

A CSJ (Control Section Job number) is an identifying project number used by the Texas Department

of Transportation. The MPO will use ‘Grouped’ CSJs for the following types of projects:

Preliminary Engineering

Right-of-Way Acquisition

Preventive Maintenance and Rehabilitation

Bridge Replacement and Rehabilitation

Railroad Grade Separations

Safety

Landscaping

Intelligent Transportation Systems Deployment

Bicycle and Pedestrian

Safety Rest Areas and Truck Weigh Stations

Transit Improvements

Projects that fall within these categories will be listed in an appendix of the Transportation

Improvement Program. Generally these Grouped CSJs will be used for projects funded under

Category 1 (Preventive Maintenance & Rehabilitation), Category 6 (Structure Rehabilitation),

Category 8 (Safety), and Category 10 (Miscellaneous). These projects are initially included in an

Appendix of a new TIP and are revised or amended administratively as allowed in Section G

Administrative Revisions.

Grouped CSJs will not be used for wholly or partially funded Category 2 (Metropolitan and Urban

Corridor), Category 5 (CMAQ, when allocated), Category 7 (STP-MM), or Category 9 (Transportation

Alternatives) projects.

170

Page 175:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

D. Use of Appendix D - Projects Undergoing Environmental Assessment

The purpose of Appendix D is to identify projects that are undergoing preliminary engineering and

environmental analysis (PE/EA) consistent with early project development. The Federal Highway

Administration allows these projects to be referenced in the current Transportation Improvement

Program in order to facilitate the feasibility and PE/EA phases. This Appendix contains projects that

are scheduled for implementation beyond the four years of the TIP time frame, and it in no way

implies that these projects are programmed in the TIP. Cost estimates are preliminary and do not

represent any commitment of construction funding. Consistency with the Metropolitan

Transportation Plan will be verified as alternatives are examined in studies or environmental

clearance efforts.

Projects listed in Appendix D will include, at a minimum, MPO ID number, county, sponsoring entity,

street name, project limits, project description, estimated let date and preliminary project cost.

E. Quarterly Review of Projects

Category 2 (Metropolitan and Urban Corridor) Projects

The implementing agency will submit amendments to the Category 2 (Metropolitan and Urban

Corridor) projects to the MPO in writing. For cost increases greater than 10%, the implementing

agency will also submit to the MPO justification for the cost increase and the funding source of the

additional amount. For new projects being amended into the TIP that are not part of the current

Unified Transportation Program, the implementing agency will also submit to the MPO which other

Category 2 projects are being amended to allow for the inclusion of the new project unless the new

projects are funded using additional allocation.

Category 7 (STP-MM) and Category 9 (TA) Projects

Every three (3) months, a detailed review of Category 7 (STP-MM) and Category 9 (TA) funded

projects in the TIP will be conducted. These projects will be reviewed for progress towards their

letting (contract) dates, cost estimates, description and limits. If warranted by the detailed review,

projects may be re-prioritized at the discretion of the Transportation Policy Board.

If the quarterly review warrants amendment(s) to the TIP, such amendment(s) will be presented

to the Transportation Policy Board for consideration in sufficient time to allow the amendment(s) to

be incorporated into the next regularly scheduled quarterly amendment of the Statewide

Transportation Improvement Program.

F. Amendment Process The following changes will require an amendment to the TIP and MTP:

Adding or deleting project(s) Revising the project scope of work

Revising the project cost

171

Page 176:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

Revising funding categories

Revising the phase of work (ex: from P.E. to construction)

Revising project limits

Amendments to the TIP and MTP require a two-step process. To permit adequate public review

and comment, amendments to the TIP and MTP will be presented at a Transportation Policy Board

meeting with action on the amendment occurring at the following Transportation Policy Board

meeting (approximately 30 days after initial presentation). TIP and MTP amendments are provided

in the meeting package which is posted on the MPOs website a week prior to TAC and TPB meetings.

Amendments to both the TIP and the MTP may be initiated concurrently.

Amendments to the TIP or the MTP requiring quick action due to impending federal or state

requirements or deadlines (or for other reasons deemed in the community's best interest) may be

accomplished by a 75% vote of the TPB quorum present to waive the routine two-step process. In

these cases, the Transportation Policy Board will hold a special public hearing within their normal

meeting agenda to specifically solicit public comment on the proposed TIP or MTP amendment.

These actions will be emphasized on the meeting agenda that is both mailed and e-mailed out ten

(10) days prior to the Transportation Policy Board meeting. This will alert the public and permit

special attendance to comment on the action prior to adoption by the Transportation Policy Board.

Governing bodies of the sponsoring agencies will promptly notify the MPO in writing of any currently

programmed projects that are proposed to be deleted from the TIP. The governing body of the

sponsoring agency shall state its preference for project replacement in the written notification. The

Transportation Policy Board will provide direction and/or may consider action at the next appropriate

meeting with respect to amending the TIP.

To the extent possible, any project amended outside the timeframe of the current TIP due to funding

limitations will have priority consideration in being amended back into the TIP when additional

funding becomes available.

G. Administrative Revisions The MPO Director is authorized to approve certain “administrative changes” to the TIP with the

notification of such to the appropriate transportation planning partners. The intent of this section is not to circumvent the public process for amending the TIP, but to allow for minor corrections to the TIP that do not materially change a project’s function including minor revisions to project limits, scope or cost.

H. Category 7 (STP-MM) Projects

Basic Requirements for STP-MM Projects All projects submitted for consideration for funding through normal Category 7 (STP-MM) program

allocations will compete through a standard project call when a new TIP is being developed. The

Transportation Policy Board will approve a schedule, parameters and project selection criteria prior

to the formal project call. Submitted projects must meet the following basic requirements:

172

Page 177:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

1. Projects will be submitted to the MPO through an implementing agency (Alamo Area Council

of Governments, Alamo Regional Mobility Authority, Texas Department of Transportation,

VIA Metropolitan Transit and cities and counties within the MPO Study Area) and appropriate

commitments of local match shall be made. Approval of the commitment of the local match

from the Texas Department of Transportation District Engineer or the policy body of the

local agency submitting the project for consideration will be obtained and submitted to the

MPO. An ‘in-kind’ match is not allowed for construction projects.

