Agenda
1. SPRC #2 Follow-Up
2. Transportation:
• Infrastructure
• Transportation Improvements
• Automobile Parking
• Deliveries
3. Open Space:
• Orientation and Use
• Relationship to Adjacent
• Compliance
• Landscape Plan
4. Q & A / Discussion
Pg 1
16 Sep 2015 SPRC #3
![Page 2: Agenda - Amazon Web Servicesarlingtonva.s3.amazonaws.com/wp-content/uploads/sites/31/... · 2015-09-30 · Pg 3 16 Sep 2015 SPRC #3 SPRC 2 Follow-up –Wilson Boulevard Bridge Update](https://reader033.vdocuments.us/reader033/viewer/2022042007/5e7043afb1dc045d2d5a7934/html5/thumbnails/2.jpg)
Pg 2
SPRC 2 Follow-Up:
a) Bridge update
b) Connectivity – Randolph Street and Liberty Center South Pedestrian Pathway
c) Mews – Scale, Proportions, and Materials Palette
d) Glebe Road Enhancements
16 Sep 2015 SPRC #3
![Page 3: Agenda - Amazon Web Servicesarlingtonva.s3.amazonaws.com/wp-content/uploads/sites/31/... · 2015-09-30 · Pg 3 16 Sep 2015 SPRC #3 SPRC 2 Follow-up –Wilson Boulevard Bridge Update](https://reader033.vdocuments.us/reader033/viewer/2022042007/5e7043afb1dc045d2d5a7934/html5/thumbnails/3.jpg)
Pg 3
16 Sep 2015 SPRC #3SPRC 2 Follow-up – Wilson Boulevard Bridge Update
Proposed Bridge Alignment
Note that this image is provided for illustrative purposes only to demonstrate the proposed bridge alignment. The final design of the
bridge will be developed through a future effort involving community participation.
![Page 4: Agenda - Amazon Web Servicesarlingtonva.s3.amazonaws.com/wp-content/uploads/sites/31/... · 2015-09-30 · Pg 3 16 Sep 2015 SPRC #3 SPRC 2 Follow-up –Wilson Boulevard Bridge Update](https://reader033.vdocuments.us/reader033/viewer/2022042007/5e7043afb1dc045d2d5a7934/html5/thumbnails/4.jpg)
Pg 4
16 Sep 2015 SPRC #3SPRC 2 Follow-up – Wilson Boulevard Bridge Update
NEW ELEVATOR to CONNECT ALL MALL LEVELS:
GROUND LEVEL
Upper Plaza
Adjacency (and access) to Key Pedestrian Points:• Lower Plaza
• Wilson Boulevard Bridge Landing at Upper Level
• Key Mall Entry Point from Grade
• Escalators and Steps
Lower Plaza
Below
Pedestrian Bridge Above
N
Steps to lower plaza
Escalator to lower plaza
![Page 5: Agenda - Amazon Web Servicesarlingtonva.s3.amazonaws.com/wp-content/uploads/sites/31/... · 2015-09-30 · Pg 3 16 Sep 2015 SPRC #3 SPRC 2 Follow-up –Wilson Boulevard Bridge Update](https://reader033.vdocuments.us/reader033/viewer/2022042007/5e7043afb1dc045d2d5a7934/html5/thumbnails/5.jpg)
Pg 5SPRC 2 Follow-Up – Randolph Street Connectivity
Connection to Mews
16 Sep 2015 SPRC #3
Key
4040 WILSON BLVD(Under Const)
675 N Randolph(DARPA)
COUNTY GARAGE
• 6’ Wide with 10’ Ceiling
• Well Lit & Security Monitored
• Fully HC Accessible
• Same hours as Wilson Bridge
![Page 6: Agenda - Amazon Web Servicesarlingtonva.s3.amazonaws.com/wp-content/uploads/sites/31/... · 2015-09-30 · Pg 3 16 Sep 2015 SPRC #3 SPRC 2 Follow-up –Wilson Boulevard Bridge Update](https://reader033.vdocuments.us/reader033/viewer/2022042007/5e7043afb1dc045d2d5a7934/html5/thumbnails/6.jpg)
Pg 6
16 Sep 2015 SPRC #3SPRC 2 Follow-Up – Randolph Street Connectivity
Key
Connection to Mews