2. All submitted projects shall be developed in accordance with minimum standards as defined

by AASHTO and/or NACTO, as applicable.

3. Each implementing agency is encouraged to address Title VI and Environmental Justice

considerations in submitting projects to the MPO for consideration.

4. Agencies should consider the transit service area when submitting projects.

5. Pedestrian and bicycle facilities will be included in all future transportation improvement

projects. Any exceptions will need to be adequately justified by management of the

implementing entity. Bicycle and pedestrian components included in a funded project may

not be deleted from the project at a future date.

6. Funded STP-MM projects will also be included in the MTP. Note: Amendments to the MTP

and the TIP are made through the amendment process at the discretion of the

Transportation Policy Board. Amendments to the MTP and TIP, can be made simultaneously.

7. A roadway project submitted for consideration in the TIP must be on a functionally classified

facility as defined by the MPO and approved by Federal Highway Administration through the

State. Roadway projects on facilities classified as a local street or minor collector do NOT

qualify for Federal funding.

8. All deadlines set by the MPO are firm.

STP-MM Call for Projects Process Prior to each STP-MM project call, MPO staff will develop the schedule, submittal form and call for projects process, to include workshop(s) jointly hosted by the MPO and TxDOT. These items will be reviewed and acted upon by the Bicycle Mobility Advisory Committee (BMAC), Pedestrian Mobility Advisory Committee (PMAC), and Technical Advisory Committee (TAC) with final action by the Transportation Policy Board. MPO staff will be responsible for assembling data for the technical scoring process. A subcommittee of BMAC and PMAC will score standalone bicycle and pedestrian projects. A subcommittee of TAC will score added capacity and operational projects.

173

Page 178:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

STP-MM Project Selection

The TAC will review the technical scoring, public input, project readiness and agency priorities and

make a recommendation to the MPO’s Executive Committee on a slate of projects to be funded. The Executive Committee will make a recommendation to the Transportation Policy Board. The TAC may request presentations by implementing agencies.

STP-MM Project Implementation

1. Unless allocated a fixed amount, each STP-MM project will have a cost figure in the

approved TIP that is an estimate. This TIP “Estimated Construction Bid” shall include all

construction costs at 100% and shall designate what percent match is required by the

local agency.

“Estimated Construction Bid” is defined as all anticipated bid item costs of the improvement project, other than for right-of-way acquisition, utility relocation or betterment, preliminary engineering, environmental analysis/clearance, contingency, change orders and construction engineering. The amount programmed as the “Construction Cost” in the TIP shall equal the “Estimated Construction Bid”.

2. Unless allocated a fixed amount, each selected STP-MM project may be adjusted when

bids are approved.

a. If bids are higher than the TIP Construction Cost, the TIP estimate shall become a

fixed construction funding cap.

b. If the Approved Construction Bid is lower than the TIP Construction Cost, the TIP shall be administratively revised by MPO staff to reflect the approved Construction bid (excludes any right-of-way acquisition, utility relocation or betterment, preliminary engineering, environmental analysis/clearance, contingency, and construction engineering)

c. Following the establishment of the project construction amount in items 2a and 2b

above, the sponsoring entity is then eligible for up to 10% contingency of STP-MM project funding towards eligible change orders and up to 11% of STP-MM project funding towards eligible construction engineering and construction management costs. An under run in contingency cannot cover an over run in construction engineering/construction management and vice versa.

As these eligible change orders and eligible construction engineering costs are potential costs, they are not specifically programmed in the TIP towards the STP-MM. These costs, if incurred, would impact future fiscal allocations and it must be acknowledged that this could require the delay and/or re-scoping of existing TIP projects to remain fiscally constrained by fiscal year.

174

Page 179:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

3. Once a project is included in the TIP, TxDOT and the local governmental entity (implementing agency) shall execute a Funding Agreement.

a. Prior to letting, the executed Funding Agreement will be based on the Estimated

Construction Bid (identified as Construction Cost in the TIP) and reflect:

Estimated Construction Bid + maximum 10% contingency of STP-MM project funding for eligible change orders + maximum 11% of STP-MM funding for eligible construction engineering and construction management costs.

b. Post Letting, if the Approved Construction Bid (excluding any right-of-way

acquisition, utility relocation or betterment, preliminary engineering, environmental

analysis/clearance, contingency, and construction engineering) is lower than the TIP

Construction Cost, the Funding Agreement will be amended and re-executed to

reflect:

Approved Construction Bid + maximum 10% contingency of STP-MM project funding for eligible change orders + maximum 11% of STP-MM funding for eligible construction engineering and construction management costs.

4. Owner requested change orders will be covered 100% by the local agency. Owner

requested change orders are the result of changes requested by the local agency, not

included in the original TPB approved scope of work.

I. Category 9 (TA) Projects

Basic Requirements for TA Projects The MPO will hold a competitive call for projects for TA funding. The Transportation Policy Board

will approve a schedule, parameters and project selection criteria prior to the formal project call.

Submitted projects must meet the following basic requirements:

1. Projects will be submitted to the MPO through an implementing agency and appropriate

commitments of local match shall be made. Approval of the commitment of the local match

from the agency submitting the project for consideration will be obtained and submitted to

the MPO. An ‘in-kind’ match is not allowed for construction projects.

2. All submitted projects shall be developed in accordance with minimum standards as defined

by AASHTO and/or NACTO, as applicable.

3. Each implementing agency is encouraged to address Title VI and Environmental Justice

considerations in submitting projects to the MPO for consideration.

175

Page 180:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

4. Agencies should consider the transit service area when submitting projects.

5. Funded TA projects will also be included in the MTP. Note: Amendments to the MTP and

the TIP are made through the amendment process at the discretion of the Transportation

Policy Board. Amendments to the MTP and TIP, can be made simultaneously.

6. All deadlines set by the MPO are firm.

TA Call for Projects Process Prior to each TA project call, MPO staff will develop the schedule, submittal form and call for projects process. These items will be reviewed and acted upon by the Bicycle Mobility Advisory Committee (BMAC), Pedestrian Mobility Advisory Committee (PMAC), and Technical Advisory Committee (TAC) with final action by the Transportation Policy Board. MPO staff will be responsible for assembling data for the technical scoring process. A subcommittee of BMAC and PMAC will score TA projects.

TA Project Selection BMAC and PMAC will review the technical scoring, public input, project readiness and agency

priorities and make a recommendation to the Technical Advisory Committee on a slate of projects to be funded. The TAC may request project presentations by implementing agencies and will make a recommendation to the MPO’s Executive or Transportation Policy Board, as directed by the approved call for projects process.

J. Public Involvement

The MPO commits to a public involvement process that includes the provision of timely information,

provides reasonable public access to technical and policy information, provides adequate public

notice, seeks out and considers traditionally underserved populations, and documents significant

comments. Please see the MPO Policy 2: Public Participation Plan for additional information on

public involvement.

Adopted: December 4, 2017

176

Page 181:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

FY 2021 – 2024 Transportation Improvement Program

APPENDIX H

FAST Act Requirements

177

Page 182:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

Alamo Area Metropolitan Planning Organization

This page intentionally left blank.

178

Page 183:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

FAST Act Requirements Integration of Performance Measures into the

Alamo Area Metropolitan Planning Organization FY 2021 – 2024 Transportation Improvement Program

Introduction

The Moving Ahead for Progress (MAP‐21) federal transportation bill instituted performance

measurement to provide greater accountability and transparency to achieve the most efficient and

effective investment of transportation resources. Performance measurement requirements were

refined in the Fixing America’s Surface Transportation (FAST) Act. State DOTs and Metropolitan Planning

Organizations (MPOs) are required to move towards a performance‐based planning process with an

emphasis on project selection based on specific planning factors. Among its project scoring criteria, the

Alamo Area Metropolitan Planning Organization (AAMPO) considers the following factors for selection

of projects in its financially constrained project list:

• Highway Safety: Three year average of vehicle‐related fatal and incapacitating crashes within

the project limits

• Congestion: Current and future Volume/Capacity ratio in excess of 1.0

• Bicycle and Pedestrian Safety: Three year average of bicycle and pedestrian‐related fatal and

incapacitating crashes within the project limits, adjacent vehicle volumes and speeds and

proximity to moving traffic

Safety

Under the FAST Act, States are required to set annual safety performance targets. The annual measures

States set targets for include:

• Number of fatalities (The total number of persons suffering fatal injuries in a motor vehicle crash

during a calendar year).

• Rate of fatalities per 100 million vehicle miles traveled (VMT) (The ratio of total number of

fatalities to the number of vehicle miles traveled (VMT expressed in 100 Million VMT) in a

calendar year).

• Number of serious injuries (The total number of persons suffering at least one serious injury in a

motor vehicle crash during a calendar year).

• Rate of serious injuries per 100 million VMT (The ratio of total number of serious injuries to the

number of VMT (VMT expressed in 100 Million VMT) in a calendar year).

• Number of non‐motorized fatalities and number of non‐motorized serious injuries combined

(The combined total number of non‐motorized fatalities and non‐motorized serious injuries

involving a motor vehicle during a calendar year).

179

Page 184:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

The Texas Department of Transportation established the statewide targets to support the Strategic

Highway Safety Plan (SHSP) and the Highway Safety Improvement Program (HSIP). Once the State of

Texas set their safety targets, MPOs within Texas were required to either adopt the Texas targets or set

their own that would help achieve the statewide target. To date, the AAMPO Transportation Policy

Board has adopted TxDOT’s statewide safety targets which are found in the table below.

Safety Targets

(expressed as a five year average) Adopted

January 2018 Adopted

January 2019 Adopted

January 2020 Adopted

January 2021

Total Traffic Fatalities Year per

Calendar Year 3,703.8 3,791 4,068 pending

Rate of Traffic Fatalities per

100M VMT 1.432 1.413 1.48 pending

Number of Serious Injuries 17,565.4 17,751 18,602 pending

Rate of Serious Injuries per

100M VMT 6.740 6.550 6.56 pending

Number of Non Motorized

Fatalities and Serious Injuries 2,250.6 2,237.6 2,477 pending

The graphs below document the AAMPO study area crash trends since 2010.

180

Page 185:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

For each safety target, overall, crashes and rates are trending downward. This may be due to the extensive education programs such as Vision Zero and Street Skills classes that have been implemented in the last few years. Additionally, an emphasis on safe sidewalks, bike lanes, lighting, pavement markings, improved traffic signals and other funded infrastructure improvements should result in a downward on crashes and rates.

Transit Asset Management As part of the FAST Act, performance measures were incorporated for transit agencies, primarily through the Transit Asset Management (TAM) assessment and planning requirements. A Tier II provider in the Alamo Area, Alamo Regional Transit, opted to work toward achievement of the statewide TAM plan and targets. VIA Metropolitan Transit (VIA) is the only Tier 1 transit provider serving the Alamo Area and developed its own TAM plan to meet that requirement. All assets owned by VIA were examined using the Federal Transit Administration (FTA) Transit Economic Requirements Model (TERM) which uses a scale of one to five to determine the quality of the asset. The scale is as follows:

1 = Poor: The asset is critically damaged or in need of immediate repair; well past useful life.