![Page 7: Agenda - Amazon Web Servicesarlingtonva.s3.amazonaws.com/wp-content/uploads/sites/31/... · 2015-09-30 · Pg 3 16 Sep 2015 SPRC #3 SPRC 2 Follow-up –Wilson Boulevard Bridge Update](https://reader033.vdocuments.us/reader033/viewer/2022042007/5e7043afb1dc045d2d5a7934/html5/thumbnails/7.jpg)
Pg 7
Key
16 Sep 2015 SPRC #3SPRC 2 Follow-up:
Mews Scale, Proportions, and Materials
![Page 8: Agenda - Amazon Web Servicesarlingtonva.s3.amazonaws.com/wp-content/uploads/sites/31/... · 2015-09-30 · Pg 3 16 Sep 2015 SPRC #3 SPRC 2 Follow-up –Wilson Boulevard Bridge Update](https://reader033.vdocuments.us/reader033/viewer/2022042007/5e7043afb1dc045d2d5a7934/html5/thumbnails/8.jpg)
Pg 8
Key
16 Sep 2015 SPRC #3SPRC 2 Follow-up:
Mews Scale, Proportions, and Materials
A B
Proposed Section A Proposed Section B
![Page 9: Agenda - Amazon Web Servicesarlingtonva.s3.amazonaws.com/wp-content/uploads/sites/31/... · 2015-09-30 · Pg 3 16 Sep 2015 SPRC #3 SPRC 2 Follow-up –Wilson Boulevard Bridge Update](https://reader033.vdocuments.us/reader033/viewer/2022042007/5e7043afb1dc045d2d5a7934/html5/thumbnails/9.jpg)
Pg 9
19.5’
+/- 24’
City Center DC
Mews
UK
16 Sep 2015 SPRC #3SPRC 2 Follow-up:
Mews Scale, Proportions, and Materials
20’ Cady’s
Alley DC
![Page 10: Agenda - Amazon Web Servicesarlingtonva.s3.amazonaws.com/wp-content/uploads/sites/31/... · 2015-09-30 · Pg 3 16 Sep 2015 SPRC #3 SPRC 2 Follow-up –Wilson Boulevard Bridge Update](https://reader033.vdocuments.us/reader033/viewer/2022042007/5e7043afb1dc045d2d5a7934/html5/thumbnails/10.jpg)
Current
Design
Pg 10
Key
16 Sep 2015 SPRC #3SPRC 2 Follow-up:
Mews Scale, Proportions, and Materials
Previous Design
![Page 11: Agenda - Amazon Web Servicesarlingtonva.s3.amazonaws.com/wp-content/uploads/sites/31/... · 2015-09-30 · Pg 3 16 Sep 2015 SPRC #3 SPRC 2 Follow-up –Wilson Boulevard Bridge Update](https://reader033.vdocuments.us/reader033/viewer/2022042007/5e7043afb1dc045d2d5a7934/html5/thumbnails/11.jpg)
Current
Design
Pg 11
Key
16 Sep 2015 SPRC #3SPRC 2 Follow-up:
Mews Scale, Proportions, and Materials
![Page 12: Agenda - Amazon Web Servicesarlingtonva.s3.amazonaws.com/wp-content/uploads/sites/31/... · 2015-09-30 · Pg 3 16 Sep 2015 SPRC #3 SPRC 2 Follow-up –Wilson Boulevard Bridge Update](https://reader033.vdocuments.us/reader033/viewer/2022042007/5e7043afb1dc045d2d5a7934/html5/thumbnails/12.jpg)
Pg 12
PLAN VIEW
CONTEXT ELEVATIONDedicated
Office Entry
New
Mall Entry
16 Sep 2015 SPRC #3SPRC 2 Follow-up – Glebe Enhancements
![Page 13: Agenda - Amazon Web Servicesarlingtonva.s3.amazonaws.com/wp-content/uploads/sites/31/... · 2015-09-30 · Pg 3 16 Sep 2015 SPRC #3 SPRC 2 Follow-up –Wilson Boulevard Bridge Update](https://reader033.vdocuments.us/reader033/viewer/2022042007/5e7043afb1dc045d2d5a7934/html5/thumbnails/13.jpg)
Pg 13
16 Sep 2015 SPRC #3SPRC 2 Follow-up – Glebe Enhancements
Granite ‘carpet’ at pedestrian entrancesExisting parking has been
removed and sidewalk extended
Streetscape elements match treatment at Wilson Blvd:
Café Seating Zones
Separate Entrances are now
provided for retail and office uses
• Continuous Street Tree Planting• Sidewalk Paving
• Totem Concept• Street Furniture
Key
Glebe Road
Off Peak Parking
Continuous Tree Planting Concrete Paving Granite Paving Light Totems Street Furniture
![Page 14: Agenda - Amazon Web Servicesarlingtonva.s3.amazonaws.com/wp-content/uploads/sites/31/... · 2015-09-30 · Pg 3 16 Sep 2015 SPRC #3 SPRC 2 Follow-up –Wilson Boulevard Bridge Update](https://reader033.vdocuments.us/reader033/viewer/2022042007/5e7043afb1dc045d2d5a7934/html5/thumbnails/14.jpg)
Pg 14
16 Sep 2015 SPRC #3SPRC 2 Follow-up – Glebe Enhancements
Key
![Page 15: Agenda - Amazon Web Servicesarlingtonva.s3.amazonaws.com/wp-content/uploads/sites/31/... · 2015-09-30 · Pg 3 16 Sep 2015 SPRC #3 SPRC 2 Follow-up –Wilson Boulevard Bridge Update](https://reader033.vdocuments.us/reader033/viewer/2022042007/5e7043afb1dc045d2d5a7934/html5/thumbnails/15.jpg)
Pg 15
Transportation1. Infrastructure:
• Context Map, Bus Routes, Bus Stops
• Bicycle paths, Bike Share and Car Share Locations
• Vehicular and pedestrian circulation diagram
• Street Dimensions - Existing and proposed
2. Transportation Improvements
3. Parking:
• Automobile Parking
• Bicycle Parking
4. Loading and servicing
Transportation – Agenda 16 Sep 2015 SPRC #3
![Page 16: Agenda - Amazon Web Servicesarlingtonva.s3.amazonaws.com/wp-content/uploads/sites/31/... · 2015-09-30 · Pg 3 16 Sep 2015 SPRC #3 SPRC 2 Follow-up –Wilson Boulevard Bridge Update](https://reader033.vdocuments.us/reader033/viewer/2022042007/5e7043afb1dc045d2d5a7934/html5/thumbnails/16.jpg)
Pg 16
Transportation – Context 16 Sep 2015 SPRC #3
![Page 17: Agenda - Amazon Web Servicesarlingtonva.s3.amazonaws.com/wp-content/uploads/sites/31/... · 2015-09-30 · Pg 3 16 Sep 2015 SPRC #3 SPRC 2 Follow-up –Wilson Boulevard Bridge Update](https://reader033.vdocuments.us/reader033/viewer/2022042007/5e7043afb1dc045d2d5a7934/html5/thumbnails/17.jpg)
Pg 17
Transportation – Bus Routes 16 Sep 2015 SPRC #3
![Page 18: Agenda - Amazon Web Servicesarlingtonva.s3.amazonaws.com/wp-content/uploads/sites/31/... · 2015-09-30 · Pg 3 16 Sep 2015 SPRC #3 SPRC 2 Follow-up –Wilson Boulevard Bridge Update](https://reader033.vdocuments.us/reader033/viewer/2022042007/5e7043afb1dc045d2d5a7934/html5/thumbnails/18.jpg)
Pg 18
Transportation – Bus Stops and Crossings 16 Sep 2015 SPRC #3
![Page 19: Agenda - Amazon Web Servicesarlingtonva.s3.amazonaws.com/wp-content/uploads/sites/31/... · 2015-09-30 · Pg 3 16 Sep 2015 SPRC #3 SPRC 2 Follow-up –Wilson Boulevard Bridge Update](https://reader033.vdocuments.us/reader033/viewer/2022042007/5e7043afb1dc045d2d5a7934/html5/thumbnails/19.jpg)
Pg 19
Transportation – Bicycle Path, Bike Share and Car Share Locations
Car Share Services
Capital Bike Share
Dedicated Bike Lanes
KEY:
16 Sep 2015 SPRC #3
10
9
17
10
11
15
11
11
17
Shared Auto/Bike Lanes
1
1
1
11
1 1
1
3
2
3
1
2
![Page 20: Agenda - Amazon Web Servicesarlingtonva.s3.amazonaws.com/wp-content/uploads/sites/31/... · 2015-09-30 · Pg 3 16 Sep 2015 SPRC #3 SPRC 2 Follow-up –Wilson Boulevard Bridge Update](https://reader033.vdocuments.us/reader033/viewer/2022042007/5e7043afb1dc045d2d5a7934/html5/thumbnails/20.jpg)
Mews
East Plaza
Parking &
Service
Residential
Entry
Pg 20
New Office
Entry
West Plaza
Buch Site
Wilson Blvd
Office