2 = Marginal: Defective or deteriorated in need of replacement; exceeded useful life.

3 = Adequate : Moderately deteriorated or defective; has not exceeded useful life.

4 = Good: Good condition, no longer new, may be slightly defective/deteriorated but is functional.

5 = Excellent: No visible defects, new or near new, may still be under warranty if applicable.

An asset is deemed to be in good repair if it has a rating of 3, 4, or 5 on this scale. Likewise, an asset is deemed to not be in good repair if it has a rating of 1 or 2. Using this scale, VIA examined revenue vehicles, non‐revenue vehicles and facilities.

In June 2020, the AAMPO approved the TAM targets below.

1. Equipment ‐ percentage of non‐revenue vehicles that have either met or exceeded their useful life benchmark (ULB):

Asset Class 2020 Performance Targets

Automobiles 2.69%

Trucks and Other Rubber Tire Vehicles 5.91%

181

Page 186:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

2. Rolling Stock ‐ percentage of revenue vehicles that have either met or exceeded their useful life

benchmark (ULB):

Asset Class 2020 Performance Targets

Articulated Bus 0%

Bus 0%

Vans 0%

3. Facilities – percentage of facilities rated below condition 3 (adequate) on the TERM scale:

Asset Class 2020 Performance Targets

Administrative 0%

Maintenance 0%

Passenger/Parking 0%

Roadway System Performance Targets Under the FAST Act, States are required to set targets for Roadway System Performance, specifically Interstate Reliability, Non Interstate National Highway System Reliability and Truck Travel Time Reliability. In December 2018, the AAMPO Transportation Policy Board adopted targets for the study area that will contribute to the State being able to meet its adopted targets. For the Alamo Area the adopted targets are:

1. Interstate Reliability: 65.0% 2. Non Interstate National Highway System Reliability: 45.0% 3. Truck Travel Time Reliability: 2.20

The AAMPO commits to planning for and programming projects that contribute to the accomplishments of these targets. The AAMPO will also monitor the established targets and report achievements to the Transportation Policy Board as required. The AAMPO understands it is not yet required to set targets for 1) Annual Hours of Peak Excess Delay per Capita, 2) Percent Non‐SOV Travel, and 3) Total Emissions Reductions based on the current applicability determination. Bridge / Pavement Condition Targets Under the FAST Act, States are required to set targets for Bridge and Pavement Condition for both Interstate and Non Interstate National Highway System roadways. In December 2018, the AAMPO Transportation Policy Board adopted targets for the Metropolitan Area Boundary (study area). These targets are as follows:

1. Pavement in Good Condition: a. National Highway System (Interstate): 66.4% b. National Highway System (Non Interstate): 52.3%

182

Page 187:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

2. Pavement in Poor Condition

a. National Highway System (Interstate): 0.3% b. National Highway System (Non Interstate): 14.3%

3. National Highway System Bridge Condition a. Good: 50.42% b. Poor: 0.8%

The AAMPO commits to planning for and programming projects that contribute to the accomplishments of these targets. The AAMPO will also monitor the established targets and report achievements to the Transportation Policy Board as required.

FY 2021 – FY 2024 Transportation Improvement Program Analysis

Upon adoption of the FAST Act, a direct correlation between TAM Plans, safety targets, roadway system performance targets and bridge/pavement condition targets needed to be established through project selection as reflected in the Transportation Improvement Programs (TIPs). The AAMPO’s FY 2021‐2024

TIP was reviewed and this analysis developed showing how projects included in the TIP help achieve TAM plan requirements, safety, roadway reliability, and pavement and bridge condition.

Transit Projects

VIA Metropolitan Transit developed investment priorities for vehicles and facilities. Transit projects listed in the FY 2021‐2024 Transportation Improvement Program include:

Revenue Vehicles

1. Purchasing of CNG buses ($45,075,016)

2. Purchasing of paratransit vehicles ($10,249,960)

Non‐Revenue Vehicles

1. From 2021 through 2024 VIA plans to continue its replacement program of non‐revenue cars and trucks ($1,865,271)

Facilities

1. VIA has planned for improvements to many of its passenger facilities including: IH 10 Park & Pool lot, Randolph P&R, Robert Thompson Transit Center and others. Total investment for

the four year time period in passenger facilities is $41,147,137. 2. VIA has also planned for improvements to its Maintenance Facility, Bus Yard,

Administration Building, and a new satellite Maintenance Facility for a total investment of $43,286,941.

Roadway Projects

Safety

Most of the roadway projects included in the TIP have significant impact on improving safety and thus

work towards achieving the adopted safety targets. Generally, these projects include: stand‐alone safe

183

Page 188:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

bicycle and pedestrian projects and Complete Streets (road diet) projects; added capacity and

operational projects that also include safe bicycle and pedestrian facilities; intersection improvements;

safety lighting; improved traffic signals; grade separated overpasses; installation of flashing beacons;

and Intelligent Transportation Systems projects. While it would be redundant to relist the relevant

projects in the TIP in this document, some of the major efforts include:

Implementing the Safety Service Patrol on controlled access highways in Bexar, Comal and

Kendall Counties to quickly clear disabled vehicles and primary crashes and prevent secondary

crashes

Constructing direct connectors at the following interchange locations: SH 151 at Loop 1604, IH

10 at Loop 1604, IH 410 N at Loop 1604, IH 35 at IH 410 North and at IH 410 South, to reduce

conflict points and crashes

Constructing interchange improvements at IH 410/US 281/San Pedro to reduce weaving which

will prevent crashes

Constructing a bicycle and pedestrian bridge on SS 536 at the San Antonio River

A number of roadway projects in the TIP also include improvements to bicycle and pedestrian facilities

to improve the safety of non‐motorized travelers. Additionally, there are a number of locally funded

road diet projects to reduce the number of vehicle travel lanes and provide wider sidewalks and marked

bike lanes.

Additional safety improvements from the Grouped CSJ project list include:

Improving traffic signals at 18 locations

Improving safety lighting at 18 locations

Improving pavement markings on 97 roadway segments

Implementing pedestrian safety improvements at 5 locations

For many years the AAMPO has been proactively working to improve safety in the region. AAMPO staff

have been long time users of TxDOT’s Crash Records Information System (CRIS dataset) and have

reported, through project scoring processes, online dashboards, and presentations, the crash data trend

for the region. Since 1997, AAMPO staff have also worked with partner agency staff on our Active

Transportation Program to host Walkable Community Workshops with schools and neighborhood

groups to identify bicycle and pedestrian needs in their communities. AAMPO staff also hold Streets

Skills classes for teens and adults in both English and Spanish for new and returning cyclists. Bicycle

helmets and bike light sets are provided as an incentive for participation. AAMPO staff also assists with

school bike rodeos to be sure safe cycling starts early. The City of San Antonio was an early adopter of

the Vision Zero initiative and the AAMPO continues to partner with San Antonio and other local

governments on safety outreach efforts.

Roadway System Reliability

Because the AAMPO’s project selection process considers reliability, specifically reliability in the form of

reducing congestion, both current and projected congestion levels, many of the roadway projects

included in the TIP can have significant impact on improving travel reliability and thus work towards

achieving the adopted targets. Generally, these projects include: added capacity projects and certain

184

Page 189:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

operational projects including intersection improvements, grade separated overpasses and interchange

direct connectors. While it would be redundant to relist all of the relevant projects in the TIP in this

document, some of the major efforts, primarily focusing on the National Highway System, include:

Constructing direct connectors at the following interchange locations: SH 151 at Loop 1604, IH

10 at Loop 1604, IH 410 N at Loop 1604, IH 35 at IH 410 North and at IH 410 South, to reduce

conflict points and crashes *

Constructing interchange improvements at IH 410/US 281/San Pedro to reduce weaving which

will prevent crashes

Expanding IH 35 North from IH 410 S to FM 3009 from 8 to 14 lanes, including

HOV/special use lanes *

Expanding IH 10 East from Bexar/Guadalupe County Line to FM 465 from 4 to 6 lanes *

Expanding IH 10 East from FM 464 to SH 123 from 4 to 6 lanes *

Expanding Loop 1604 from SH 16 to Redland Road from 4 to 10 lanes expressway to include

HOV/special use lanes

Expanding SH 151 from Loop 1604 to IH 410 from 4 to 6 lanes expressway

Expanding SH 46 from Farhills to US 281 from 2 to 6 lanes *

Those projects noted with an asterisk (*) are on heavy truck travel roadways and improvements to these

roadways can improve truck travel time reliability.

The AAMPO has used its travel demand model to evaluate the projects programmed in its FY 2021‐2024

TIP, The table below shows the adopted projects in the TIP do fairly maintain speeds, thus maintaining

travel reliability on the system.

Facility Type 2017 Speed (mph) 2025 Speed (mph)

Interstate Freeways 40.6 39.3

Other Freeways 41.5 40.2

Expressways 34.2 33.2

Principal Arterials 25.2 23.9

Minor Arterials 22.5 21.0

Collectors 21.7 20.2

Frontage Roads 22.1 20.9

Ramps 26.7 25.4

Totals 29.7 28.3

185

Page 190:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

Bridge/Pavement Condition

Bridge and pavement condition targets are related to those roadways on the National Highway System.

Typically, when roadway capacity is added, the existing travel lanes are reconstructed also. As noted in

the previous section, many added capacity projects are included in the AAMPO’s FY 2021‐2024 TIP. For

each of these projects, then, when new lanes are added, the existing lanes are reconstructed, thus

improving the condition of the entire facility. Major projects where pavement condition will be

significantly improved include:

IH 35 North from IH 410 S to FM 3009

IH 10 East from Bexar/Guadalupe County Line to FM 465

IH 10 East from FM 464 to SH 123

Loop 1604 from SH 16 to Redland Road

SH 151 from Loop 1604 to IH 410 SH 46 from Farhills to US 281

Additionally, 24 roadways are identified in the TIP for pavement rehabilitation

As noted in the Grouped CSJ project list, 10 locations are identified for replacement or rehabilitation of a bridge.

Conclusion

The AAMPO has proactively responded to the requirements of performance planning and target setting.

The AAMPO Transportation Policy Board commits to supporting, planning and programming funding for

projects and programs that contribute to the accomplishments of:

transit asset management,

safety targets,

NHS interstate reliability,

NHS non interstate reliability,

truck travel reliability,

NHS interstate pavement condition,

NHS non interstate pavement condition, and

NHS bridge condition.

The MPO, along with its partners will continue to monitor the established targets for all performance

measures and report achievements.

186

Page 191:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

A Resolution Adopting the Safety TargetsEstablished by the Texas Department of

Transportation for Year 2020

WHEREAS, the Alamo Area Metropolitan Planning Organization (MPO) is responsible fora multi-modal transportation planning and programming process; and

WHEREAS, the MPO provides local direction for urban transportation planning and theallocation of federal transportation funds to entities within the region; and

WHEREAS, Moving Ahead for Progress in the 21st Century Act and subsequent FixingAmerica's Surface Transportation Act require the implementation of PerformanceMeasures to assist in the transportation planning process; and

WHEREAS, the Texas Department of Transportation (TxDOT) has adopted its StrategicHighway Safety Plan, a data-driven statewide-coordinated safety plan to help reducefatalities and serious injuries on all public roads; and

WHEREAS, TxDOT has established targets for five Safety Performance measures foryear 2020 as follows:

1. Number of Fatalities: 4,0682. Rate of Fatalities per 100 million Vehicle Miles Traveled (VMT): 1.483. Number of Serious lnjuries: 18,6024. Rate of Serious lnjuries per 100 million VMT: 6.565. Number of Non-Motorized Fatalities and Serious lnjuries: 2,477; and

WHEREAS, the Alamo Area MPO previously took action supporting TxDOT's statewidesafety targets for 2018 and 2019.