Entry
Concourse
Entry
RESIDENTIAL UNITS
RESIDENTIAL AMENITY
OFFICE
BUILDING CIRCULATION
RETAIL CIRCULATION / SVC
RETAIL
VERTICAL CIRCULATION
Existing County
Parking Garage
Store
Entry
Office
Entry
New Office
Entry
POTENTIAL TENANT ENTRANCES
Transportation – Circulation through project16 Sep 2015 SPRC #3
![Page 21: Agenda - Amazon Web Servicesarlingtonva.s3.amazonaws.com/wp-content/uploads/sites/31/... · 2015-09-30 · Pg 3 16 Sep 2015 SPRC #3 SPRC 2 Follow-up –Wilson Boulevard Bridge Update](https://reader033.vdocuments.us/reader033/viewer/2022042007/5e7043afb1dc045d2d5a7934/html5/thumbnails/21.jpg)
Pg 21
Transportation – Wilson Boulevard
• Existing Sidewalk Width (BOC to FOB) = +/- 12’-0” TO +/-68’-0”
• Proposed Sidewalk Width (BOC to FOB) = +/-19’-6” TO +/-71’-0” (10’ clear minimum maintained)
• Curb to Curb width is reduced along project frontage
• Installation of new pedestrian bridge spaces the reduced width roadway
• Mid block crossing is shortened by +/- 17’ and center median is largely removed
• New lane alignment reduced the bow in the current roadway
• Removal of dedicated right turn land at Randolph in favor of shared “thru-right”
• Traffic signal pole to remain – ongoing coordination with County’s signalization plan
• Installation of Nub at N Randolph Street corner and new crosswalk
• Upgraded streetscape, including: paving materials, bike racks, street lights, street furniture, increased quantity and quality of planting areas.
16 Sep 2015 SPRC #3
Key
Proposed Curb Line
Existing Curb Line
N
![Page 22: Agenda - Amazon Web Servicesarlingtonva.s3.amazonaws.com/wp-content/uploads/sites/31/... · 2015-09-30 · Pg 3 16 Sep 2015 SPRC #3 SPRC 2 Follow-up –Wilson Boulevard Bridge Update](https://reader033.vdocuments.us/reader033/viewer/2022042007/5e7043afb1dc045d2d5a7934/html5/thumbnails/22.jpg)
Pg 22
Transportation – N Randolph Street
• Curb-to-curb width and striping remains the same
• Installation of nub at Wilson Blvd. corner and new crosswalk
• Existing Sidewalk Width (BOC to FOB) = +/- 16’-0”
• Proposed Sidewalk Width (BOC to FOB) = +/-16’-8” TO +/-21’-0” (10’-0” clear with +/-8’ at bus shelter)
• Traffic signal pole to remain - ongoing coordination with County’s signalization plan
• Upgraded bus shelters (2) to serve the existing bus stop (which is to remain)
• Upgraded streetscape, including: paving materials, bike racks, street lights, street furniture, increased quantity and quality of planting areas
16 Sep 2015 SPRC #3
Proposed Curb Line
Existing Curb Line
N
Key
![Page 23: Agenda - Amazon Web Servicesarlingtonva.s3.amazonaws.com/wp-content/uploads/sites/31/... · 2015-09-30 · Pg 3 16 Sep 2015 SPRC #3 SPRC 2 Follow-up –Wilson Boulevard Bridge Update](https://reader033.vdocuments.us/reader033/viewer/2022042007/5e7043afb1dc045d2d5a7934/html5/thumbnails/23.jpg)
Pg 23
Transportation – Glebe Road
• Curb-to-curb width and striping remains the same (except removal of parallel spaces)
• Existing Sidewalk Width (BOC to FOB) = +/- 5’-0” ’MIN. TO 47’-6” MAX.
• Proposed Sidewalk Width (BOC to FOB) = +/- 5’-0” MIN (exiting pinchpoint. TO 55’-6” MAX (8’-0” clear minimum maintained).