NOW, THEREFORE, BE lT RESOLVED that the Alamo Area MPO hereby supportsTxDOT's statewide safety targets for year 2020.

BE lT FURTHER RESOLVED THAT the Alamo Area MPO supports TxDOT's visionarygoals to end traffic fatalities on Texas roads by year 2050 and reduce fatal crashes byhalf by year 2035.

BE lT FURTHER RESOLVED, that the Alamo Area MPO will plan and program projectsthat contribute to the accomplishments of said targets and goals.

BE lT FURTHER RESOLVED, that the Alamo Area MPO will monitor the establishedtargets and goals and report achievements to the Transportation Policy Board in Fall2020.

PASSED AND APPROVED this 27th day of January 2020

n Wolff, Chair

PO

Alamo Area Metropolitan Planning Organization187

Page 192:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

1lPlonning

amorea A Resolution Adopting the

Roadway System Performance Targets insupport of the

Texas Department of Transportation

WHEREAS, the Alamo Area Metropolitan Planning Organization (MPO) is responsible fora multi-modaltransportation planning and programming process; and

WHEREAS, the MPO provides local direction for urban transportation planning and theallocation of federal transportation funds to entities within the region; and

WHEREAS, Moving Ahead for Progress in the 21st CenturyAct and subsequent FixingAmerica's Surface Transportation Act require the implementation of PerformanceMeasures to assist in the transportation planning process; and

WHEREAS, the Texas Department of Transportation has established and adopted year2022 Roadway System Performance Targets, a data-driven statewide-coordinatedsystem to maintain travel reliability for people and for freight; and

WHEREAS, the MPO supports the regional 2022 targets developed by the Texas A&MTransportation lnstitute for the study area that contribute to the State meeting its adoptedtargets as follows:

1. lnterstate Reliability: 65.0%

2. Non Interstate National Highway System Reliability:45.0%

3. Truck Travel Time Reliability: 2.20

WHEREAS, the MPO understands it is not yet required to set targets for 1) Annual Hoursof Peak Hour Excess Delay per Capita, 2) Percent Non-SOV Travel; and 3) TotalEmissions Reduction based on the current applicability determination; and

NOW, THEREFORE, BE lT RESOLVED that the Alamo Area Metropolitan PlanningOrganization Transportation Policy Board hereby commits to the regional 2022 RoadwaySystem Performance Targets outlined above.

BE lT FURTHER RESOLVED, that the Transportation Policy Board will plan andprogram projects that contribute to the accomplishments of said targets.

BE lT FURTHER RESOLVED, that the MPO will monitor the established targets andreport achievements to the Transportation Policy Board as needed.

PASSED AND APPROVED this 1Oth day of December 2018

Kevin Wolff, ChairAlamo Area Metropolitan Planning Organization188

Page 193:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

xlPlonning

rFH

amorea A Resolution Adopting the

Bridge/Pavement Gond ition Targetsestablished by the

Texas Department of Transportation

WHEREAS, the Alamo Area Metropolitan Planning Organization (MPO) is responsible fora multi-modal transportation planning and programming process; and

WHEREAS, the MPO provides local direction for urban transportation planning and theallocation of federal transportation funds to entities within the region; and

WHEREAS, Moving Ahead for Progress in the 21st Century Act and subsequent FixingAmerica's Surface Transportation Act require the implementation of PerformanceMeasures to assist in the transportation planning process; and

WHEREAS, the State of Texas Department of Transportation has established andadopted year 2022 targets for Bridge and Pavement Conditions as follows.

1. Pavement in Good Conditiona, National Highway Sysfem (lnterstate): 66.4%b. National Highway Sysfem (Non-lnterstate): 52.3%

2. Pavement in Poor Conditiona. National HighwaySysfem (lnterstate): 0.3%ob. National Highway Sysfem (Non-lnterstate): 14.3%

3. National Highway System Bridge Conditiona. Good: 50.42%b. Poor:0.80%

NOW, THEREFORE, BE lT RESOLVED that the Alamo Area Metropolitan PlanningOrganization Transportation Policy Board hereby adopts the Texas Department ofTransportation's Bridge and Pavement Condition targets, as outlined above, within theMetropolitan Area Boundary.

BE lT FURTHER RESOLVED that the Transportation Policy Board will plan and programprojects that contribute to the accomplishment of said targets.

BE lT FURTHER RESOLVED that the MPO will monitor the established targets andreport achievements to the Transportation Policy Board as needed.

PASSED AND APPROVED this 1Oth day of December 2018

Kevin Wolff, ChairAlamo Area Metropolitan Planning Organization

189

Page 194:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

A Resolution Adopting the Transit AssetManagement Targets Established by

VIA Metropolitan Transit

WHEREAS, the Alamo Area Metropolitan Planning Organization (MPO) is responsible for amulti-modal transportation planning and programming process; and

WHEREAS, the MPO provides local direction for urban transportation planning and theallocation of federal transportation funds to entities within the region; and

WHEREAS, Moving Ahead for Progress in the 21st Century Act and subsequent FixingAmerica's Surface Transportation Act require the implementation of Performance Measures toassist in the transportation planning process; and

WHEREAS, VIA Metropolitan Transit has adopted its Transit Asset Management Targets tomaintain assets in a state of good repair; and

WHEREAS, VIA Metropolitan Transit has established targets for four Transit AssetManagement Performance measures for:

1. Equipment - percentage of non-revenue vehicles that have either met or exceeded theiruseful life benchmark (ULB)

a. Automobiles: 2.690/ob. Trucks and Other Rubber tire Vehicles. 5.91o/o

2. Rolling Stock - percentage of revenue vehicles that have either met or exceeded their ULB:a. Articulated Bus: 0%b. Bus: 0o/o

c. Vans: lYo

3. lnfrastructure - N/A, no passenger rail infrastructure

4. Facilities - percentage of facilities rated below condition 3 (adequate) on the TERM scalea. Administrative: 0%b. Maintenance: 0%c. Passenger/Parking: 0%

WHEREAS, VIA Metropolitan Transit will share their targets annually, but the MPO will revisittransit targets only when updating the Metropolitan Transportation Plan and/or Transportationlmprovement Program.