• Pursuing VDOT approval of “off-Peak” parallel parking on Glebe Road - from Randolph to the mid-block cut-through at Macys
• Pursuing VDOT approval to plant in the existing Glebe Road median
• Upgraded streetscape, including: paving materials, bike racks, street lights, street furniture, increased quantity and quality of planting areas.
16 Sep 2015 SPRC #3
Proposed Curb Line
Existing Curb Line
N
Key
![Page 24: Agenda - Amazon Web Servicesarlingtonva.s3.amazonaws.com/wp-content/uploads/sites/31/... · 2015-09-30 · Pg 3 16 Sep 2015 SPRC #3 SPRC 2 Follow-up –Wilson Boulevard Bridge Update](https://reader033.vdocuments.us/reader033/viewer/2022042007/5e7043afb1dc045d2d5a7934/html5/thumbnails/24.jpg)
Pg 24
Transportation Improvements:
Transportation Improvements16 Sep 2015 SPRC #3
• Reducing pedestrian crossing distance across Wilson Blvd
• Increasing sidewalk widths
• Removal of right turn lane only on Wilson Blvd
• Improving alignment of eastbound travel lanes on Wilson Blvd
• Re-building pedestrian bridge over Wilson Blvd
• Pursuing off-peak street parking on Glebe Road
• Pursuing filling in three parking spaces on Glebe Road
• No new curb cuts
• Traffic Demand Management Plan in Conjunction with County Staff
![Page 25: Agenda - Amazon Web Servicesarlingtonva.s3.amazonaws.com/wp-content/uploads/sites/31/... · 2015-09-30 · Pg 3 16 Sep 2015 SPRC #3 SPRC 2 Follow-up –Wilson Boulevard Bridge Update](https://reader033.vdocuments.us/reader033/viewer/2022042007/5e7043afb1dc045d2d5a7934/html5/thumbnails/25.jpg)
Pg 25
Transportation – On-Street Parking16 Sep 2015 SPRC #3
ON-STREET PARKING:
Glebe:
• Exist: 2 metered HC +1 unmetered loading
• Proposed: 0 via removal of existing spaces
• Pursuing +/- 900 linear feet of off peak
parking w/ VDOT.
N Randolph:
• Exist: +/- 131 linear feet of multi-meter parking
• Proposed: no change
Wilson Boulevard:
• Exist: +/- 420 linear feet of multi-meter parking
• Proposed: +/- 330 linear feet of multi-meter
parking
![Page 26: Agenda - Amazon Web Servicesarlingtonva.s3.amazonaws.com/wp-content/uploads/sites/31/... · 2015-09-30 · Pg 3 16 Sep 2015 SPRC #3 SPRC 2 Follow-up –Wilson Boulevard Bridge Update](https://reader033.vdocuments.us/reader033/viewer/2022042007/5e7043afb1dc045d2d5a7934/html5/thumbnails/26.jpg)
Pg 26
Transportation – Residential Parking
Residential Building Parking:
• 288 Total Automobile Spaces + 8 Motorcycle Spaces
• 4 Subterranean Levels
• 0.7 Automobile spaces per Apartment Unit (excluding motorcycle spaces)
• 13% Compact Space Ratio
• Access from Randolph Street uses Existing Service Ramp Location
• No New Curb Cuts for the Entire Project
16 Sep 2015 SPRC #3
![Page 27: Agenda - Amazon Web Servicesarlingtonva.s3.amazonaws.com/wp-content/uploads/sites/31/... · 2015-09-30 · Pg 3 16 Sep 2015 SPRC #3 SPRC 2 Follow-up –Wilson Boulevard Bridge Update](https://reader033.vdocuments.us/reader033/viewer/2022042007/5e7043afb1dc045d2d5a7934/html5/thumbnails/27.jpg)
Pg 27
Transportation – Bicycle Parking
166 Class I Bike SpacesIn P1 and P2 levels of Garage
for Residents and Retail Employees
20 Class III Bike SpacesAt Grade for Visitors
and Retail Patrons
Residential Building:
(20 spaces required)
(166 spaces required)
Additional existing bicycle spacesIn existing County Garage
Mall / Office Buildings:
Macy’s / Office Abv:
52 Class III Bike SpacesAt Grade for Visitors
and Retail Patrons
(51 spaces required)
At Grade for Visitors
and Retail Patrons
(26 spaces required)
26 Class III Bike Spaces
for Office and Retail Employees, and Visitors
16 Sep 2015 SPRC #3
![Page 28: Agenda - Amazon Web Servicesarlingtonva.s3.amazonaws.com/wp-content/uploads/sites/31/... · 2015-09-30 · Pg 3 16 Sep 2015 SPRC #3 SPRC 2 Follow-up –Wilson Boulevard Bridge Update](https://reader033.vdocuments.us/reader033/viewer/2022042007/5e7043afb1dc045d2d5a7934/html5/thumbnails/28.jpg)
Pg 28
Transportation – Loading and Servicing
1
2
3
4
5
6
78
9
10
1415
16
17 LOADING SPACES ARE PROVIDED:
(12 ft wide by 40 ft long by 14 feet high)
14 Spaces are provided for Non Residential Use; (9 are required)
3 Spaces are provided for Residential Use; (3 are required)
Key Plan
11
12
13
17
(12 ft wide by 25 ft long by 14 feet high)
(These spaces currently exist)
Macy’s/
Buch E*Trade MALL
4200
Wilson
Res
Bldg TOTAL
Loading
Sp Req’d
Retail Area
(GSF)148,353
(with
mall)325,955 0 51,860 526,168 8
Office Area
(GSF)156,563 161,000 0 183,691 0 501,254 1
Residential
(Apt Units)0 0 0 0 406 406 3
16 Sep 2015 SPRC #3
![Page 29: Agenda - Amazon Web Servicesarlingtonva.s3.amazonaws.com/wp-content/uploads/sites/31/... · 2015-09-30 · Pg 3 16 Sep 2015 SPRC #3 SPRC 2 Follow-up –Wilson Boulevard Bridge Update](https://reader033.vdocuments.us/reader033/viewer/2022042007/5e7043afb1dc045d2d5a7934/html5/thumbnails/29.jpg)
Pg 29
Open Space Design1. Overview
2. West Plaza
3. East Plaza
4. Streetscape
• Wilson Blvd
• N. Randolph Street
• Glebe Road
Open Space – Agenda16 Sep 2015 SPRC #3
![Page 30: Agenda - Amazon Web Servicesarlingtonva.s3.amazonaws.com/wp-content/uploads/sites/31/... · 2015-09-30 · Pg 3 16 Sep 2015 SPRC #3 SPRC 2 Follow-up –Wilson Boulevard Bridge Update](https://reader033.vdocuments.us/reader033/viewer/2022042007/5e7043afb1dc045d2d5a7934/html5/thumbnails/30.jpg)
Pg 30
Open Space – Context16 Sep 2015 SPRC #3
CONTEXT:
SITE
Existing County Parks
Nearby Plazas /
Pocket Parks
![Page 31: Agenda - Amazon Web Servicesarlingtonva.s3.amazonaws.com/wp-content/uploads/sites/31/... · 2015-09-30 · Pg 3 16 Sep 2015 SPRC #3 SPRC 2 Follow-up –Wilson Boulevard Bridge Update](https://reader033.vdocuments.us/reader033/viewer/2022042007/5e7043afb1dc045d2d5a7934/html5/thumbnails/31.jpg)
a) *
Pg 31
Open Space – Overview16 Sep 2015 SPRC #3
OPEN SPACE SUMMARY:
35,875 sf Existing Open Space
8,200 sf Net Added Open Space
(at sidewalk area)
+/-28,700 sf Open Space Previously Enclosed
(on multiple levels)
![Page 32: Agenda - Amazon Web Servicesarlingtonva.s3.amazonaws.com/wp-content/uploads/sites/31/... · 2015-09-30 · Pg 3 16 Sep 2015 SPRC #3 SPRC 2 Follow-up –Wilson Boulevard Bridge Update](https://reader033.vdocuments.us/reader033/viewer/2022042007/5e7043afb1dc045d2d5a7934/html5/thumbnails/32.jpg)
Pg 32
Open Space – Overview16 Sep 2015 SPRC #3
TREE SUMMARY:
30 Existing Street Trees in Public Space
43 Street Trees Proposed upon Full Build Out
Streetscape design features continuous
tree planters to maximize soil volumes and
help ensure healthy large canopy trees.