NOW, THEREFORE, BE lT RESOLVED that the Alamo Area Metropolitan PlanningOrganization Transportation Policy Board hereby adopts VIA Metropolitan Transit's TransitAsset Management targets.

BE lT FURTHER RESOLVED, that the Transportation Policy Board will plan and programprojects that contribute to the accomplishments of said targets.

BE lT FURTHER RESOLVED, that the MPO will monitor the established targets and reportachievements to the Transportation Policy Board in Fall 2020.

PASSED AND APPROVED this 22nd day of June 2020.

Kevin Wolff, Chair

PO

Alamo Area Metropolitan Planning Organization190

Page 195:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

191

Page 196:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

192

Page 197:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

193

Page 198:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

194

Page 199:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

195

Page 200:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

196

Page 201:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

197

Page 202:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

Alamo Area Metropolitan Planning Organization

This page intentionally left blank.

198

Page 203:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

FY 2021 – 2024 Transportation Improvement Program

APPENDIX I

Regionally Significant Roadway List

199

Page 204:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

Alamo Area Metropolitan Planning Organization

This page intentionally left blank.

200

Page 205:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

Alamo Area Metropolitan Planning Organization

Regionally Significant Project List

June 23, 2020

CSJ MPO Number Roadway Name Limit From Limit To Description Let Year 2017 ML 2025 ML 2035 ML 2045 ML 2017 FR 2025 FR 2035 FR 2045 FR Network Year Phase

0017-10-168 61.2 IH 35 North IH 410 S IH 410 NExpand from 8 ln to 14 ln expy - add 6 new express lanes incl 2 HOV-special use lns, & from 4/6 to 4/6 FR lanes & DCs at IH 410 S & IH 410

N; 1 lane DC: NB 35 to WB 410N; 2 lane DC: NB 410S to NB 35; SB 35 to SB 410S; EB 410N to SB 352022 8 8 14 14 4/6 4/6 4/6 4/6 2035,2045 C,E

2452-01-029 2020 Loop 1604 US 90 West Military Dr. Expand from 4 to 6 lane expressway & from 4 to 4 FR lanes 2030 4 4 6 6 4 4 4 4 2035,2045 C

3544-04-002 3153SH 211 (TX

Research Pkwy)

FM 1957 (Potranco Rd),

N 2.9 MiMedina County Line Construct two lane rural highway on new location 2021 0 2 2 2 0 0 0 0 2025,2035,2045 C

3544-05-001 3154SH 211 (TX

Research Pkwy)

Medina Co. Line, 4.5 Mi

N of FM 1957, NMedina Co. Line, 2.0 Mi S of FM 471 Construct two lane rural highway on new location 2021 0 2 2 2 0 0 0 0 2025,2035,2045 C

0016-07-113 3477 IH 35 IH 410 N Guadalupe/Bexar County Line

Expand from 8 ln to 14 ln expy - add 6 new express lanes incl 2 HOV-special use lns, & from 4/6 to 4/6 FR lanes & DCs at IH 410N & LP

1604; 1 lane DC: NB 35 to WB 1604; EB 1604 to SB 35; 2 lane DC: SB 35 to WB 1604; EB 1604 to NB 35; EB 410N to NB 35;SB 35 to WB

410N

2021 8 14 14 14 4/6 4/6 4/6 4/6 2025,2035,2045 C,E

0017-10-180 3514 IH 35 North US 281/IH 37, East IH 410 S Expand from 6 lane to 10 lane expy - add 4 new express lanes including 2 HOV - special use lanes & from 6 to 6 FR lanes 2040 6 6 6 10 6 6 6 6 2045 C

2452-03-087 3530 Loop 1604 Redland Road IH 35 North Expand from 4 to 10 lane expressway - including 2 HOV - special use lanes & from 4 to 4 FR lanes 2025 4 10 4 4 2035,2045 E,C

2452-03-113 3786 Loop 1604 US 281 Redland Road Expand from 4 to 10 lane expressway - including 2 HOV - special use lanes & from 4 to 4 FR lanes 2024 4 10 10 10 4 4 4 4 2025,2035,2045 C

2452-01-052 3911 Loop 1604 West Military Drive Braun RdExpand from 4 to 6 lane expressway & from 4/6 to 4/6 FR lanes, including direct connectors at SH 151 - NB 1604 to EB 151; WB 151 to SB

16042030 4 4 6 6 4/6 4/6 4/6 4/6 2035,2045 C

2452-01-053 3912 Loop 1604 Braun Rd SH 16 Expand from 4 to 8 lane expressway and from 6 to 6 FR lanes 2030 4 4 8 8 6 6 6 6 2035,2045 C

2452-02-083 3913 Loop 1604 SH 16 IH 10 Expand from 4 to 10 lane expressway - including 2 HOV-special use lanes, & from 4 to 4 FR lanes Reference #4049 and #5556 2021 4 10 10 10 4 4 4 4 2025,2035,2045 C

0915-12-509 3988 Bulverde Road Marshall Road Wilderness Oak Reconstruct and expand from 2 to 4 lanes with shoulder, pedestrian ramps, curb, bridge construction and drainage improvements 2021 2 4 4 4 0 0 0 0 2025,2035,2045 C