![Page 33: Agenda - Amazon Web Servicesarlingtonva.s3.amazonaws.com/wp-content/uploads/sites/31/... · 2015-09-30 · Pg 3 16 Sep 2015 SPRC #3 SPRC 2 Follow-up –Wilson Boulevard Bridge Update](https://reader033.vdocuments.us/reader033/viewer/2022042007/5e7043afb1dc045d2d5a7934/html5/thumbnails/33.jpg)
Pg 33
16 Sep 2015 SPRC #3Open Space – West Plaza
Key
54’
10
9’
Lower Plaza
Ampitheater
Upper Plaza• Seating / Planting Areas
• Feature Elements
• 18 inch stepped seating
• Interspersed lush planting
• Wood/Stone warm mat’ls
• Flexible Program-focused
• Multi-Use
+/-2,500 SF
![Page 34: Agenda - Amazon Web Servicesarlingtonva.s3.amazonaws.com/wp-content/uploads/sites/31/... · 2015-09-30 · Pg 3 16 Sep 2015 SPRC #3 SPRC 2 Follow-up –Wilson Boulevard Bridge Update](https://reader033.vdocuments.us/reader033/viewer/2022042007/5e7043afb1dc045d2d5a7934/html5/thumbnails/34.jpg)
Pg 34
16 Sep 2015 SPRC #3Open Space – West Plaza
Key
Wilson Boulevard
![Page 35: Agenda - Amazon Web Servicesarlingtonva.s3.amazonaws.com/wp-content/uploads/sites/31/... · 2015-09-30 · Pg 3 16 Sep 2015 SPRC #3 SPRC 2 Follow-up –Wilson Boulevard Bridge Update](https://reader033.vdocuments.us/reader033/viewer/2022042007/5e7043afb1dc045d2d5a7934/html5/thumbnails/35.jpg)
Pg 35
16 Sep 2015 SPRC #3Open Space – West Plaza
Key
Outdoor Dining Holiday Events
![Page 36: Agenda - Amazon Web Servicesarlingtonva.s3.amazonaws.com/wp-content/uploads/sites/31/... · 2015-09-30 · Pg 3 16 Sep 2015 SPRC #3 SPRC 2 Follow-up –Wilson Boulevard Bridge Update](https://reader033.vdocuments.us/reader033/viewer/2022042007/5e7043afb1dc045d2d5a7934/html5/thumbnails/36.jpg)
Pg 36
16 Sep 2015 SPRC #3Open Space – West Plaza
Key
![Page 37: Agenda - Amazon Web Servicesarlingtonva.s3.amazonaws.com/wp-content/uploads/sites/31/... · 2015-09-30 · Pg 3 16 Sep 2015 SPRC #3 SPRC 2 Follow-up –Wilson Boulevard Bridge Update](https://reader033.vdocuments.us/reader033/viewer/2022042007/5e7043afb1dc045d2d5a7934/html5/thumbnails/37.jpg)
Pg 37
16 Sep 2015 SPRC #3Open Space – West Plaza
Key
![Page 38: Agenda - Amazon Web Servicesarlingtonva.s3.amazonaws.com/wp-content/uploads/sites/31/... · 2015-09-30 · Pg 3 16 Sep 2015 SPRC #3 SPRC 2 Follow-up –Wilson Boulevard Bridge Update](https://reader033.vdocuments.us/reader033/viewer/2022042007/5e7043afb1dc045d2d5a7934/html5/thumbnails/38.jpg)
Pg 38
16 Sep 2015 SPRC #3Open Space – West Plaza (Winter)
Key
Feb View
![Page 39: Agenda - Amazon Web Servicesarlingtonva.s3.amazonaws.com/wp-content/uploads/sites/31/... · 2015-09-30 · Pg 3 16 Sep 2015 SPRC #3 SPRC 2 Follow-up –Wilson Boulevard Bridge Update](https://reader033.vdocuments.us/reader033/viewer/2022042007/5e7043afb1dc045d2d5a7934/html5/thumbnails/39.jpg)
Pg 39
16 Sep 2015 SPRC #3Open Space – West Plaza
Key