2452-02-128 4049 SL 1604 IH 10 US 281Expand from 4 to 10 lane expressway - including 2 HOV - special use lanes & from 4 to 4 frontage roads; 10/19 - add project; spin off of 2452-

02-083 (MPO #3913); no impact to conformity2021 4 10 10 10 4 4 4 4 2025,2035,2045 C

0915-12-585 5317 Blanco Road West Oak Estates Borgfeld Rd Expand from a 2 to 4 lane divided roadway with raised median, bike lanes, sidewalks, curbs and drainage 2021 2 4 4 4 0 0 0 0 2025,2035,2045 C

1433-01-028 5329 FM 2252 Evans Road Comal/Bexar County Line Expand from 2 lanes to 4 lanes with raised median or continuous left turn lane, bike lanes and sidewalk 2023 2 2 4 4 0 0 0 0 2035,2045 C

3212-06-017 5330.2 FM 3351Comal/Bexar County

LineIH 10 Expand from 2 to 4 lanes with turn lanes, bike lanes & sidewalks 2027 2 2 4 4 0 0 0 0 2035,2045 C

0849-01-055 5377 FM 471 Old FM 471 Medina County Line Expand from 2 to 4 lane divided with bike lanes and sidewalks 2022 2 4 4 4 0 0 0 0 2025,2035,2045 C

1477-01-043 5379 FM 1516 FM 78 IH 10 Expand from 2 to 4 lane divided with bike lanes and sidewalks 2022 2 4 4 4 0 0 0 0 2025,2035,2045 C

0024-07-059 5380 US 90 SH 211 0.8 Miles W of IH 410Expand from 4 lane divided to 6 lane expressway and 4 FR lanes (LP 1604 to SH 211) - 1 lane DC - SB 1604 to WB 90; NB 1604 to EB 90; NB

1604 to WB 90; EB 90 to NB 1604 & EB 90 to SB 1604; 2 lane DC: WB 90 to NB 1604 & WB 90 to SB 16042024 4 4 6 6 0 0 4 4 2035,2045 C

0024-08-138 5381 US 90 0.8 Miles W of IH 410 IH 410 Expand from 4 lane divided to 6 lane expressway and from 4 to 4 FR lanes 2024 4 4 6 6 4 4 4 4 2035,2045 C

3508-01-029 5382 SH 151 LP 1604 IH 410 Expand from 4 lane to 6 lane expressway and from 4/6 to 4/6 FR lanes including WB SH 151 to NB LP 1604 2 lane direct connector 2022 4 6 6 6 4/6 4/6 4/6 4/6 2025,2035,2045 C

2255-01-084 5386 SL 16040.38 Mi North of FM

1303FM 1303 Expand from 2 lanes to 4 lanes divided 2026 2 2 4 4 0 0 0 0 2035,2045 C

2255-02-027 5387 SL 1604 US 87 US 181 Expand from 2 lanes to 4 lanes divided 2026 2 2 4 4 0 0 0 0 2035,2045 C

2255-02-028 5388 SL 1604 US 181 0.38 Mi North of FM 1303 Expand from 2 lanes to 4 lanes divided 2026 2 2 4 4 0 0 0 0 2035,2045 C

2452-04-015 5389 SL 1604FM 1346 - Houston

StreetUS 87 Expand from 2 lanes to 4 lanes divided 2026 2 2 4 4 0 0 0 0 2035,2045 C

0072-07-075 5401 IH 10Kendall/Bexar County

LineFM 3351 Expand from 4 to 8 lane expressway - 2 new general purpose, 2 new HOV lanes & from 4 to 4 FR lanes 2025 4 4 8 8 4 4 4 4 2035,2045 C

0521-05-144 5402 IH 410 US 90 IH 35 SExp fr 6 to 8 lns btwn US 90 & Valley Hi; frm 4 to 6 lns btwn Valley Hi & IH 35 S; frm 4/6 to 4/6 FR ln; construct all DCs at IH 35 S; all DCs are

1 lane; cloverleaf remains for FR connectivity2028 4/6 4/6 6/8 6/8 4/6 4/6 4/6 4/6 2035,2045 C

0000-00-000 5408.1 Bulverde Road Briar Crest North of Quiet Meadow Street Expand from 2 lanes and CTL to 4 lanes and CTL 2021 2 4 4 4 0 0 0 0 2025,2035,2045 C

2452-04-017 5554 SL 1604 Martinez Creek FM 1346 - Houston Street Expand from 2 lanes to 4 lanes divided 2025 2 4 4 4 0 0 0 0 2025,2035,2045 C

2452-01-070 5557 SL 1604 0.7 Mi North of FM 2536 Macdona-Lacoste Rd Expand from 2 lanes to 4 lanes divided 2031 2 2 4 4 0 0 0 0 2035,2045 C

2452-03-111 9107 SL 1604 FM 78 IH 10 East Expand from 4 lane divided to 4 lane expressway and from 0 to 4 FR lanes 2025 4 4 4 4 0 0 4 4 2035,2045 C

2020-02-031 9110.1 Loop 1604 IH 35 S 0.7 Mi North of FM 2536 Expand from 2 lanes to 4 lanes divided 2031 2 2 4 4 0 0 0 0 2035,2045 C

2452-01-066 9110.2 Loop 1604 Macdona-Lacoste Rd US 90 W Expand from 2 lanes to 4 lanes divided 2022 2 2 4 4 0 0 0 0 2025,2035,2045 C

Note: Sorted by MPO Project Number

201

Page 206:  · Alamo Area Metropolitan Planning Organization ii FY 2021 – 2024 Transportation Improvement Program Opportunities for Public Comment Public Meeting Dates All meetings were simila

Alamo Area Metropolitan Planning Organization

This page intentionally left blank.