![Page 40: Agenda - Amazon Web Servicesarlingtonva.s3.amazonaws.com/wp-content/uploads/sites/31/... · 2015-09-30 · Pg 3 16 Sep 2015 SPRC #3 SPRC 2 Follow-up –Wilson Boulevard Bridge Update](https://reader033.vdocuments.us/reader033/viewer/2022042007/5e7043afb1dc045d2d5a7934/html5/thumbnails/40.jpg)
Pg 40
16 Sep 2015 SPRC #3Open Space – East Plaza
Key
Include Street Rendering
+/-28’
+/-
15
0’
+/-36’
![Page 41: Agenda - Amazon Web Servicesarlingtonva.s3.amazonaws.com/wp-content/uploads/sites/31/... · 2015-09-30 · Pg 3 16 Sep 2015 SPRC #3 SPRC 2 Follow-up –Wilson Boulevard Bridge Update](https://reader033.vdocuments.us/reader033/viewer/2022042007/5e7043afb1dc045d2d5a7934/html5/thumbnails/41.jpg)
Pg 41
16 Sep 2015 SPRC #3Streetscape – Elements
![Page 42: Agenda - Amazon Web Servicesarlingtonva.s3.amazonaws.com/wp-content/uploads/sites/31/... · 2015-09-30 · Pg 3 16 Sep 2015 SPRC #3 SPRC 2 Follow-up –Wilson Boulevard Bridge Update](https://reader033.vdocuments.us/reader033/viewer/2022042007/5e7043afb1dc045d2d5a7934/html5/thumbnails/42.jpg)
Pg 42
16 Sep 2015 SPRC #3
Key
Streetscape – Wilson Boulevard
10’ CLEAR
POTENTIAL FEATURE
ELEMENTS
1
75
3
6
28
8
![Page 43: Agenda - Amazon Web Servicesarlingtonva.s3.amazonaws.com/wp-content/uploads/sites/31/... · 2015-09-30 · Pg 3 16 Sep 2015 SPRC #3 SPRC 2 Follow-up –Wilson Boulevard Bridge Update](https://reader033.vdocuments.us/reader033/viewer/2022042007/5e7043afb1dc045d2d5a7934/html5/thumbnails/43.jpg)
Pg 43
16 Sep 2015 SPRC #3
Key
Streetscape – Wilson Boulevard
1
8
2 5
6
1
10’ CLEAR
3
POTENTIAL FEATURE
ELEMENT
3
![Page 44: Agenda - Amazon Web Servicesarlingtonva.s3.amazonaws.com/wp-content/uploads/sites/31/... · 2015-09-30 · Pg 3 16 Sep 2015 SPRC #3 SPRC 2 Follow-up –Wilson Boulevard Bridge Update](https://reader033.vdocuments.us/reader033/viewer/2022042007/5e7043afb1dc045d2d5a7934/html5/thumbnails/44.jpg)
Pg 44
16 Sep 2015 SPRC #3Streetscape – Wilson Boulevard
Key
10’ CLEAR3
5
1
22
7
6
8
5
![Page 45: Agenda - Amazon Web Servicesarlingtonva.s3.amazonaws.com/wp-content/uploads/sites/31/... · 2015-09-30 · Pg 3 16 Sep 2015 SPRC #3 SPRC 2 Follow-up –Wilson Boulevard Bridge Update](https://reader033.vdocuments.us/reader033/viewer/2022042007/5e7043afb1dc045d2d5a7934/html5/thumbnails/45.jpg)
Pg 45
Key
16 Sep 2015 SPRC #3
Future Pedestrian Pathway
8’ CLEAR PATH
Streetscape - Randolph
![Page 46: Agenda - Amazon Web Servicesarlingtonva.s3.amazonaws.com/wp-content/uploads/sites/31/... · 2015-09-30 · Pg 3 16 Sep 2015 SPRC #3 SPRC 2 Follow-up –Wilson Boulevard Bridge Update](https://reader033.vdocuments.us/reader033/viewer/2022042007/5e7043afb1dc045d2d5a7934/html5/thumbnails/46.jpg)
Pg 46
16 Sep 2015 SPRC #3Streetscape – Glebe Road
Key
4
![Page 47: Agenda - Amazon Web Servicesarlingtonva.s3.amazonaws.com/wp-content/uploads/sites/31/... · 2015-09-30 · Pg 3 16 Sep 2015 SPRC #3 SPRC 2 Follow-up –Wilson Boulevard Bridge Update](https://reader033.vdocuments.us/reader033/viewer/2022042007/5e7043afb1dc045d2d5a7934/html5/thumbnails/47.jpg)
Thank You
Pg 47
16 Sep 2015 SPRC #3